CN202519587U - Elongated back pressure bracket - Google Patents

Elongated back pressure bracket Download PDF

Info

Publication number
CN202519587U
CN202519587U CN2012201551296U CN201220155129U CN202519587U CN 202519587 U CN202519587 U CN 202519587U CN 2012201551296 U CN2012201551296 U CN 2012201551296U CN 201220155129 U CN201220155129 U CN 201220155129U CN 202519587 U CN202519587 U CN 202519587U
Authority
CN
China
Prior art keywords
bracket
back pressure
utility
elongated back
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012201551296U
Other languages
Chinese (zh)
Inventor
蒲朝钦
石雅清
徐进文
李向阳
李宗根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Original Assignee
Fifth Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd filed Critical Fifth Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority to CN2012201551296U priority Critical patent/CN202519587U/en
Application granted granted Critical
Publication of CN202519587U publication Critical patent/CN202519587U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses an elongated back pressure bracket. The elongated back pressure bracket is characterized by comprising a bracket upper part and a bracket lower part, between which a connecting plate is arranged. Compared with the prior art, the elongated back pressure bracket has the advantages that the bracket is constructed through two parts of structures, the bracket lower part is firstly welded before a steel boxed cofferdam is released to the lowest tidal water level, and then the bracket upper part is welded, so that the influence of fluctuated tidal water on construction can be avoided.

Description

A kind of extended type back-pressure bracket
[technical field]
The utility model relates to a kind of new structure that is used for deep water steel box work progress suspention steel box and anti-steel box come-up, specifically relates to a kind of extended type back-pressure bracket.
[background technology]
Along with Chinese economic development, bridge constructions such as over strait, rivers grand bridge, bridge are also more and more.The deep water cushion cap adopts the construction of steel box more in the bridge construction at present.The structure of load-bearing bracket is generally simple shaped steel or steel plate, and welding procedure is used to bear the weight of steel box and part-structure concrete on the skeleton shaped steel of box bed die.But because the influence that impacted by the fluctuation tidal water flow, and cushion cap is many below the neap water level in the design, and the welding of bracket can't be carried out in water.
[utility model content]
The utility model is in order to solve above-mentioned deficiency, a kind of extended type back-pressure bracket to be provided.
The above-mentioned purpose of the utility model realizes through following technical scheme: a kind of extended type back-pressure bracket is characterized in that: comprise bracket top and bracket bottom, said bracket top and bracket bottom weld together through junction plate.
The construction sequence of the utility model: at first transfer before below the neap water level at the steel box; Accomplish the welding procedure of bracket substructure; When transferring to design elevation; Weld the superstructure of bracket again, and final welding bracket and pile foundation steel casing, it is stressed by the power system conversion of suspension system to the back-pressure bracket to accomplish the steel box.
The utility model advantage compared with prior art is: the bracket of the utility model can the branch two-part structure be constructed; Transfer to the neap water level welding bracket bottom earlier at the steel box; After weld bracket top again, avoid receiving the fluctuation tidal water flow to impact and influence construction.
[description of drawings]
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the utility model construction side elevational view;
Fig. 3 is the utility model construction front elevation view.
In the accompanying drawing, 1-pile foundation steel casing; 2-bed die skeleton shaped steel; 3-bracket top; The 4-junction plate; 5-bracket bottom; 6-front triangle link plate; 7-side triangle link plate.
[specific embodiment]
Below in conjunction with accompanying drawing the utility model is further detailed:
As shown in Figure 1, a kind of extended type back-pressure bracket is characterized in that: comprise bracket top 3 and bracket bottom 5, said bracket top 3 welds together through junction plate 4 with bracket bottom 5.
Like Fig. 2, shown in 3; The extended type back-pressure bracket of the utility model; After accomplishing steel box base plate assembly unit welding procedure; According to construction drawing blanking processing each structure semiproduct (water logging there is not the steel box degree of depth to carry out blanking to bracket bottom 5 length according to neap water level trend, and bracket top 3 length are carried out blanking according to concrete back cover end face absolute altitude).At first welding procedure bracket bottom 5, front triangle link plate 6, side triangle link plate 7 on bed die skeleton shaped steel 2; Need measure the verticality of bracket bottom 5 during welding bracket bottom 5; Measure and weld after qualified; On inspection weldquality qualified after, transfer steel box base plate and assembly unit steel box side plate, can transfer the steel box to design elevation after accomplishing.Transfer to accomplish and afterwards steel box plan-position and absolute altitude measurement are checked, qualified back is carried out temporary fixed on pile foundation steel casing 1.After accomplishing above-mentioned work, can welding procedure bracket top 3, junction plate 4.When bracket top 3 is installed; The panel that guarantees bracket top 3 is close to pile foundation steel casing 1; Should guarantee the dead in line of bracket top 3 and bracket bottom 5 simultaneously; Carry out the welding of bracket top 3 and pile foundation steel casing 1 and the butt welding of bracket top 3 and bracket bottom 5 after carrying out above work, after accomplishing junction plate 4 is close to bracket top 3 and welds with bracket bottom 5 web faces.Carry out once comprehensively weldquality inspection after above-mentioned whole welding procedure is accomplished, can carry out the concrete back cover of steel box and the construction of cushion cap operation after the passed examination.
What should explain at last is: the foregoing description only be for explain clearly that the utility model does for example; And be not the qualification to embodiment; Those of ordinary skill for affiliated field; On the basis of above-mentioned explanation, can also make other multi-form variation or change, need not here also can't give to all embodiments exhaustive, and the conspicuous variation of being amplified out thus or the change still be among the protection domain of the utility model.

