CN202514349U - Assembled framework and greening wall using assembled framework - Google Patents

Assembled framework and greening wall using assembled framework Download PDF

Info

Publication number
CN202514349U
CN202514349U CN2012200716145U CN201220071614U CN202514349U CN 202514349 U CN202514349 U CN 202514349U CN 2012200716145 U CN2012200716145 U CN 2012200716145U CN 201220071614 U CN201220071614 U CN 201220071614U CN 202514349 U CN202514349 U CN 202514349U
Authority
CN
China
Prior art keywords
cup
channel
section steel
trip
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012200716145U
Other languages
Chinese (zh)
Inventor
李德刚
李君豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GREEN ENVIRONMENTAL PROTECTION (HOLDING) CO Ltd
Original Assignee
GREEN ENVIRONMENTAL PROTECTION (HOLDING) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from PCT/CN2012/070555 external-priority patent/WO2013107013A1/en
Application filed by GREEN ENVIRONMENTAL PROTECTION (HOLDING) CO Ltd filed Critical GREEN ENVIRONMENTAL PROTECTION (HOLDING) CO Ltd
Priority to CN2012200716145U priority Critical patent/CN202514349U/en
Application granted granted Critical
Publication of CN202514349U publication Critical patent/CN202514349U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a greening wall using an assembled framework. The greening wall using the assembled framework comprises a modular panel, planting holes and planting cups. Tenons are arranged on the frame of the modular panel. Through holes are arranged in the tenons. Connecting accessories are arranged at the upper ends of the tenons. The lower ends of the tenons are arranged at openings of U-shaped channel steel. Flanges are arranged at the openings of the channel steel. The flanges are in fit with grooves which are arranged in spring nuts. The spring nuts are clamped in the channel steel. Bolts sequentially penetrate through the connecting accessories and the tenons and then are tightly fixed with the spring nuts. The utility model additionally discloses the assembled framework, which comprises the channel steel, the spring nuts and the bolts. The channel steel is U-shaped. Inverted-L-shaped flanges are arranged at the openings of the channel steel. The flanges are in fit with the grooves which are arranged in the spring nuts. The spring nuts are clamped in the channel steel. The connecting accessories are arranged at the upper ends of the openings of the channel steel. The bolts penetrate through the connecting accessories and are tightly fixed with the spring nuts. By adopting the assembled framework, the modular panel can be conveniently, rapidly, safely and reliably installed on a wall, the maintenance is facilitated, the goals of preset assembling and cyclic use are realized, and the environment not only can be greened, but also can be protected.

