CN202521637U - Additional middle arch for steam boiler - Google Patents
Additional middle arch for steam boiler Download PDFInfo
- Publication number
- CN202521637U CN202521637U CN2012201909817U CN201220190981U CN202521637U CN 202521637 U CN202521637 U CN 202521637U CN 2012201909817 U CN2012201909817 U CN 2012201909817U CN 201220190981 U CN201220190981 U CN 201220190981U CN 202521637 U CN202521637 U CN 202521637U
- Authority
- CN
- China
- Prior art keywords
- hogging
- arch
- brick
- grate
- sides
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Compositions Of Oxide Ceramics (AREA)
Abstract
The utility model provides an additional middle arch for an SHL6-13AIII steam boiler, which is characterized in that (1) a middle arch is additionally arranged 1850 mm away from a rear wall, the bottom of the middle arch is 500 mm higher than the surface of a grate, 460 mm in width and 230 mm in thickness, and refractory bricks are mainly selected from standard refractory bricks and special-shaped refractory bricks; and (2) boiler walls on both sides of the grate are reinforced by using structural steel firstly, then a middle arch bracket is manufactured of a board and placed on the surface of the grate, skew blocks are placed on the boiler walls on both sides of the grate, the brick joint during brickwork is controlled to be 1-2 mm, and the brickwork is started from the skew blocks on both sides and divided into an upper layer and a lower layer; when the brickwork is performed at the just middle position and the last brick is laid, the last brick must be a special-shaped refractory brick, no refractory mortar is placed, and the last brick is directly and forcedly squeezed down by using a heavy hammer; and when the arch is completely built, the arch is required to be maintained 3-5 days, and then, the middle arch bracket is removed. The additional middle arch disclosed by the utility model has the advantages of high boiler heat efficiency and less flame-lifting possibility.
Description
Technical field
The utility model patent relates to a kind of boiler plant, and it is a kind of modified chain-grate boiler, is that the SHL6-13AIII steam boiler is set up hogging transformation, and boiler is caught fire soon, and boiler output improves, and coal combustion is more complete.
Background technology
Defectives such as steam boiler SHL6-13AIII is unreasonable because of former design, and coal-fired ignition point takes off fire easily away from coal gate, and chamber flue gas temperature is on the low side, and phosphorus content is high in the cinder, and energy consumption is big.
Summary of the invention
The utility model patent proposes the SHL6-13AIII steam boiler is added hogging, and concrete grammar is: (1) is set up hogging one at the wall 1850mm from the back; The hogging bottom is 500mm from the grate surface height; Width is 460mm, thickness 230mm, main selection standard refractory brick of refractory brick and quarl.
(2) building method; On the furnace wall of fire grate both sides, reinforce earlier with shaped steel; Guarantee to bear the thrust of hogging to horizontal direction; Make a hogging carriage with plank according to the hogging characteristic dimension of being known again, the hogging carriage is placed on the grate surface, on two wing furnace walls of hogging carriage, place the arch springing fragment of brick; Again the refractory brick of different size is put one time along the hogging carriage, confirmed how much the collocation situation of various refractory brick blocks and the fire clay brickwork joint thickness that will continue to employ is.Basic condition confirm good after, just can begin to have built hogging with the wet fire clay of mixing, the brickwork joint of block is controlled at 1~2mm, can not be too thick, deny meeting influence the intensity of hogging.Build the skew block of hogging since two sides by laying bricks or stones, fragment of brick is placed on wooden carriage lastblock and builds in the past with suffering, and the fragment of brick of building hogging by laying bricks or stones divides upper and lower two layers; When building when putting last piece brick right in the middle, use quarl, and not put fire clay; Directly force down firmly with weight; After arch all finishes building, maintain 3~5 days, after making, arch removes the hogging carriage that plank is processed again.
Behind the reincarnate, increased the coverage rate of arch, improved furnace temperature greatly, both strengthened burning, prolonged the stroke of flue gas again, flammable fugitive constituent is had in burner hearth than the time of staying mixes with air and burns fully fire grate.Solved the difficulty of catching fire of wet coal, problem such as ash content carbon is high, and boiler output is low.Boiler output by original 5 tons/time, can reach design load now, furnace outlet mouth temperature increases to 760 degree from original 600 degree at present, boiler slag carbon content reduces to 15% by original 32%, boiler thermal output improves more than 6%.
This patent beneficial effect is that boiler thermal output is high, and burning coal wide adaptability is difficult for taking off fire.
Description of drawings
Below in conjunction with accompanying drawing and embodiment this patent is described further.
Fig. 1 is that steam boiler adds hogging boiler structure sketch map behind reincarnate.
(1) among the figure, face arch, (2), hogging, (3), rear arch.
The specific embodiment
(1) at the wall 1850mm from the back, set up hogging one, the hogging bottom is 500mm from the grate surface height, and width is 460mm, thickness 230mm, main selection standard refractory brick of refractory brick and quarl.
