CN104746863A - Dismantling construction platform for concrete chimney - Google Patents

Dismantling construction platform for concrete chimney Download PDF

Info

Publication number
CN104746863A
CN104746863A CN201510126314.0A CN201510126314A CN104746863A CN 104746863 A CN104746863 A CN 104746863A CN 201510126314 A CN201510126314 A CN 201510126314A CN 104746863 A CN104746863 A CN 104746863A
Authority
CN
China
Prior art keywords
platform
support
operating platform
main body
operating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510126314.0A
Other languages
Chinese (zh)
Other versions
CN104746863B (en
Inventor
王杰
杨岩
刘博�
沈字宏
田野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN201510126314.0A priority Critical patent/CN104746863B/en
Publication of CN104746863A publication Critical patent/CN104746863A/en
Application granted granted Critical
Publication of CN104746863B publication Critical patent/CN104746863B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Movable Scaffolding (AREA)

Abstract

The invention discloses a dismantling construction platform for a concrete chimney and belongs to the field of building dismantling technologies. The dismantling construction platform for the concrete chimney comprises a supporting platform and an operating platform. The supporting platform comprises a supporting platform body, hoisting points and a guard bar system. The operating platform comprises an operating platform supporting system and an operating platform auxiliary system. The supporting platform body is a load-bearing frame of the construction platform. The operating platform supporting system is located between the inner side of the supporting platform body and a chimney body. The operating platform auxiliary system is located on the upper surface of the operating platform supporting system and is used for installing face sealing wooden planks of the operating platform in a paving mode. The hoisting points are located on upper chord members of the inner side and the outer side of the upper surface of the supporting platform. The guard bar system is installed on main chord members on the inner side and the outer side of the supporting platform body. The dismantling construction platform for the concrete chimney has the advantages of being high in structure safety coefficient, good in stability and suitable for manual dismantlement construction operation of high-altitude concrete chimneys.

