CN202543348U - Conveying device for aluminum electrolytic raw material - Google Patents

Conveying device for aluminum electrolytic raw material Download PDF

Info

Publication number
CN202543348U
CN202543348U CN2012200351485U CN201220035148U CN202543348U CN 202543348 U CN202543348 U CN 202543348U CN 2012200351485 U CN2012200351485 U CN 2012200351485U CN 201220035148 U CN201220035148 U CN 201220035148U CN 202543348 U CN202543348 U CN 202543348U
Authority
CN
China
Prior art keywords
raw material
thermal source
electrolysis
chute
source pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200351485U
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Xin hair Huayuan Aluminum Co., Ltd.
Original Assignee
Hunan Shengtong Technology Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Shengtong Technology Group Co Ltd filed Critical Hunan Shengtong Technology Group Co Ltd
Priority to CN2012200351485U priority Critical patent/CN202543348U/en
Application granted granted Critical
Publication of CN202543348U publication Critical patent/CN202543348U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electrolytic Production Of Metals (AREA)

Abstract

The utility model discloses a conveying device for aluminum electrolytic raw material. The conveying device comprises a chute; openings are respectively arranged at two ends of the chute; a hot source pipeline is communicated between the openings of the two ends; the hot source pipeline is arranged in the chute; and the hot source pipeline is communicated with outside. The conveying device for the aluminum electrolytic raw material provided by the utility model can be used for improving the temperature of the aluminum electrolytic raw material, enhancing the stability an electrolytic bath, and reducing energy consumption of the aluminum electrolyzing.

