CN202492780U - Ski-run constructed by scaffold - Google Patents

Ski-run constructed by scaffold Download PDF

Info

Publication number
CN202492780U
CN202492780U CN2012200328563U CN201220032856U CN202492780U CN 202492780 U CN202492780 U CN 202492780U CN 2012200328563 U CN2012200328563 U CN 2012200328563U CN 201220032856 U CN201220032856 U CN 201220032856U CN 202492780 U CN202492780 U CN 202492780U
Authority
CN
China
Prior art keywords
scaffold
ski
building
ski trail
adg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200328563U
Other languages
Chinese (zh)
Inventor
杨帆
赵红军
黄铮
柏春有
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING ADG SCAFFOLDING ENGINEERING Co Ltd
Original Assignee
BEIJING ADG SCAFFOLDING ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING ADG SCAFFOLDING ENGINEERING Co Ltd filed Critical BEIJING ADG SCAFFOLDING ENGINEERING Co Ltd
Priority to CN2012200328563U priority Critical patent/CN202492780U/en
Application granted granted Critical
Publication of CN202492780U publication Critical patent/CN202492780U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a ski-run constructed by a scaffold. The ski-run comprises a jumping area, a landing area and a buffer area, and is characterized in that the jumping area comprises a scaffold and a jumping ski surface; the landing area comprises the scaffold and a landing ski surface; and the buffer area comprises the scaffold and a buffer ski surface. Furthermore, the scaffold is an ADG modularized scaffold. The ADG modularized scaffold comprises an adjustable base, a scaffold body, a main keel and secondary keels; and the ski surfaces are respectively arranged on the upper end faces of the secondary keels. The scaffold body comprises vertical uprights, cross bars and diagonal draw bars, and connecting devices are arranged on the ends of the vertical uprights and the cross bars. The connecting devices comprise U-shaped clamping pieces and C-shaped clamping pieces. According to the utility model, the ADG modularized scaffold is adopted, so that the ski-run is good in stability, light and high in strength. Meanwhile, the U-shaped clamping pieces and the C-shaped clamping pieces are matched and fixed, the mounting speed is quick and the precision is high, in addition, limitation for constructing the ADG modularized scaffold is greatly reduced, and requirements for people to ski can be satisfied.