Description

A kind of concrete chimney Demolition Construction platform
Technical field
The invention belongs to demolishing buildings technical field, particularly a kind of concrete chimney Demolition Construction platform.Particularly provide safe, the stable operation platform in the manual demolition of high-altitude, realize high efficiency and the security reliability of high-altitude dismantling.
Background technology
The concrete structure structure such as current chimney are because it is highly high, remove the features such as danger is large, normal employing directional blasting technology, and for special area, have inflammable and explosive danger or surrounding enviroment, close on the factors such as residential block and must use manual demolition, how safety is accomplished for safety prevention measure, reliably practicality and high efficiency is a large technical barrier again simultaneously, the present invention, by the mode of lifting construction platform, realizes the safety of work high above the ground, stability.
Summary of the invention
The object of the invention is to provide a kind of concrete chimney Demolition Construction platform, solves specific region towering structure Demolition Construction personal safety security problem.
A kind of concrete chimney Demolition Construction platform, comprise support platform and operating platform, support platform comprises support platform main body 1, lifting point 2 and fence sytsem; Operating platform comprises operating platform support system 3 and operating platform accessory system; Support platform main body 1 is the supporting frame of operation platform, plays load-bearing effect; Operating platform support system 3, inside support platform main body 1 and between funnel body 6, in order to reduce the span of encorbelmenting of operating platform accessory system, is the load-carrying members of operating platform; Operating platform accessory system is positioned at the upper surface of operating platform support system 3, for the front cover wood springboard 8 of operating platform of mating formation; Lifting point 2 is positioned on the upper cord member of the medial and lateral of support platform upper surface, for lifting operation platform.Fence sytsem is arranged on the medial and lateral main chord part of support platform main body 1, plays safety protection function.
Support platform main body 1: support platform main body 1 is just polygonal ring-shaped platform structure, be a unit with the circular arc at 12 °, 15 ° or 18 ° angles, amount to 20,24 or 30 box unit, composition collar-shaped platform structure, form box circulus because each unit combines, therefore support platform has certain globality; The main chord part of support platform main body 1 is hot finished steel pipe, secondary chord member part (connecting rod) is hot finished steel pipe.Support platform main body 1 adopts front cover steel plate 9 on the surface, and thickness is 6mm.
Operating platform support system 3: operating platform support system 3 adopts channel-section steel 5, channel-section steel 5 two ends of operating platform support system 3 outer ring are welded on the side main chord in support platform main body 1 inner ring, and the channel-section steel 5 of inner ring welds with the channel-section steel 5 of adjacent turn; Operating platform support system 3 is successively removed from the inside to the outside along with removing reduction highly.
Described channel-section steel 5 is 16# channel-section steel.
Operating platform accessory system: operating platform accessory system all adopts standard tray pipe, design 24 support bars 7 of encorbelmenting altogether, become radioactivity to be uniformly distributed respectively from the support platform center of circle, encorbelmenting, support bar 7 designs " several " font fixed point with support platform main body 1 intersection area, and support bar 7 of encorbelmenting adopts iron wire to tie with fixed point; The front cover wood springboard 8 spreading 50mm above operating platform accessory system thick carries out front cover.Reserved opening in the middle of operation platform, so that lifting construction, opening is according to chimney upper dimension adjustment size.
It is support bar 7 inner end of encorbelmenting is held out against the outer wall of funnel body 6 when colligation after 3 support bars 7 of encorbelmenting adopt temporary fixed mode, platform hoisted in position to be onstructed colligation is firm again that described iron wire ties.
Lifting point 2: totally 6 groups, lifting point 2, often organize 2, the inside and outside main string along support platform main body 1 is arranged symmetrically, and each lifting point 2 is independent hoist cable design; Lifting point 2 is welded with the main chord part of support platform main body 1; Lifting point 2 and hoist cable 4 adopt 9 #the shackle of D type connects.
Hoist cable 4 is selected 6*37 wire rope, strength grade is 1550N/mm 2.
Fence sytsem: the vertical rod of fence sytsem is welded with support platform main body 1, outer side rail hangs close order protective screening.
The invention has the advantages that: operation platform utilize inner side inscribe chimney cylindrical, in connect form that regular polygon is aided with transverse link and realize internal diameter and progressively can adjust with chimney radius change.Interior outside adopts guardrail form to realize the safety of work high above the ground personnel, this operation platform has that design margin evaluation is high, the feature of good stability, be applicable to the manual demolition construction operation of high-altitude concrete chimney, can effectively the danger of high-altitude manual work be protected, be ensured, be met the requirement of high-altitude manual demolition.
Accompanying drawing explanation
Fig. 1 is operation platform threedimensional model schematic diagram.Wherein, support platform main body 1, lifting point 2, operating platform support system 3, lifting wire rope 4.
Fig. 2 is support platform agent structure plan view.
Fig. 3 is support platform agent structure elevation.
Fig. 4 is operating platform support system plan view.Wherein, lifting point 2, channel-section steel 5, funnel body 6.
Fig. 5 is operating platform accessory system plan view.Wherein, funnel body 6, support bar 7 of encorbelmenting.
Fig. 6 is that operating platform is mated formation figure.Wherein, lifting point 2, funnel body 6, front cover not springboard 8, front cover steel plate 9.
Fig. 7 is the A-A sectional drawing of Fig. 2.
Fig. 8 is the B-B sectional drawing of Fig. 6.
Detailed description of the invention
A kind of concrete chimney Demolition Construction platform, comprise support platform and operating platform, support platform comprises support platform main body 1, lifting point 2 and fence sytsem; Operating platform comprises operating platform support system 3 and operating platform accessory system; Support platform main body 1 is the supporting frame of operation platform, plays load-bearing effect; Operating platform support system 3, inside support platform main body 1 and between funnel body 6, in order to reduce the span of encorbelmenting of operating platform accessory system, is the load-carrying members of operating platform; Operating platform accessory system is positioned at the upper surface of operating platform support system 3, for operating platform of mating formation front cover wood springboard 8 so that upper people operation.Lifting point 2 is positioned on the upper cord member of the medial and lateral of support platform upper surface, for lifting operation platform.Fence sytsem is arranged on the medial and lateral main chord part of support platform main body 1, plays safety protection function.
Support platform main body 1: support platform main body 1 is just polygonal ring-shaped platform structure, be a unit with the circular arc at 15 ° of angles, amount to 24 box unit, composition collar-shaped platform structure, form box circulus because each unit combines, therefore support platform has certain globality; The main chord part of support platform main body 1 is hot finished steel pipe, secondary chord member part (connecting rod) is hot finished steel pipe.Support platform main body 1 adopts front cover steel plate 9 on the surface, and thickness is 6mm.
Operating platform support system 3: operating platform support system 3 adopts channel-section steel 5, channel-section steel 5 two ends of operating platform support system 3 outer ring are welded on the side main chord in support platform main body 1 inner ring, and the channel-section steel 5 of inner ring welds with the channel-section steel 5 of adjacent turn; Operating platform support system 3 is successively removed from the inside to the outside along with removing reduction highly.
Described channel-section steel 5 is 16# channel-section steel.
Operating platform accessory system: operating platform accessory system all adopts standard tray pipe, design 24 support bars 7 of encorbelmenting altogether, become radioactivity to be uniformly distributed respectively from the support platform center of circle, encorbelmenting, support bar 7 designs " several " font fixed point with support platform main body 1 intersection area, and support bar 7 of encorbelmenting adopts iron wire to tie with fixed point; The front cover wood springboard 8 spreading 50mm above operating platform accessory system thick carries out front cover.Reserved opening in the middle of operation platform, so that lifting construction, opening is according to chimney upper dimension adjustment size.
It is support bar 7 inner end of encorbelmenting is held out against the outer wall of funnel body 6 when colligation after 3 support bars 7 of encorbelmenting adopt temporary fixed mode, platform hoisted in position to be onstructed colligation is firm again that described iron wire ties.
Lifting point 2: totally 6 groups, lifting point 2, often organize 2, the inside and outside main string along support platform main body 1 is arranged symmetrically, and each lifting point 2 is independent hoist cable design; Lifting point 2 is welded with the main chord part of support platform main body 1; Lifting point 2 and hoist cable 4 adopt 9 #the shackle of D type connects.
Hoist cable 4 is selected 6*37 wire rope, strength grade is 1550N/mm 2.
Fence sytsem: the vertical rod of fence sytsem is welded with support platform main body 1, outer side rail hangs close order protective screening.