Description

A kind of e Foerderanlage of electrolysis of aluminum raw material
Technical field
The utility model relates to the aluminum electrolysis device, is specifically related to a kind of e Foerderanlage of electrolysis of aluminum raw material.
Background technology
Aluminium cell is the main equipment of aluminium metallurgy, since spontaneous clear sodium aluminum fluoride-alumina molten salt electrolysis method, has continued more than 100 year.The production technology of electrolysis of aluminum has also had great progress, by the small test groove to soderberg cell, till now large pre-baked cell again.But in each stage of the development of electrolyzer, the raw material of producing aluminium all is an aluminum oxide, in order to keep the normal operation of aluminium cell, also must add molecular ratio that fluoride salt regulates aluminium cell to keep the normal operation of electrolysis of aluminum material balance and electrolyzer.
In the pre-calcining electrolytic cell production process, the electrolysis temperature normal temps of electrolysis of aluminum is at 920~960 ℃, and the aluminum oxide and the temperature of ALUMNIUM FLUORIDE raw material that join in the electrolyzer are about about 45 ℃; After in electrolyzer, adding aluminum oxide and ALUMNIUM FLUORIDE, raw material is heated earlier, is dissolved into then in the ionogen; This process can absorb great amount of heat; Thereby reduce the local temperature of electrolyzer, cause the aluminium cell local temperature differential excessive, reduce the stability of electrolyzer.Through Theoretical Calculation, can draw when 2 ℃ of aluminum oxide and the every risings of ALUMNIUM FLUORIDE, the ton aluminium power consumption of aluminum electrolysis reduces by 1 and spends.
The utility model content
The purpose of the utility model is to overcome above shortcoming, and a kind of temperature that can improve the electrolysis of aluminum raw material is provided, and strengthens the stability of electrolyzer, reduces the e Foerderanlage of the electrolysis of aluminum raw material of electrolysis of aluminum energy consumption.
The technical scheme of the utility model is:
A kind of e Foerderanlage of electrolysis of aluminum raw material comprises chute, and the two ends of said chute are respectively arranged with opening, is communicated with the thermal source pipeline between the said openings at two ends, and said thermal source pipeline is arranged in the chute, and said thermal source pipeline is communicated with extraneous thermal source.
Preferably, said thermal source pipeline and electrolysis flue gas pipe connection.
Further, the heading of the interior electrolytic aluminum raw material of the flow direction of flue gas and chute is opposite in the said thermal source pipeline.
Preferably, be provided with wire spiral in the said thermal source pipeline.
Preferably, the xsect of said thermal source pipeline is rectangle or circular or Polygons.
Further, the cross-sectional area of said thermal source pipeline is 25-60cm2.
Preferably, the outside surface of said chute is provided with thermal insulating warm-keeping layer.
The e Foerderanlage of the electrolysis of aluminum raw material that the utility model provides has following characteristics:
1, improves the temperature of electrolysis of aluminum raw material, strengthen the stability of electrolyzer.The electrolysis of aluminum raw material gets into electrolyzer through chute, is furnished with the thermal source pipeline in the chute, and the thermal source pipeline is communicated with extraneous thermal source; Make the electrolysis of aluminum raw material before getting into electrolyzer, receive the external heat source heating; Material temperature raises, and behind the entering electrolyzer, caloric receptivity is few; Local temperature difference reduces in the electrolyzer, and the operation of electrolyzer is more stable.
2, electrolysis of aluminum energy consumption reduces.Raw material in the chute is through the mode of external heat source heating, and after raw material got into electrolyzer, the amplitude that electrolyzer temperature reduces was little, and the power consumption of electrolysis of aluminum reduces.External heat source adopts the flue gas that produces in the electrolytic process, and flue-gas temperature is about 150 °, and energy is fully utilized, and has practiced thrift the energy.
Description of drawings
In order to be illustrated more clearly in the utility model embodiment; To do to introduce simply to the accompanying drawing of required use among the embodiment below; Obviously, the accompanying drawing in describing below only is some embodiment of the utility model, for those of ordinary skills; Under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the structural representation of the utility model raw material conveying device;
Reference numeral: 1-chute, 2-raw material, 3-thermal source pipeline.
Embodiment
To combine the accompanying drawing among the utility model embodiment below, the technical scheme among the utility model embodiment is carried out clear, intactly description, obviously, described embodiment only is a part of embodiment of the utility model, rather than whole embodiment.Based on the embodiment of the utility model, those of ordinary skills are not making the every other embodiment that is obtained under the creative work prerequisite, all belong to the scope of the utility model protection.
Embodiment is following:
The e Foerderanlage of electrolysis of aluminum raw material comprises chute 1, and the two ends of chute 1 are respectively arranged with opening, and is communicated with thermal source pipeline 3 between the openings at two ends, and thermal source pipeline 3 is arranged in the chute 1, and the thermal source pipeline is communicated with extraneous thermal source.
The electrolysis of aluminum raw material comprises aluminum oxide and ALUMNIUM FLUORIDE, behind chute, gets in the electrolyzer, and the two ends of chute are provided with opening, and the part of thermal source pipeline 3 heating raws is distributed in the chute, and the contact area of raw material and heat is big, and heats is good.
Preferably, thermal source pipeline 3 and electrolysis flue gas pipe connection, the flue-gas temperature that produces in the electrolytic process is utilized the fume afterheat heating raw, energy efficient about 150 °.
Preferably, the flow direction of the flow direction of flue gas and chute 1 interior electrolytic aluminum raw material 2 is opposite in the thermal source pipeline 3, and heat exchange method is convection current, and heat transfer efficiencies is high.
Also can be provided with wire spiral in the thermal source pipeline 3, the type of heating of raw material adopts electrically heated, and the raw material heat-up rate is fast, and heating efficiency is high.
The xsect of thermal source pipeline 3 can be rectangle or circular or Polygons, and thermal source pipeline 3 can contain folding shape in chute, and folding shape structure increases the contact area of raw material and thermal source pipeline, and heats is good.
Preferably, the cross-sectional area of said thermal source pipeline is 25-60cm 2, the size adjustment according to chute when satisfying raw material unit time blanking amount, makes the heat transmission big as far as possible.
Preferably, the outside surface of chute 1 is provided with thermal insulating warm-keeping layer, and thermal insulating warm-keeping layer can adopt thermal insulation paint or heat-insulating material to realize, reduces scattering and disappearing of the interior raw material heat of chute, improves heating efficiency.
Also can be employed in the outer setting thermal source pipeline of chute to the heating of raw material in the chute, the thermal source pipeline surrounds or part is surrounded chute is complete.
The feed bin of raw material equally also can be provided with the thermal source pipeline, and the mounting means of thermal source pipeline is similar with the mounting means in chute, makes raw material that the process of intensification, insulation all arranged in whole transportation process, has a narrow range of temperature in the electrolyzer, and electrolyzer is more stable.

