CN202643143U CN 201220187826 CN201220187826U CN202643143U CN 202643143 U CN202643143 U CN 202643143U CN 201220187826 CN201220187826 CN 201220187826 CN 201220187826 U CN201220187826 U CN 201220187826U CN 202643143 U CN202643143 U CN 202643143U
Authority
CN
China
Prior art keywords
lifting device
material lifting
work material
assembly
aloft work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220187826
Other languages
Chinese (zh)
Inventor
金惠昌
蔡燕妮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Little Swan Building Machinery Co Ltd
Original Assignee
Wuxi Little Swan Building Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Little Swan Building Machinery Co Ltd filed Critical Wuxi Little Swan Building Machinery Co Ltd
Priority to CN 201220187826 priority Critical patent/CN202643143U/en
Application granted granted Critical
Publication of CN202643143U publication Critical patent/CN202643143U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a bidirectional moving high altitude working material elevating device, which belongs to a building machinery; the bidirectional moving high altitude working material elevating device comprises an elevator module and a rope guide wheel module, wherein the elevator module and the rope guide wheel module are suspended on a front beam and can synchronously move on the front beam; the bidirectional moving high altitude working material elevating device is characterized in that the front beam is horizontally arranged on the front and back groups of brackets; the two groups of brackets are respectively mounted on two parallel cross guide rails; and a balancing block is arranged on the back bracket. The bidirectional moving high altitude working material elevating device provided by the utility model is an elevating structure with a horizontal structure; the whole equipment has the advantages of lower absolute height and good stability; moreover, through the adoption of the elevating module moving on the front beam as well as the brackets moving on the rails, longitudinal and transverse bidirectional movements are formed to satisfy horizontal movement requirements after materials are elevated in place; and stability, safety and no blind point are achieved. Finally, the bidirectional moving high altitude working material elevating device provided by the utility model has the advantages of low labor intensity of a user as well as accurate and reliable operation because automatic equipment or sensing equipment is adopted in a plurality of places.