Claims (9)

1. a concrete chimney Demolition Construction platform, comprises support platform and operating platform, it is characterized in that, support platform comprises support platform main body (1), lifting point (2) and fence sytsem; Operating platform comprises operating platform support system (3) and operating platform accessory system; Support platform main body (1) is the supporting frame of operation platform, plays load-bearing effect; Operating platform support system (3) is positioned between support platform main body (1) inner side and funnel body (6), in order to reduce the span of encorbelmenting of operating platform accessory system, is the load-carrying members of operating platform; Operating platform accessory system is positioned at the upper surface of operating platform support system (3), for front cover wood springboard (8) of operating platform of mating formation, so that upper people operation; Lifting point (2) is positioned on the upper cord member of the medial and lateral of support platform upper surface, for lifting operation platform; Fence sytsem is arranged on the medial and lateral main chord part of support platform main body (1), plays safety protection function.
2. operation platform according to claim 1, it is characterized in that, described support platform main body (1) is just polygonal ring-shaped platform structure, is a unit with the circular arc at 12 °, 15 ° or 18 ° angles, amount to 20,24 or 30 box unit, composition collar-shaped platform structure; The main chord part of support platform main body (1) is hot finished steel pipe, secondary chord member part is hot finished steel pipe; Support platform main body (1) adopts front cover steel plate (9) on the surface, and thickness is 6mm.
3. operation platform according to claim 1, it is characterized in that, described operating platform support system (3) adopts channel-section steel (5), channel-section steel (5) two ends of operating platform support system (3) outer ring are welded on the side main chord in support platform main body (1) inner ring, and the channel-section steel (5) of inner ring welds with the channel-section steel (5) of adjacent turn; Operating platform support system (3) is successively removed from the inside to the outside along with removing reduction highly.
4. operation platform according to claim 3, is characterized in that, described channel-section steel (5) is 16# channel-section steel.
5. operation platform according to claim 1, it is characterized in that, described operating platform accessory system all adopts standard tray pipe, design 24 support bars of encorbelmenting (7) altogether, become radioactivity to be uniformly distributed respectively from the support platform center of circle, design " several " font fixed point in support bar of encorbelmenting (7) and support platform main body (1) intersection area, support bar of encorbelmenting (7) and fixed point adopt iron wire to tie; Front cover wood springboard (8) spreading 50mm above operating platform accessory system thick carries out front cover; Reserved opening in the middle of operation platform, so that lifting construction.
6. operation platform according to claim 5, it is characterized in that, it is that support bar (7) inner end of encorbelmenting after 3 support bars of encorbelmenting (7) adopt temporary fixed mode, platform hoisted in position to be onstructed when colligation holds out against the outer wall of funnel body (6) colligation is firm again that described iron wire ties.
7. operation platform according to claim 1, it is characterized in that, totally 6 groups, described lifting point (2), often organize 2, inside and outside main string along support platform main body (1) is arranged symmetrically, and each lifting point (2) are independent hoist cable design; Lifting point (2) is welded with the main chord part of support platform main body (1); Lifting point (2) and hoist cable (4) adopt 9 #the shackle of D type connects.
8. operation platform according to claim 7, is characterized in that, described hoist cable (4) is used 6*37 wire rope, strength grade is 1550N/mm 2.
9. operation platform according to claim 1, is characterized in that, the vertical rod of described fence sytsem is welded with support platform main body (1), and outer side rail hangs close order protective screening.
CN201510126314.0A 2015-03-20 2015-03-20 A kind of concrete chimney Demolition Construction platform Active CN104746863B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510126314.0A CN104746863B (en) 2015-03-20 2015-03-20 A kind of concrete chimney Demolition Construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510126314.0A CN104746863B (en) 2015-03-20 2015-03-20 A kind of concrete chimney Demolition Construction platform

