CN202509793U - Limiting device for jacking of buildings or structures - Google Patents

Limiting device for jacking of buildings or structures Download PDF

Info

Publication number
CN202509793U
CN202509793U CN2012201370252U CN201220137025U CN202509793U CN 202509793 U CN202509793 U CN 202509793U CN 2012201370252 U CN2012201370252 U CN 2012201370252U CN 201220137025 U CN201220137025 U CN 201220137025U CN 202509793 U CN202509793 U CN 202509793U
Authority
CN
China
Prior art keywords
limiting
jacking
thick pillar
limited post
spacing hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012201370252U
Other languages
Chinese (zh)
Inventor
赵国强
葛以衡
桂钰
陈俊良
于国伦
陈佳璋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Municipal Engineering Group Co Ltd
Original Assignee
Shanghai Urban Construction Municipal Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Municipal Engineering Group Co Ltd filed Critical Shanghai Urban Construction Municipal Engineering Group Co Ltd
Priority to CN2012201370252U priority Critical patent/CN202509793U/en
Application granted granted Critical
Publication of CN202509793U publication Critical patent/CN202509793U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to the technical field of jacking of buildings or structures, and in particular relates to a limiting device for jacking of buildings or structures. The limiting device comprises a plurality of limiting holes and limiting columns, wherein the number of the limiting columns corresponds to that of the limiting holes, the limiting holes are vertically formed on huge pillar beam systems, the bottoms of the limiting columns are fixed on an underpinning, the limiting columns are matched with the limiting holes in shape and are sleeved in the limiting holes, and the limiting columns are in clearance fit with the limiting holes. The limiting device disclosed by the utility model has the advantages that the limiting columns are arranged in gaps among the huge pillar beam systems, and when the buildings or the structures are jacked, a limiting effect of the limiting device is realized through confliction between the porous inner wall of the huge pillar beam systems and the limiting columns, so that the damage on the buildings or the structures is avoided; in addition, limiting devices can be arranged on multiple points of the huge pillar beam systems, and the limiting positions are separated, so that overlarge local pressure on the buildings or the structures is avoided.

