CN202596165U - Pouring template of large methane tank body - Google Patents
Pouring template of large methane tank body Download PDFInfo
- Publication number
- CN202596165U CN202596165U CN 201220224895 CN201220224895U CN202596165U CN 202596165 U CN202596165 U CN 202596165U CN 201220224895 CN201220224895 CN 201220224895 CN 201220224895 U CN201220224895 U CN 201220224895U CN 202596165 U CN202596165 U CN 202596165U
- Authority
- CN
- China
- Prior art keywords
- template
- tank body
- pouring
- methane tank
- formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a pouring template of a large methane tank body. Pouring templates are mutually connected and surround to form a pouring circle. The pouring template comprises an inner template and an outer template, wherein the inner template is connected with the outer template through a bolt; a forming cavity is formed between the inner template and the outer template; the inner template and the outer template are respectively a door frame-shaped metallic framework formed by angle iron; a bending face of the angle iron is outward; steel plates are welded on inner side faces of the metallic frameworks; lockholes are respectively arranged on a left side and a right side of the inner template and the outer template; and a plurality of pouring templates of the large methane tank body are correspondingly and sequentially connected right and left through the lockholes by bolts to assemble a methane tank body pouring circle with a circular ring shaped cavity. Due to the adoption of the structure, the pouring template welded by the metallic frameworks formed by angle iron and the steel plates, and the methane tank body pouring circle sequentially assembled right and left by the pouring templates are utilized, so that a mold can be assembled and disassembled quickly and conveniently, the construction speed is accelerated, the disassembled inner template and outer template can be reutilized, and the production cost is saved.
Description
Technical field
The utility model relates to a kind of formwork for placing of biomass pool body, relates in particular to the formwork for placing of large methane tank body.
Background technology
Along with further applying of the development of biogas technology and production and use of marsh gas technology, not only can carry out harmless treatment to town and country production and sanitary sewage and excrement of animals, can also utilize as a kind of clean energy resource.
The casting method of traditional large methane tank body is: with the brick model that builds up the pond body, joints cement concrete within it again, wait the fixedly moulding of water-setting concrete, maintenance good after, get the brick form removal.The model of this biomass pool body and casting method shortcoming thereof are: mold strength is low to be prone to fall apart, and can not firmly fiddle with during the pouring cement concrete, builds the pond body out-of-flatness of moulding, easy infiltration.When modeling and form removal, need the block of a brick to build or dismounting, modeling trouble, form removal also bother, and be time-consuming, and speed of application is slow, and model can not reuse, and cost is high.
Summary of the invention
The purpose of the utility model provides the large methane tank body formwork for placing that a kind of convenient and quick construction, formwork for placing can reuse.
In order to realize above purpose; The utility model adopts following technical scheme, and a kind of formwork for placing of large methane tank body, formwork for placing interconnect to surround into builds circle; Said formwork for placing comprises inner formword and exterior sheathing; Inner formword is connected through bolt with exterior sheathing, forms molding cavity between inner formword and the exterior sheathing, and inner formword and exterior sheathing are all formed " doorframe " shape metallic framework by angle steel; The angle steel folding surface outwardly; Steel plate is welded on the metallic framework medial surface, and the inner formword and the exterior sheathing left and right sides are equipped with lockhole, and the formwork for placing of several piece large methane tank body is built circle through the biomass pool body that lockhole assembles into annular cavity about with the bolt correspondence successively.
Be provided with reinforcing rib in the middle of said " doorframe " shape metallic framework.
The bolt of said connection inner formword and exterior sheathing is stud or single ended bolt.
The utility model has adopted above structure and casting method, utilizes the metallic framework of angle steel composition and the formwork for placing that steel plate is welded into, and the biomass pool body that is assembled into successively about formwork for placing is built circle; Rapid modeling and form removal have been realized; Accelerated speed of application, and the interior lamina membranacea of pulling down and exterior sheathing can reuse, practice thrift cost of production; The bolt that connects inner and outer template stays in the Chi Tizhong that builds, and has strengthened the intensity of pond body.
Description of drawings
Below in conjunction with accompanying drawing the utility model is done further explain:
Fig. 1 is the structural representation of the formwork for placing of the utility model large methane tank body;
Fig. 2 is the syndeton sketch map of the formwork for placing of two large methane tank bodies;
The structural representation of building circle that Fig. 3 is assembled into when building for the formwork for placing of the utility model large methane tank body.
The specific embodiment
Like Fig. 1, shown in 2 or 3; A kind of formwork for placing 1 of large methane tank body; Formwork for placing 1 interconnects to surround into builds circle 2, and said formwork for placing 1 comprises inner formword 3 and exterior sheathing 4, and inner formword 3 is connected through bolt 5 with exterior sheathing 4; Form molding cavity 6 between inner formword 3 and the exterior sheathing 4; Inner formword 3 is all formed " doorframe " shape metallic framework 7 by angle steel with exterior sheathing 4, angle steel folding surface 7a outwardly, steel plate 8 is welded on metallic framework 7 medial surfaces; Inner formword 3 is equipped with lockhole 9 with exterior sheathing 4 left and right sides, and the biomass pool body that the formwork for placing 1 of several piece large methane tank body assembles into annular cavity about through lockhole 9 usefulness bolts 10 correspondences is successively built and enclosed 2.
Be provided with reinforcing rib 11 in the middle of said " doorframe " shape metallic framework 7.
The bolt 5 of said connection inner formword 3 and exterior sheathing 4 is stud or single ended bolt.
