CN202622994U - Steel pedestal structure for pouring precast beam - Google Patents

Steel pedestal structure for pouring precast beam Download PDF

Info

Publication number
CN202622994U
CN202622994U CN 201220331804 CN201220331804U CN202622994U CN 202622994 U CN202622994 U CN 202622994U CN 201220331804 CN201220331804 CN 201220331804 CN 201220331804 U CN201220331804 U CN 201220331804U CN 202622994 U CN202622994 U CN 202622994U
Authority
CN
China
Prior art keywords
steel
channel
layer
pedestal
section steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220331804
Other languages
Chinese (zh)
Inventor
龙少奇
范海军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING QINHE PREPARATIONS Co Ltd
Original Assignee
CHONGQING QINHE PREPARATIONS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING QINHE PREPARATIONS Co Ltd filed Critical CHONGQING QINHE PREPARATIONS Co Ltd
Priority to CN 201220331804 priority Critical patent/CN202622994U/en
Application granted granted Critical
Publication of CN202622994U publication Critical patent/CN202622994U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a steel pedestal structure for pouring a precast beam. The steel pedestal structure is characterized by comprising a plurality of steel bottom plates which are arranged on the bottommost layer at intervals side by side, wherein a first layer of channel steel, a second layer of channel steel and a third layer of channel steel are arranged above the steel bottom plates sequentially; a plurality of large-size channel steels are arranged in the first layer of channel steel longitudinally side by side along the length direction of a pedestal; a plurality of medium-size channel steels are arranged in the second layer of channel steel transversely side by side along the width direction of the pedestal; a plurality of small-size channel steels are arranged in the third layer of channel steel longitudinally side by side along the length direction of the pedestal; opening sides of the small-size channel steels positioned on two sides in the third layer of channel steel face outwards; and a layer of steel plate is paved above the third layer of channel steel. The steel pedestal structure has the advantages of simple structure and convenience for implementation; when used, the steel pedestal structure can be paved and installed directly without cast-in-place, so that the production time is saved; and the steel pedestal structure can also be moved and used repeatedly, so that the production cost is saved.

