CN202492805U - Preformed anchor hole positioning mould of bridge pier supporting pad-stone - Google Patents

Preformed anchor hole positioning mould of bridge pier supporting pad-stone Download PDF

Info

Publication number
CN202492805U
CN202492805U CN 201220067214 CN201220067214U CN202492805U CN 202492805 U CN202492805 U CN 202492805U CN 201220067214 CN201220067214 CN 201220067214 CN 201220067214 U CN201220067214 U CN 201220067214U CN 202492805 U CN202492805 U CN 202492805U
Authority
CN
China
Prior art keywords
anchor hole
bridge pier
stone
steel plate
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220067214
Other languages
Chinese (zh)
Inventor
黄学文
程勇东
赵鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Engineering Co Ltd of CTCE Group
Original Assignee
First Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of CTCE Group filed Critical First Engineering Co Ltd of CTCE Group
Priority to CN 201220067214 priority Critical patent/CN202492805U/en
Application granted granted Critical
Publication of CN202492805U publication Critical patent/CN202492805U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a preformed anchor hole positioning mould of bridge pier supporting pad-stone. The preformed anchor hole positioning mould comprises a plurality of mould bodies which are arranged at intervals on a capping beam formwork; two ends of each mould body are respectively provided with steel plate positioning holes; and a plurality of preformed anchor hole openings are arranged between the steel plate positioning holes at two ends; and a fixed steel plate is arranged outside the preformed anchor hole openings. According to the preformed anchor hole positioning mould of bridge pier supporting pad-stone, the positioning accuracy of the support pad-stone is improved and the pre-embedded accuracy of the anchor holes is effectively improved.

Description

A kind of bridge pier bearing pad stone is reserved the anchor hole positioning clamping fixture
Technical field
The utility model relates to a kind of bridge pier bearing pad stone and reserves the anchor hole positioning clamping fixture, and a kind of being applied in the bridge engineering of more specifically saying so is for improving the tooling device of bearing pad stone prepared screw-bolt hole precision.
Background technology
Bridge pier top bearing pad stone adopts the design of reinforced concrete structure form usually, and bridge pad is connected with substructure through the reservation anchor hole that in pinner, is provided with.Wherein the reserved location of anchor hole is a unmanageable difficult point in the construction.Prior art generally is with pre-buried pvc pipe and pinner reinforcing bar binding, positions.The deficiency of its existence is: the anchor hole position is prone to deviation, difficulty of correction occurs after the deviation.
The utility model content
The purpose of the utility model provides a kind of bridge pier bearing pad stone to reserve the anchor hole positioning clamping fixture, improves bearing pad stone anchor hole positioning accuracy, effectively raises the pre-buried precision of anchor hole.
The technical scheme of the utility model is following:
A kind of bridge pier bearing pad stone is reserved the anchor hole positioning clamping fixture; Be included in and be placed with several mold bodies on the bent cap template at interval; The two ends of mold body have the steel plate locating hole; Offer a plurality of reservation anchor hole holes between the steel plate locating hole at two ends, reserve the anchor hole hole outside and be provided with fixation steel plate.
Described mold body has four.
The utility model adopts steel work, reduces because of adopting conventional job practices in work progress, to cause the prepared screw-bolt hole off normal, and its internal model making, convenience quick for installation, the preformed hole precision is high; Minimizing is because of correcting the waste that cause partially in the hole.The utility model improves bearing pad stone anchor hole positioning accuracy, effectively raises the pre-buried precision of anchor hole.
Description of drawings
Fig. 1 is the scheme of installation of the utility model.
Fig. 2 is the structural representation of the utility model.
The specific embodiment
Referring to accompanying drawing; A kind of bridge pier bearing pad stone is reserved the anchor hole positioning clamping fixture; Be included in and be placed with four mold bodies 2 on the bent cap template 1 at interval; The two ends of mold body 2 have steel plate locating hole 3, offer a plurality of reservation anchor hole holes 4 between the steel plate locating hole 3 at two ends, reserve the anchor hole hole outside and are provided with fixation steel plate 5.
One, internal model making
1, according to the relative dimensions of design drawing, the relative position of reserving anchor hole hole and bent cap template is calculated, on mold body 2, hole then.
2, after mold body 2 has bored the hole, reserving anchor hole hole welding fixation steel plate 5, fixation steel plate 5 plays fixation when PVC installs.
Two, mold uses
1, in bent cap concreting to design elevation, this bearing pad stone anchor hole mold body 2 is installed.2,, come mold body 2 is positioned through steel plate locating hole 3 according to drawing design size and relative position.
3, check after mold is had good positioning, confirm to advance the bent cap concrete with pvc pipe is pre-buried after errorless.
4, behind the concrete initial set this mold body 2 is removed.

Claims (2)

1. a bridge pier bearing pad stone is reserved the anchor hole positioning clamping fixture; Be included in and be placed with several mold bodies on the bent cap template at interval; It is characterized in that: the two ends of mold body have the steel plate locating hole; Offer a plurality of reservation anchor hole holes between the steel plate locating hole at two ends, reserve the anchor hole hole outside and be provided with fixation steel plate.
2. bridge pier bearing pad stone according to claim 1 is reserved the anchor hole positioning clamping fixture, and it is characterized in that: described mold body has four.
CN 201220067214 2012-02-28 2012-02-28 Preformed anchor hole positioning mould of bridge pier supporting pad-stone Expired - Fee Related CN202492805U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220067214 CN202492805U (en) 2012-02-28 2012-02-28 Preformed anchor hole positioning mould of bridge pier supporting pad-stone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220067214 CN202492805U (en) 2012-02-28 2012-02-28 Preformed anchor hole positioning mould of bridge pier supporting pad-stone

Publications (1)

Publication Number Publication Date
CN202492805U true CN202492805U (en) 2012-10-17

Family

ID=46999040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220067214 Expired - Fee Related CN202492805U (en) 2012-02-28 2012-02-28 Preformed anchor hole positioning mould of bridge pier supporting pad-stone

Country Status (1)

Country Link
CN (1) CN202492805U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104846749A (en) * 2015-06-06 2015-08-19 中铁三局集团有限公司 Anchor bolt hole support for pier caps

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104846749A (en) * 2015-06-06 2015-08-19 中铁三局集团有限公司 Anchor bolt hole support for pier caps
CN104846749B (en) * 2015-06-06 2016-05-11 中铁三局集团有限公司 Pier cap anchor hole support

Similar Documents

Publication Publication Date Title
CN201443203U (en) Mold of preformed hole of cast-in-place reinforced concrete slab
CN102926538A (en) Reaction box and construction method of reaction wall
CN202012153U (en) Steel bar positioning fixture
CN204738236U (en) Pier vertical reinforcement installation mould
CN206752492U (en) A kind of steel column positioning adjustment device
CN202492805U (en) Preformed anchor hole positioning mould of bridge pier supporting pad-stone
CN202214735U (en) Pedestal anchor bolt positioning tool for shallow foundation
CN204960289U (en) Builder's jack is encorbelmented whole combination of girder steel and can be had enough to meet need anchor assembly
CN202467192U (en) Positioning device for reserved hole of concrete floor
CN107859247B (en) Multifunctional reinforcement protection layer control device and construction method
CN204491418U (en) Pier shaft bearing pad stone reserving hole navigation system
CN202248286U (en) Mounting structure of wall body built-in fitting
CN202644563U (en) Installation device for embedded foundation bolt of small facility
CN203441094U (en) Embedded part of hydraulic climbing formwork
CN209760295U (en) Pre-buried T type bolt fixed knot of underground pipe gallery electric power support constructs
CN102864937A (en) Construction method of rear added insert of prefabricated pillar
CN203008239U (en) Reinforcement steel protection layer cushion block
CN201771083U (en) Positioning and anti-floating device of cast-in-situ reinforced concrete floor system inner mould
CN203769335U (en) Suspension plate clamping device for constructing connection and combination body of prefabricated plates
CN202500221U (en) Connection system of combined floor board and side face of concrete wall
CN103711325B (en) A kind of boatswain chair card device for building prefabricated chunk johning knot zoarium
CN104695713A (en) Reinforcing steel bar connecting mechanism and accurate reinforcing steel bar connecting method thereof
CN204781603U (en) Built -in cast -in -place reinforced concrete column of posture
CN203905510U (en) High-precision embedded bolt mold
CN204510481U (en) Shaped steel junction plate vertical in steel building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121017

Termination date: 20180228

CF01 Termination of patent right due to non-payment of annual fee