Description

A kind of aloft work material lifting device of way moving
Technical field
The utility model relates to a kind of vehicle for construction, but a kind of material lifting machine equipment of the way moving for the aloft work material lifting particularly.
Background technology
Bont is a kind of construction machinery equipment of vertical lifting weight, is mainly used in the occasions such as material handling of industrial transport and aloft work.
The bont of existing suspension hook class, basic comprising have comprised gig (mainly being winch), sheave assembly and support, and gig and sheave assembly are rack-mount fixing, carry out work.Such as Chinese patent ZL200420032988.1, a kind of gig, disclosed content like this: a kind of support of rotatable crane pattern is arranged, can rotate, the structure that is similar to harbor crane is carried out work.This structure and the bont of similarly using for reference the single armed style of crane, shortcoming are that device height is too high, and poor stability in the time of lifting is unfavorable for the work that fabrication is interior and building pushes up.And the scope blind spot of its movable lifting thing is many, the scheme of circular movement especially, and the operation of nearly circle centre position is very difficult and dangerous.
Summary of the invention
The purpose of this utility model is the particular surroundings for top of building or interior of building, overcome the stability of the described existing single arm type bont of background technology and the shortcoming of moving range, invent a kind of Stability Analysis of Structures firmly, promote steadily, translation stability and safety and highly lower material lifting device.
For reaching above-mentioned utility model purpose, the technological means that the utility model provides is:
A kind of aloft work material lifting device of way moving contains gig assembly, sheave assembly, and described gig assembly and sheave assembly are suspended on the front-axle beam, both can be on front-axle beam synchronizing moving; It is characterized in that: being arranged on forward and backward two pack supports of described front-axle beam level, two pack supports are installed in respectively on two parallel cross slide waies; Be provided with balance block on the after poppet.
Preferably: described gig assembly is provided with electric pushrod, and the fixed end of electric pushrod is fixed on the front-axle beam, and the gig assembly can be vertically moved automatically along front-axle beam.
Support preferred: described front frame be one perpendicular to the rigid bar of front-axle beam.Described after poppet is symmetrically arranged two straight rod members, and the upper end links together and is fixed on the front-axle beam, and laterally outwards diverge the lower end, is " eight " font on the fore-and-aft direction; Two tripodia supported form after both common formations were last.
Support further preferred: the lower end of described forward and backward support, be provided with drive motor, retarder, roller and anti-skidding device, roller is arranged in and is used on the guide rail sliding, and drive motor cooperates reductor that the braking force of roller is provided.
Also be provided with weight sensor on the described gig assembly, the limit weight in order to restriction lifting material improves safety.
The utility model is a kind of bont of horizontal structure, and whole equipment absolute altitude is lower, good stability; And, utilize on the front-axle beam support mobile on mobile gig assembly and the track, form the way moving of vertical and horizontal, satisfy the material lifting later movement requirement that puts in place, this moves still is parallel motion, stable, safely, do not have a blind spot.At last, automation equipment or sensing equipment are adopted in device of the present utility model many places, and user's labor content is low, operation is accurately reliable.
Description of drawings
Fig. 1, lateral plan of the present utility model.
Fig. 2, back view of the present utility model.
Fig. 3, birds-eye view of the present utility model.
The specific embodiment
Below in conjunction with the view of three directions of Fig. 1 ~ 3, the concrete structure of the utility model device is described.
Such as Fig. 1 and Fig. 3, the aloft work material lifting device of way moving of the present utility model, front-axle beam 1 are the parts that hang gig assembly 7 and sheave assembly 5, above both being suspended on by pulley 2, and can be mobile at front-axle beam 1; And fixing with connecting rod 8, keep both synchronizing movings, this moves is longitudinally.Concrete, gig assembly 7 is the gigs with rope rolling apparatus, and the top weight sensor that also is provided with.Establish electric pushrod 9 on the gig assembly 7, the fixed end of electric pushrod 9 is fixed on the front-axle beam 1, like this, by the promotion of electric pushrod 9, it is mobile just to control gig assembly 7 and sheave assembly 5 fore-and-aft directions (namely vertical), under the environment such as the roof, stretch out exactly outside the metope, can promote action, promote action and pass through the pulling steel wire by gig assembly 7, finish with the suspension hook 4 of steel wire end.
What the utility model adopted is the hitch 3 of horizontal, concrete structure as depicted in figs. 1 and 2, being arranged on front frame 6 and the after poppet 10 of described front-axle beam 1 level.Front frame 6 be one perpendicular to the rigid bar of front-axle beam 1, such as Steel material; After poppet 10 is symmetrically arranged two straight rod members, and the upper end crosses and is fixed on together on the front-axle beam 1, and the lower end is fork laterally outwards, front and back look up (such as the view direction of Fig. 2) be " eight " font, in a lateral direction, two after poppets 10 still are on the straight line.Two pack supports are installed in respectively on two parallel cross slide waies 17, and transversely guide rail 17 is done horizontal movement; Be provided with balance block 11 on the after poppet 10, the weight of balance block is determined according to the front and back support spacing of extension elongation, weight of material and the hitch 3 of front-axle beam 1, guarantees that the antidumping safety system of hitch 3 is more than or equal to 2.
It is fixing to be provided with two guide rail pipe links 16 between the cross slide way 17, and guide rail pipe link 16 adjustable lengths, cross slide way 17 can extending lengths, only need 2 groups of cross slide waies 17, just can be used alternatingly the utility rate.
The lower end of forward and backward support, be equipped with drive motor 13, retarder 12, roller 15 and anti-skidding device 14, roller (15) is arranged on the guide rail 17, drive motor 13 cooperate reductors 12 provide roller power allow whole suspension gear 3 transversely guide rail 17 laterally move, anti-skidding device 14 makes equipment not need anti-skidding when mobile.Can expect easily, on two pin of after poppet 10, only need to drive motor 13 and retarder 12 be set at a pin
The advantage of suspension gear 3 of the present utility model is the structure of horizontal front-axle beam 1, in order to improve intensity, front frame 6 upper ends can also be set exceed front-axle beam 1, draws fulcrum as a string, connects the front and back end of front-axle beam 1 with inelastic string.

Claims (9)

