CN202609770U - Lead electrolysis electrode charging and discharging groove lifting frame - Google Patents
Lead electrolysis electrode charging and discharging groove lifting frame Download PDFInfo
- Publication number
- CN202609770U CN202609770U CN 201220264251 CN201220264251U CN202609770U CN 202609770 U CN202609770 U CN 202609770U CN 201220264251 CN201220264251 CN 201220264251 CN 201220264251 U CN201220264251 U CN 201220264251U CN 202609770 U CN202609770 U CN 202609770U
- Authority
- CN
- China
- Prior art keywords
- hook
- suspension bracket
- frame type
- electrolysis electrode
- elongated slot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Electrolytic Production Of Metals (AREA)
Abstract
The utility model relates to a lead electrolysis electrode charging and discharging groove lifting frame, which belongs to lifting and transporting machinery and structurally comprises a frame type lifting frame formed by welding two pieces of short channel steel (1) and two pieces of long channel steel (2), wherein a pair of hanging shafts (3) are symmetrically welded on the waist of the two pieces of long channel steel (2) in the length direction, two leg parts of each piece of long channel steel are provided with 24 to 36 pairs of lifting hook holes, a lifting hook (5) with the lower end bent into an L shape is penetrated into each pair of lifting hook holes, and a sinuous clamp (6) with a long elliptic hole is arranged on the hook body of the lifting hook (5) and is connected with a push-pull rod (7). When the lifting frame is used, the manual sheet arrangement by hand is not needed, the work efficiency is greatly improved, and the work intensity is effectively lightened.
Description
Technical field
The utility model relates to handling machinery, is specifically related to a kind of plumbous electrolysis electrode and takes on the groove suspension bracket.
Background technology
The refining of lead bullion adopts electrolysis process, and its anode is the lead anode sheet that adopts the lead bullion casting.Normally the lead anode sheet is arranged plate the enterprising pedestrian worker of the suspension hook of suspension bracket, every batch of 24-36 sheet, then groove under the lifting.Manual work separates the lead anode sheet one by one from suspension hook again then, and on the horizontal anode bar that rides over electrolytic bath, spacing is adjusted in manual work again.This operating process manual operation labour intensity is bigger, and work efficiency is extremely low.
On April 25th, 2012, Chinese utility model Granted publication CN202201992U discloses a kind of device that is used for the operation of nickel sulfide anode row plate, comprises the frame type suspension bracket of being processed by the bar steel; On a pair of steel of frame type suspension bracket symmetry, offer the suspension hook through hole that is uniformly distributed with; The suspension hook through hole is passed in 12 pairs of suspension hook upper ends, is fixed on the suspension bracket; The frame type suspension bracket is through four suspension rods and a suspension ring articulated lifting arm.Though this device can 24 anode strips of a handling; Respectively organize the die opening that keeps identical and requirement up to specification between the anode strip naturally after putting to the anode bar of electrolytic bath; Need not screening manually; But the separation of respectively organizing anode strip still will be operated from suspension hook one by one, still can't resolve all anode strips from the last technical matters of separating of suspension hook.
The utility model content
The utility model technical matters to be solved provides a kind of plumbous electrolysis electrode and takes on the groove suspension bracket; Utilize a handling 24-36 of this device sheet lead anode sheet; After putting to the anode bar of electrolytic bath; All anode strips are realized flash liberation from suspension hook, and each organizes the die opening that keeps identical and requirement up to specification between the lead anode sheet naturally, need not screening manually.Efficiency improves greatly, effectively reduces labor intensity.
The utility model is realized through following technical scheme.
A kind of plumbous electrolysis electrode takes on the groove suspension bracket, comprises one by two short channel-section steels and two frame type suspension brackets that the elongated slot steel is welded, and is long to being welded with a pair of suspended axle symmetrically on the waist of two elongated slot steel; Two shanks of every elongated slot steel offer many to up/down perforation, the hook on hole that is uniformly distributed with, are coated with the suspension hook that a lower end curves " L " font in every pair of hook on hole; The hook of said suspension hook is held on one's body and is connected with the diameter nut head bigger than hook on hole, the hook body between channel-section steel two legs partly locate to be welded with one with the axial vertical paper clip of hook body; Be symmetrically installed with two parallel pull bars along long to leaning on two elongated slot steel limits in the above-mentioned frame type suspension bracket, the length of every pull bar is longer than frame type suspension bracket; Above-mentioned every pull bar upper edge bar is provided with the pin that equates with corresponding suspension hook quantity on one side in uniform way to arranging; Each pin puts in respectively in the back-shaped hole of above-mentioned correspondence position paper clip.
Synchronous for the operation that keeps above-mentioned two pull bars, at an end that leans on frame type suspension bracket, there is a connecting rod handle that two pull bars are coupled together.
