CN202492841U - Post-grouting concrete pre-stressed hollow square pile - Google Patents

Post-grouting concrete pre-stressed hollow square pile Download PDF

Info

Publication number
CN202492841U
CN202492841U CN2012200833628U CN201220083362U CN202492841U CN 202492841 U CN202492841 U CN 202492841U CN 2012200833628 U CN2012200833628 U CN 2012200833628U CN 201220083362 U CN201220083362 U CN 201220083362U CN 202492841 U CN202492841 U CN 202492841U
Authority
CN
China
Prior art keywords
hollow square
concrete pre
square pile
post
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200833628U
Other languages
Chinese (zh)
Inventor
梁军起
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG ZHONGJI PILE INDUSTRY Co Ltd
Original Assignee
ZHEJIANG ZHONGJI PILE INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG ZHONGJI PILE INDUSTRY Co Ltd filed Critical ZHEJIANG ZHONGJI PILE INDUSTRY Co Ltd
Priority to CN2012200833628U priority Critical patent/CN202492841U/en
Application granted granted Critical
Publication of CN202492841U publication Critical patent/CN202492841U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a post-grouting concrete pre-stressed hollow square pile. A central through hole running through the whole post-grouting concrete pre-stressed hollow square pile is arranged in the center of the concrete pre-stressed hollow square pile in the longitudinal axis direction of the post-grouting concrete pre-stressed hollow square pile; the cross section of the post-grouting concrete pre-stressed hollow square pile is in a square structure with circular arc-shaped periphery; the cross section of the central through hole of the post-grouting concrete pre-stressed hollow square pile is square; and the geometric dimensions of sections at the internal periphery and the external periphery of the post-grouting concrete pre-stressed hollow square pile in the whole longitudinal axis direction are identical. According to the utility mode, a grouting pipe is pre-embedded in the prefabrication process of the post-grouting concrete pre-stressed hollow square pile, and the post grouting technique can be carried out after the pile foundation pile-sinking construction is finished, so that the physical-mechanical property of the soil body is changed, the load-bearing capability of the pile body is improved, and the connection between piles is also improved.

Description

A kind of grouting behind shaft or drift lining concrete pre-stress hollow square pile
Technical field
The utility model relates to the improvement of grouting behind shaft or drift lining concrete pre-stress hollow square pile in the building field and the prefabricated production of cast-in-place concrete structure post, particularly a kind of grouting behind shaft or drift lining concrete pre-stress hollow square pile.
Background technology
Mostly the existing concrete hollow square pile is prefabricated units, and after pile sinking was accomplished, pile body itself contact with the soil body and very fits, and often needs the supporting capacity of the stop time competence exertion stake of length itself, and with between be connected relatively poor.
The utility model content
The technical problem that the utility model will solve provides a kind of grouting behind shaft or drift lining concrete pre-stress hollow square pile, to reduce or to avoid problem noted earlier.
For achieving the above object, the technical scheme of the utility model is following:
A kind of grouting behind shaft or drift lining concrete pre-stress hollow square pile; Said grouting behind shaft or drift lining concrete pre-stress hollow square pile y direction, concrete pre-stress hollow square pile center are provided with the central through hole that runs through whole grouting behind shaft or drift lining concrete pre-stress hollow square pile; The cross section of said grouting behind shaft or drift lining concrete pre-stress hollow square pile is that periphery is that the cross section of the central through hole of the square structure of circular arc, said grouting behind shaft or drift lining concrete pre-stress hollow square pile is square, and said grouting behind shaft or drift lining concrete pre-stress hollow square pile is identical in the interior periphery cross section geometry of whole y direction.
Preferably, said grouting behind shaft or drift lining concrete pre-stress hollow square pile length direction is extended with main muscle, Grouting Pipe and the spiral stirrup around said main muscle, and said main muscle is square.
Through technique scheme, the beneficial effect of the utility model is:
A kind of grouting behind shaft or drift lining concrete pre-stress hollow square pile of the utility model, pre-buried Grouting Pipe in the pile body forming process behind pile foundation construction, is carried out grouting process, from but the soil body fully contact with pile body.On the one hand the soil body is fully contacted with pile body, before the soil body stops, higher pile body bearing capacity is provided, simultaneously, slip casting makes the soil body obtain reinforcing, and also can increase pile body bearing capacity, strengthen simultaneously stake with between be connected.
Description of drawings
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art; To do to introduce simply to the accompanying drawing of required use in embodiment or the description of the Prior Art below; Obviously, the accompanying drawing in describing below only is some embodiment of the utility model, for those of ordinary skills; Under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the utility model vertical view;
Fig. 2 is the utility model elevation;
Fig. 3 is the utility model vertical view.
The numeral corresponding component title represented among the figure with letter:
10, through hole 11, Grouting Pipe
The specific embodiment
For technological means, creation characteristic that the utility model is realized, reach purpose and be easy to understand understanding with effect, below in conjunction with concrete diagram, further set forth the utility model.
Extremely shown in Figure 3 referring to Fig. 1; A kind of grouting behind shaft or drift lining concrete pre-stress hollow square pile of the utility model; Said grouting behind shaft or drift lining concrete pre-stress hollow square pile y direction, concrete pre-stress hollow square pile center are provided with the central through hole 10 that runs through whole grouting behind shaft or drift lining concrete pre-stress hollow square pile; The cross section of said grouting behind shaft or drift lining concrete pre-stress hollow square pile is that periphery is that the cross section of the central through hole 10 of the square structure of circular arc, said grouting behind shaft or drift lining concrete pre-stress hollow square pile is square, and said grouting behind shaft or drift lining concrete pre-stress hollow square pile is identical in the interior periphery cross section geometry of whole y direction.
The utility model grouting behind shaft or drift lining concrete pre-stress hollow square pile length direction is extended with main muscle, Grouting Pipe 11 and the spiral stirrup around said main muscle, and said main muscle is square.
More than show and described basic principle of the utility model and the advantage of principal character and the utility model.The technician of the industry should understand; The utility model is not restricted to the described embodiments; The principle of describing in the foregoing description and the manual that the utility model just is described; Under the prerequisite that does not break away from the utility model spirit and scope, the utility model also has various changes and modifications, and these variations and improvement all fall in the utility model scope that requires protection.The utility model requires protection domain to be defined by appending claims and equivalent thereof.

