CN202513570U - Non-outage device for changing electric energy meter - Google Patents

Non-outage device for changing electric energy meter Download PDF

Info

Publication number
CN202513570U
CN202513570U CN2012201928856U CN201220192885U CN202513570U CN 202513570 U CN202513570 U CN 202513570U CN 2012201928856 U CN2012201928856 U CN 2012201928856U CN 201220192885 U CN201220192885 U CN 201220192885U CN 202513570 U CN202513570 U CN 202513570U
Authority
CN
China
Prior art keywords
electric energy
outage
energy meter
meter
circuit breaker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012201928856U
Other languages
Chinese (zh)
Inventor
吴继亮
毛丽荣
胡秋生
沈从和
吴世斌
张强
刘敏
吴庆泉
吴朝晖
黄斌颖
林晓泉
周一俊
吴剑
彭鑫
胡芬芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGYUAN POWER SUPPLY BUREAU
State Grid Corp of China SGCC
Original Assignee
QINGYUAN POWER SUPPLY BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGYUAN POWER SUPPLY BUREAU filed Critical QINGYUAN POWER SUPPLY BUREAU
Priority to CN2012201928856U priority Critical patent/CN202513570U/en
Application granted granted Critical
Publication of CN202513570U publication Critical patent/CN202513570U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a non-outage device for changing an electric energy meter, which comprises a circuit breaker, wherein the circuit breaker is connected with two incoming wires and two outgoing wires. The non-outage device for changing the electric energy meter has the advantages that a complex link of publishing an ''outage notice'', which takes most time and is most uncontrollable, before the electric energy meter is set is omitted by the non-outage device in a mode of replacing the electric energy meter under the non-outage status, so that operation personnel can directly enter the working status when arriving at the field and do not need to firstly confirm whether the outage notifying work is implemented, the worry of trouble in the rear that clients make a complaint because of feeling dissatisfied is relieved, and the working efficiency is improved. The wiring protector has the characteristics of convenience in manufacturing, low construction cost, simplicity in operation, convenience in carrying, safety and reliability, the operation maintaining cost can be saved for power supply enterprises, and the time limit for setting the meter in turns is shortened. Although no charging is performed because of directly bypassing the meter during meter setting in the non-outage mode, normal electric quantity loss is caused for the client if the meter is set in an outage mode, and the social benefit created by the meter setting in the non-outage mode and good evaluations from client can not be measured by the electric quantity.

