CN207452955U - A kind of measurement in a closed series Tower System - Google Patents

A kind of measurement in a closed series Tower System Download PDF

Info

Publication number
CN207452955U
CN207452955U CN201721106337.6U CN201721106337U CN207452955U CN 207452955 U CN207452955 U CN 207452955U CN 201721106337 U CN201721106337 U CN 201721106337U CN 207452955 U CN207452955 U CN 207452955U
Authority
CN
China
Prior art keywords
measurement
tower
tube coupling
interlude
coupling component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721106337.6U
Other languages
Chinese (zh)
Inventor
林鸣
刘晓东
李毅
张志刚
姬海
张秀振
刘兆权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Highway Consultants Co Ltd
Original Assignee
CCCC Highway Consultants Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Highway Consultants Co Ltd filed Critical CCCC Highway Consultants Co Ltd
Priority to CN201721106337.6U priority Critical patent/CN207452955U/en
Application granted granted Critical
Publication of CN207452955U publication Critical patent/CN207452955U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of measurement in a closed series Tower Systems, including the measurement tower being mounted on tube coupling component, at least one manhole well is connected on the measurement tower, each manhole well connects the tube coupling component, the top of the measurement tower is connected with platform assembly, the platform assembly includes being respectively facing two connecting rods at the tube coupling component both ends, and each connecting rod is transversely provided with lateral bracket, and both ends of each lateral bracket respectively with tube coupling component are mutually parallel.The measurement in a closed series Tower System optimizes structure, it is easier for installation, operation can be realized by shorter platform assembly, make operation simpler, it is applicable not only to the measurement of each parameter of posture when immersed tube tunnel tube coupling component is transferred, but also suitable for each parameter measurement of posture of land tunnel pipelines docking, it ensure that pipeline merging precision.