1. the aloft work material lifting device of a way moving contains gig assembly (7), sheave assembly (5), and described gig assembly (7) and sheave assembly (5) are suspended on the front-axle beam (1), and both can be at the upper synchronizing moving of front-axle beam (1); It is characterized in that: being arranged on forward and backward two pack supports (6,10) of described front-axle beam (1) level, two pack supports are installed in respectively on parallel two cross slide waies (17); Be provided with balance block (11) on the after poppet (10).
2. the aloft work material lifting device of way moving according to claim 1, it is characterized in that: gig assembly and sheave assembly are fixed together with connecting rod (8).
3. the aloft work material lifting device of way moving according to claim 1 and 2, it is characterized in that: described gig assembly (7) is provided with electric pushrod (9), and the fixed end of electric pushrod (9) is fixed on the front-axle beam (1).
4. the aloft work material lifting device of way moving according to claim 1 is characterized in that: described front frame (6) be one perpendicular to the rigid bar of front-axle beam (1).
5. the aloft work material lifting device of way moving according to claim 1, it is characterized in that: described after poppet (10) is symmetrically arranged two straight rod members, the upper end links together and is fixed on the front-axle beam (1), and laterally outwards diverge the lower end, is " eight " font on the fore-and-aft direction.
6. the aloft work material lifting device of way moving according to claim 1 is characterized in that: be provided with two guide rail pipe links (16) between the described cross slide way (17) and fix.
7. the aloft work material lifting device of way moving according to claim 1, it is characterized in that: the lower end of described forward and backward support, be provided with drive motor (13), retarder (12), roller (15) and anti-skidding device (14), roller (15) is arranged on the guide rail (17), and drive motor (13) cooperates reductor (12) that roller power is provided.
8. the aloft work material lifting device of way moving according to claim 1, it is characterized in that: gig assembly (7) is the gig with rope rolling apparatus.
9. it is characterized in that: also be provided with weight sensor on the described gig assembly (7) according to claim 1 or the aloft work material lifting device of 8 described way movings.
CN 201220187826 2012-04-28 2012-04-28 Bidirectional moving high altitude working material elevating device Expired - Fee Related CN202643143U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220187826 CN202643143U (en) 2012-04-28 2012-04-28 Bidirectional moving high altitude working material elevating device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220187826 CN202643143U (en) 2012-04-28 2012-04-28 Bidirectional moving high altitude working material elevating device

Publications (1)

Publication Number Publication Date
CN202643143U true CN202643143U (en) 2013-01-02

Family

ID=47412280

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220187826 Expired - Fee Related CN202643143U (en) 2012-04-28 2012-04-28 Bidirectional moving high altitude working material elevating device

Country Status (1)

Country Link
CN (1) CN202643143U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102642778A (en) * 2012-04-28 2012-08-22 无锡市小天鹅建筑机械有限公司 Bidirectional moving aloft working material lifting device
CN107055340A (en) * 2017-03-13 2017-08-18 钟浪雅 It is a kind of to detect the gantry crane that support frame bears weight

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102642778A (en) * 2012-04-28 2012-08-22 无锡市小天鹅建筑机械有限公司 Bidirectional moving aloft working material lifting device
CN107055340A (en) * 2017-03-13 2017-08-18 钟浪雅 It is a kind of to detect the gantry crane that support frame bears weight
CN107055340B (en) * 2017-03-13 2018-07-20 深圳市上羽科技有限公司 A kind of gantry crane that can detect the born weight of supporting rack

Similar Documents

Publication Publication Date Title
CN104100288A (en) Trolley type fully-mechanized coal mining hydraulic support assembling frame
CN105347206A (en) Intelligent assisting platform for gas insulated substation (GIS) dismounting
CN201125132Y (en) Telescoping device for telescopic arm of trolley crane
CN202643143U (en) Bidirectional moving high altitude working material elevating device
CN103288002A (en) Simple combination portal upper-air heavy-article hoisting device
CN202465099U (en) Single-girder partial hanging gantry crane
CN102923582B (en) Gantry crane
CN202449763U (en) Simple pneumatic crane
CN205170212U (en) Semi -portal crane
CN102642778A (en) Bidirectional moving aloft working material lifting device
CN202390106U (en) Lifting hook portal crane easy to maintain
CN204162313U (en) Building hanging device
CN202296641U (en) Clashing-prevention protection device of travelling cable of lift
CN205653068U (en) Reinforcement type gantry crane
CN205275061U (en) Semi -portal crane
CN213141328U (en) Hanging basket for mounting safety type outdoor high-rise building electrical appliances
CN114148880A (en) Unmanned automatic steel coil carrying crane
CN202449760U (en) Container portal crane with rails
CN202429913U (en) Movable crane
CN202465196U (en) Tunnel stacker crane
CN208203101U (en) A kind of quarry tipper step ladder
CN202609884U (en) Mobile sit-on-the-fence frame hanging basket suspension mechanism
CN206691869U (en) A kind of single pile movement system
CN201459602U (en) Equipment for bridge construction
CN104386599A (en) Balancing weight moving and clamping device for tower crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130102

Termination date: 20200428