Description

A kind of electric energy meter changes the table device that do not have a power failure
Technical field
The utility model relates to a kind of electric energy meter and changes the table device that do not have a power failure.
Background technology
The electric energy meter cycle by turns and the professional mileometer adjustment of change electricity consumption all need the operation that has a power failure in short-term to the client; Because the client has relatively high expectations to uninterrupted power supply, inform work though carry out by all kinds of means to have a power failure, but some client do not have " power off notifying " advance notice of going or staying meaning power supply department in advance; The customer information archives are incomplete in the power marketing system; Telephone number change is frequent, and client's multiple uncertain factor such as fail in time to receive calls causes the client not know the operation that has a power failure.Be exactly always the client thinks that the power supply department power failure is wrong, the power failure of power supply enterprise is felt dissatisfied, exists than the big customer thus and complain risk.Need prior notice client time and effort consuming before the power failure operation, it is on the low side to cause the electric energy meter cycle to rotate and change the professional mileometer adjustment operating efficiency of electricity consumption, notifies more than the used time ratio actual job time of client.
The utility model content
The purpose of the utility model is to provide a kind of electric energy meter to change the table device that do not have a power failure, and can effectively solve needs when prior art need be changed electric energy meter to have a power failure, and influences the problem of the normal electricity consumption of client.
In order to solve the problems of the technologies described above, the utility model is realized through following technical scheme: a kind of electric energy meter changes the table device that do not have a power failure, and comprises circuit breaker, is connected to two inlet wires and two outlets on the said circuit breaker.
Preferably, said circuit breaker is parallel with the Miswire determining device, and said Miswire determining device is provided with acoustic-optic alarm; Prevent to connect anti-line the normal electricity consumption of client is impacted, remind the staff simultaneously.
Preferably; Also comprise protection relay; The control switch of said protection relay and circuit breaker series connection, said Miswire determining device is parallelly connected with the control switch and the circuit breaker of protection relay, and the breaking coil of said protection relay links to each other with the Miswire determining device; Occurring connecing under the situation of anti-line, can open protection outage automatically.
Preferably, also comprise disconnecting relay, the control switch of said disconnecting relay is connected with circuit breaker, and the switch of said disconnecting relay is also connected with the Miswire determining device; All normally restart the connection circuit down in all situation, further improve the wiring fail safe.
Preferably, be connected with voltmeter in the said outlet; Whether normal, have or not the situation of loose contact if observing output voltage.
Preferably, the end of the end of said inlet wire and outlet all is connected with wire clamp; Make things convenient for fast-wiring, increase work efficiency.
Compared with prior art; The utility model has the advantages that: saved " power off notifying " this road before the mileometer adjustment through the mode of using this device to carry out not have a power failure replacing table meter and accounted for time, least controlled numerous and diverse link most; Make the operating personnel once can directly getting into operating state and need not to confirm earlier whether the power failure work of informing puts in place to the scene; Remove the discontented trouble and worry of complaining of client, improved operating efficiency.And the wiring protector has simple for production, cheap, simple to operate, easy to carry, safe and reliable characteristics; Can be power supply enterprise and practice thrift operation expense; Shorten the mileometer adjustment time limit by turns; Mileometer adjustment is not directly chargeed around table though do not have a power failure, and adopts the power failure mileometer adjustment can cause the normal power loss of client yet, and good evaluation of social benefit that the mileometer adjustment that do not have a power failure is created and client can't be weighed by power consumption.
Description of drawings
Fig. 1 changes the table schematic representation of apparatus that do not have a power failure for a kind of electric energy meter of the utility model;
Sketch map when Fig. 2 does not have a power failure the device connection for a kind of electric energy meter of the utility model changes table.
Embodiment
Consult Fig. 1 and change the do not have a power failure embodiment of device of table for a kind of electric energy meter of the utility model; A kind of electric energy meter changes the table device that do not have a power failure; Comprise circuit breaker 1, Miswire determining device 4, protection relay 6, disconnecting relay 7, be connected to two inlet wires 2 and two outlets 3 on the said circuit breaker 1, the control switch of said protection relay 6 and circuit breaker 1 series connection; Said Miswire determining device 4 is parallelly connected with the control switch and the circuit breaker 1 of protection relay 6; The breaking coil of said protection relay 6 links to each other with Miswire determining device 4, and said Miswire determining device 4 is provided with acoustic-optic alarm 5, and the control switch of said disconnecting relay 7 is all connected with circuit breaker 1 and Miswire determining device 4; Be connected with voltmeter 8 in the said outlet 3, the end of the end of said inlet wire 2 and outlet 3 all is connected with wire clamp.
The connection layout of as shown in Figure 2 device is received two inlet wires 2 on the line before the primary circuit electric energy meter switch 10, and with the rear that primary circuit circuit breaker 9 is received in two outlets 3, the staff just can change or keep in repair electric energy meter 11 under situation about not having a power failure.The effect of Miswire determining device 4: protector can the automatic disconnection circuit when turnover phase line and zero line wrong, even circuit breaker 1 combined floodgate can not cause short circuit yet, has the wiring error acousto-optic hint.
This device has been installed has been carried out the operating process of electric energy meter when changing table: 1. carried out according to the charged dress of electric energy meter (tearing open) operation or work standard and change the table preparation routine; 2. killer switch is in off-state in the inspection primary circuit; 3. successively inlet wire is clipped on the input terminal in the electric energy metering box, check whether the power supply indicator on the Miswire determining device is lighted,, need reexamine if the explanation power supply contact that do not work is bad; 4. successively outlet is clipped to the outlet terminal in the electric energy metering box, the voltmeter of inspection Miswire determining device indicates whether normally, if do not have indication or indicate declaration of exception outlet contact bad, need reexamine terminal clamp; 5. whether the inspection acoustic-optic alarm reports to the police, if report to the police then explanation turnover line is not corresponding, protection relay starts simultaneously, and the automatic disconnection circuit needs the transposing circuit, does not report to the police if audible-visual annunciator, and explains that wiring is correct; 6. the disconnecting relay that closes is connected circuit; 7. break off the isolation switch of primary circuit in the ammeter box successively, disjunction electric energy meter outlet circuit breaker carries out electric energy meter mounting or dismounting operation.Save " power off notifying " this road before the mileometer adjustment through the mode of using this device to carry out not have a power failure replacing table meter and accounted for time, least controlled numerous and diverse link most; Make the operating personnel once can directly getting into operating state and need not to confirm earlier whether the power failure work of informing puts in place to the scene; Remove the discontented trouble and worry of complaining of client, improved operating efficiency.And the wiring protector has simple for production, cheap, simple to operate, easy to carry, safe and reliable characteristics; Can be power supply enterprise and practice thrift operation expense; Shorten the mileometer adjustment time limit by turns; Mileometer adjustment is not directly chargeed around table though do not have a power failure, and adopts the power failure mileometer adjustment can cause the normal power loss of client yet, and good evaluation of social benefit that the mileometer adjustment that do not have a power failure is created and client can't be weighed by power consumption.
The above is merely the specific embodiment of the utility model; But the technical characterictic of the utility model is not limited thereto; Any those skilled in the art is in the field of the utility model, and variation of being done or modification all are encompassed among the claim of the utility model.