Description

A kind of assembling frame and adopt the greening wall of this assembling frame
Technical field
The utility model relates to the greening wall, relates in particular to a kind of assembling frame and adopts the greening wall of this assembling frame.
Background technology
The greening wall; Be meant and make full use of different land occupation conditions; Selection is climbed up by holding on to plant and other plant setting and is depended on or the greening mode of paving on various structure and other space structure, comprises the greening on viaduct, building wall, domatic, river course embankment, roof, courtyard, flower stand, frame, balcony, corridor, post, fence, withered tree and various artificial hillock and the Architectural Equipment; It has the reduction noise, beautifies the environment, and purifies air, and improves city environmental quality and increases afforestation coverage rate, improves the effect of urban ecological environment.Wherein, modularization body of wall greening has obtained extensive use because its combination is more flexible, yet how modular plant being installed on the greening wall becomes a difficult problem; Traditional mounting means is to add skeleton at metope, and this kind installation method not only bothers, and is attractive in appearance inadequately; Revise difficulty, safeguard inconvenience, greening wall and plant are installed all can not independently more mend replacement; And skeletal fixation is on body of wall, and fixed point is easy to generate the hidden danger of leaking, and skeleton corrosion etc. influences entire system service life.
The utility model content
The purpose of the utility model is to the problems referred to above; A kind of assembling frame is provided, attractive in appearance inadequately on the wall to solve the installation of traditional modular plant, and trouble is installed; Safeguard inconvenience; The problem that whole service life is short provides a kind of this assembling frame of employing simultaneously, and the greening wall that can independently more mend replacement, be convenient to safeguard.
The purpose of the utility model is to realize through following technical scheme:
A kind of assembling frame; Comprise channel-section steel, spring nut and bolt, said channel-section steel is a U type structure, and its opening part is provided with the anti-limit of inverted L shape; The groove of offering on said anti-limit and the spring nut matches; Said spring nut is stuck in the channel-section steel, and said channel-section steel open upper end is provided with connection fittings, and said bolt passes connection fittings and spring nut is fastening.
Preferably, said connection fittings are the backing plate that has through hole.
Preferably, said groove is a dentation.
A kind of greening wall that adopts said assembling frame; Comprise module faceplate, be arranged at the implantation hole on the module faceplate and be arranged at the plantation cup in the implantation hole, the frame of said module faceplate is provided with trip, has through hole on the said trip; And the trip upper end is provided with connection fittings; Its lower end is positioned on the opening of U type channel-section steel, and said channel-section steel opening part is provided with the anti-limit of inverted L shape, and the groove of offering on said anti-limit and the spring nut matches; Said spring nut is stuck in the channel-section steel, and is fastening with spring nut behind screw bolt passes connection fittings, the trip.
Special, adjacent trip place is provided with draw-in groove on the said module faceplate frame, and trip, the draw-in groove of said trip, draw-in groove and another equal modules panel are complementary.
Special, said module faceplate tilts and is provided with 16 implantation hole, is provided with the plantation cup in the said implantation hole, and said plantation cup becomes big cylindrical structural from bottom to top successively for bore, and its opening part fastens has bowl cover.
Further, said bowl cover is a circular configuration, and middle has manhole, is provided with the donut that a plurality of radiuses increase from the inside to the outside successively in the said manhole, connects through connecting rod between each annulus.
Preferably; The cup of said plantation cup is provided with projection on one's body, and said implantation hole lower end is provided with retainer ring, has size and the identical recess of projection of planting cup on the said retainer ring; And retainer ring is provided with the insurance lockmaking groove that matches with projection, and plantation cup rotary setting is in implantation hole.
Preferably, the cup body of said plantation cup has osculum with cup at the end, and cup also is provided with dismountable draining rod on one's body.
Preferably, the bowl cover of said module faceplate, implantation hole, plantation cup and cup body be can independent dismounting the unit, conveniently more mend replacement, be convenient to safeguard.
The beneficial effect of the utility model does, said greening wall is through adopting this assembling frame, and can be conveniently quick, safe and reliable module faceplate be installed on the wall is simple in structure, is easy to realize; And module faceplate adopts trip, draw-in groove bond layout, is convenient to the expansion of vertical and horizontal; And module faceplate the tilt implantation hole and plantation cup of pattern design meet plant growing ecology; Implantation hole is independently placed plantation cup, and reducing phytopathogen can cross-infection; The rotation of implantation hole and plantation cup cooperates, is convenient for changing, and being provided with effectively to prevent to get loose and dropping of insurance lockmaking groove; Further, the plantation cup is gone up the osculum that is provided with, and make things convenient for the moisture entering and drain redundant moisture, and the draining that cup is provided with on one's body rod, the convenient water source that guides accurately flow to lower floor, reduces to run off; And be provided with the donut that a plurality of radiuses increase from the inside to the outside successively in the bowl cover manhole, connect through connecting rod between each annulus, the big I of manhole cooperates the plant growing size to cut out, and bowl cover is fastened on the plantation cup opening convenient and reliable.In addition, the bowl cover of the module faceplate, implantation hole, plantation cup of greening wall, plantation cup, cup body and plant are installed can both independently more mend replacement, maintains easily, preset assembling, Recycling can greening environment environmental protection again; Special, adopt the greening wall of assembling frame can two-sidedly execute working face, monomer-type is planted to plant and is changed rapidly, the indivedual plants of ability access, light weight reduces structural bearing simultaneously.
