CN202578717U - Four-direction connection box for arch frame - Google Patents

Four-direction connection box for arch frame Download PDF

Info

Publication number
CN202578717U
CN202578717U CN 201220163370 CN201220163370U CN202578717U CN 202578717 U CN202578717 U CN 202578717U CN 201220163370 CN201220163370 CN 201220163370 CN 201220163370 U CN201220163370 U CN 201220163370U CN 202578717 U CN202578717 U CN 202578717U
Authority
CN
China
Prior art keywords
bow member
junction plate
connection plate
preliminary bracing
arch frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220163370
Other languages
Chinese (zh)
Inventor
陈长强
陈海军
荆永军
李永纯
韩冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Stock Co Ltd
Original Assignee
China Railway Tunnel Stock Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Stock Co Ltd filed Critical China Railway Tunnel Stock Co Ltd
Priority to CN 201220163370 priority Critical patent/CN202578717U/en
Application granted granted Critical
Publication of CN202578717U publication Critical patent/CN202578717U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model belongs to the technical field of tunnel construction, and provides a four-direction connection box for an arch frame. The four-direction connection box comprises two cambered plates (12) and four connection plates, wherein the four connection plates are a connection plate I (8) connected with an outer layer preliminary supporting arch frame, a connection plate II (9) connected with a temporary steel support and a connection plate III (10) and a connection plate IV (11) which are connected with an inner layer preliminary supporting arch frame; the connection plate I (8) and the connection plate II (9) are positioned on the inner sides and the outer sides of the two cambered plates (12); and the connection plate III (10) and the connection plate IV (11) are positioned at the upper ends and the lower ends of the two cambered plates. Under the condition that a stress system consisting of the outer layer preliminary supporting arch frame and the temporary steel support is not damaged, the inner layer preliminary supporting arch frame is built; and the four-direction connection box has the characteristics of high safety and convenience in operation.

Description

Bow member four-way connecting box
Technical field
The utility model belongs to the tunnel construction technology field, relates generally to a kind of bow member four-way connecting box.
Background technology
At present, the tunnel preliminary bracing is mostly two-layer or multilayer bow member+sprayed mortar structure is formed, and in the tunnel excavation process, is provided with temporary steel support; How to guarantee that preliminary bracing bow member and smooth connection between the temporary steel support are the key factors of safety for tunnel engineering.Traditional connected mode is to be connected with temporary steel support immediately after outer preliminary bracing bow member sets up completion; When setting up internal layer preliminary bracing bow member, earlier temporary steel support is separated with outer preliminary bracing bow member, treat again temporary steel support and internal layer preliminary bracing bow member to be linked together after internal layer preliminary bracing bow member has set up.Traditional method bring great hidden danger to safety for tunnel engineering, and efficiency of construction is lower owing to will remove temporary steel support earlier before setting up internal layer preliminary bracing bow member.
The utility model content
In order to overcome the deficiency of prior art middle arch rack connected mode, the purpose of the utility model is to propose a kind of bow member four-way connecting box.
The utility model adopts following technical scheme for accomplishing the foregoing invention task:
A kind of bow member four-way connecting box, described bow member four-way connecting box includes two arcs and four junction plates; Described four junction plates are respectively: in order to the junction plate I that is connected with outer preliminary bracing bow member, junction plate II and junction plate III, the junction plate IV in order to be connected with internal layer preliminary bracing bow member in order to be connected with temporary steel support; Described junction plate I, junction plate II are positioned at the inside and outside both sides of two arcs, and described junction plate III, junction plate IV are positioned at the two ends up and down of two arcs.
The use of described bow member four-way connecting box is: after the installation of outer preliminary bracing bow member, bow member four-way connecting box is connected one with outer preliminary bracing bow member, again bow member four-way connecting box is connected one with temporary steel support; When internal layer preliminary bracing bow member is installed, directly internal layer preliminary bracing bow member is connected with bow member four-way connecting box and get final product.
A kind of bow member four-way connecting box that the utility model proposes; Overcome the deficiency of prior art middle arch rack connected mode; Under the situation of not destroying outer preliminary bracing bow member and the formed stress system of temporary steel support; Carry out setting up of internal layer preliminary bracing bow member, have security performance height, convenience operation.
Description of drawings
Fig. 1 is the user mode figure of the utility model.
Among the figure: 1, outer preliminary bracing bow member, 2, temporary steel support, 3, bow member four-way connecting box; 4, internal layer preliminary bracing bow member, 5, outer preliminary bracing bow member junction plate, 6, internal layer preliminary bracing bow member junction plate; 7, temporary steel support junction plate, 8, the junction plate I, 9, the junction plate II; 10, junction plate III, 11, the junction plate IV, 12, arc.
The specific embodiment
In conjunction with accompanying drawing and specific embodiment the utility model is explained;
As shown in Figure 1, a kind of bow member four-way connecting box, described bow member four-way connecting box is arranged between outer preliminary bracing bow member 1 and the temporary steel support 2; Include two arcs 12 and four junction plates; Described four junction plates are respectively: in order to the junction plate I 8 that is connected with outer preliminary bracing bow member 1, junction plate II 9 and junction plate III 10, the junction plate IV 11 in order to be connected with internal layer preliminary bracing bow member 4 in order to be connected with temporary steel support 2; Described junction plate I 8, junction plate II 9 are positioned at the inside and outside both sides of two arcs 12, and described junction plate III 10, junction plate IV 11 are positioned at the two ends up and down of two arcs 12.
The utility model in use; After outer preliminary bracing bow member 1 installation; Use high-strength bolt that the junction plate I 8 of bow member four-way connecting box 3 is connected one with outer preliminary bracing bow member junction plate 5, pass through high-strength bolt again the junction plate II 9 of bow member four-way connecting box 3 is connected one with temporary steel support junction plate 7; When internal layer preliminary bracing bow member 4 is installed, through high-strength bolt internal layer preliminary bracing junction plate 6 is connected with junction plate III 10, the junction plate IV 11 of bow member four-way connecting box and to get final product.Under the situation of not removing already installed temporary steel support 2, still can reach the purpose of smooth installation internal layer preliminary bracing bow member 4 like this.