Claims (6)

1. an electric energy meter changes the table device that do not have a power failure, and it is characterized in that: comprise circuit breaker (1), be connected to two inlet wires (2) and two outlets (3) on the said circuit breaker (1).
2. a kind of electric energy meter as claimed in claim 1 changes the table device that do not have a power failure, and it is characterized in that: said circuit breaker (1) is parallel with Miswire determining device (4), and said Miswire determining device (4) is provided with acoustic-optic alarm (5).
3. a kind of electric energy meter as claimed in claim 2 changes the table device that do not have a power failure; It is characterized in that: also comprise protection relay (6); The control switch of said protection relay (6) and circuit breaker (1) series connection; Said Miswire determining device (4) is parallelly connected with the control switch and the circuit breaker (1) of protection relay (6), and the breaking coil of said protection relay (6) links to each other with Miswire determining device (4).
4. change the table device that do not have a power failure like each described a kind of electric energy meter in the claim 1 to 3; It is characterized in that: also comprise disconnecting relay (7); The control switch of said disconnecting relay (7) is connected with circuit breaker (1), and the switch of said disconnecting relay (7) is also connected with Miswire determining device (4).
5. change the table device that do not have a power failure like each described a kind of electric energy meter in the claim 1 to 3, it is characterized in that: be connected with voltmeter (8) in the said outlet (3).
6. change the table device that do not have a power failure like each described a kind of electric energy meter in the claim 1 to 3, it is characterized in that: the end of the end of said inlet wire (2) and outlet (3) all is connected with wire clamp.
CN2012201928856U 2012-04-28 2012-04-28 Non-outage device for changing electric energy meter Expired - Lifetime CN202513570U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201928856U CN202513570U (en) 2012-04-28 2012-04-28 Non-outage device for changing electric energy meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201928856U CN202513570U (en) 2012-04-28 2012-04-28 Non-outage device for changing electric energy meter

Publications (1)

