CN202544489U - Construction site greening ecological enclosing wall - Google Patents
Construction site greening ecological enclosing wall Download PDFInfo
- Publication number
- CN202544489U CN202544489U CN 201220169447 CN201220169447U CN202544489U CN 202544489 U CN202544489 U CN 202544489U CN 201220169447 CN201220169447 CN 201220169447 CN 201220169447 U CN201220169447 U CN 201220169447U CN 202544489 U CN202544489 U CN 202544489U
- Authority
- CN
- China
- Prior art keywords
- enclosure wall
- building site
- steel sheet
- wall
- purlin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Fencing (AREA)
Abstract
The utility model discloses a construction site greening ecological enclosing wall which comprises at least two H type steel sheet piles. The upper-middle portions of the H type steel sheet piles form vertical columns of the enclosing wall, steel circumference purlins are arranged between adjacent vertical columns, planters are arranged on angle steel circumference purlins, the upper ends of the vertical columns are provided with tip circumference purlins, and the surface of one side of the enclosing wall is provided with a blocking plate. The construction site greening ecological enclosing wall has the advantages of bettering ecological environment, shortening the construction period, improving the working efficiency and being simple in construction method, easy to operate and convenient to construct.
Description
Technical field
The utility model relates to the building structure technology field, especially relates to a kind of building site afforestation ecological enclosure wall.
Background technology
The civilization mark turns an important indicator for the job site into, more and more receives the attention of unit in charge of construction and supervision department.The building site was normally not only dirty but also random in people's impression.Along with the continuous standard of building trade, the requirement of building site " scenery externalization " improves constantly.The building enclosing not only is confined to the space and cuts off as building site and townie separator bar, also should contribute for city trees and shrubsization.Therefore, press at present and a kind ofly can play the green ecological enclosure wall that the enclosing effect can be beautified the environment again.
Chinese patent mandate publication number: CN102287072A; Authorize open day on December 21st, 2011; A kind of combined type enclosure wall is disclosed; Comprise two rhizosphere wall columns, be located at two cross band plates between the two rhizosphere wall columns, be located at the curtain wall penel of two plurality of parallel between the cross band plate, snapping each other between the said adjacent curtain wall penel.The enclosure wall of this invention has quick detachable, is prone to the characteristics of carrying.Weak point is to play the greening effect.
Chinese patent mandate publication number: CN101906900A; Authorize open day on December 8th, 2010; A kind of fence structure is disclosed; It builds glue or two cylinders of connector connection by on central post, using, the long cube that cylinder is made up of polyphenyl plate, reinforcing mat, adhesive linkage or float coat, and the height of cylinder is a little more than the height of wallboard; One side of cylinder is the plane, and opposite side is provided with two convexities, and the centre of two convexities is provided with depression; One side of wallboard is inserted in the groove after two cylinders merge, and the opposite side of wallboard inserts in the groove after two other cylinder merges, and the top of cylinder connects cap and constitutes.This invention has reusable, practices thrift cost, the characteristics of easy construction.Weak point is to play the greening effect.
Summary of the invention
The utility model is in order to overcome the deficiency that enclosure wall of the prior art can not play the greening effect, a kind of building site afforestation ecological enclosure wall to be provided.
The building site afforestation ecological enclosure wall that use a kind of job site, this enclosure wall adopts assembled structure, can reach repeated use and reduce the purpose of constructing the enclosure wall required time, has practiced thrift social resources, has improved operating efficiency.
To achieve these goals, the utility model adopts following technical scheme:
A kind of building site afforestation ecological enclosure wall comprises at least two H shaped steel sheet piles, and the middle and upper part of H shaped steel sheet pile constitutes the column of enclosure wall; Be provided with angle steel between the adjacent upright posts and enclose purlin, angle steel encloses purlin and is provided with colored groove, and the column upper end is provided with the top and encloses purlin.