Description of drawings
According to accompanying drawing and embodiment the utility model is done further explain below.
Fig. 1 is the structural representation of a kind of assembling frame of the utility model;
Fig. 2 is the structural representation of the utility model module faceplate;
Fig. 3 is the structural representation of the utility model plantation cup;
Fig. 4 is the cup lid structure sketch map of the utility model plantation cup;
Fig. 5 expands structural representation for the utility model module faceplate;
Fig. 6 is the structural representation of the utility model draining rod;
Fig. 7 adopts the greening wall of assembling frame for the utility model.
Among the figure:
1, channel-section steel; 2, spring nut; 3, anti-limit; 4, connection fittings; 5, bolt; 6, trip; 7, implantation hole; 8, projection; 9, osculum; 10, connecting rod; 11, annulus; 12, draining rod.
Embodiment
Please, provided the structural representation of the said a kind of assembling frame of the utility model, in present embodiment with reference to shown in Figure 1; A kind of assembling frame comprises channel-section steel 1, spring nut 2 and bolt 5, and said channel-section steel 1 is a U type structure; Its opening part is provided with the anti-limit 3 of inverted L shape, and the groove of offering on said anti-limit 3 and the spring nut 2 matches, and said spring nut is stuck in the channel-section steel 1; Said channel-section steel 1 open upper end is provided with connection fittings 4, and it is fastening with spring nut 2 that said bolt 5 passes connection fittings 4;
Preferably, said connection fittings 4 are for having the backing plate of through hole, and are easy to assembly easy.
Preferably, said groove is a dentation.
During installation, put into spring nut 2 along channel-section steel 1 opening direction earlier, the easy design of spring nut 2 round edges is put into easily; With 90 ℃ of spring nut 2 rotations, make the groove of spring nut 2 be positioned at 3 places, anti-limit on channel-section steel 1 opening, place connection fittings 4 at channel-section steel 1 opening part; Inserting bolt 5 is passed connection fittings 4 and is got into spring nut 2; With spanner rotating bolt 5,, formed a strong and firm connection to guarantee the entering of spring nut 2 dentation grooves and to pin the anti-limit 3 on channel-section steel 1 opening.
Shown in Fig. 2-7, a kind of greening wall that adopts said assembling frame comprises module faceplate, is arranged at the implantation hole 7 on the module faceplate and is arranged at the plantation cup in the implantation hole 7; The frame of said module faceplate is provided with trip 6; Have through hole on the said trip 6, and trip 6 upper ends are provided with connection fittings 4, its lower end is positioned on the opening of U type channel-section steel 1; Said channel-section steel 1 opening part is provided with the anti-limit 3 of inverted L shape; The groove of offering on said anti-limit 3 and the spring nut 2 matches, and said spring nut 2 is stuck in the channel-section steel 1, and bolt 5 passes connection fittings 4 successively, trip 6 backs are fastening with spring nut 2.
Special, adjacent trip 6 places are provided with draw-in groove on the said module faceplate frame, and said trip 6, draw-in groove are complementary with trip 6, the draw-in groove of another equal modules panel, are convenient to the vertical and horizontal expansion.
Special, said module faceplate tilts and is provided with 16 implantation hole 7, is provided with the plantation cup in the said implantation hole 7; The inclination pattern design meets plant growing ecology, and said plantation cup is that bore becomes big cylindrical structural from bottom to top successively, and its opening part fastens has bowl cover; Install easily, firm.
Further; Said bowl cover is a circular configuration, and middle has manhole, is provided with the donut 11 that a plurality of radiuses increase from the inside to the outside successively in the said manhole; Connect through connecting rod 10 between each annulus 11, the big I of center of circle through hole cooperates the cutting of plant growing size.
Preferably, the cup of said plantation cup is provided with projection 8 on one's body, and said implantation hole 7 lower ends are provided with retainer ring; Have the identical recess of projection 8 of size and plantation glass on the said retainer ring, and retainer ring is provided with the insurance lockmaking groove that matches with projection 8, during installation; Earlier projection 8 alignment recess are put into the plantation cup, rotation plantation cup makes projection 8 get into insurance lockmaking groove; Effectively preventing gets loose drops, and plants the cup rotary setting in implantation hole 7, can independent dismounting.
Preferably, the cup body of said plantation cup has osculum 9 with cup at the end, make things convenient for moisture to get into and drain redundant moisture, and cup also is provided with dismountable draining rod 12 on one's body, and convenient guiding water source accurately flow to lower floor, reduces and runs off.
During installation, module faceplate is put on the channel-section steel 1 opening alignment modules panel trip 6 conjugation positions; Configuration connection fittings 4, inserting bolt 5 is through the connection fittings 4 that put in place and get into spring nut 2, with spanner rotating bolt 5; To guarantee that spring nut 2 dentation grooves get into and pin the anti-limit 3 on channel-section steel 1 opening; Then can be through assembling frame is fixing on the wall, thus module faceplate and the implantation hole 7 that is arranged on the module faceplate are fixed on the wall with the plantation cup, form the greening wall.
Above embodiment has just set forth the basic principle and the characteristic of the utility model; The utility model is not limited by the foregoing description; Under the prerequisite that does not break away from the utility model spirit and scope; The utility model also has various variations and change, and these variations and change all fall in the utility model scope that requires protection.The utility model requires protection domain to be defined by appending claims and equivalent thereof.

Claims (10)

1. assembling frame; It is characterized in that: comprise channel-section steel, spring nut and bolt, said channel-section steel is a U type structure, and its opening part is provided with the anti-limit of inverted L shape; The groove of offering on said anti-limit and the spring nut matches; Said spring nut is stuck in the channel-section steel, and said channel-section steel open upper end is provided with connection fittings, and said bolt passes connection fittings and spring nut is fastening.
2. a kind of assembling frame according to claim 1 is characterized in that: said connection fittings are the backing plate that has through hole.
3. a kind of assembling frame according to claim 1 is characterized in that: said groove is a dentation.
4. greening wall that adopts the said assembling frame of claim 1; Comprise module faceplate, be arranged at the implantation hole on the module faceplate and be arranged at the plantation cup in the implantation hole, it is characterized in that: the frame of said module faceplate is provided with trip, has through hole on the said trip; And the trip upper end is provided with connection fittings; Its lower end is positioned on the opening of U type channel-section steel, and said channel-section steel opening part is provided with the anti-limit of inverted L shape, and the groove of offering on said anti-limit and the spring nut matches; Said spring nut is stuck in the channel-section steel, and is fastening with spring nut behind screw bolt passes connection fittings, the trip.
5. greening wall according to claim 4 is characterized in that: adjacent trip place is provided with draw-in groove on the said module faceplate frame, and trip, the draw-in groove of said trip, draw-in groove and another equal modules panel are complementary.
6. greening wall according to claim 4; It is characterized in that: said module faceplate tilts and is provided with 16 implantation hole; Be provided with the plantation cup in the said implantation hole, said plantation cup becomes big cylindrical structural from bottom to top successively for bore, and its opening part fastens has bowl cover.
7. greening wall according to claim 6; It is characterized in that: said bowl cover is a circular configuration; Middle has manhole, is provided with the donut that a plurality of radiuses increase from the inside to the outside successively in the said manhole, connects through connecting rod between each annulus.
8. greening wall according to claim 6; It is characterized in that: the cup of said plantation cup is provided with projection on one's body; Said implantation hole lower end is provided with retainer ring; Have the identical recess of projection of size and plantation cup on the said retainer ring, and retainer ring is provided with the insurance lockmaking groove that matches with projection, plantation glass rotary setting is in implantation hole.
9. greening wall according to claim 6 is characterized in that: the cup body of said plantation cup has osculum with cup at the end, and cup also is provided with dismountable draining rod on one's body.
10. according to each described greening wall of claim 4 to 9, it is characterized in that: the bowl cover of said module faceplate, implantation hole, plantation cup and cup body be can independent dismounting the unit.
CN2012200716145U 2012-01-19 2012-02-29 Assembled framework and greening wall using assembled framework Expired - Lifetime CN202514349U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200716145U CN202514349U (en) 2012-01-19 2012-02-29 Assembled framework and greening wall using assembled framework

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
PCT/CN2012/070555 WO2013107013A1 (en) 2012-01-19 2012-01-19 Assembly framework and landscaping wall adopting the assembly framework
CNPCT/CN2012/070555 2012-01-19
CN2012200716145U CN202514349U (en) 2012-01-19 2012-02-29 Assembled framework and greening wall using assembled framework

Publications (1)

Publication Number Publication Date
CN202514349U true CN202514349U (en) 2012-11-07

Family

ID=47097333

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200716145U Expired - Lifetime CN202514349U (en) 2012-01-19 2012-02-29 Assembled framework and greening wall using assembled framework

Country Status (1)

Country Link
CN (1) CN202514349U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103380707A (en) * 2013-07-19 2013-11-06 张宇顺 Plant cultivation unit and three-dimensional greening wall comprising same
CN105594581A (en) * 2015-12-25 2016-05-25 深圳市润和天泽城市立体生态科技有限公司 Hydroponic green plant wall
CN109315282A (en) * 2018-12-12 2019-02-12 芭芭拉(厦门)农业科技有限公司 Vertical hydroponic system
CN109315281A (en) * 2018-12-12 2019-02-12 芭芭拉(厦门)农业科技有限公司 It is deployable to draw leaky fixing device
CN109898549A (en) * 2019-03-12 2019-06-18 中国十九冶集团有限公司 Ecological rubble barricade and its construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103380707A (en) * 2013-07-19 2013-11-06 张宇顺 Plant cultivation unit and three-dimensional greening wall comprising same
CN103380707B (en) * 2013-07-19 2015-05-20 张宇顺 Plant cultivation unit and three-dimensional greening wall comprising same
CN105594581A (en) * 2015-12-25 2016-05-25 深圳市润和天泽城市立体生态科技有限公司 Hydroponic green plant wall
CN109315282A (en) * 2018-12-12 2019-02-12 芭芭拉(厦门)农业科技有限公司 Vertical hydroponic system
CN109315281A (en) * 2018-12-12 2019-02-12 芭芭拉(厦门)农业科技有限公司 It is deployable to draw leaky fixing device
CN109898549A (en) * 2019-03-12 2019-06-18 中国十九冶集团有限公司 Ecological rubble barricade and its construction method

Similar Documents

Publication Publication Date Title
CN202514349U (en) Assembled framework and greening wall using assembled framework
CN101736806B (en) Three-dimensional reservoir in three-dimensional green forest and comprehensive utilization of structure thereof with wind power
WO2007117064A1 (en) Solar street light
US20120005954A1 (en) Modular growing panel system and method for covering structures with vegetation
KR20200009934A (en) Solar Panel Fixing System
CN204317148U (en) Edible mushroom photovoltaic green-house
CN204825684U (en) Ecological sound screen
KR100535743B1 (en) Assembly retaining supporter for plant tree
CN204343192U (en) The green totally-enclosed sound barrier in a kind of viaduct
CN207692542U (en) A kind of tree pool structure with protecting cover
CN108222233B (en) Rain inlet structure for constructing sponge city and construction method thereof
CN215223415U (en) Vine climbing frame for greening
CN214329413U (en) Building landscape integrated device of characteristic small town
CN203181648U (en) Three-dimensional greening plantation system
CN203735149U (en) Roof garden large-scale tree fixing structure
CN210460174U (en) Garden guardrail
CN201137308Y (en) Human and vehicle shunting type villa group
CN208768553U (en) A kind of community's road scaffolding system for vegetable growing
KR102075395B1 (en) Demolition and reconstruction structure and method of construction
KR100384351B1 (en) Constructing method soundproof wall available plant planting
CN207213914U (en) A kind of garden landscape lamp with precipitation measurement function
CN213927825U (en) Outdoor wear-resisting anticorrosive wooden view guardrail
CN220469554U (en) Municipal administration drainage pipe maintains with foldable warning rail
CN214403034U (en) Landscape guardrail capable of planting three-dimensional greening
CN205560522U (en) Light -emitting diode (LED) lawn lamp

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20121107