Publication Number Publication Date
CN202513570U true CN202513570U (en) 2012-10-31

Family

ID=47066027

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201928856U Expired - Lifetime CN202513570U (en) 2012-04-28 2012-04-28 Non-outage device for changing electric energy meter

Country Status (1)

Country Link
CN (1) CN202513570U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105527476A (en) * 2015-12-23 2016-04-27 华威博奥电力设备有限公司 Device and method for plugging and unplugging electric energy meter without power-off
CN110763884A (en) * 2019-11-26 2020-02-07 云南电网有限责任公司临沧供电局 Method for rapidly plugging and unplugging on-load replacement metering device
CN112798835A (en) * 2020-12-28 2021-05-14 广东电网有限责任公司中山供电局 Uninterrupted meter replacing device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105527476A (en) * 2015-12-23 2016-04-27 华威博奥电力设备有限公司 Device and method for plugging and unplugging electric energy meter without power-off
CN110763884A (en) * 2019-11-26 2020-02-07 云南电网有限责任公司临沧供电局 Method for rapidly plugging and unplugging on-load replacement metering device
CN110763884B (en) * 2019-11-26 2023-03-17 云南电网有限责任公司临沧供电局 Method for rapidly plugging and unplugging on-load replacement metering device
CN112798835A (en) * 2020-12-28 2021-05-14 广东电网有限责任公司中山供电局 Uninterrupted meter replacing device

Similar Documents

Publication Publication Date Title
CN103997079B (en) A kind of electric vehicle alternating-current charging pile and using method thereof
CN101281229A (en) Power distribution network distribution circuit fault location system
WO2012068774A1 (en) Lithium iron battery-based direct current power supply emergency response system for transformer substation
CN101539612A (en) System for on-line monitoring of running quality of battery
CN102280864B (en) Post-failure live treatment method for protection device of distribution network system and portable protection device
CN204156542U (en) A kind of electric vehicle alternating-current charging pile
CN202513570U (en) Non-outage device for changing electric energy meter
CN110542772A (en) Nondestructive replacement device and method for electric energy meter
CN109787132A (en) A kind of intelligence 10kV septal accessory pathways vehicle and temporary transmission system
CN103163419A (en) Indicator and method for cable core correction and transformer tripping outlet correction
CN202206125U (en) Portable protection device for electrification process after distribution system protection device failure
JP2013172599A (en) Leakage detection automatic restoration system
CN105048561A (en) Alternating current charging pile device
CN204992580U (en) Expanded not repeated fixed measuring equipment of dual power supply
CN201289990Y (en) Multifunctional low voltage distribution box
CN103592507A (en) Voltage loop alarm for metering devices of transformer station
CN201199263Y (en) Test device for load-matching monitoring instrument
CN113049877A (en) Device and method for managing user load abnormity by special transformer metering point
CN207301792U (en) A kind of interface test system between DC control system and stabilized control system
CN104505823A (en) Method for power maintenance through transient power stop and transient stop selective reclosing circuit
CN201044489Y (en) Short message locating trouble device
CN214590762U (en) Power supply control device for vehicle-mounted water purifying equipment
CN204992274U (en) Dual supply massive quantity power supply and high expanded not repeated fixed measuring equipment of low meter that supplies
CN205581225U (en) Electric automobile direct current vehicle interface circuit simulator
CN104682563B (en) Operation and maintenance integral management platform of AC/ DC system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121107

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 323800 LISHUI, ZHEJIANG PROVINCE TO: 323899 LISHUI, ZHEJIANG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20121107

Address after: Songyuan town Meng Zhou Street 201 No. 323899 Zhejiang city of Lishui Province in Qingyuan County

Patentee after: Qingyuan Power Supply Bureau

Patentee after: State Grid Corporation of China

Address before: 323800, No. 201, Meng Chau Street, Pine Town, Zhejiang, Lishui

Patentee before: Qingyuan Power Supply Bureau

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20121031