The utility model is a kind of quick detachable, building site greening enclosure wall of being prone to carrying that can use in the building site, and different with common enclosure wall is, can plant plant on the enclosure wall, and plant can be beautified the environment, and reduces noise.Make green enclosure wall become a beautiful scenery in city.
Consider that the building site need solidly be gone along with sb. to guard him reliably and the requirement of enhancement of environment, the afforestation ecological enclosure wall adopts the steel work framing, and setting up cultivation has the colored groove of plant to fill, and is configured to solid reliable greening and environmental protection enclosure wall.
H shaped steel sheet pile lower end is squeezed in the soil, and the middle and upper part of H shaped steel sheet pile is as the column of enclosure wall.Angle steel encloses purlin and constitutes the carriage of laying colored groove.The flower groove can adopt colored groove or other finished product flower groove of concreting, and the flower rooved face is imitated woodworking and handled, and can reach better appearance.
Adopt to insert and make a call to 250 * 250H shaped steel sheet pile framing, 3.6 meters to 4.3 meters of steel sheet pile overall heights, steel sheet pile thickness 10mm.Wherein, squeeze into that foundation pile length is 1.8 meters in the soil, 1.8 meters-2.5 meters on top is as column.Foundation pile and column can adopt the complete H shaped steel of integral type, adopt the connector segmentation to connect then.
As preferably, the surface of said enclosure wall one side is provided with baffle plate.Baffle plate has improved the enclosing buffer action of enclosure wall, and to plant stable growing environment is provided.Baffle plate can be located at enclosure wall on the metope of building site one side.
As preferably, the surface of said enclosure wall one side is provided with the rhombus bamboo fence.The rhombus bamboo fence both can be used as the sealing enclosing, can be used as the support of climbing up by holding on to of plant growing again.The rhombus bamboo fence can be located on the metope of the outside side in building site.
As preferably, said colored groove is a rectangle, and the height of the cell wall of flower groove one side is lower than the height of other cell wall.Highly low cell wall is positioned at towards sunlight one side, is convenient to the irradiation that plant is accepted more sunlight.
As preferably, said colored trench bottom is provided with drain hole.Drain hole is used to get rid of redundant moisture.
As preferably, angle steel encloses purlin and is made up of two angle steel between adjacent upright posts.
As preferably, the top is enclosed purlin and is the channel-section steel that Open Side Down.
The job practices of building site afforestation ecological enclosure wall comprises the steps:
(1) axis location in stake position is inserted and is broken H shaped steel sheet pile, the wall of between the column more than the ground, laying bricks;
(2) angle steel is installed and is enclosed purlin, the top is installed encloses purlin, baffle plate is installed;
(3) lay colored groove, greening construction is installed bamboo fence.
Said step (1) can be replaced by following step:
Carry out axis location, stake position, in soil, imbed basic built-in fitting, H shaped steel sheet pile is fixed on the basic built-in fitting wall of between the column more than the ground, laying bricks.The basis built-in fitting is the concrete foundation built-in fitting.
Therefore, the utlity model has following beneficial effect:
(1) adopts the green plants wall surface construction, not only played the effect of enclosing, and can contribute, reduce noise, improve the ecological environment for afforestation of city;
(2) plant growing is in the flower groove, and the flower groove can separate and make up with wall frame, reaches reusable purpose, can reduce the waste of resource;
(3) employed material is a material common on the building site, like H shaped steel, angle steel etc., draws materials conveniently, and cost is low; But adopt reusable fabricated structure to construct the reduction of erection time, increase work efficiency;
(4) spend groove to install from bottom to top, remove and then carry out from top to bottom, flower groove good stability;
(5) building worker method is simple, easy to operate, easy construction.
Description of drawings
Fig. 1 is a kind of structural representation of the utility model;
Fig. 2 is the another kind of structural representation of the utility model;
Fig. 3 is a kind of structural representation that the angle steel of the utility model encloses purlin;
Fig. 4 is a kind of structural representation of the colored groove of the utility model.