Description

Stopping means is used in building or structure jacking
Technical field
The utility model relates to building or structure jacking technical field, is specifically related to a kind of being used for to use stopping means in the displacement restriction of building or structure jacking building or structure jacking process are carried out to(for) superstructure.
Background technology
At present; When building or structure carry out jacking; When carrying out jacking for bridge or house, can be because the deflection of small horizontal length travel, horizontal cross displacement or horizontal direction may appear in the influence of other unfavorable factor in vertical error that hydraulic jack is installed and the jacking process in the jacking process; In a single day just be difficult to correct again and displacement occurs, and have potential safety hazard.For avoiding occurring this type of situation, need usually the plane stopping means to be set at building or structure, restriction is in length and breadth to contingent displacement.
Common stopping means is laid the displacement that steel work or concrete structure limit horizontal direction in the jacking process on jacking integrally-built four jiaos or four limits; As shown in Figure 1; In bridge jacking, the thick pillar hoop is set on bridge pier, on the thick pillar hoop, limited post is set; Be welded to connect in aggregatesly between thick pillar hoop and the limited post, utilize the integral rigidity of limited post, thick pillar hoop, post to come to carry out spacing during jacking bridge top.
This kind structure has following shortcoming in actual use: the one, for facade damage is arranged, friction that can be relative between limited post and building, the structure external surface in the jacking process; The 2nd, concentrate spacing position, and excessive for building, structure local pressure, effect is undesirable.
Summary of the invention
The purpose of the utility model is the weak point according to above-mentioned prior art; Provide a kind of building or structure jacking to use stopping means; The gap that this device passed through between the thick pillar girder system is provided with limited post, cooperates through drawing and pulling type and has realized the jacking of limit function carry out to(for) building or structure.
The utility model purpose realizes being accomplished by following technical scheme:
Stopping means is used in a kind of building or structure jacking; Relate to the thick pillar girder system on building or structure, the foundation underpinning of treating jacking and the post that is clamped in said building or structure; It is characterized in that: said stopping means comprise some spacing holes and with the corresponding limited post of said spacing hole quantity; Said spacing hole vertically is opened on the said thick pillar girder system; Said limited post bottom is fixed on the said foundation underpinning, and said limited post and said spacing hole form fit and quilt cover change in said spacing hole, said limited post and said spacing hole matched in clearance.
Said thick pillar girder system is constituted by some thick pillar beams and some linking beams, and said linking beam is located between per two adjacent thick pillar beams, and said thick pillar beam is connected as a single entity, and said spacing hole vertically is opened on the said linking beam.
Said limited post is the cuboid steel framed structure.
The utility model has the advantages that: the gap through between the thick pillar girder system is provided with limited post, is inwall and the realization of the conflict between limited post position-limiting action through the perforate of thick pillar girder system in jacking, has avoided the damage of damage building or structure; And can stopping means be set at the multiple spot at thick pillar girder system place, and spacing position is disperseed, avoided excessive for building, structure local pressure.
Description of drawings
Accompanying drawing 1 is this device overall structure sketch map.
The specific embodiment
Through embodiment the utility model characteristic and other correlated characteristic are done further explain below in conjunction with accompanying drawing, so that technician's of the same trade understanding:
As shown in Figure 1, label 1-6 representes respectively: bent cap 1, bridge pier 2, thick pillar beam 3, linking beam 4, limited post 5, foundation underpinning 6.
Referring to Fig. 1, present embodiment combines the disconnected capital of bridge to rise construction operation to be elaborated for the concrete structure of stopping means:
When the disconnected post of bridge was constructed, the building unit that relates to mainly comprised bent cap 1, bridge pier 2, thick pillar beam 3 and linking beam 4, and wherein thick pillar beam 3 is exactly to be attached to post (bridge pier 2) girder system all around, is a kind of theory that underpins, and in translation and bridge jacking, has used more.During jacking, jack-up hydraulic ram passes to thick pillar beam 3 to power, and thick pillar beam 3 passes to bridge pier 2 to power again, and bridge pier 2 passes to superstructure (bent cap 1 etc.), the friction Transfer of Shear through new and old concrete between thick pillar beam 3 and the bridge pier 2.Referring to Fig. 1, have three posts respectively at the same bridge pier 2 of bridge in the present embodiment, have respectively on it between 3, three thick pillar beams 3 of thick pillar beam and connect into a thick pillar girder system with linking beam 4.
Each linking beam 4 is rectangular-shaped frame type reinforced concrete structure, is located between per two adjacent thick pillar beams 3, and said thick pillar beam 3 is connected as a single entity.Wherein has perforate in the frame construction of linking beam 4; This perforate is cuboid frame sidewall and vertically is provided with, and present embodiment has utilized the built-up section of this perforate as stopping means just, i.e. spacing hole; Corresponding, a limited post 5 is set on the position of foundation underpinning 6 corresponding spacing holes.Limited post 5 is the cuboid steel framed structure; Its bottom is fixed on the said foundation underpinning 6; Said limited post 5 changes in said spacing hole with said spacing hole form fit and quilt cover, has certain clearance between said limited post 5 and the said spacing hole, forms matched in clearance.This spacing gap can suitably be adjusted through increasing steel plate.
When jacking; Through the mutual conflict between limited post 5 outer surfaces and the spacing hole inwall; Each limited post 5 can limit superstructure moving of four direction in the horizontal direction; And the rotation of level, so limited the displacement of superstructure, and before jacking He in the jacking, can carry out trickle adjusting through steel plate.And spacing hole and limited post 5 can be set on the multiple spot position of thick pillar girder system, so spacing position is disperseed, avoided excessive for building, structure local pressure.
Although above detailed description through embodiment describes for the technical scheme of the utility model, the scope of law that should be appreciated that this description is limited the words of the utility model appending claims.It only is exemplary should being interpreted as for the detailed description of stopping means in the foregoing description, rather than comprises the embodiment that each is possible.Even because exhaustive each possible embodiment be not impossible also be unpractical.So those skilled in the art should recognize that obviously spacing hole can directly utilize the gap on the thick pillar girder system in the stopping means, also can when pouring into a mould the thick pillar girder system, be chosen in targetedly and reserve some spacing holes on the thick pillar girder system according to operating mode.Spacing hole and limited post shape also select also not only to be confined to this simultaneously; As long as the sidewall of limited post, spacing hole vertically is provided with and cooperatively interacts; The displacement that makes progress when not retraining the superstructure jacking can realize spacing function; The time can combine actual condition to select other other shapes in construction, like cylindric, prism-shaped etc., and this still falls within the scope of claims.