Publications (2)

Publication Number Publication Date
CN104746863A true CN104746863A (en) 2015-07-01
CN104746863B CN104746863B (en) 2016-11-23

Family

ID=53587059

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510126314.0A Active CN104746863B (en) 2015-03-20 2015-03-20 A kind of concrete chimney Demolition Construction platform

Country Status (1)

Country Link
CN (1) CN104746863B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351493A (en) * 2016-08-29 2017-01-25 中国冶集团有限公司 Construction platform and installation method of concrete silos
CN110203858A (en) * 2019-06-24 2019-09-06 山东电力建设第三工程有限公司 Extendible dynamic formula job platform in heat absorption tower
CN114278113A (en) * 2021-12-29 2022-04-05 北京首钢建设集团有限公司 Construction method for dismantling reinforced concrete chimney in complex environment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351493A (en) * 2016-08-29 2017-01-25 中国冶集团有限公司 Construction platform and installation method of concrete silos
CN110203858A (en) * 2019-06-24 2019-09-06 山东电力建设第三工程有限公司 Extendible dynamic formula job platform in heat absorption tower
CN114278113A (en) * 2021-12-29 2022-04-05 北京首钢建设集团有限公司 Construction method for dismantling reinforced concrete chimney in complex environment

Also Published As

Publication number Publication date
CN104746863B (en) 2016-11-23

Similar Documents

Publication Publication Date Title
CN203487803U (en) Safety protection structure for elevator shaft construction
CN204781887U (en) Prefabricated assembly type structure's no outrigger construction platform
CN104746863A (en) Dismantling construction platform for concrete chimney
CN105088979B (en) Demolition blasting method for large bridge
JP6603824B2 (en) Upper scattering prevention curing system and upper scattering prevention curing method at the time of multi-story building dismantling
CN104278828A (en) Concrete chimney demolition operating platform
CN203795820U (en) Loading and unloading platform for lifting discharging platform
CN203783105U (en) Fast construction operating platform used for section steel column interior pouring concrete
CN211689948U (en) Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge
KR100944458B1 (en) Apparatus preventing separation of cage for construction
CN210564332U (en) Movable safety steel cat ladder
CN112727147A (en) Outdoor suspended step dismantling method
CN108118885A (en) Vertical transport protective platform and its application in steel structure column docking construction
CN205382718U (en) Sparse passway for escaping of steel platform die carrier system
CN202913679U (en) Double-function construction operation protection derrick in elevator shaft way
KR20130053256A (en) Insulated safety cover for building scaffolding stee-pipe
CN203729571U (en) Tool type crawling ladder used for construction site
CN204826697U (en) Railway continuous beam construction safety protective guard strides
CN205088574U (en) A operation platform that is used for high pier binder, bent cap construction usefulness
CN208471409U (en) A kind of spliced driver's lane device of derrick crane
CN205935740U (en) Wooden structural floor slab equipment suspended ceiling system of existing building
CN203961330U (en) Job site safe construction protective guard
CN203050072U (en) Steel operation platform used for casting and compacting of concrete inside steel column
CN206337800U (en) Elevator shaft operating platform frame
CN215717454U (en) Indoor elevator shaft protection device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant