CN202266019U - Combined structure of building template of building support pillar - Google Patents
Combined structure of building template of building support pillar Download PDFInfo
- Publication number
- CN202266019U CN202266019U CN2011203113997U CN201120311399U CN202266019U CN 202266019 U CN202266019 U CN 202266019U CN 2011203113997 U CN2011203113997 U CN 2011203113997U CN 201120311399 U CN201120311399 U CN 201120311399U CN 202266019 U CN202266019 U CN 202266019U
- Authority
- CN
- China
- Prior art keywords
- gusset
- side plate
- extension board
- building
- plate body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model relates to a combined structure of a building template of a building support pillar, which comprises a first corner plate, a second corner plate, a third corner plate and a fourth corner plate. The first corner plate, the second corner plate, the third corner plate and the fourth corner plate are enclosed to form a pillar cavity. When the combined structure is implemented specifically, construction workers firstly arrange the combined structure at a position where the building support pillar is required to be built, then a steel bar framework or a framework made of other materials is placed in the pillar cavity, and finally the construction workers pour concrete or cement mortar into the pillar cavity. After the concrete or the cement mortar is hardened, fixed and formed, the construction workers detach the combined structure from a frame-type structure of a building so as to achieve whole construction procedures.
Description
Technical field
The utility model relates to a kind of construction formwork, is meant a kind of in order to make the construction formwork of building support column especially.
Background technology
As everyone knows; Each country more and more stresses social cityization now; Urbanization is social economy's change procedure; Comprise that non-agriculturalization of agricultural population, size of urban population constantly expand, urban land is constantly to the suburb expansion, and continuous increase of city quantity and urban society, economy, technological change get into the rural process.Of paramount importance in process of urbanization is exactly to build some infrastructure and people's house in the city, can hold many population; So just require to build a large amount of buildings; Along with the existing Building technology of development of social productivity has also obtained swift and violent development; For structural strength and the quality that promotes building, shorten building cycle, present building adopts the structure of frame type more; Its framework mainly is that the material that tower structure adopted mainly comprises shaped steel and steel concrete by the rigidly connected cage construction of beam and column.Tower structure has following advantage in practical implementation, and at first, steel concrete that tower structure is used or shaped steel have good resistance to compression and bending resistance, therefore, can add the space and the height of edifice.Secondly, it can alleviate the weight of building.At last, it has shock resistance and globality preferably.So adopt the structure of frame type in a large number just because of the present building of plurality of advantages of tower structure as stated; But constructor's its construction sequence when carrying out concrete construction building generally comprises now; At first plank or other plate bodys are fixed into a unitary mould through nail or clip; Then in unitary mould, arrange reinforcing bar; Placing of concrete in this unitary mould afterwards, after concrete fully solidified, the constructor need disassemble to accomplish integral construction by plank or other plate bodys that aid will be formed mould successively.Above-mentioned job practices construction sequence in concrete application of utilizing plank or other plate bodys to be fixed into unitary mould through nail or clip is very lack of standardization, is unfavorable for controlling the total quality of building.And this is the major defect for conventional art.
The utility model content
The utility model provides a kind of combining structure of construction formwork of building support column, and utilizing the technology of the utility model to carry out architecture construction can the standard construction step, improve construction quality, and this is the main purpose for the utility model.
The technical scheme that the utility model adopted is: a kind of combining structure of construction formwork of building support column, it comprises first gusset, second gusset, set square and Square consisting of two isosceles right-angled triangles.
This first gusset comprises that first plate body and first connects side plate, and this first connection side plate symmetry is connected this first plate body both sides, offers some first connecting holes on this first connection side plate.
This second gusset comprises that second plate body and second connects side plate, and this second connection side plate symmetry is connected this second plate body both sides, offers some second connecting holes on this second connection side plate.
This set square comprises that the 3rd plate body, the 3rd connects side plate and the 3rd extension board; The 3rd connects the side plate symmetry is connected the 3rd plate body both sides; The 3rd extension board symmetry is connected the end of the 3rd plate body both sides, offers some the 3rd connecting holes on the 3rd extension board.
This Square consisting of two isosceles right-angled triangles comprises that the 4th plate body, the 4th connects side plate and the 4th extension board; The 4th connects the side plate symmetry is connected the 4th plate body both sides; The 4th extension board symmetry is connected the end of the 4th plate body both sides, offers some the 4th connecting holes on the 4th extension board.