Description

A kind of measurement in a closed series Tower System
Technical field
The utility model is related to engineering measuring technology field, more particularly to a kind of measurement in a closed series Tower System.
Background technology
The existing underwater installation of immersed tube tunnel, in order to ensure immersed tube tube coupling merging precision, it is necessary to carried out to immersed tube Lower section installation process measures always, the parameters such as posture, plan-position, elevation including measuring tube coupling.
Existing method is generally adopted by the top of the tube coupling of immersed tube installation measurement tower respectively and outside measurement tower The manhole well of side.For the ease of measurement, general use installs a measurement tower and corresponding manhole well at the both ends of tube coupling respectively. The problem of so bringing is, although installing a measurement tower and manhole well at the both ends of tube coupling respectively, can be convenient for measuring tube coupling The parameter at both ends, but bring that construction is cumbersome, installation is relatively difficult, and need the phase of two measurement towers and manhole well Mutual matching coordinative, operation are also cumbersome.
Utility model content
The purpose of the utility model is to overcome the existing tube coupling in the presence of the prior art when transferring docking, in order to survey The parameter at its both ends is measured, using a measurement tower and manhole well is installed respectively at tube coupling both ends, brings cumbersome, peace of constructing Relatively difficult, operational coordination also cumbersome above-mentioned deficiency is filled, a kind of measurement in a closed series Tower System is provided.
In order to realize above-mentioned purpose of utility model, the utility model provides following technical scheme:
A kind of measurement in a closed series Tower System, including the measurement tower being mounted on tube coupling component, it is described measurement tower on be connected with to A few manhole well, each manhole well connect the tube coupling component, and the top of the measurement tower is connected with platform assembly, institute Stating platform assembly includes being respectively facing two connecting rods at the tube coupling component both ends, and each connecting rod is transversely provided with transverse direction Bracket.
The measurement in a closed series Tower System by using a measurement tower on tube coupling component, connects at measurement tower top end Platform assembly is connect, platform assembly includes being respectively facing two connecting rods at tube coupling component both ends, and each connecting rod is transversely provided with horizontal stroke To bracket, measuring device is set in two lateral brackets, you can realize the posture to tube coupling both ends, plan-position, elevation etc. Parameter is carried out at the same time measurement;Tradition needs install two measurement towers at the both ends of tube coupling component respectively relatively could realize tube coupling structure For the parameters measurement of part, which optimizes structure, easier for installation, passes through shorter platform group Operation can be realized in part, which is the state that exposes the surface always at work, facilitates personnel's construction and access manhole Well makes operation simpler, is applicable not only to the measurement of each parameter of posture when immersed tube tunnel tube coupling component is transferred, but also suitable For each parameter measurement of posture of land tunnel pipelines docking, pipeline merging precision ensure that.
Preferably, each both ends of the lateral bracket respectively with the tube coupling component are mutually parallel.
Preferably, the measurement tower includes pedestal, interlude and top section along longitudinal direction, and the tube chamber welds with base is in the tube coupling Component, the interlude are connected to by bolt assembly on the pedestal, and the top section is connected to described by bolt assembly On the interlude.
The measurement tower is assembled respectively by pedestal, interlude and top section, particularly by tube chamber welds with base in tube coupling component In main body, interlude is connected to by bolt assembly on pedestal, and top section is also to be connected between by bolt assembly in section, is made The installation strength of tower is measured in position base bigger, and it is smaller in interlude and top section, it is strong to realize the installation of measurement tower Differentiation is spent, the effect that can be realized is that, when running into beam wind effect, which deforms upon, and can pass through top first The deformation of section and interlude discharges partial deformation power, if it is rigid monoblock type connection entirely to avoid measurement tower, higher survey Amount tower is then easy to damage pedestal and causes measurement tower fracture, improves safety coefficient.
Preferably, the bolt assembly between the interlude and the pedestal includes:Pedestal top described in erecting and welding respectively End and two backing plates of mid-section bottom, weld several reinforcing plates between one of backing plate and base outer perimeter, another pad Several reinforcing plates are welded between plate and interlude periphery, are bolted between two backing plates.
Preferably, the bolt assembly between the interlude and the top section includes:It is intermediate described in erecting and welding respectively Section top and two backing plates of top section bottom, weld several reinforcing plates, separately between one of backing plate and interlude periphery Several reinforcing plates are welded between one backing plate and top section periphery, are bolted between two backing plates.
The bolt assembly is welded on by backing plate on pedestal, interlude or top section, then pad surfaces and pedestal, centre Section or top section periphery are additionally provided with reinforcing plate to improve bonding strength, and two neighboring backing plate is bolted again, is equivalent to bottom Seat, middle interruption or top section it is adjacent between be connected with each other by the seat structure of larger area, improve bonding strength and just Degree ensure that the stability of measurement tower.
Preferably, the pedestal, interlude and top section are assembled steel tube supporting structure.
Preferably, the measurement tower section is to form the rectangle knot with hollow cavity by assembled steel tube supporting structure Structure.
Preferably, each manhole well is arranged in the hollow cavity of the measurement tower.
Preferably, each manhole well is connected in a manner of anchor ear on measurement tower by hoop component, passes through several Manhole well and measurement tower are connected with each other by hoop component, are solidified as a whole, and easy to disassemble.
Preferably, the manhole well there are two being set in the hollow cavity of the measurement tower.
Two manhole wells are set in the measurement tower, and one can be used as tube coupling mooring, sinking just in two manhole well passages Personnel channel when being needed during position into inside tube coupling, another can be used as interim pipeline access way of constructing, two manhole wells Passage cooperates, and improves tube coupling component and subsequently docks construction efficiency.
Compared with prior art, the beneficial effects of the utility model:
1st, a kind of measurement in a closed series Tower System described in the utility model, by using a survey on tube coupling component Tower is measured, in measurement tower top end connecting platform component, platform assembly includes being respectively facing two connecting rods at tube coupling component both ends, often A connecting rod is transversely provided with lateral bracket, sets measuring device in two lateral brackets, you can realize the appearance to tube coupling both ends The parameters such as state, plan-position, elevation are carried out at the same time measurement;Tradition needs to install two surveys respectively at the both ends of tube coupling component relatively For amount tower could realize the parameters measurement of tube coupling component, which optimizes structure, and installation is more square Just, operation can be realized by shorter platform assembly, which is the state that exposes the surface always at work, convenient Personnel construct and access manhole's well, make operation simpler, and posture when being applicable not only to the decentralization of immersed tube tunnel tube coupling component is each The measurement of parameter, but also suitable for each parameter measurement of posture of land tunnel pipelines docking, ensure that pipeline merging precision;
2nd, a kind of measurement in a closed series Tower System described in the utility model, the measurement tower pass through pedestal, interlude and top section It assembles respectively, particularly by tube chamber welds with base in tube coupling member body, interlude is connected to by bolt assembly on pedestal, top Section is also to be connected between by bolt assembly in section, makes the installation strength of measurement tower in position base bigger, and in centre Section and top section are smaller, and to realize the installation strength differentiation of measurement tower, the effect that can be realized is, when running into beam wind Effect, the measurement tower deform upon, can discharge partial deformation power by the deformation of top section and interlude first, avoid surveying If amount tower is rigid monoblock type connection entirely, higher measurement tower is then easy to damage pedestal and causes measurement tower fracture, improves Safety coefficient;
3rd, a kind of measurement in a closed series Tower System described in the utility model, the bolt assembly of use is to be welded on bottom by backing plate On seat, interlude or top section, then pad surfaces are additionally provided with reinforcing plate with the company of raising with pedestal, interlude or top section periphery Connect intensity, two neighboring backing plate is bolted again, be equivalent to pedestal, it is middle interruption or top section it is adjacent between by larger The seat structure of area is connected with each other, and improves bonding strength and rigidity, ensure that the stability of measurement tower;
4th, a kind of measurement in a closed series Tower System described in the utility model sets two manhole wells, two people in measurement tower Personnel channel when can be needed as tube coupling mooring, sinking when in place into inside tube coupling in the well passage of hole, another can As interim pipeline access way of constructing, two manhole well passages cooperate, and improve tube coupling component and subsequently dock construction efficiency.
Description of the drawings:
Fig. 1 is a kind of front view of measurement in a closed series Tower System described in the utility model;
Fig. 2 is a kind of top view of measurement in a closed series Tower System described in the utility model;
Fig. 3 is that tower and the connection structure top view of manhole well are measured in Fig. 1;
Fig. 4 is the enlarged diagram of partial structurtes A in Fig. 1;
Fig. 5 is the schematic diagram that a kind of measurement in a closed series Tower System described in the utility model is used cooperatively with tube coupling component;
Fig. 6 is the top view of Fig. 5.
It is marked in figure:
1st, tube coupling component, 2, measurement tower, 21, pedestal, 22, interlude, 23, top section, 3, manhole well, 4, platform assembly, 41st, connecting rod, 42, lateral bracket, 5, hoop component, 6, bolt assembly, 61, backing plate, 62, reinforcing plate, 63, bolt.
Specific embodiment
The utility model is described in further detail with reference to test example and specific embodiment.It but should not be by this The scope for being interpreted as the above-mentioned theme of the utility model is only limitted to following embodiment, all to be realized based on the utility model content Technology belongs to the scope of the utility model.
As shown in Figs. 1-5, a kind of 2 system of measurement in a closed series tower, it is described including the measurement tower 2 being mounted on tube coupling component 1 At least one manhole well 3 is connected on measurement tower 2, each manhole well 3 connects the tube coupling component 1, the measurement tower 2 Top is connected with platform assembly 4, and the platform assembly 4 includes being respectively facing two connecting rods 41 at 1 both ends of tube coupling component, Each connecting rod 41 is transversely provided with lateral bracket 42, and each lateral bracket 42 is mutually flat with the both ends of tube coupling component 1 respectively Row, two connecting rods 41 are respectively welded at 2 top of measurement tower.
Above-mentioned measurement tower 2 includes pedestal 21, interlude 22 and top section 23 along longitudinal direction, and the pedestal 21 is welded on institute Tube coupling component 1 is stated, the interlude 22 is connected to by bolt assembly 6 on the pedestal 21, and the top section 23 passes through bolt Component 6 is connected on the interlude 22.The measurement tower 2 is assembled respectively by pedestal 21, interlude 22 and top section 23, Particularly pedestal 21 is welded in 1 main body of tube coupling component, interlude 22 is connected to by bolt assembly 6 on pedestal 21, top Section 23 is also to be connected between by bolt assembly 6 in section 22, makes the installation strength of measurement tower 2 in 21 position bigger of pedestal, And it is smaller in interlude 22 and top section 23, to realize the installation strength differentiation of measurement tower 2, the effect that can be realized That, when running into beam wind effect, which deforms upon, can first by the deformation of top section 23 and interlude 22 come Partial deformation power is discharged, if it is rigid monoblock type connection entirely to avoid measurement tower 2, higher measurement tower 2 is then easy to damage bottom Seat 21 and cause measurement tower 2 be broken, improve safety coefficient.
In addition, the bolt assembly 6 between the interlude 22 and pedestal 21 includes:21 top of pedestal described in erecting and welding respectively With two backing plates 61 of 22 bottom of interlude, one of backing plate 61 and pedestal weld several reinforcing plates 62 between 21 periphery, Several reinforcing plates 62 are welded between 22 periphery of another backing plate 61 and interlude, pass through bolt 63 between two backing plates 61 Connection.Bolt assembly 6 between interlude 22 and the top section 23 includes:22 top of interlude described in erecting and welding respectively With two backing plates 61 of 23 bottom of top section, one of backing plate 61 and interlude weld several reinforcing plates between 22 periphery 62, several reinforcing plates 62 are welded between 23 periphery of another backing plate 61 and top section, pass through spiral shell between two backing plates 61 Bolt 63 connects.The bolt assembly 6 is welded on by backing plate 61 on pedestal 21, interlude 22 or top section 23, then 61 table of backing plate Face is additionally provided with reinforcing plate 62 to improve bonding strength, two neighboring backing plate 61 with pedestal 21, interlude 22 or 23 periphery of top section Connected again by bolt 63, be equivalent to pedestal 21, it is middle interruption or top section 23 it is adjacent between by the bearing knot of larger area Structure is connected with each other, and improves bonding strength and rigidity, ensure that the stability of measurement tower 2.
As shown in Fig. 2, the pedestal 21, interlude 22 and top section 23 are assembled steel tube supporting structure, make measurement tower 2 Section is to form rectangular configuration or quadrilateral structure with hollow cavity, all manhole wells by assembled steel tube supporting structure 3 are arranged in the hollow cavity of the measurement tower 2.Each manhole well 3 is connected to survey by hoop component 5 in a manner of anchor ear It measures on tower 2, manhole well 3 and measurement tower 2 is connected with each other by several hoop components 5, are solidified as a whole, but it is easy to disassemble, it should Hoop component 5 includes the anchor ear for being arranged on 3 outer wall of manhole well and connection anchor ear and the company for measuring 2 each vertical steel pipe stent of tower Extension bar.
As shown in figure 3, being equipped with two manhole wells 3 in the hollow cavity of above-mentioned measurement tower 2, set in the measurement tower 2 Two manhole wells 3, when being needed when one can be used as tube coupling mooring, sinking in place in two 3 passages of manhole well into inside tube coupling Personnel channel, another can be used as the interim pipeline access way of constructing, and two 3 passages of manhole well cooperate, and improve tube coupling Component 1 subsequently docks construction efficiency.For the immersed tube of seabed, the manhole at perforation top in the manhole well 3 is set, is set on manhole Openable watertight door is put, manhole well 3 is arranged near measurement tower 2, and 3 structure of manhole well is also using merogenesis assembled, Ke Yifen For three sections of 21 parts of pedestal, center section and top section, in addition to being directly welded at except 21 part of pedestal on tube coupling component 1, other Two intersegmental use bolts 63 connect.The necessary strict control of two 3 passages of manhole well, it is ensured that safety avoids the occurrence of what seawater poured into Risk;After the completion of sinking, sealing of hole should be carried out to top manway, it is ensured that permanent watertight and structural strength.
As shown in fig. 6, a kind of measurement in a closed series Tower System described in the utility model, by using mounted on tube coupling component 1 On a measurement tower 2, measurement 2 top connecting platform component 4 of tower, platform assembly 4 include be respectively facing 1 both ends of tube coupling component Two connecting rods 41, each connecting rod 41 is transversely provided with lateral bracket 42, and measurement dress is set in two lateral brackets 42 It puts, you can realize that the parameters such as the posture to tube coupling both ends, plan-position, elevation are carried out at the same time measurement;Tradition is needed in pipe relatively For the parameters measurement that two measurement towers 2 could realize tube coupling component 1 is installed at the both ends of section component 1 respectively, which surveys Amount Tower System optimizes structure, easier for installation, and operation can be realized by shorter platform assembly 4, make operation simpler It is single, the measurement of each parameter of posture when immersed tube tunnel tube coupling component 1 is transferred is applicable not only to, but also suitable for land tunneltron Each parameter measurement of posture of road docking, ensure that pipeline merging precision.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (10)

1. a kind of measurement in a closed series Tower System, which is characterized in that including the measurement tower (2) being mounted on tube coupling component (1), the survey At least one manhole well (3) is connected on amount tower (2), each manhole well (3) connects the tube coupling component (1), the survey The top of amount tower (2) is connected with platform assembly (4), and the platform assembly (4) includes being respectively facing tube coupling component (1) both ends Two connecting rods (41), each connecting rod (41) is transversely provided with lateral bracket (42).
A kind of 2. measurement in a closed series Tower System according to claim 1, which is characterized in that each lateral bracket (42) point Both ends not with the tube coupling component (1) are mutually parallel.
3. a kind of measurement in a closed series Tower System according to claim 1, which is characterized in that the measurement tower (2) is wrapped along longitudinal direction Pedestal (21), interlude (22) and top section (23) are included, the pedestal (21) is welded on the tube coupling component (1), the centre Section (22) is connected to by bolt assembly (6) on the pedestal (21), and the top section (23) is connected to by bolt assembly (6) On the interlude (22).
4. a kind of measurement in a closed series Tower System according to claim 3, which is characterized in that the interlude (22) and the bottom Bolt assembly (6) between seat (21) includes:Pedestal (21) top described in difference erecting and welding and the two of interlude (22) bottom A backing plate (61) welds several reinforcing plates (62), another backing plate between one of backing plate (61) and pedestal (21) periphery (61) several reinforcing plates (62) are welded between interlude (22) periphery, pass through bolt (63) between two backing plates (61) Connection.
5. a kind of measurement in a closed series Tower System according to claim 3, which is characterized in that the interlude (22) and the top Bolt assembly (6) between section (23) includes:At the top of interlude (22) and top section (23) bottom described in erecting and welding respectively Two backing plates (61), several reinforcing plates (62) are welded between one of backing plate (61) and interlude (22) periphery, it is another Several reinforcing plates (62) are welded between a backing plate (61) and top section (23) periphery, pass through spiral shell between two backing plates (61) Bolt (63) connects.
6. according to a kind of any measurement in a closed series Tower Systems of claim 3-5, which is characterized in that the pedestal (21), in Between section (22) and top section (23) be assembled steel tube supporting structure.
7. a kind of measurement in a closed series Tower System according to claim 6, which is characterized in that described measurement tower (2) section is logical It crosses assembled steel tube supporting structure and forms the rectangular configuration with hollow cavity.
8. a kind of measurement in a closed series Tower System according to claim 7, which is characterized in that each manhole well (3) is all provided with It puts in the hollow cavity of the measurement tower (2).
9. a kind of measurement in a closed series Tower System according to claim 8, which is characterized in that each manhole well (3) passes through Hoop component (5) is connected in a manner of anchor ear on measurement tower (2).
A kind of 10. measurement in a closed series Tower System according to claim 9, which is characterized in that the hollow cavity of the measurement tower (2) The manhole well (3) there are two setting in vivo.
CN201721106337.6U 2017-08-30 2017-08-30 A kind of measurement in a closed series Tower System Active CN207452955U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721106337.6U CN207452955U (en) 2017-08-30 2017-08-30 A kind of measurement in a closed series Tower System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721106337.6U CN207452955U (en) 2017-08-30 2017-08-30 A kind of measurement in a closed series Tower System