Among the figure: H shaped steel sheet pile 1, angle steel enclose purlin 2, spend groove 3, top to enclose purlin 4, rhombus bamboo fence 5, brick wall 6, basic built-in fitting 7, drain hole 8.
The specific embodiment
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is done further description.
Embodiment as shown in Figure 1 is a kind of building site afforestation ecological enclosure wall, comprises two H shaped steel sheet piles 1, and the middle and upper part of H shaped steel sheet pile constitutes the column of enclosure wall; Be provided with angle steel between the adjacent upright posts and enclose purlin 2, angle steel encloses purlin and is provided with colored groove 3, and the column upper end is provided with the top and encloses purlin 4.Enclosure wall is provided with baffle plate near the surface of building site one side.Surface near enclosure wall one side outside the building site is provided with rhombus bamboo fence 5.
As shown in Figure 4, the flower groove is a rectangle, and the height of the cell wall of flower groove one side is lower than the height of other cell wall; The flower trench bottom is provided with drain hole 8.
As shown in Figure 3, angle steel encloses purlin and is made up of two angle steel between adjacent upright posts; It is the channel-section steel that Open Side Down that purlin is enclosed at the top.
Construction sequence is described below:
Steel sheet pile sets: adopt fluid pressure type steel sheet pile special-purpose machinery to insert and beat.The stake machine forearm steel sheet pile of slinging is opened a head clamping plate and is clamped pile crown, and vertical back is inserted into projected depth at the hydraulic vibration driver of design attitude through pile driver with steel sheet pile.Follow-up steel sheet pile is inserted to beat according to first steel sheet pile and is carried out, and on the corner steel sheet pile adopts aluminium-plastic panel to carry out the processing of arc bound edge.Allowable error is in the steel sheet pile construction: stake top mark high deviation ± 100 millimeters, and steel sheet pile misalignment of axe ± 100 millimeter, the steel sheet pile perpendicularity deviation is 1%; In the process of setting, whether should monitor in the allowable error scope, in time correct when exceeding.
As shown in Figure 2, construction sequence (1) can be replaced by following step:
Carry out axis location, stake position, in soil, imbed basic built-in fitting, H shaped steel sheet pile is fixed on the basic built-in fitting wall of between the column more than the ground, laying bricks.
The basis built-in fitting.As shown in Figure 2, C15 concreting is adopted on ± 0.00 following enclosure wall basis, wide 200 millimeters high 300 millimeters, H shaped steel sheet pile lower end is fixedly connected to form column through stone bolt and C15 concrete.
After finishing, the construction work in building site promptly carries out pulling out of steel sheet pile.After will laterally enclosing the purlin dismounting, adopt crane to cooperate and carry out pulling out of steel sheet pile with vibrating hammer; The forced vibration disturbance soil property of promptly utilizing vibrating hammer to produce; Destroy the native cohesion of steel sheet pile on every side to overcome pile extraction resistance, rely on the effect that has added crane that stake is pulled out.The stake hole that stays after steel sheet pile is pulled out must be done backfill immediately and handled, and backfill is generally with compacting method or insert method, and material therefor is a medium sand.Perhaps will laterally enclose directly bolt is unloaded after purlin is removed promptly dismountable.
Claims (7)
1. a building site afforestation ecological enclosure wall is characterized in that, comprises at least two H shaped steel sheet piles (1), and the middle and upper part of H shaped steel sheet pile constitutes the column of enclosure wall; Be provided with angle steel between the adjacent upright posts and enclose purlin (2), angle steel encloses purlin and is provided with colored groove (3), and the column upper end is provided with the top and encloses purlin (4).
2. building site according to claim 1 afforestation ecological enclosure wall is characterized in that the surface of said enclosure wall one side is provided with baffle plate.
3. building site according to claim 1 afforestation ecological enclosure wall is characterized in that the surface of said enclosure wall one side is provided with rhombus bamboo fence (5).
4. building site according to claim 1 afforestation ecological enclosure wall is characterized in that said colored groove is a rectangle, and the height of the cell wall of flower groove one side is lower than the height of other cell wall.
5. building site according to claim 1 afforestation ecological enclosure wall is characterized in that said colored trench bottom is provided with drain hole (8).
6. according to claim 1 or 2 or 3 or 4 or 5 described building site afforestation ecological enclosure walls, it is characterized in that angle steel encloses purlin and is made up of two angle steel between adjacent upright posts.
7. according to claim 1 or 2 or 3 or 4 or 5 described building site afforestation ecological enclosure walls, it is characterized in that it is the channel-section steel that Open Side Down that purlin is enclosed at the top.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220169447 CN202544489U (en) | 2012-04-20 | 2012-04-20 | Construction site greening ecological enclosing wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220169447 CN202544489U (en) | 2012-04-20 | 2012-04-20 | Construction site greening ecological enclosing wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202544489U true CN202544489U (en) | 2012-11-21 |
Family
ID=47165141
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220169447 Expired - Fee Related CN202544489U (en) | 2012-04-20 | 2012-04-20 | Construction site greening ecological enclosing wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202544489U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102677958A (en) * | 2012-04-20 | 2012-09-19 | 浙江水利水电专科学校 | Building site greening ecological enclosing wall and construction method |
CN110656810A (en) * | 2019-09-30 | 2020-01-07 | 江苏师范大学 | Multi-functional building site rail |
-
2012
- 2012-04-20 CN CN 201220169447 patent/CN202544489U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102677958A (en) * | 2012-04-20 | 2012-09-19 | 浙江水利水电专科学校 | Building site greening ecological enclosing wall and construction method |
CN110656810A (en) * | 2019-09-30 | 2020-01-07 | 江苏师范大学 | Multi-functional building site rail |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102677958B (en) | Building site greening ecological enclosing wall and construction method | |
CN203174619U (en) | Reverse raft concrete terrace | |
CN106545111A (en) | For the prefabricated constructional column at body of wall external corner, rammed earth wall construction and its construction method | |
CN203821625U (en) | Fiber cloth-reinforced mortar-free reinforced masonry shear wall | |
CN202544489U (en) | Construction site greening ecological enclosing wall | |
CN106284653A (en) | The construction method that a kind of balcony construct capital interspaces in advance | |
CN206467828U (en) | A kind of fabricated construction insulation and decoration integrated plate wall | |
CN101469559B (en) | Composite heat insulating walling and mounting method thereof | |
CN101761187A (en) | Construction separating device for concrete of vertical structure in same wall body with different labels as well as pouring and tamping method thereof | |
CN202247938U (en) | Wedge-shaped foundation bolt preformed hole core formwork device | |
CN201649123U (en) | Assembly integrated counterfort retaining wall | |
CN206205166U (en) | It is a kind of can synchronous crossed construction outer wall of basement waterproofing protection structure | |
CN202741632U (en) | Reinforcing mesh sheet bending machine | |
CN213573164U (en) | Ancient building clear water wall body migration bottom reinforcing apparatus | |
CN108412036A (en) | Assembled H profile steel column-isolated footing-concrete collar tie beam cross connecting node | |
CN111719578B (en) | Archaized building and construction process | |
CN203530998U (en) | Precast independent foundation | |
CN211713648U (en) | Arch bridge stone arch coupon fixing structure | |
CN207348605U (en) | A kind of enclosure structure | |
CN203905045U (en) | Moving foundation of hoisting machine | |
CN203684798U (en) | Assembled safeguard handrail for constructional engineering and road engineering | |
CN202047419U (en) | Foundation bottom plate with column cap of beamless underground parking garage | |
CN206646526U (en) | Side-slope greening and protection monomer convex precast concrete | |
CN202745081U (en) | Large-size rubble concrete settlement joint template system | |
CN206090606U (en) | Integrated basis of low layer steel construction building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121121 Termination date: 20140420 |