Claims (3)

1. stopping means is used in building or structure jacking; Relate to the thick pillar girder system on building or structure, the foundation underpinning of treating jacking and the post that is clamped in said building or structure; It is characterized in that: said stopping means comprise some spacing holes and with the corresponding limited post of said spacing hole quantity; Said spacing hole vertically is opened on the said thick pillar girder system; Said limited post bottom is fixed on the said foundation underpinning, and said limited post and said spacing hole form fit and quilt cover change in said spacing hole, said limited post and said spacing hole matched in clearance.
2. stopping means is used in a kind of building according to claim 1 or structure jacking; It is characterized in that: said thick pillar girder system is constituted by some thick pillar beams and some linking beams; Said linking beam is located between per two adjacent thick pillar beams; And said thick pillar beam is connected as a single entity, said spacing hole vertically is arranged on the said linking beam.
3. stopping means is used in a kind of building according to claim 1 or structure jacking, it is characterized in that: said limited post is the cuboid steel framed structure.
CN2012201370252U 2012-04-01 2012-04-01 Limiting device for jacking of buildings or structures Expired - Lifetime CN202509793U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201370252U CN202509793U (en) 2012-04-01 2012-04-01 Limiting device for jacking of buildings or structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201370252U CN202509793U (en) 2012-04-01 2012-04-01 Limiting device for jacking of buildings or structures

Publications (1)

Publication Number Publication Date
CN202509793U true CN202509793U (en) 2012-10-31

Family

ID=47062285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201370252U Expired - Lifetime CN202509793U (en) 2012-04-01 2012-04-01 Limiting device for jacking of buildings or structures

Country Status (1)

Country Link
CN (1) CN202509793U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104989123A (en) * 2015-07-09 2015-10-21 上海天演建筑物移位工程股份有限公司 Displacement limiting device and method for building slope adjusting jacking
CN107165285A (en) * 2017-06-01 2017-09-15 浙江省建筑设计研究院 A kind of chute type lateral limiting device for building jacking

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104989123A (en) * 2015-07-09 2015-10-21 上海天演建筑物移位工程股份有限公司 Displacement limiting device and method for building slope adjusting jacking
CN107165285A (en) * 2017-06-01 2017-09-15 浙江省建筑设计研究院 A kind of chute type lateral limiting device for building jacking

Similar Documents

Publication Publication Date Title
CN103669226A (en) River-crossing prestressed concrete continuous beam bridge box girder 0# block support construction method
CN105113540A (en) Construction method for newly-built large deep foundation pit basements under protection building
CN101781912B (en) Vertical positioning connection structure of tower body of tower mast mechanical equipment and foundation
CN203654786U (en) Bolt positioning frame for subgrade contact network support pillar construction
CN202509793U (en) Limiting device for jacking of buildings or structures
CN201738597U (en) Sectional steel and steel pipe combined type support system of beam with high and large cross section
CN202227590U (en) Column rib locator for reinforced concrete column
CN204266132U (en) Adopt the railway Frame Pier crossbeam of D type beam
CN109339479B (en) Internal replacement structure and method for existing reinforced concrete building
CN101397814A (en) Supporting method of factory building roof system at super large column-removed spacing
CN102815606A (en) Device for realizing operation of mobile tower crane on structural floor and construction method
CN203144907U (en) Large-span dual-layer bailey truss structure
CN207934054U (en) A kind of prefabricated assembled raft foundation
CN102758405A (en) Technology for integrally jacking steel box girder and concrete beam
CN102828616A (en) High-formwork support system for roof
CN102296527A (en) Portal pier continuous rigid frame beam
CN202865731U (en) Saddle weight steel box structure of steel truss cable-stayed bridge
CN210127028U (en) Gantry crane end well track beam and gantry crane end well track mounting assembly
CN211142816U (en) Construction platform
CN203498852U (en) Vertical connecting structure of tower crane chassis and foundation
CN203065975U (en) Box beam block number zero pouring supporting system
CN203034378U (en) Transverse adjusting and limiting device
CN208685617U (en) A kind of foundation underpinning system of old brick foundation building
CN203846405U (en) Bridge construction cast-in-place template
KR101341618B1 (en) Concrete form apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20121031

CX01 Expiry of patent term