Claims (2)

1. grouting behind shaft or drift lining concrete pre-stress hollow square pile; Said grouting behind shaft or drift lining concrete pre-stress hollow square pile y direction, concrete pre-stress hollow square pile center are provided with the central through hole that runs through whole grouting behind shaft or drift lining concrete pre-stress hollow square pile; It is characterized in that; The cross section of said grouting behind shaft or drift lining concrete pre-stress hollow square pile is that periphery is that the cross section of the central through hole of the square structure of circular arc, said grouting behind shaft or drift lining concrete pre-stress hollow square pile is square, and said grouting behind shaft or drift lining concrete pre-stress hollow square pile is identical in the interior periphery cross section geometry of whole y direction.
2. grouting behind shaft or drift lining concrete pre-stress hollow square pile according to claim 1 is characterized in that, said grouting behind shaft or drift lining concrete pre-stress hollow square pile length direction is extended with main muscle, Grouting Pipe and the spiral stirrup around said main muscle, and said main muscle is square.
CN2012200833628U 2012-03-07 2012-03-07 Post-grouting concrete pre-stressed hollow square pile Expired - Fee Related CN202492841U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200833628U CN202492841U (en) 2012-03-07 2012-03-07 Post-grouting concrete pre-stressed hollow square pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200833628U CN202492841U (en) 2012-03-07 2012-03-07 Post-grouting concrete pre-stressed hollow square pile

Publications (1)

Publication Number Publication Date
CN202492841U true CN202492841U (en) 2012-10-17

Family

ID=46999076

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200833628U Expired - Fee Related CN202492841U (en) 2012-03-07 2012-03-07 Post-grouting concrete pre-stressed hollow square pile

Country Status (1)

Country Link
CN (1) CN202492841U (en)

Similar Documents

Publication Publication Date Title
CN203755334U (en) Single-pipe tower prefabricated spiral steel pipe pile foundation
CN102345292B (en) A kind of composite prestressed uplift pile with enlarged footing
CN203229943U (en) Steel reinforcement laying structure of squeezed bearing plate of pile foundation well
CN202492841U (en) Post-grouting concrete pre-stressed hollow square pile
CN202577288U (en) Post grouting concrete prestress hollow square pile
CN202492840U (en) Post-grouting concrete prestressed hollow quadrate pile
CN202482857U (en) Post-grouting concrete prestressed hollow square pile
CN209523212U (en) Assembled independent foundation
CN202247910U (en) Soil retaining structure with different inclination angles of anti-skid cement soil pile
CN202482858U (en) Post-grouting concrete prestress hollow square pile
CN202577286U (en) Post-grouting concrete prestress hollow square pile
CN202577307U (en) Post grouting device of pile foundation
CN205188944U (en) Reinforcing concrete circular pile
CN203904978U (en) Mixture reinforcing bar cast-in-place pile for foundation pit supporting
CN201148617Y (en) Opening-shaped pile tip with covered edge
CN205046554U (en) Core combined type anti structure of floating of stress tube stake is in advance irritated to built -in anchor rope
CN203625886U (en) Prefabricated concrete square pile with high strength
CN204125931U (en) Foundation pile structure
CN104196004A (en) Overall length core pouring prestress pipe pile composite foundation
CN201671097U (en) Prestressed pull-out resistance type concrete tubular pile
CN203639900U (en) Hollow pile
CN202108042U (en) Unbonded back tension pre-stress stiffening core composite pile
CN202194144U (en) Foundation ditch slant uplift pile
CN207193966U (en) A kind of prestressed concrete pipe pile
CN203668917U (en) High-rise and super high-rise super-strong grouting tension pre-formed pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121017

Termination date: 20160307

CF01 Termination of patent right due to non-payment of annual fee