Description

A kind of precast beam is built steel pedestal structure
Technical field
The utility model relates to science of bridge building, especially relates to a kind of bridge precast beam and builds steel pedestal structure.
Background technology
Along with development of technology, in the construction of contemporary science of bridge building, when carrying out the bridge deck construction, select to adopt the form construction of precast beam more and more, promptly earlier crossbeam is built on-site prefabricatedly, lay being transported to the construction point then.Precast beam is according to length, generally is divided into several kinds of specifications such as 20 meters, 25 meters, 30 meters, 35 meters and 40 meters, and wherein, the precast beam width is also with length incremental variations between 0.5 meter to 1 meter.
In the prior art, when building precast beam, generally be earlier build a coupling earlier according to the size of required precast beam the concrete pedestal as brace foundation, and then on the concrete pedestal, lay steel plate, be that bed die is built with the steel plate.This mode, pedestal can't move, and when the job location changes, often just need near the job location, build the concrete pedestal again, causes waste, and pedestal need be cast-in-place simultaneously, often delays the production time.
The utility model content
Deficiency to above-mentioned prior art; The technical problem that the utility model will solve is: how to provide a kind of precast beam of movable type to build steel pedestal structure; Making it can directly lay installation can use, need not cast-in-place, so saved the production time; Can repeat simultaneously to move and use, save production cost.
In order to solve the problems of the technologies described above, adopted following technical scheme in the utility model:
A kind of precast beam is built steel pedestal structure; It is characterized in that; Comprise that spacing parallel arranging is arranged at some steel sole plates of the bottom, the steel sole plate top is disposed with ground floor channel-section steel, second layer channel-section steel and the 3rd layer of channel-section steel, vertically is set side by side with some large size channel-section steels along the pedestal length direction in the said ground floor channel-section steel; Laterally be set side by side with some medium size channel-section steels along the pedestal width in the said second layer channel-section steel; Vertically be set side by side with some small size channel-section steels along the pedestal length direction in said the 3rd layer of channel-section steel, the small size channel-section steel open side that is positioned at both sides in the 3rd layer of channel-section steel outwards is provided with, and the 3rd layer of channel-section steel top is equipped with one deck steel plate.Large, medium and small described in this programme is for three layers of channel-section steel, is respectively the relation that the size model increases progressively successively.
The pedestal structure of the utility model, main material is obtained by the channel-section steel of steel plate and three kinds of models, and is simple in structure; It is convenient to implement, though steel pedestal cost is higher than the concrete pedestal, reuses owing to can wholely move; So the whole cost for long-term use will be lower than the concrete pedestal, cast-in-place owing to need not simultaneously, installing and laying can be used; So very convenient quick, do not influence production.The small size channel-section steel open side that wherein is positioned at both sides in the 3rd layer of channel-section steel outwards is provided with, and can directly use as ending slurry pipe mounting groove, and the convenient slurry pipe that ends is installed.
As optimization, the corresponding distributed and arranged of said second layer channel-section steel is in the top of steel sole plate position.Like this, can improve the supporting effect of steel sole plate, guarantee the pedestal bulk strength.
In sum, the utility model possesses simple in structure, implements advantage easily, can directly lay installation during use and can use, and need not cast-in-placely, so saved the production time, can repeat simultaneously to move and use, and has saved production cost.
Description of drawings
Fig. 1 is the structural representation of the utility model.
The specific embodiment
Below in conjunction with the specific embodiment and accompanying drawing the utility model is done further to specify.
During practical implementation; As shown in Figure 1, a kind of precast beam is built steel pedestal structure, comprises that spacing parallel arranging is arranged at some steel sole plates 1 of the bottom; Steel sole plate 1 top is disposed with ground floor channel-section steel 2, second layer channel-section steel 3 and the 3rd layer of channel-section steel 4; Vertically be set side by side with some large size channel-section steels along the pedestal length direction in the said ground floor channel-section steel 2, laterally be set side by side with some medium size channel-section steels along the pedestal width in the said second layer channel-section steel 3, vertically be set side by side with some small size channel-section steels along the pedestal length direction in said the 3rd layer of channel-section steel 4; The small size channel-section steel open side that is positioned at both sides in the 3rd layer of channel-section steel 4 outwards is provided with, and the 3rd layer of channel-section steel 4 top are equipped with one deck steel plate 5.Said second layer channel-section steel 3 corresponding distributed and arranged are in the top of steel sole plate 1 position.
During practical implementation, the utility model can be used as many groups, splices the back according to the length of precast beam during installation and uses, and can avoid long like this and is unfavorable for transportation.

Claims (2)

1. a precast beam is built steel pedestal structure; It is characterized in that; Comprise that spacing parallel arranging is arranged at some steel sole plates of the bottom, the steel sole plate top is disposed with ground floor channel-section steel, second layer channel-section steel and the 3rd layer of channel-section steel, vertically is set side by side with some large size channel-section steels along the pedestal length direction in the said ground floor channel-section steel; Laterally be set side by side with some medium size channel-section steels along the pedestal width in the said second layer channel-section steel; Vertically be set side by side with some small size channel-section steels along the pedestal length direction in said the 3rd layer of channel-section steel, the small size channel-section steel open side that is positioned at both sides in the 3rd layer of channel-section steel outwards is provided with, and the 3rd layer of channel-section steel top is equipped with one deck steel plate.
2. precast beam as claimed in claim 1 is built steel pedestal structure, it is characterized in that, the corresponding distributed and arranged of said second layer channel-section steel is in the top of steel sole plate position.
CN 201220331804 2012-07-10 2012-07-10 Steel pedestal structure for pouring precast beam Expired - Lifetime CN202622994U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220331804 CN202622994U (en) 2012-07-10 2012-07-10 Steel pedestal structure for pouring precast beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220331804 CN202622994U (en) 2012-07-10 2012-07-10 Steel pedestal structure for pouring precast beam

Publications (1)

Publication Number Publication Date
CN202622994U true CN202622994U (en) 2012-12-26

Family

ID=47376233

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220331804 Expired - Lifetime CN202622994U (en) 2012-07-10 2012-07-10 Steel pedestal structure for pouring precast beam

Country Status (1)

Country Link
CN (1) CN202622994U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105856415A (en) * 2015-01-22 2016-08-17 中交路桥建设有限公司 Prefabricated box beam bottom wedge block dry sand adjustment construction method
CN108058267A (en) * 2017-12-14 2018-05-22 山西路桥第二工程有限公司 Precast T-Beam channel steel base construction method
CN109109155A (en) * 2018-10-22 2019-01-01 湖南路桥建设集团有限责任公司 A kind of installation method and structure of the combined steel moald-cavity pedestal of assembled
CN110053934A (en) * 2019-05-20 2019-07-26 佛山市集知汇科技有限公司 A kind of intelligence precast beam production equipment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105856415A (en) * 2015-01-22 2016-08-17 中交路桥建设有限公司 Prefabricated box beam bottom wedge block dry sand adjustment construction method
CN105856415B (en) * 2015-01-22 2018-04-17 中交路桥建设有限公司 Prefabricated case beam beam bottom voussoir dry sand adjusts construction method
CN108058267A (en) * 2017-12-14 2018-05-22 山西路桥第二工程有限公司 Precast T-Beam channel steel base construction method
CN109109155A (en) * 2018-10-22 2019-01-01 湖南路桥建设集团有限责任公司 A kind of installation method and structure of the combined steel moald-cavity pedestal of assembled
CN110053934A (en) * 2019-05-20 2019-07-26 佛山市集知汇科技有限公司 A kind of intelligence precast beam production equipment

Similar Documents

Publication Publication Date Title
CN103669114B (en) Ballast bed base prefabricated slab and application thereof
CN202622994U (en) Steel pedestal structure for pouring precast beam
CN203924349U (en) A kind of prefabricated panel and superposed beam rapid installing connection structure
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN103806656A (en) Construction method of cast-in-place concrete flat slab built-in thin-wall hollow box body
CN204019724U (en) Make the mold of prefabricated case beam framework of steel reinforcement
CN103730869B (en) A kind of groined type fixes embedded box and construction method thereof
CN204059109U (en) Modern tram solid concrete roabed integral structure
CN102322071A (en) Universal base structure of main transformer of 220kV substation
CN104631674A (en) Composite floor slab and construction method thereof
CN203701066U (en) Soil pressure meter position-adjustable fixed installation device
CN203393740U (en) Integral reinforced concrete foundation structure for assembling drainage pipelines
CN103806426A (en) Adjustable position fixing installation device of soil pressure gauge
CN205152790U (en) Concrete bridge face and pavement construction are supported and stop device with reinforcing bar net piece
CN202595756U (en) Piled raft foundation structure of narrow-base power transmission tower
CN209264097U (en) A kind of embedded type sensor mounting groove
CN202148694U (en) Prefabricated T-shaped beam steel bar colligation positioning device
CN201176551Y (en) Precast slab for roads
CN202809400U (en) Precast slab for ballast bed base
CN202559750U (en) Mold for making positioning device for shear wall body reinforcing cage of high-rise building
CN203440990U (en) Toothed web box-type steel and concrete composite flat beam
CN205259049U (en) A assembly type decking for landing stage construction
CN103015447A (en) Piled raft foundation structure provided with column pier type pile cap structures
CN203654815U (en) Multi-beam-typed shared hole pile foundation simply support structure deposit beam pedestal
CN203049590U (en) Filling construction structure for shallowly-buried karst cave

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20121226

CX01 Expiry of patent term