The step of casting method that the formwork for placing of using said large methane tank body is built the large methane tank body is following:
A, described formwork for placing 1 through lockhole 9 usefulness bolts 10 correspondences of its left and right sides about successively the connecting ring winding dress up biomass pool body and build circle 2, build circle 2 for annular cavity;
B, make a call to one 12 building circle 2 centers, peek section with need build the isometric steel wire 13 of large methane tank body radius, steel wire 13 1 end 13a are fixed in the stake 12, other end 13b is fixed on the formwork for placing 1;
C, to annular cavity build the circle 2 the pouring cement concretes;
D, treat the cement concrete coagulation forming, pull down the steel wire 13 on the formwork for placing 1;
E, pull down the bolt 10 of building circle 2 the adjacent formwork for placing 1 of connection, pull down the nut of the nut that connects on the formwork for placing 1 on inner formword 3 and exterior sheathing 4 studs or the nut on the single ended bolt, sawed-off single ended bolt;
F, pull down inner formword 3 and exterior sheathing 4;
G, be reassembled into formwork for placing 1 to inner formword of pulling down 3 and exterior sheathing 4, on the pond body of having built, repeat A to F step and accomplish until large methane tank body monolithic architecture.
Claims (3)
1. the formwork for placing of large methane tank body; Its formwork for placing interconnects to surround into builds circle, and said formwork for placing comprises inner formword and exterior sheathing, it is characterized in that: its inner formword is connected through bolt with exterior sheathing; Form molding cavity between inner formword and the exterior sheathing; Inner formword and exterior sheathing are all formed " doorframe " shape metallic framework by angle steel, the angle steel folding surface outwardly, steel plate is welded on the metallic framework medial surface; The inner formword and the exterior sheathing left and right sides are equipped with lockhole, and the formwork for placing of several piece large methane tank body is built circle through the biomass pool body that lockhole assembles into annular cavity about with the bolt correspondence successively.
2. the formwork for placing of large methane tank body according to claim 1 is characterized in that: be provided with reinforcing rib in the middle of said " doorframe " shape metallic framework.
3. the formwork for placing of large methane tank body according to claim 1 is characterized in that: the bolt of said connection inner formword and exterior sheathing is stud or single ended bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220224895 CN202596165U (en) | 2012-05-17 | 2012-05-17 | Pouring template of large methane tank body |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220224895 CN202596165U (en) | 2012-05-17 | 2012-05-17 | Pouring template of large methane tank body |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202596165U true CN202596165U (en) | 2012-12-12 |
Family
ID=47313713
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220224895 Expired - Fee Related CN202596165U (en) | 2012-05-17 | 2012-05-17 | Pouring template of large methane tank body |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202596165U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102635230A (en) * | 2012-05-17 | 2012-08-15 | 福建莆田鸿达牧业有限公司 | Pouring template and pouring method for large methane pool body |
CN112160492A (en) * | 2020-10-09 | 2021-01-01 | 迟庆峰 | Punching angle steel concrete |
-
2012
- 2012-05-17 CN CN 201220224895 patent/CN202596165U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102635230A (en) * | 2012-05-17 | 2012-08-15 | 福建莆田鸿达牧业有限公司 | Pouring template and pouring method for large methane pool body |
CN102635230B (en) * | 2012-05-17 | 2015-12-16 | 福建莆田鸿达牧业有限公司 | The formwork for placing of large methane tank body and casting method |
CN112160492A (en) * | 2020-10-09 | 2021-01-01 | 迟庆峰 | Punching angle steel concrete |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201206328Y (en) | Preform formwork of cast-in-place concrete rib floor | |
CN102635230B (en) | The formwork for placing of large methane tank body and casting method | |
CN205575408U (en) | Concrete precast component shedder | |
CN104652815A (en) | Construction method for pouring water-stopping upstanding beams in kitchens and toilets | |
CN101812882B (en) | Concrete shear wall with once-molded filling wall and manufacturing method thereof | |
CN202596165U (en) | Pouring template of large methane tank body | |
CN205712565U (en) | A kind of prefabricated two-sided wall | |
CN204357001U (en) | A kind of prefabrication and assembly construction profile steel concrete column skeleton | |
CN204163266U (en) | The large plate of hollow lath component building hollow wall | |
CN205012645U (en) | Be used for figurate(d) formwork support composite set of special -shaped curved surface structure | |
CN104878872A (en) | Ultra-high performance concrete cover plate with truss structure framework and production method of ultra-high performance concrete cover plate | |
CN204849831U (en) | Novel well bore preformed block | |
CN211873406U (en) | Precast concrete hollow wall structure | |
CN204510590U (en) | A kind of reinforcement upper cover plate steel wire net rack inner support casing | |
CN203669198U (en) | Floor plate for mobile house | |
CN203924694U (en) | Biogas charging and discharging pond die special for concrete | |
CN203905326U (en) | Construction form for construction of roof exhaust pipe piers | |
CN204282528U (en) | A kind of prefabricated balcony structure | |
CN202689278U (en) | Superimposed hollow slab | |
CN202266019U (en) | Combined structure of building template of building support pillar | |
CN202689531U (en) | Flexible and retractable climbing shuttering system for single-cylinder-body structure | |
CN207177093U (en) | A kind of concrete turned legs | |
CN204899034U (en) | Prefabricated wall post | |
CN202745073U (en) | Assemble type prefabricated reinforcement concrete inspection well closing section connector | |
CN203834935U (en) | Construction device for house beam supporting column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121212 Termination date: 20200517 |
|
CF01 | Termination of patent right due to non-payment of annual fee |