This first gusset and this second gusset are connected between this set square and this Square consisting of two isosceles right-angled triangles; This first connection side plate of these first gusset both sides is fixedly connected on the 3rd extension board and the 4th extension board of this set square and this Square consisting of two isosceles right-angled triangles respectively through latch; This second connection side plate of these second gusset both sides is fixedly connected on respectively on the 3rd extension board and the 4th extension board of this set square and this Square consisting of two isosceles right-angled triangles through latch, and centers on formation one post chamber by this first gusset, this second gusset, this set square and this Square consisting of two isosceles right-angled triangles.
This first gusset is identical with this second gusset structure, and this set square is identical with this Square consisting of two isosceles right-angled triangles structure.
The beneficial effect of the utility model is: the utility model constructor in practical implementation at first need be arranged on the position that needs to build the building column with the utility model; Then in this post chamber, place the skeleton of cage of reinforcement or other materials; Last constructor need be in this post chamber placing of concrete or cement mortar; In the sclerosis of concrete or cement mortar fixedly after the moulding; The constructor pulls down the utility model to accomplish whole construction sequence from the tower structure of building, utilizes the technology of the utility model to carry out architecture construction and has the standard construction step, improves the effect of construction quality.
Description of drawings
Fig. 1 is the schematic perspective view of the utility model.
Fig. 2 is the part perspective view of the utility model.
The specific embodiment
Shown in Fig. 1 to 2, a kind of combining structure 10 of construction formwork of building support column, it comprises first gusset 11, second gusset 12, set square 13 and Square consisting of two isosceles right-angled triangles 14.
This first gusset 11, this second gusset 12, this set square 13 and this Square consisting of two isosceles right-angled triangles 14 are around the construction formwork 10 that forms this building support column.
Wherein, this first gusset 11 is identical with these second gusset, 12 structures, and this set square 13 is identical with these Square consisting of two isosceles right-angled triangles 14 structures.
This first gusset 11 comprises that first plate body 111 and first connects side plate 112, and these first connection side plate, 112 symmetries are connected this first plate body, 111 both sides, offer some first connecting holes on this first connection side plate 112.
This second gusset 12 comprises that second plate body 121 and second connects side plate 122, and these second connection side plate, 122 symmetries are connected this second plate body, 121 both sides, offer some second connecting holes on this second connection side plate 122.
This set square 13 comprises that the 3rd plate body the 131, the 3rd connects side plate 132 and the 3rd extension board 133; The 3rd connects side plate 132 symmetries is connected the 3rd plate body 131 both sides; The 3rd extension board 133 symmetries are connected the end of the 3rd plate body 131 both sides, offer some the 3rd connecting holes on the 3rd extension board 133.
This Square consisting of two isosceles right-angled triangles 14 comprises that the 4th plate body the 141, the 4th connects side plate 142 and the 4th extension board 143; The 4th connects side plate 142 symmetries is connected the 4th plate body 141 both sides; The 4th extension board 143 symmetries are connected the end of the 4th plate body 141 both sides, offer some the 4th connecting holes on the 4th extension board 143.
This first gusset 11 and this second gusset 12 are connected between this set square 13 and this Square consisting of two isosceles right-angled triangles 14.
This first connection side plate 112 of these first gusset, 11 both sides is fixedly connected on respectively on the 3rd extension board 133 and the 4th extension board 143 of this set square 13 and this Square consisting of two isosceles right-angled triangles 14 through latch.
This second connection side plate 122 of these second gusset, 12 both sides is fixedly connected on respectively on the 3rd extension board 133 and the 4th extension board 143 of this set square 13 and this Square consisting of two isosceles right-angled triangles 14 through latch.
And by this first gusset 11, this second gusset 12, this set square 13 and this Square consisting of two isosceles right-angled triangles 14 around forming a post chamber 16.
The utility model constructor in practical implementation at first need be arranged on the position that needs to build the building column with the utility model; Then in this post chamber 16, place the skeleton of cage of reinforcement or other materials; Last constructor need be in this post chamber 16 placing of concrete or cement mortar; Fixedly after the moulding, the constructor pulls down the utility model to accomplish the construction sequence of integral body from the tower structure of building in the sclerosis of concrete or cement mortar.
