CN202599078U - Device for adjusting coal gas in shaft furnace - Google Patents

Device for adjusting coal gas in shaft furnace Download PDF

Info

Publication number
CN202599078U
CN202599078U CN 201220181401 CN201220181401U CN202599078U CN 202599078 U CN202599078 U CN 202599078U CN 201220181401 CN201220181401 CN 201220181401 CN 201220181401 U CN201220181401 U CN 201220181401U CN 202599078 U CN202599078 U CN 202599078U
Authority
CN
China
Prior art keywords
coal gas
pipeline
shaft furnace
furnace
adjusting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220181401
Other languages
Chinese (zh)
Inventor
谢学荣
李晓清
梁利生
朱锦明
钱良丰
赵华盛
宋文刚
周海忠
陈旭东
胡双柏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baosteel Group Corp
Original Assignee
Baoshan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoshan Iron and Steel Co Ltd filed Critical Baoshan Iron and Steel Co Ltd
Priority to CN 201220181401 priority Critical patent/CN202599078U/en
Application granted granted Critical
Publication of CN202599078U publication Critical patent/CN202599078U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

The utility model discloses a device for adjusting coal gas in a shaft furnace. The device comprises at least one pipeline and sealing plates, wherein at least one pipeline penetrates through a peripheral pipe of the shaft furnace; a channel is formed on an annular wall in the peripheral pipe below the pipelines; and the sealing plates are arranged in walls, which are positioned at the head and tail ends of the pipeline, of the shaft furnace to seal part of the channel and form an opening through which coal gas can enter a center position in the furnace along the channel below the pipelines. By the device, a great deal of coal gas can arrive at the center position of the furnace, so that distribution of dust and coal gas flow on a cross section is improved, the coal gas utilization rate and the metallization rate are high, the furnace charge pressure difference is reduced, the stability of operation of the furnace is greatly improved, the adaptability of the furnace is improved, the probability of abnormal states of the pipeline and the like is reduced, and the yield is improved.