Because the plumbous electrolysis electrode of the utility model takes on the groove suspension bracket and has adopted technique scheme; When handling electrolytic lead anode strip is constructed; The utility model frame type suspension bracket is placed above the slice platform of lead anode sheet casting machine, have the lead anode sheet of carrying slice arranging apparatus will cast earlier to sequence on this slice platform by the required spacing of plumbous electrolytic bath lead anode sheet.At this moment; Manual operation connecting rod handle pushes away forward; Two parallel pull bars drive cooresponding paper clip motion through all pins on it, and to hang direction parallel with lead anode sheet ear towards fitly changing into simultaneously to make " L " font hook of suspension hook on the utility model both sides; Controller chassis type suspension bracket descends, and " L " font hook of all suspension hooks interleaves down from the hanger on lead anode sheet both sides; When " L " font hook of the suspension hook on both sides all is positioned at the below of lead anode sheet both sides hanger; Frame type suspension bracket stops to descend; The connecting rod of manual operation simultaneously handle is toward post-tensioning; Two parallel pull bars drive cooresponding paper clip gyroscopic movement through all pins on it, make " L " font hook of the suspension hook on both sides fitly change into vertical with lead anode sheet hanger direction towards the while.Controller chassis type suspension bracket rises, and this moment, the suspension hook on both sides hooked lead anode sheet hanger, accomplished the lifting process.
When lifting appliance with the utility model during together with lead anode sheet handling to plumbous electrolytic bath top, controller chassis type suspension bracket descends, the lead anode sheet gets in the plumbous electrolytic bath, the groove that the hanger on lead anode sheet both sides will ride over plumbous electrolytic bath both sides along or muddled goddess of lightning's line on.The hanger that the suspension hook that frame type suspension bracket continues to drop to both sides breaks away from lead anode sheet both sides stops; At this moment; Manual operation connecting rod handle pushes away forward; Two parallel pull bars drive cooresponding paper clip motion through all pins on it, and to hang direction parallel with lead anode sheet ear towards fitly changing into simultaneously to make " L " font hook of suspension hook on the utility model both sides; Controller chassis type suspension bracket rises, and " L " font hook of all suspension hooks is extracted out between the hanger on lead anode sheet both sides, accomplishes the tankage process.
The employing 24-36 of the utility model is to up/down perforation, the hook on hole that is uniformly distributed with, can a handling 24-36 sheet lead anode sheet, and put respectively to organize to the plumbous electrolytic bath and keep required die opening between the lead anode sheet naturally, need not screening manually.Efficiency improves greatly, effectively reduces labor intensity, and has realized safe operation.
Description of drawings
Fig. 1 is the main TV structure scheme drawing of the utility model.
Fig. 2 is the birds-eye view of Fig. 1.
Fig. 3 is the left cutaway view of Fig. 1.
Fig. 4 is the A portion enlarged view of Fig. 2.
Fig. 5 is the B portion enlarged view of Fig. 3.
Reference numeral is among the figure: 1 short channel-section steel; 2 elongated slot steel; 3 suspended axles; 4 lifting ropes; 5 suspension hooks; 6 paper clips; 7 pull bars; 8 pins; 9 connecting rods handle; 10 crossbeams.
The specific embodiment
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is done further detailed explanation:
A kind of plumbous electrolysis electrode takes on the groove suspension bracket; Comprise one by two short channel-section steels 1 and two frame type suspension brackets that elongated slot steel 2 is welded; Long to being welded with 3, two pairs of suspended axles of a pair of suspended axle 3 being connected symmetrically on the waist of two elongated slot steel 2 through lifting rope 4 and weight-lifting equipment; The hook on hole that two shanks of every elongated slot steel offer 24 pairs of up/down perforations, are uniformly distributed with is coated with the suspension hook 5 that a lower end curves " L " font in every pair of hook on hole; The hook of said suspension hook 5 is held on one's body and is connected with the diameter nut head bigger than hook on hole, the hook body between channel-section steel two legs partly locate to be welded with one with the axial vertical paper clip 6 of hook body; Is symmetrically installed with two parallel pull bars 7 along long to leaning on two elongated slot steel 2 limits in the above-mentioned frame type suspension bracket, the length of every pull bar is longer than frame type suspension bracket, make the pull bar two ends pass the short channel-section steel 1 at frame type suspension bracket two ends respectively after, stretch out surplus long part in addition; Above-mentioned every pull bar 7 upper edge bars are provided with the pin 8 that equates with corresponding suspension hook 5 quantity on one side in uniform way to arranging; Each pin 8 puts in respectively in the back-shaped hole of above-mentioned correspondence position paper clip 6.Above-mentioned hook on hole is along the arrangement pitches and the required die opening correspondent equal of plumbous electrolytic bath lead anode sheet of elongated slot steel 2.An above-mentioned end that leans on frame type suspension bracket has a connecting rod handle 9 that two pull bars 7 are coupled together.Also be provided with crossbeam 10 on the above-mentioned frame type suspension bracket.