Claims (1)

1. extended type back-pressure bracket, it is characterized in that: comprise bracket top and bracket bottom, said bracket top and bracket bottom weld together through junction plate.
CN2012201551296U 2012-04-13 2012-04-13 Elongated back pressure bracket Expired - Fee Related CN202519587U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201551296U CN202519587U (en) 2012-04-13 2012-04-13 Elongated back pressure bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201551296U CN202519587U (en) 2012-04-13 2012-04-13 Elongated back pressure bracket

Publications (1)

Publication Number Publication Date
CN202519587U true CN202519587U (en) 2012-11-07

Family

ID=47102542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201551296U Expired - Fee Related CN202519587U (en) 2012-04-13 2012-04-13 Elongated back pressure bracket

Country Status (1)

Country Link
CN (1) CN202519587U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103388340A (en) * 2012-05-07 2013-11-13 中铁十局集团第五工程有限公司 Lengthened back pressure bracket

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103388340A (en) * 2012-05-07 2013-11-13 中铁十局集团第五工程有限公司 Lengthened back pressure bracket

Similar Documents

Publication Publication Date Title
CN202492865U (en) Correction device of transmission tower
CN204940142U (en) A kind of bridge jacking support
CN201722776U (en) Beam column nodal point suitable for square steel pipe column
CN201843143U (en) Cofferdam of deep-water single-wall steel lifting box
CN104594201B (en) A kind of method utilizing one-sided pier-side bracket to set up pier top girder steel
CN103938663A (en) Correction device of inclined power transmission tower made of signal-splicing steel angle principal material
CN203270461U (en) Bailey beam support without buttress in soft foundation
CN205188954U (en) Novel reinforced concrete prefabrication side stake pile extension structure
CN205024600U (en) A work platform that is used for bridge aquatic pile foundation to be under construction
CN204385629U (en) A kind of support for the construction of suspension bridge king-tower top rail
CN207159834U (en) A kind of device of constructing continuous beam end bay Cast-in-Situ Segment
CN202519587U (en) Elongated back pressure bracket
CN104196261A (en) Connection joint for existing concrete column and added steel beams
CN204551751U (en) The syndeton of a kind of new increasing steel beam and concrete column
CN204126294U (en) The back ruggedized construction that a kind of steel plate combines with reinforcing bar
CN104265005B (en) The back ruggedized construction that a kind of steel plate combines with reinforcing bar
CN203594058U (en) Inclined transmission tower rectification device with single-spliced angle steel as main material
CN102852155A (en) Composite pile foundation
CN207452955U (en) A kind of measurement in a closed series Tower System
CN202689585U (en) Ground fitting up assembly mould of large steel truss
CN216040750U (en) Be applicable to circular single-column mound bridge antidumping reinforcing apparatus
CN202745208U (en) Joint connection of re-combined bamboo timber frame structure
CN205046924U (en) Wind power generation tower with can flexible down tube of a stretch -draw
CN201835390U (en) Beam-column rigid connection joint for tubular concrete column
CN209685126U (en) A kind of steel vestibule integrally promotes lifting lug device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121107

Termination date: 20130413