CN202530772U - Temporary protection structure of side slope - Google Patents

Temporary protection structure of side slope Download PDF

Info

Publication number
CN202530772U
CN202530772U CN2012201966557U CN201220196655U CN202530772U CN 202530772 U CN202530772 U CN 202530772U CN 2012201966557 U CN2012201966557 U CN 2012201966557U CN 201220196655 U CN201220196655 U CN 201220196655U CN 202530772 U CN202530772 U CN 202530772U
Authority
CN
China
Prior art keywords
railing
side slope
railings
cross bar
embedded iron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012201966557U
Other languages
Chinese (zh)
Inventor
项谱成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2012201966557U priority Critical patent/CN202530772U/en
Application granted granted Critical
Publication of CN202530772U publication Critical patent/CN202530772U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a temporary protection structure of a side slope. The temporary protection structure of the side slope is characterized by comprising embedded iron, railings, a baseboard, transverse rods, a dense-mesh safety net, a girth and a soil-retaining wall. The embedded iron is pre-embedded in the concrete girth on the soil-retaining wall; the heights of the railings are 120 mm; steel pipes with thickness of 48 mm are used as the railings; the steel pipes are in welded connection with the embedded iron; the baseboard with height of 120 mm is arranged at the bottoms of the railings; the transverse rods are arranged between the railings; the distance among the transverse rods is 600 mm; and the dense-mesh safety net is suspended outside the railings and the transverse rods. The temporary protection structure of the side slope is simple and practical.

Description

The interim protective construction of a kind of side slope
Technical field
The utility model relates to the interim protective construction of a kind of side slope, is applicable to construction field.
Background technology
To the side slope construction operation, safeguard procedures must be set, the side slope periphery must be provided with guard rail, avoids the guard rail disappearance to cause potential safety hazard.Face the important content that the limit security protection becomes safety in production during slope construction.
The utility model content
The technical problem that the utility model solves provides the interim protective construction of a kind of side slope, and solution is faced frontier defense and protected unsafe problem.
The utility model comprises embedded iron, railing, baseboard, cross bar, close order safety net, grit, retaining wall.The pre-buried embedded iron of concrete grit above the retaining wall; Rail height is 1200mm, and it is the steel pipe of 48mm that railing adopts diameter, and steel pipe and embedded iron are welded to connect; The railing bottom is provided with and highly is the baseboard of 120mm; Cross bar is set between the railing, and the cross bar spacing is 600mm, the outer close order safety net of side mounting of railing and cross bar.
The utility model is simple and practical.
Description of drawings
The interim protective construction sketch map of Fig. 1 side slope.
Reference numeral: 1, embedded iron; 2, railing; 3, baseboard; 4, cross bar; 5, close order safety net; 6, grit; 7, retaining wall.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described in detail.
Fig. 1 is the interim protective construction sketch map of side slope.The utility model comprises embedded iron 1, railing 2, baseboard 3, cross bar 4, close order safety net 5, grit 6, retaining wall 7.Concrete grit 6 pre-buried embedded irons 1 above the retaining wall 7; Railing 2 highly is 1200mm, and it is the steel pipe of 48mm that railing 2 adopts diameter, and steel pipe and embedded iron 1 are welded to connect; Railing 2 bottoms are provided with and highly are the baseboard 3 of 120mm; Cross bar 4 is set between the railing 2, and cross bar 4 spacings are 600mm, railing 2 and the close order safety net 5 of cross bar 4 outer side mountings.

Claims (1)

1. the interim protective construction of side slope is characterized in that comprising embedded iron, railing, baseboard, cross bar, close order safety net, grit, retaining wall, the pre-buried embedded iron of concrete grit above the retaining wall; Rail height is 1200mm, and it is the steel pipe of 48mm that railing adopts diameter, and steel pipe and embedded iron are welded to connect; The railing bottom is provided with and highly is the baseboard of 120mm; Cross bar is set between the railing, and the cross bar spacing is 600mm, the outer close order safety net of side mounting of railing and cross bar.
CN2012201966557U 2012-04-22 2012-04-22 Temporary protection structure of side slope Expired - Fee Related CN202530772U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201966557U CN202530772U (en) 2012-04-22 2012-04-22 Temporary protection structure of side slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201966557U CN202530772U (en) 2012-04-22 2012-04-22 Temporary protection structure of side slope

Publications (1)

Publication Number Publication Date
CN202530772U true CN202530772U (en) 2012-11-14

Family

ID=47131966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201966557U Expired - Fee Related CN202530772U (en) 2012-04-22 2012-04-22 Temporary protection structure of side slope

Country Status (1)

Country Link
CN (1) CN202530772U (en)

Similar Documents

Publication Publication Date Title
CN204040506U (en) Hydraulic lifting protector
CN202530772U (en) Temporary protection structure of side slope
CN203946812U (en) A kind of for the removable column type hoisting frame of shurry pump
CN203654790U (en) 3m safety net-picking type steel support
CN204174950U (en) A kind of rope type faces frontier defense guardrail
CN204023422U (en) A kind of assembling Coping Construction operating platform
CN202039893U (en) Protection cover of scraper conveyer
CN104746863A (en) Dismantling construction platform for concrete chimney
CN203583906U (en) Disassembling-free floor edge guardrail in decoration stage
CN208518313U (en) Attachment type raise scaffold top layer safeguard structure
CN203584352U (en) Drift diameter gauge capable of dredging whole-well drill strings in one time
CN205558245U (en) Building support for construction
CN204552131U (en) One can face bound defence rail by temporary traffic
CN204435226U (en) The removable protection guardrail of a kind of bridge
CN202017349U (en) Protection post for limb and hole operation
CN203961329U (en) A kind of safety protection structure for building
CN203867208U (en) Safe protection device for elevator shaft opening of building construction
CN202323720U (en) Capping beam template supporting device
CN203160725U (en) Shaped type protective barrier
CN204691291U (en) Integral movable type bent cap top operation safety protection platform
CN106150115A (en) Bound defence rail is faced at a kind of hole
CN202969973U (en) Overhanging type vertical protective shed
CN203050072U (en) Steel operation platform used for casting and compacting of concrete inside steel column
CN202990447U (en) Constructional engineering tool type stair guard railing
CN203452694U (en) Mud tank

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121114

Termination date: 20130422