Claims (7)

1. the e Foerderanlage of an electrolysis of aluminum raw material comprises chute, it is characterized in that; The two ends of said chute are respectively arranged with opening; Be communicated with the thermal source pipeline between the said openings at two ends, said thermal source pipeline is arranged in the chute, and said thermal source pipeline is communicated with extraneous thermal source.
2. the e Foerderanlage of electrolysis of aluminum raw material according to claim 1 is characterized in that, said thermal source pipeline and electrolysis flue gas pipe connection.
3. the e Foerderanlage of electrolysis of aluminum raw material according to claim 2 is characterized in that, the heading of the interior electrolytic aluminum raw material of the flow direction of flue gas and chute is opposite in the said thermal source pipeline.
4. the e Foerderanlage of electrolysis of aluminum raw material according to claim 1 is characterized in that, is provided with wire spiral in the said thermal source pipeline.
5. the e Foerderanlage of electrolysis of aluminum raw material according to claim 1 is characterized in that, the xsect of said thermal source pipeline is rectangle or circular or Polygons.
6. the e Foerderanlage of electrolysis of aluminum raw material according to claim 5 is characterized in that, the cross-sectional area of said thermal source pipeline is 25-60cm 2
7. according to the e Foerderanlage of each described electrolysis of aluminum raw material in the claim 1 to 6, it is characterized in that the outside surface of said chute is provided with thermal insulating warm-keeping layer.
CN2012200351485U 2012-02-03 2012-02-03 Conveying device for aluminum electrolytic raw material Expired - Fee Related CN202543348U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200351485U CN202543348U (en) 2012-02-03 2012-02-03 Conveying device for aluminum electrolytic raw material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200351485U CN202543348U (en) 2012-02-03 2012-02-03 Conveying device for aluminum electrolytic raw material

Publications (1)

Publication Number Publication Date
CN202543348U true CN202543348U (en) 2012-11-21

Family

ID=47164012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200351485U Expired - Fee Related CN202543348U (en) 2012-02-03 2012-02-03 Conveying device for aluminum electrolytic raw material

Country Status (1)

Country Link
CN (1) CN202543348U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110894614A (en) * 2018-09-13 2020-03-20 沈阳铝镁设计研究院有限公司 Device for preheating and conveying aluminum oxide by forced ventilation of electrolytic cell

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110894614A (en) * 2018-09-13 2020-03-20 沈阳铝镁设计研究院有限公司 Device for preheating and conveying aluminum oxide by forced ventilation of electrolytic cell

Similar Documents

Publication Publication Date Title
CN104630827B (en) Cathode aluminum bar for electrolytic aluminum
CN102134727B (en) Method for recycling waste heat of electrolytic cell and device thereof
CN202543348U (en) Conveying device for aluminum electrolytic raw material
CN201593925U (en) Device for cooling sintering furnace of solar battery
CN202849557U (en) Electrolytic aluminium anode preheating device
CN202543391U (en) Polysilicon ingot furnace
CN207192798U (en) A kind of graphitizing furnace fast cooling structure
CN203582982U (en) Forced heat transfer type aluminum electrolytic tank
CN102889695A (en) Large-sized solar flat plate collector
CN204897409U (en) Production lithium cell anode material's acheson box for graphitizing furnace
CN202153061U (en) Large-sized solar flat plate collector
CN201706896U (en) Fast cooling and waste heat utilization device for sintered brick kiln
CN202549905U (en) Crystalline silicon solar cell sintering device
CN205873910U (en) Interior string of graphitizing furnace device
CN203974594U (en) A kind of magnetic suspension composite conducting rail
CN202024638U (en) Heat pipe heat exchanger
CN207849785U (en) A kind of double thermal-medium boilers
CN203116347U (en) Transverse coil heat exchange water tank
CN202968664U (en) Insulating and heating system for producing high-purity zinc powder by using hot galvanizing slag
CN203464746U (en) Water-cooled cooling conductive system of corundum smelting furnace
CN202014386U (en) Sample heating pipe
CN202805916U (en) Heating plate of thermal transfer printing electrochemical aluminum device
CN203224129U (en) Heating unit of sintering area of solar cell sintering furnace
CN208804747U (en) A kind of solar energy phase transition heat accumulation heating plant
CN102140012A (en) Float glass forming cooling water packet

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhang Cunzhong

Inventor before: The inventor has waived the right to be mentioned

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20171221

Address after: 252100 Xin Fa Hope Industrial Park, Chiping County, Liaocheng City, Shandong

Patentee after: Shandong Xin hair Huayuan Aluminum Co., Ltd.

Address before: Sheng Tong Industrial Park No. 109 Venus Road 410200 in Hunan province Changsha District of Wangcheng City

Patentee before: Hunan Shengtong Technology Group Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121121

Termination date: 20180203