Claims (1)

1. bow member four-way connecting box, it is characterized in that: described bow member four-way connecting box includes two arcs (12) and four junction plates; Described four junction plates are respectively: in order to the junction plate I (8) that is connected with outer preliminary bracing bow member (1), junction plate II (9) and junction plate III (10), the junction plate IV (11) in order to be connected with internal layer preliminary bracing bow member (4) in order to be connected with temporary steel support (2); Described junction plate I (8), junction plate II (9) are positioned at the inside and outside both sides of two arcs (12), and described junction plate III (10), junction plate IV (11) are positioned at the two ends up and down of two arcs (12).
CN 201220163370 2012-04-18 2012-04-18 Four-direction connection box for arch frame Expired - Fee Related CN202578717U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220163370 CN202578717U (en) 2012-04-18 2012-04-18 Four-direction connection box for arch frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220163370 CN202578717U (en) 2012-04-18 2012-04-18 Four-direction connection box for arch frame

Publications (1)

Publication Number Publication Date
CN202578717U true CN202578717U (en) 2012-12-05

Family

ID=47248138

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220163370 Expired - Fee Related CN202578717U (en) 2012-04-18 2012-04-18 Four-direction connection box for arch frame

Country Status (1)

Country Link
CN (1) CN202578717U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102606174A (en) * 2012-04-18 2012-07-25 中铁隧道股份有限公司 Four-direction connection box for lagging jacks

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102606174A (en) * 2012-04-18 2012-07-25 中铁隧道股份有限公司 Four-direction connection box for lagging jacks
CN102606174B (en) * 2012-04-18 2014-07-02 中铁隧道股份有限公司 Four-direction connection box for lagging jacks

Similar Documents

Publication Publication Date Title
CN103572763B (en) Large-span steel supports pattern foundation pit supporting structure Demolition Construction method
CN204139459U (en) Regeneration concrete hetermorphiscal column
CN205475854U (en) Roof beam wall composite external wall component
CN202578717U (en) Four-direction connection box for arch frame
CN202250098U (en) Pipe piece lining structure capable of providing continuous counterforce action face used for shield tunnel
CN203531483U (en) Tower body connection structure of single-pipe tower and single-pipe tower
CN204024041U (en) The double-deck shear wall formwork erecting structure of deformation joint
CN206457955U (en) A kind of oblique close rib composite wall board structure
CN202866084U (en) Concrete composite floor slab with truss provided with floor support
CN204434123U (en) Tower body in tower crane resistance to deformation
CN204152527U (en) The combined type preliminary bracing system of wall multiple-arch tunnel in implicit expression
CN202672484U (en) Steel pipe single-post structure
CN204370571U (en) A kind of floor plates constructing structure for building
CN102606174B (en) Four-direction connection box for lagging jacks
CN204238443U (en) A kind of detachable suspension column fastening devices
CN201507061U (en) Pre-fabricated panel for anti-shock
CN204139577U (en) Embedment means formula wall-connecting piece after a kind of
CN203593526U (en) Movable type hoisting device
CN202440851U (en) Structure for supporting construction elevator foundation on basement top plate
CN202031596U (en) Connection structure of wear-resistant plate in tunneller transportation system
CN203452056U (en) Diversion tunnel gate lifting device
CN201924941U (en) Hoisting device for reinforced concrete pipe segment
CN205189390U (en) H shaped steel post operation platform
CN204238830U (en) A kind of gate, assembly type building site
CN204676863U (en) elevator shaft operating platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121205

Termination date: 20170418

CF01 Termination of patent right due to non-payment of annual fee