Description

A kind of shaft furnace coal gas adjusting device
Technical field
The utility model relates to metallurgical equipment, particularly a kind of shaft furnace coal gas adjusting device.
Background technology
Along with resource consumption, contradiction that coke is in short supply become increasingly conspicuous, a great problem that metallurgy industry faces is exactly constantly rising violently of cost of material, like iron ore, continues in recent years to sharp rise, and reduces pig iron cost and seems particularly urgent.In the smelting iron and steel, how improving gas utilization rate, reduce coke ratio and coal ratio, is the most important thing thereby reduce supplies consumption.
In order to produce high-end product, low silicon smelting becomes trend of the times, and reducing the siliceous necessary condition of the pig iron is to guarantee that sufficient slag iron physics heat is to satisfy the needs of desulfurization.If long-term underheat average siliceously is lower than reasonable lower limit, slag iron physics heat is not enough, can cause the cupola well situation to worsen even coal gas runs off normal.Though low coke ratio, high gas utilization rate and high coke ratio, low gas utilization rate all can obtain dry iron, clearly the former is our needs.From falling the burnt angle of silicon joint, it is dual improving the gas utilization rate effect, in the time of high and stable yields, keeps high gas utilization rate very necessary.
Reasonably the coal gas distributions helps to obtain low stock column pressure reduction, high gas unit consumption and high gas utilization rate, thereby obtains high degree of metalization.Part coal gas flows through in development and forms high-temperature region, pipeline etc. easily, and reasonably the coal gas distributions can reduce the high-temperature region, the risk of the working of a furnaces such as reduction bonds, pipeline.
Traditional measures such as high wind speed, high blast energy, high wind-warm syndrome, high oxygen enrichment, high roof pressure have progressively solved and have inscribed between furnace condition anterograde, have kept higher gas utilization rate, but still have many conflicts, are the unity of opposites like High Pressure Difference and gas utilization rate.Do not have gas utilization rate without pressure reduction, keep high gas utilization rate to need certain pressure reduction.But the rising of pressure reduction will threaten the stable smooth operation of the working of a furnace.In case raw material changes greatly, will cause coal gas stream unstable, generation pipeline, the material etc. that collapses cause the decline of gas utilization rate, thereby have increased the weight of the dependence to raw material.The high-temperature behavior of the raising of coke quality, particularly coke (CRI, CSR) is laid a good foundation for improving gas utilization rate.But the cost of coke is high, and coking brings serious environmental pollution.
In existing regulating measure, measures such as air port air blast, logical oxygen cause the edge air-flow strong, a little less than the center; In order to suppress the edge, distribution devices such as cloth plate washer, distributing device have been invented in the centre of development; They control cloth radius, fabric thickness or cloth point above the stove charge level, thereby regulate the coal gas distributions, improve gas utilization rate; But the adjusting yardstick of edge coal gas stream is difficult to control, and is careless slightly, is easy to change into the edge and crosses Sheng even edge pipeline.Under the cloth mode contexts such as cloth plate washer,, penetrate and carry out according to original trend basically in the process,, arrive the charge level top, form top coal gas output up to penetrating charge level in case bottom coal gas distribution pattern forms.
Summary of the invention
The purpose of the utility model is to provide a kind of shaft furnace coal gas adjusting device, makes coal gas more arrive the stove center more, thereby improves dust and coal gas distributions on the cross section; Obtain high gas utilization rate and high degree of metalization; Reduce furnace charge pressure reduction simultaneously, improve the stability of furnace maneuver greatly, improve stove adaptability; The occurrence probability of abnormal conditions such as minimizing pipeline improves output.
For achieving the above object, the technical scheme of the utility model is:
A kind of shaft furnace coal gas adjusting device, it comprises, and at least one pipeline runs through the setting of shaft furnace bustle pipe, and pipeline below bustle pipe internal ring wall forms a passage; Closure plate, its be arranged at said pipeline end to end two ends vertical furnace within the walls, seal the part of above-mentioned passage, formation can make coal gas get into the opening of center in the stove along square channel under the pipeline.
Further, described pipeline is a three-decker, comprises internal lining pipe, outer tube and baffle.
Be provided with ceramic fiber blanket between described outer tube and the baffle.
Described pipeline is triangular form or platypelloid type hollow-core construction.
In addition, establish water cooled pipeline in the described pipeline.
After the utility model is installed; Form the nature angle of rest (repose) owing to add furnace charge, the pipeline below forms a triangular duct naturally, and coal gas is after gas inlet gets into bustle pipe; Part coal gas is through getting in the stove after the bustle pipe air inlet of under shed penetrates furnace wall around the edge; Part coal gas arrives the stove center through the triangular duct that the coal gas adjusting device forms, thereby improves dust and coal gas distributions on the cross section, obtains high gas utilization rate and high degree of metalization; Reduce furnace charge pressure reduction simultaneously, improve the stability of furnace maneuver greatly, improve stove adaptability, the occurrence probability of abnormal conditions such as minimizing pipeline improves output.
The beneficial effect of the utility model:
1. improve dust and coal gas distribution on the cross section in the stove.
2. improve gas utilization rate and degree of metalization.
3. reduce furnace charge pressure reduction, improve the stability of furnace maneuver greatly, improve stove adaptability.
4. reduce the occurrence probability of abnormal condition such as pipeline, improve output.
Description of drawings
Fig. 1 is the structural representation of the utility model embodiment.
Fig. 2 is the A-A cross-sectional schematic of Fig. 1.
Fig. 3 is the B-B cross-sectional schematic of Fig. 1.
Fig. 4 is the structural representation of pipeline among the utility model embodiment.
The specific embodiment
Referring to Fig. 1~Fig. 4, a kind of shaft furnace coal gas adjusting device of the utility model, it comprises, and two pipelines 1,2 run through shaft furnace 10 bustle pipes 20 and are provided with, and pipeline below bustle pipe 20 internal ring walls form a passage; Closure plate 3; It is arranged at said pipeline 1, and (with pipeline 1 is example; Down with) end to end in the furnace wall at two ends, formation can make coal gas get into the opening 201 of center in the stove along 1 time square channel of pipeline, through regulating closure plate 3; Can regulate the size of opening 201, thereby regulate the coal gas amount that three corner channels get into the stove center along pipeline 1 below.
Described pipeline 1 is a three-decker, comprises internal lining pipe 11, outer tube 12 and baffle 13.
Be provided with ceramic fiber blanket between described outer tube and the baffle.
Described pipeline 1 is triangular form or platypelloid type hollow-core construction.Establish water cooled pipeline 4 in the described pipeline 1.
Coal gas is after gas inlet 30 gets into bustle pipe 20; Part coal gas is through getting in the stove after bustle pipe 20 air inlets 202 of under shed penetrate furnace wall around the edge; The passage that part coal gas forms through pipeline 1,2 belows naturally arrives the stove center; Thereby improve dust and coal gas distributions on the cross section, obtain high gas utilization rate and high degree of metalization; Reduce furnace charge pressure reduction simultaneously, improve the stability of furnace maneuver greatly, improve stove adaptability, the occurrence probability of abnormal conditions such as minimizing pipeline improves output.
The utility model coal gas adjusting device is used in the middle of furnace charge, improves coal gas and distributes, and improves gas utilization rate, is suitable for blast furnace technology, smelting reduction process or other metallurgy industry and produces qualified molten iron.