Publications (1)

Publication Number Publication Date
CN207452955U true CN207452955U (en) 2018-06-05

Family

ID=62249312

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721106337.6U Active CN207452955U (en) 2017-08-30 2017-08-30 A kind of measurement in a closed series Tower System

Country Status (1)

Country Link
CN (1) CN207452955U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113356271A (en) * 2021-06-11 2021-09-07 中船黄埔文冲船舶有限公司 Business turn over device of manhole well immersed tube
CN113700017A (en) * 2021-08-31 2021-11-26 中交第四航务工程局有限公司 Underwater stay cord positioning method and measuring and positioning method for underwater installation of immersed tube

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113356271A (en) * 2021-06-11 2021-09-07 中船黄埔文冲船舶有限公司 Business turn over device of manhole well immersed tube
CN113700017A (en) * 2021-08-31 2021-11-26 中交第四航务工程局有限公司 Underwater stay cord positioning method and measuring and positioning method for underwater installation of immersed tube
CN113700017B (en) * 2021-08-31 2023-02-03 中交第四航务工程局有限公司 Underwater stay cord positioning method and measuring and positioning method for underwater installation of immersed tube

Similar Documents

Publication Publication Date Title
CN102482860B (en) Offshore support structure and associated method of installing
CN104234079B (en) A kind of subway station Y type cast steel combines steel pipe column construction method
CN201053123Y (en) Deep foundation ditch tower crane platform base frame
CN207452955U (en) A kind of measurement in a closed series Tower System
EP3868962A1 (en) Assembly of a jacket structure
CN100501014C (en) Single-arm steel hanging box and construction method thereof
CN103225311B (en) For the fixing leveling structure that marine fan jacket foundation is installed
CN102146492A (en) Method for installing converter body equipment and tooling platform
CN207714108U (en) A kind of support system of the more arcading arched aqueducts of large span or bridge
CN205804277U (en) A kind of supporting construction for sheet-pile wharf breast wall pouring template
CN203866802U (en) Single-foot column oil production platform
CN108327848B (en) A kind of engineering ship is flexible to raise position of foetus installation method
CN207228148U (en) A kind of single-pipe tower precast splice type basis
CN110485386A (en) A kind of lifting operation method of ultra-large type gates of segmental shape installation in flood discharging tunnel
CN203238651U (en) Fixing and leveling structure for installing offshore wind turbine jacket foundation
CN206986872U (en) A kind of monoblock type job platform for offshore wind farm construction
CN207160721U (en) A kind of super-huge iron tower of power transmission line supervisor
CN201158822Y (en) Single-wall steel hanging box
CN205501971U (en) Attached component of special integrated form of marine wind power
CN208455485U (en) Combined type single wall steel bushing case apparatus
CN101344005B (en) Method for simultaneously mounting internal barrel and internals of deep well high pressure aeration reactor
CN109113750B (en) Emergency device for reinforcing failure of shield end and construction method thereof
CN105464060A (en) Supporting leg and iron shoe transportation construction method of inner-hole pressure steel pipe
CN207227959U (en) Overall peace is torn open connects high construction platform built in formula radial pattern colyliform steel pile casting
CN208416809U (en) A kind of offshore wind turbine pile foundation support table basis