Claims (4)
1. a plumbous electrolysis electrode takes on the groove suspension bracket, comprises a frame type suspension bracket that is welded by two short channel-section steels (1) and two elongated slot steel (2), and is long to being welded with a pair of suspended axle (3) symmetrically on the waist of two elongated slot steel (2); It is characterized in that: two shanks of every elongated slot steel offer many to up/down perforation, the hook on hole that is uniformly distributed with, are coated with the suspension hook (5) that a lower end curves " L " font in every pair of hook on hole; The hook of said suspension hook (5) is held on one's body and is connected with the diameter nut head bigger than hook on hole, the hook body between channel-section steel two legs partly locate to be welded with one with the axial vertical paper clip (6) of hook body; Be symmetrically installed with two parallel pull bars (7) along long to leaning on two elongated slot steel (2) limit in the above-mentioned frame type suspension bracket, the length of every pull bar is longer than frame type suspension bracket; Above-mentioned every pull bar (7) upper edge bar is provided with the pin (8) that equates with corresponding suspension hook (5) quantity on one side in uniform way to arranging; Each pin (8) puts in respectively in the back-shaped hole of above-mentioned correspondence position paper clip (6).
2. plumbous electrolysis electrode according to claim 1 takes on the groove suspension bracket, it is characterized in that: said hook on hole is along the arrangement pitches and the required die opening correspondent equal of plumbous electrolytic bath lead anode sheet of elongated slot steel (2).
3. plumbous electrolysis electrode according to claim 1 takes on the groove suspension bracket, it is characterized in that: at an end that leans on frame type suspension bracket, have a connecting rod handle (9) that two pull bars (7) are coupled together.
4. plumbous electrolysis electrode according to claim 1 takes on the groove suspension bracket, it is characterized in that: on frame type suspension bracket, also be provided with crossbeam (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220264251 CN202609770U (en) | 2012-06-06 | 2012-06-06 | Lead electrolysis electrode charging and discharging groove lifting frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220264251 CN202609770U (en) | 2012-06-06 | 2012-06-06 | Lead electrolysis electrode charging and discharging groove lifting frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202609770U true CN202609770U (en) | 2012-12-19 |
Family
ID=47343485
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220264251 Expired - Fee Related CN202609770U (en) | 2012-06-06 | 2012-06-06 | Lead electrolysis electrode charging and discharging groove lifting frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202609770U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108275564A (en) * | 2018-03-30 | 2018-07-13 | 五冶集团上海有限公司 | A kind of Wide and Thick Slab turns steel rider road more changing device |
CN109835803A (en) * | 2019-01-18 | 2019-06-04 | 云锡文山锌铟冶炼有限公司 | Zinc electrolysis negative plate hanging apparatus |
-
2012
- 2012-06-06 CN CN 201220264251 patent/CN202609770U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108275564A (en) * | 2018-03-30 | 2018-07-13 | 五冶集团上海有限公司 | A kind of Wide and Thick Slab turns steel rider road more changing device |
CN109835803A (en) * | 2019-01-18 | 2019-06-04 | 云锡文山锌铟冶炼有限公司 | Zinc electrolysis negative plate hanging apparatus |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202609770U (en) | Lead electrolysis electrode charging and discharging groove lifting frame | |
CN102916367B (en) | Maintenance block for vertical twin bundled conductors | |
CN202809363U (en) | Steel wire rope knot splicing device | |
CN202575680U (en) | Special device for electrolytic anode strip hoisting assembly | |
CN102642767A (en) | Special electrolytic lead anode strip hoisting and assembling device | |
CN204653455U (en) | Lid fishnet | |
CN203821037U (en) | Threading assisting tool | |
CN203486816U (en) | Electric hanging bracket | |
CN206046564U (en) | A kind of machining tailing high-efficiency washing device | |
CN107445048A (en) | Material frame semi-automatic extraction fixture | |
CN204777517U (en) | Conveying mechanism in middle of ready -made clothe circulation line | |
CN208791790U (en) | A kind of automatic anode machine of starting sheet | |
CN209338637U (en) | Galvanized workpiece hangs support device | |
CN208429783U (en) | A kind of automatic planer-type electroplating production device | |
CN209798023U (en) | quenching frame and quenching device | |
CN208994943U (en) | A kind of hanging apparatus | |
CN106183344B (en) | A kind of automobile container ground panel moulding apparatus | |
CN113151883A (en) | Electroplating hanger | |
CN213475229U (en) | Lifting device for coal economizer | |
CN206553555U (en) | A kind of leather and fur hangs dye machine | |
CN214991930U (en) | Automatic plate inserting machine for electrolytic manganese metal negative plate | |
CN207840004U (en) | Vertical precise forging machine automatic charging machinery hand | |
CN220462881U (en) | Spinnable asphalt magnetic rod pulling device | |
CN205932919U (en) | Multimode hoist device | |
CN205099876U (en) | Yarn guiding frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121219 Termination date: 20170606 |