(2) building method; On the furnace wall of fire grate both sides, reinforce earlier with shaped steel; Guarantee to bear the thrust of hogging to horizontal direction; Make a hogging carriage with plank according to the hogging characteristic dimension of being known again, the hogging carriage is placed on the grate surface, on two wing furnace walls of hogging carriage, place the arch springing fragment of brick; Again the refractory brick of different size is put one time along the hogging carriage, confirmed how much the collocation situation of various refractory brick blocks and the fire clay brickwork joint thickness that will continue to employ is.Basic condition confirm good after, just can begin to have built hogging with the wet fire clay of mixing, the brickwork joint of block is controlled at 1~2mm, can not be too thick, deny meeting influence the intensity of hogging.Build the skew block of hogging since two sides by laying bricks or stones, fragment of brick is placed on wooden carriage lastblock and builds in the past with suffering, and the fragment of brick of building hogging by laying bricks or stones divides upper and lower two layers; When building when putting last piece brick right in the middle, use quarl, and not put fire clay; Directly force down firmly with weight; After arch all finishes building, maintain 3~5 days, after making, arch removes the hogging carriage that plank is processed again.
Claims (2)
1. steam boiler adds hogging, it is characterized in that: (1) is set up hogging one at the wall 1850mm from the back, and the hogging bottom is 500mm from the grate surface height, and width is 460mm, thickness 230mm, main selection standard refractory brick of refractory brick and quarl.
2. steam boiler according to claim 1 adds hogging, it is characterized in that: on the furnace wall of fire grate both sides, reinforce with shaped steel earlier, make a hogging carriage with plank again; Be placed on the grate surface, on two wing furnace walls, place the arch springing fragment of brick, the brickwork joint of block is controlled at 1~2mm; Build by laying bricks or stones since the skew block of two sides, divide upper and lower two layers, when building when putting last piece brick right in the middle; Use quarl, and do not put fire clay, directly force down firmly with weight; After arch all finishes building, maintain 3~5 days, remove the hogging carriage again.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012201909817U CN202521637U (en) | 2012-04-23 | 2012-04-23 | Additional middle arch for steam boiler |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012201909817U CN202521637U (en) | 2012-04-23 | 2012-04-23 | Additional middle arch for steam boiler |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202521637U true CN202521637U (en) | 2012-11-07 |
Family
ID=47104584
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012201909817U Expired - Fee Related CN202521637U (en) | 2012-04-23 | 2012-04-23 | Additional middle arch for steam boiler |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202521637U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104697162A (en) * | 2015-03-04 | 2015-06-10 | 哈尔滨森泰克再生能源技术开发有限公司 | Normal-pressure boiler with barrier arch in hearth in biomass floating fuel combustion mode |
-
2012
- 2012-04-23 CN CN2012201909817U patent/CN202521637U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104697162A (en) * | 2015-03-04 | 2015-06-10 | 哈尔滨森泰克再生能源技术开发有限公司 | Normal-pressure boiler with barrier arch in hearth in biomass floating fuel combustion mode |
CN104697162B (en) * | 2015-03-04 | 2017-08-25 | 哈尔滨森泰克再生能源技术开发有限公司 | The built-in barrier arch normal-pressure boiler of biomass floating fuel combustion mode burner hearth |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2019004892A1 (en) | A vertical lime kiln | |
CN2937842Y (en) | Combined garbage burner | |
CN202521637U (en) | Additional middle arch for steam boiler | |
RU2361161C2 (en) | Reverberatory furnace for metal remelting | |
CN202522044U (en) | Chain-grate type energy-saving hot-blast stove | |
CN202521636U (en) | Hogging added to boiler | |
CN201277808Y (en) | Ceramic shuttle kiln using clean coal | |
CN2869589Y (en) | Combined boiler | |
CN205481014U (en) | Large garbage truck burns burning furnace | |
CN202339106U (en) | High-loading softening heat-insulation brick for heating furnace | |
CN202002462U (en) | Settling chamber of carbon rotary kiln | |
CN103712215A (en) | Double-trolley automatic high-end energy-saving ash-collecting cremator | |
CN102747177B (en) | Blast furnace hot blast stove and construction method thereof | |
CN2788032Y (en) | High temperature carbonizing refuse incinerator | |
CN203687015U (en) | Spiral-flow type self-contained boiler burning biomass particles in membrane-type wall structure | |
CN202561799U (en) | Multi-hole energy-saving middle arch | |
CN103256619A (en) | Multihole energy-saving middle arch | |
CN201334435Y (en) | Kiln for activating coal gangues | |
CN104373941A (en) | Electric heat circulating combustion furnace | |
CN202630047U (en) | Assembled boiler for coal water slurry | |
CN204434501U (en) | A kind of vertical lime kiln | |
CN202166066U (en) | Fire grate for re-burning furnace | |
CN2429733Y (en) | Downward gasifying burner of coal boiler | |
CN203010643U (en) | Flue mounting part with air preheating function and flue piled with same | |
CN210373462U (en) | Incinerator secondary combustion chamber of garbage incineration system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121107 Termination date: 20140423 |