CN202543788U - Precast segment assembly pier structure - Google Patents

Precast segment assembly pier structure Download PDF

Info

Publication number
CN202543788U
CN202543788U CN2012201745785U CN201220174578U CN202543788U CN 202543788 U CN202543788 U CN 202543788U CN 2012201745785 U CN2012201745785 U CN 2012201745785U CN 201220174578 U CN201220174578 U CN 201220174578U CN 202543788 U CN202543788 U CN 202543788U
Authority
CN
China
Prior art keywords
segment assembly
cushion cap
prestressed
precast segment
pier structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012201745785U
Other languages
Chinese (zh)
Inventor
张剑英
曾源
宋凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN2012201745785U priority Critical patent/CN202543788U/en
Application granted granted Critical
Publication of CN202543788U publication Critical patent/CN202543788U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a precast segment assembly pier structure which comprises a bearing platform, wherein a pier body is arranged on the bearing platform; and prestressed reinforcing bars are arranged on the pier body and the bearing platform. The precast segment assembly pier structure is characterized in that the pier body consists of a plurality of precast reinforced concrete segments which are mutually connected; prestressing ducts are preserved in the precast reinforced concrete segments; and the prestressed reinforcing bars are arranged in the prestressing ducts in a penetrating way. According to the precast segment assembly pier structure disclosed by the utility model, the workload of field welding and concrete casting can be effectively reduced; the quality control is facilitated; meanwhile, the construction progress is accelerated and the influence on the ambient environment of a construction site is reduced; the theme of an economic growth mode of environment friendliness, energy economization and low carbon is accorded; and remarkable economic benefits and favorable social benefits are obtained.

Description

A kind of precast segment assembly unit bridge pier structure
Technical field
The utility model relates to the civil Engineering Design technical field, specifically a kind of precast segment assembly pier structure.
Background technology
At present, the normally used Urban Bridge substructure of China is cast-in-situ construction method, and shortcoming is a long construction period, and urban environment is brought more adverse influence.Along with constantly advancing on a large scale of China's urban construction process, energy-saving and environmental protection, low-carbon (LC) become the theme of China's economic development gradually.
One of main challenge that the design of current urban bridge structural faces be exactly the owner with the resident except require bridge structure safe and durable, also require to reduce interference, shorten the traffic jam time, reduce the various noises of generation in haulage vehicle and the construction etc. to traffic on every side through rapid construction.The proposition of these requirements has promoted carrying out of precast segment assembly unit bridge technology research work, has also promoted popularization and the application of industrialized precast segment assembling construction technology in Urban Bridge is built.
Because section assembling correlation technique research and to be applied in China less relatively, existing application and study and mainly concentrate on superstructure, the utilization of part Urban Bridge prefabricated subsection assembling technique also only is confined to the external prestressing continuous box girder.
For substructure, domestic and international research work day by day increases in recent years, but the domestic engineering precedent of still not having successful implementation.Only several bottoms adopt the engineering of prefabrication system to be the large-scale Jiang Qiaoliang of striding over strait, adopt cast-in-place wet seam connection etc. like the marine section of Donghai Bridge bridge pier pier shaft, are not the precast segment erection method bridge pier on the complete meaning.
The utility model content
The purpose of the utility model is to provide a kind of precast segment assembly unit bridge pier structure, guarantees the safety of structure.
For realizing this purpose; The technical scheme of the utility model is following: a kind of precast segment assembly unit bridge pier structure, comprise cushion cap, and cushion cap is provided with pier shaft; Said pier shaft and cushion cap are provided with prestressed reinforcement; It is characterized in that this pier shaft is made up of a plurality of interconnective prefabricated reinforced concrete sections, reserve prestressed pore passage in the prefabricated reinforced concrete sections, prestressed reinforcement is arranged in the prestressed pore passage.Two contiguous prefabricated steel concrete sections seam are provided with shear connector.Reserve prestressed pore passage in the cushion cap.Prestressed reinforcement adopts steel strand or fining twisted steel; Prestressed pore passage adopts prestress wire bellows or prestressed thick reinforcement sleeve pipe or withdrawing pipe.
The structure that can be used for precast segment assembly unit bridge pier in the utility model is fully at the precasting yard processing and fabricating; Field by using glueds joint seam or stem grafting seam form connects; Assembly unit finishes and carries out prestressed stretch-draw formation pier stud overall structure; At utmost reduced on-site concrete and built workload, reduced influence traffic and surrounding enviroment.The prestressed reinforcement that the utility model adopts connects the bridge pier sections, can comprise various bridge pier form of fractures.
Description of drawings
Fig. 1 is that the pillarwork of the utility model is formed sketch map (anchored end is in the cushion cap outside).
Fig. 2 is that the pillarwork of the utility model is formed sketch map (anchored end is inner at cushion cap).
Fig. 3 is that the prefabricated reinforced concrete sections seam section of the utility model is arranged sketch map.
The specific embodiment
A kind of precast segment assembly unit bridge pier structure comprises cushion cap 2, and cushion cap 2 is provided with pier shaft, and said pier shaft and cushion cap 2 are provided with prestressed reinforcement 3, it is characterized in that this pier shaft is made up of a plurality of interconnective prefabricated subsections 1, reserves prestress pipe 6 in the prefabricated subsection 1.The shear connector 5 that adopts male and fomale(M&F) to agree with between two contiguous prefabricated sections 1 seam 4,1 of the prefabricated subsection that cushion cap is adjacent also adopts shear connector 5.Cushion cap adopts cast-in-place mode to build, and reserves prestressed pore passage.Adopt between the contiguous prefabricated sections and glued joint seam or stem grafting seam, connect into integral body through prestressed reinforcement.According to a particular embodiment of the invention, precast pier sections 1 adopts ordinary reinforced concrete, reserves prestressed pore passage 6, and the pier stud profile comprises multiple shapes such as rectangle, square, circle, dumb-bell shape.Topmost the top of a sections is provided with prestressed anchor fixed end 7; The anchored end 8 of bottom can be in the cushion cap outside, also can be inner at cushion cap.The prestressed reinforcement material can be steel strand, also can be fining twisted steel; Presstressed reinforcing steel can be whole and wear, and also can be that segmentation connects with connector; Mud jacking after prestressed reinforcement stretch-draw finishes, the prestressing force road that sealing is reserved.
With the single-column pier about the high 10m of pier is example, vertically precast segment assembly unit pier shaft is divided into 2~3 sections, amounts to 1~2 seam.The sections height is relevant with the plant equipment ability of construction and installation, and the internal diameter of prestressed pore passage is generally 5cm~15cm, and shear connector adopts trapezoidal (30 °~60 ° at inclination angle) or fillet trapezoid cross section, and the shear connector size is 20%~45% of a bridge pier section area.
Fig. 1 is the structural representation of the pillarwork of the utility model embodiment.Wherein Fig. 1 a is an elevation, and Fig. 1 b is the lateral view of Fig. 1 a.The cushion cap 2 inner prestressed pore passages 6 of reserving, stagger on the locus each other in the duct; Cushion cap 2 is provided with prefabricated subsection pier shaft 1, is provided with prestress pipe 6 in the prefabricated subsection pier shaft 1; The sections seam adopts glueds joint seam or stem grafting seam; For the shear behavior of seam 4, the shear connector that adopts male and fomale(M&F) to agree with on the seam.
Fig. 2 is the structural representation of the pillarwork of another embodiment of the utility model.Wherein Fig. 2 a is an elevation, and Fig. 2 b is the lateral view of Fig. 2 a.In this embodiment, because anchored end is inner at cushion cap, therefore when cast-in-place cushion cap, reserve prestressed pore passage and reinforcing bar.
The pier shaft sections is made in precast yard, reserves prestressed pore passage.The cast-in-site cushion cap.Treat that the cushion cap concrete reaches after the load age, prefabricated pier shaft sections is installed in handling, adopts between sections and glueds joint seam or the connection of stem grafting seam.After accomplishing, assembly unit forms bridge abutment integral through tensioned prestressing bar.Prestressed pore passage can adopt bellows or circular sleeve or withdrawing pipe etc. to form the duct.
A kind of job practices of precast segment assembly unit bridge pier structure is characterized in that this method may further comprise the steps: A, making prefabricated reinforced concrete sections, reserve prestressed pore passage in the said prefabricated subsection; B, carry out bearing platform construction at the scene, reserve prestressed pore passage in the cushion cap; C, multistage prefabricated reinforced concrete sections is spliced on the cushion cap successively, keeps seam closely connected; D, in prefabricated subsection and cushion cap, wear prestressed reinforcement in the prestressed pore passage, prestressed reinforcement of tensioning then, and slip casting sealing in the said prestress pipe, sealing off and covering anchorage is also built bearing pad stone, accomplishes the construction of bridge pier.
The utility model has following technical characterstic: effectively reduce the workload of field Welding and concreting, be of value to quality control, accelerated construction speed simultaneously; Reduced influence, met the style of economic increase theme of environmental protection and energy saving low-carbon (LC), remarkable in economical benefits the job site surrounding enviroment; Social benefit is good; And the shear connector that seam adopts male and fomale(M&F) to agree with has strengthened the shear behavior of seam, easy construction.

Claims (5)

1. precast segment assembly unit bridge pier structure; Comprise cushion cap; Cushion cap is provided with pier shaft, and said pier shaft and cushion cap are provided with prestressed reinforcement, it is characterized in that this pier shaft is made up of a plurality of interconnective prefabricated reinforced concrete sections; Pre-buried prestressed pore passage in the prefabricated reinforced concrete sections, prestressed reinforcement is arranged in the prestressed pore passage.
2. by the described a kind of precast segment assembly unit bridge pier structure of claim 1, it is characterized in that: between two contiguous prefabricated steel concrete sections seam shear connector is set, between the prefabricated reinforced concrete sections that cushion cap is adjacent shear connector is set also.
3. by the described a kind of precast segment assembly unit bridge pier structure of claim 1, it is characterized in that: cushion cap is reserved with prestressed pore passage.
4. by the described a kind of precast segment assembly unit bridge pier structure of claim 3, it is characterized in that: the bridge pier top is provided with anchored end, and the cushion cap outside or cushion cap inside are provided with anchored end, and the two ends of prestressed reinforcement are connected with anchored end.
5. by the described a kind of precast segment assembly unit bridge pier structure of claim 3, it is characterized in that: prestressed reinforcement adopts steel strand or fining twisted steel; Prestressed pore passage adopts prestress wire bellows or prestressed thick reinforcement sleeve pipe or withdrawing pipe.
CN2012201745785U 2012-04-24 2012-04-24 Precast segment assembly pier structure Expired - Fee Related CN202543788U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201745785U CN202543788U (en) 2012-04-24 2012-04-24 Precast segment assembly pier structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201745785U CN202543788U (en) 2012-04-24 2012-04-24 Precast segment assembly pier structure

Publications (1)

Publication Number Publication Date
CN202543788U true CN202543788U (en) 2012-11-21

Family

ID=47164442

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201745785U Expired - Fee Related CN202543788U (en) 2012-04-24 2012-04-24 Precast segment assembly pier structure

Country Status (1)

Country Link
CN (1) CN202543788U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612038A (en) * 2015-01-22 2015-05-13 宁波大学 Flange-connecting concrete-filled double-wall steel pipe prefabricated assembly piers with additional dampers
CN104612039A (en) * 2015-02-04 2015-05-13 邢台路桥建设总公司 Assembled steel integrated bridge
CN105970803A (en) * 2016-06-03 2016-09-28 南京工业大学 Shearing resisting energy consumption device and construction method of prefabricated pier
CN108978447A (en) * 2018-06-29 2018-12-11 南京理工大学 The method for improving Precast Concrete Segmental Bridges bridge pier energy dissipation capacity
CN108978714A (en) * 2018-08-30 2018-12-11 北京工业大学 One kind being used for the prefabricated staggered joint erection segment separated column of underground structure
CN112853933A (en) * 2021-02-24 2021-05-28 江南大学 Segment prefabricated assembled concrete-filled steel tube pier with restorable function
CN113373798A (en) * 2021-05-14 2021-09-10 同济大学 Prefabricated assembled pier and connecting method thereof

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612038A (en) * 2015-01-22 2015-05-13 宁波大学 Flange-connecting concrete-filled double-wall steel pipe prefabricated assembly piers with additional dampers
CN104612039A (en) * 2015-02-04 2015-05-13 邢台路桥建设总公司 Assembled steel integrated bridge
CN104612039B (en) * 2015-02-04 2016-07-06 邢台路桥建设总公司 Assembled steel one bridge
CN105970803A (en) * 2016-06-03 2016-09-28 南京工业大学 Shearing resisting energy consumption device and construction method of prefabricated pier
CN108978447A (en) * 2018-06-29 2018-12-11 南京理工大学 The method for improving Precast Concrete Segmental Bridges bridge pier energy dissipation capacity
CN108978714A (en) * 2018-08-30 2018-12-11 北京工业大学 One kind being used for the prefabricated staggered joint erection segment separated column of underground structure
CN108978714B (en) * 2018-08-30 2021-05-14 北京工业大学 Be used for prefabricated fissure of displacement of underground structure to assemble segment components of a whole that can function independently post
CN112853933A (en) * 2021-02-24 2021-05-28 江南大学 Segment prefabricated assembled concrete-filled steel tube pier with restorable function
CN113373798A (en) * 2021-05-14 2021-09-10 同济大学 Prefabricated assembled pier and connecting method thereof
CN113373798B (en) * 2021-05-14 2022-09-20 同济大学 Prefabricated assembled pier and connecting method thereof

Similar Documents

Publication Publication Date Title
CN103374881A (en) Prefabricated segment assembling pier structure system and construction method thereof
CN202543788U (en) Precast segment assembly pier structure
CN104929034B (en) A kind of modularization steel reinforced concrete rapid construction small box girder bridge and its construction method
CN103924505B (en) Use prefabricated steel-concrete combination T beam and the construction method of Wavelike steel webplate
CN103938546B (en) Simply supported non-uniform construction method
CN101831875A (en) Precast assembly process of prestressed concrete cylindrical hollow pier
CN207194146U (en) Prestressing force assembly concrete frame joint attachment structure
CN204185755U (en) A kind of Wavelike steel webplate post-stressed concrete T beam
CN108867310A (en) The short rib T beam bridge of pretensioning prestressed concrete and its construction method
CN104294753A (en) Bridge prefabricated hollow pier stud connecting structure and construction method thereof
CN104947588B (en) Concrete filled steel tube-combination beam Cable-stayed Bridges system and construction method thereof
CN101215819A (en) Separated double-layer bridge-floor cable stayed bridge
CN102767186A (en) Foundation pit containment structure with prestress ribs on vertical soil-retaining structure and construction method
CN103711067A (en) Transversely assembled corrugated steel web combined box girder with small number of supports and construction method thereof
CN201317908Y (en) Double deck cable stayed bridge of separation type
CN113005926A (en) Construction method of mountain area abrupt slope pier reinforcing device
CN214459538U (en) Solid-web arch bridge system assembled by UHPC prefabricated corrugated plate segments
CN107142830B (en) Steel pipe web prestress steel-concrete combined girder structure and construction method
CN204174527U (en) The hollow pier stud syndeton of a kind of bridge prefabrication
CN110820519A (en) Tunnel arch bridge convenient for rapid construction and construction method thereof
CN103669193B (en) A kind of laterally assembled Wavelike steel webplate combination T beam and construction method
CN114197511B (en) Assembly type steel reinforced concrete light foundation and assembly method thereof
CN202830732U (en) Mixing-type cable- rope bearing bridge
CN203795293U (en) Transverse-assembly corrugated steel web combination box beam with few supports
CN206189743U (en) One shot forming's multispan is beam manufacturing in advance

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121121

Termination date: 20210424

CF01 Termination of patent right due to non-payment of annual fee