Claims (2)
1. the combining structure of the construction formwork of a building support column, it is characterized in that: it comprises first gusset, second gusset, set square and Square consisting of two isosceles right-angled triangles,
This first gusset comprises that first plate body and first connects side plate, and this first connection side plate symmetry is connected this first plate body both sides, offers some first connecting holes on this first connection side plate,
This second gusset comprises that second plate body and second connects side plate, and this second connection side plate symmetry is connected this second plate body both sides, offers some second connecting holes on this second connection side plate,
This set square comprises that the 3rd plate body, the 3rd connects side plate and the 3rd extension board; The 3rd connects the side plate symmetry is connected the 3rd plate body both sides; The 3rd extension board symmetry is connected the end of the 3rd plate body both sides, offers some the 3rd connecting holes on the 3rd extension board
This Square consisting of two isosceles right-angled triangles comprises that the 4th plate body, the 4th connects side plate and the 4th extension board; The 4th connects the side plate symmetry is connected the 4th plate body both sides; The 4th extension board symmetry is connected the end of the 4th plate body both sides, offers some the 4th connecting holes on the 4th extension board
This first gusset and this second gusset are connected between this set square and this Square consisting of two isosceles right-angled triangles; This first connection side plate of these first gusset both sides is fixedly connected on the 3rd extension board and the 4th extension board of this set square and this Square consisting of two isosceles right-angled triangles respectively through latch; This second connection side plate of these second gusset both sides is fixedly connected on respectively on the 3rd extension board and the 4th extension board of this set square and this Square consisting of two isosceles right-angled triangles through latch, and centers on formation one post chamber by this first gusset, this second gusset, this set square and this Square consisting of two isosceles right-angled triangles.
2. the combining structure of the construction formwork of a kind of building support column as claimed in claim 1 is characterized in that: this first gusset is identical with this second gusset structure, and this set square is identical with this Square consisting of two isosceles right-angled triangles structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203113997U CN202266019U (en) | 2011-08-18 | 2011-08-18 | Combined structure of building template of building support pillar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203113997U CN202266019U (en) | 2011-08-18 | 2011-08-18 | Combined structure of building template of building support pillar |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202266019U true CN202266019U (en) | 2012-06-06 |
Family
ID=46156817
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011203113997U Expired - Fee Related CN202266019U (en) | 2011-08-18 | 2011-08-18 | Combined structure of building template of building support pillar |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202266019U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104481140A (en) * | 2014-12-10 | 2015-04-01 | 高路恒 | Technology for mounting column formworks of steel frame systems |
CN108729657A (en) * | 2018-06-26 | 2018-11-02 | 徐晓胜 | A kind of section construction concrete steel form Fang Mo |
-
2011
- 2011-08-18 CN CN2011203113997U patent/CN202266019U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104481140A (en) * | 2014-12-10 | 2015-04-01 | 高路恒 | Technology for mounting column formworks of steel frame systems |
CN108729657A (en) * | 2018-06-26 | 2018-11-02 | 徐晓胜 | A kind of section construction concrete steel form Fang Mo |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201206328Y (en) | Preform formwork of cast-in-place concrete rib floor | |
CN106592755B (en) | A kind of more high-rise overall assembled steel house structural systems of modularization | |
CN102383590B (en) | A kind of split construction formwork combined system | |
CN103883051A (en) | Assembling type plate-beam connecting joint and construction method thereof | |
CN203499084U (en) | T-shaped longitudinal rib frame honeycomb composite floor slab | |
CN203393878U (en) | Straight-rib honeycomb reinforced concrete composite floor slab | |
CN203429848U (en) | T-shaped rib frame honeycomb composite floor slab | |
CN103590486A (en) | Anti-seismic energy saving three-dimensional mortise and tenon joint net fixing one-piece cast building structure and construction method | |
CN202299401U (en) | Assembling structure of building wall surface template | |
CN205242701U (en) | Lattice formula shaped steel concrete shear force wall by batten plate connection | |
CN110344535A (en) | A kind of prefabricated assembled combined wall board and construction method realized concealed beam and exempt from formwork | |
CN202266019U (en) | Combined structure of building template of building support pillar | |
CN201224941Y (en) | Environment protection type structure thermal insulation concrete building block, masonry and anti-vibration residential building | |
CN206090815U (en) | Prefabricated assembled tube structure public building | |
CN202658765U (en) | Keel framework concrete anti-crack filling wall | |
CN208502067U (en) | A kind of partial precast assembly prestress steel reinforced concrete hybrid beam | |
CN203429847U (en) | Square hole ribbed support prestressed concrete composite slab | |
CN202299397U (en) | Split-type building template | |
CN205444514U (en) | Bearing light insulation intergral template | |
CN103388366A (en) | Precast steel bar truss shear wall | |
CN209482588U (en) | It is a kind of can quick assembling built-in steel-case formula steel tube confined concrete column | |
CN204609046U (en) | Thin wall steel tube concrete frame-light-steel light-concrete compound shear wall | |
CN204225360U (en) | A kind of prefabricated post and the syndeton with precast beam | |
CN103526877B (en) | A kind of precast concrete | |
CN110374241B (en) | Floor bottom module, floor and method for constructing floor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120606 Termination date: 20120818 |