Claims (6)

1. a shaft furnace coal gas adjusting device is characterized in that, comprise,
At least one pipeline runs through the setting of shaft furnace bustle pipe, and pipeline below bustle pipe internal ring wall forms a passage;
Closure plate, its be arranged at said pipeline end to end two ends vertical furnace within the walls, seal the part of above-mentioned passage, formation can make coal gas get into the opening of center in the stove along square channel under the pipeline.
2. shaft furnace coal gas adjusting device as claimed in claim 1 is characterized in that described pipeline is a three-decker, comprises internal lining pipe, outer tube and baffle.
3. shaft furnace coal gas adjusting device as claimed in claim 2 is characterized in that, is provided with ceramic fiber blanket between described outer tube and the baffle.
4. according to claim 1 or claim 2 shaft furnace coal gas adjusting device is characterized in that described pipeline is triangular form or platypelloid type hollow-core construction.
5. according to claim 1 or claim 2 shaft furnace coal gas adjusting device is characterized in that, establishes water cooled pipeline in the described pipeline.
6. shaft furnace coal gas adjusting device as claimed in claim 4 is characterized in that, establishes water cooled pipeline in the described pipeline.
CN 201220181401 2012-04-25 2012-04-25 Device for adjusting coal gas in shaft furnace Expired - Fee Related CN202599078U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220181401 CN202599078U (en) 2012-04-25 2012-04-25 Device for adjusting coal gas in shaft furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220181401 CN202599078U (en) 2012-04-25 2012-04-25 Device for adjusting coal gas in shaft furnace

Publications (1)

Publication Number Publication Date
CN202599078U true CN202599078U (en) 2012-12-12

Family

ID=47316608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220181401 Expired - Fee Related CN202599078U (en) 2012-04-25 2012-04-25 Device for adjusting coal gas in shaft furnace

Country Status (1)

Country Link
CN (1) CN202599078U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115679028A (en) * 2022-09-16 2023-02-03 新疆八一钢铁股份有限公司 Low-silicon smelting method for Ou metallurgical furnace

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115679028A (en) * 2022-09-16 2023-02-03 新疆八一钢铁股份有限公司 Low-silicon smelting method for Ou metallurgical furnace

Similar Documents

Publication Publication Date Title
CN103993116B (en) Double tower flash iron-smelting furnace and iron smelting method
CN114350869B (en) Oxygen blast furnace type structure with furnace body blowing reducing gas
CN202599078U (en) Device for adjusting coal gas in shaft furnace
CN103966381B (en) A kind of device promoting Gas Flow reasonable layout in shaft furnace
CN104891831A (en) Energy-saving environment-friendly active lime roasting shaft kiln
CN202836150U (en) Deep cupola well rock wool cupola furnace
CN201819540U (en) Fixed temperature-regulating kiln of multi-section high temperature reduction rotary kiln
CN202912992U (en) Energy-saving and environment-friendly laterite nickel ore smelting equipment
CN211814544U (en) Hot-blast stove with hot-blast surrounding pipe
CN212955028U (en) Gas deacidification heat sink
CN205332191U (en) Circulating fluidized bed hood reinforcing means
CN208980755U (en) Improved Ou Yelu dust line horizontal pipe
CN203159642U (en) Air quantity regulation device of blast furnace
CN203820825U (en) Double-tower flash-speed smelting furnace
CN206616244U (en) A kind of blast furnace air-supply arrangement
CN207062314U (en) A kind of shaft furnace inlet duct
CN205387580U (en) Energy -concerving and environment -protective type air -feeding branch pipe
CN204787761U (en) Deposition annular channel brickwork is prevented to two thorax shaft kilns
CN202898236U (en) Vortex-type cooling system of sleeve lime kiln
CN203462069U (en) Self-preheating top-combustion type hot-air furnace
CN202170356U (en) Furnace bosh water tank blast nozzle of front-bed-free blast furnace
CN214004702U (en) Device for strengthening central gas flow of reduction furnace of Ou metallurgical furnace
CN218561350U (en) Dry quenching furnace device
CN203890377U (en) Gas-based reduction shaft furnace device
CN109355449B (en) Blast furnace ironmaking equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: BAOGANG GROUP CO., LTD.

Free format text: FORMER OWNER: BAOSHAN IRON + STEEL CO., LTD.

Effective date: 20121231

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 201900 BAOSHAN, SHANGHAI TO: 200122 PUDONG NEW AREA, SHANGHAI

TR01 Transfer of patent right

Effective date of registration: 20121231

Address after: 200122 No. 370 Pu circuit, Shanghai, Pudong New Area

Patentee after: Baosteel Group Corporation

Address before: 201900 Fujin Road, Shanghai, No. 885, No.

Patentee before: Baoshan Iron & Steel Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121212

Termination date: 20210425

CF01 Termination of patent right due to non-payment of annual fee