Description

A kind of ski trail of building with scaffold
Technical field
The utility model relates to the skiing device, specifically, relates to a kind of ski trail of building with scaffold.
Background technology
Skiing is normally from the purpose of amusement, body-building, and receives the artificial factors degree very light, thus men and women, old and young all can be on snow pack easily, slide full infinite enjoyment of enjoying skiing giocoso.Since alpine skiing have thrill, grace, freely, dynamic strong, glamour is big, can participate in wide characteristics.But skiing receives the restriction of weather and geographical conditions, can't large-arealy popularize, and the existing manual ski trail all is according to geographical conditions, adopts artificial snowy mode, receives the restriction of geographical conditions and cost equally.
Summary of the invention
The technical problem that the utility model will solve is to overcome above-mentioned defective, provides a kind of and can build in common place and the ski trail of building with scaffold with low cost.
For addressing the above problem, the technical scheme that the utility model adopted is:
A kind of ski trail of building with scaffold comprises box, footprint and buffer area three parts, it is characterized in that:
Said box comprises ground scaffold and the take-off skiing face that is arranged on the Lifting scaffold top of being installed in;
Said footprint comprises ground scaffold and the land skiing face that is arranged on the Lifting scaffold top of being installed in;
Said buffer area comprises ground scaffold and the buffering skiing face that is arranged on the Lifting scaffold top of being installed in.
Say further:
Said scaffold is an ADG modular scaffold.
Said ADG modular scaffold comprises the adjustable base that is arranged on the bottom, and adjustable base is provided with support body, and the upper surface of support body is provided with main joist, and main joist is provided with secondary joist; Said take-off skiing face, land skiing face and buffering chute surface are located at respectively on the upper surface of secondary joist.
Said support body comprises vertical rod and the cross bar that connects successively, and the end of vertical rod and cross bar is provided with linkage; Be connected with diagonal member between unconnected two ends on said adjacent vertical rod and the cross bar.
Further say:
Said linkage comprises U-shaped fastener that is separately positioned on the vertical rod two ends and the C shape fastener that is arranged on crossbar end, and U-shaped fastener and C shape fastener cooperatively interact.
Said adjustable base comprises and is installed in the base on the basal plane and is threaded in the adjusting rod on the base that the top of adjusting rod is threaded with vertical rod.
Say further again:
The left and right sides of said box, footprint and buffer area is respectively arranged with protective guard, and the end of buffer area is provided with and stops the hurdle.
The front portion of said box is provided with elevator, and elevator is connected with scaffold through fixed bar; The front portion of box and land ski trail face is provided with Stairs.
Owing to adopted technique scheme, compared with prior art, the utility model adopts ADG modular scaffold, and the supporting capacity of ADG modular scaffold is higher than general scaffolding steel pipe.By the support body that vertical rod, cross bar and diagonal member are formed, good stability.Simultaneously, the support body type of attachment all adopts U type fastener and C type fastener to fix, and installation rate is fast; Precision is high; In addition, the ski trail that ADG modular scaffold is built only needs a smooth field, and the restriction of the geographical conditions that receive reduces greatly; Can build in the overwhelming majority's place, can satisfy the needs of people's skiing.
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is described further simultaneously.
Description of drawings
Fig. 1 is the structural representation of box among a kind of embodiment of the utility model;
Fig. 2 is the structural representation of footprint among a kind of embodiment of the utility model;
Fig. 3 is the structural representation of buffer area among a kind of embodiment of the utility model;
Fig. 4 is the location diagram of main joist and secondary joist among a kind of embodiment of the utility model;
Fig. 5 is the structural representation of linkage among a kind of embodiment of the utility model;
Fig. 6 is that vertical rod is connected sketch map with cross bar among a kind of embodiment of the utility model;
Fig. 7 is the vertical view of box, footprint and buffer area among a kind of embodiment of the utility model.
Among the figure: the 1-elevator; The 2-fixed bar; The 3-linkage; The 4-cross bar; The 5-vertical rod; The 6-diagonal member; The 7-main joist; The 8-secondary joist; The 9-adjustable base; 10-take-off skiing face; 11-land skiing face; 12-cushions skiing face; 13-stops the hurdle; The 14-adjusting rod; The 15-base; 16-C shape fastener; 17-U shape fastener; The 18-Stairs; The 19-protective guard; The 20-lamp bracket.
The specific embodiment
Embodiment:
A kind of ski trail of building with scaffold like Fig. 1, Fig. 2, shown in Figure 3, comprises box, footprint and buffer area three parts.The box comprises ground scaffold and the take-off skiing face 10 that is arranged on the Lifting scaffold top of being installed in.The footprint comprises ground scaffold and the land skiing face 11 that is arranged on the Lifting scaffold top of being installed in.Buffer area comprises ground scaffold and the buffering skiing face 12 that is arranged on the Lifting scaffold top of being installed in.
In the present embodiment, said scaffold is an ADG modular scaffold.ADG modular scaffold comprises the adjustable base 9 that is arranged on the bottom, and adjustable base 9 is provided with support body, and the upper surface of support body is provided with main joist 7, and main joist 7 is provided with secondary joist 8.Take-off skiing face 10, land skiing face 11 and buffering chute surface 12 are located at respectively on the upper surface of secondary joist 8.
Support body comprises the vertical rod 5 and cross bar 4 that connects successively, and the end of vertical rod 5 and cross bar 4 is provided with linkage 3; Be connected with diagonal member 6 between unconnected two ends on said adjacent vertical rod 5 and the cross bar 4.Said linkage 3 comprises U-shaped fastener 17 that is separately positioned on vertical rod 5 two ends and the C shape fastener 16 that is arranged on cross bar 4 ends, and U-shaped fastener 17 cooperatively interacts with C shape fastener 16.Such design can guarantee to bear enough big bearing capacity.
Adjustable base 9 comprises and is installed in the base on the basal plane and is threaded in the adjusting rod 14 on the base 15 that the top of adjusting rod 14 is threaded with vertical rod 5.When the undesirable height of height of support body, can be through regulating different adjusting rods 14, meet the requirements up to the height of support body.
In addition, for the consideration of safety, in the box, the left and right sides of footprint and buffer area is respectively arranged with protective guard 19, the end of buffer area is provided with and stops hurdle 13.
Same, in order to consider actual needs, the front portion of box is provided with elevator 1, and elevator 1 is connected with scaffold through fixed bar 2.The front portion that is exactly box and land ski trail face in addition is provided with Stairs 18, is for the situation of preventing an accident.In addition, lamp bracket 20 is set, for enough illuminations were provided when cloudy day or the night in the both sides of footprint and buffer area.

Claims (8)

1. a ski trail of building with scaffold comprises box, footprint and buffer area three parts, it is characterized in that:
Said box comprises ground scaffold and the take-off skiing face (10) that is arranged on the Lifting scaffold top of being installed in; Said footprint comprises ground scaffold and the land skiing face (11) that is arranged on the Lifting scaffold top of being installed in; Said buffer area comprises ground scaffold and the buffering skiing face (12) that is arranged on the Lifting scaffold top of being installed in.
2. according to the ski trail of building with scaffold described in the claim 1, it is characterized in that: said scaffold is an ADG modular scaffold.
3. according to the ski trail of building with scaffold described in the claim 2; It is characterized in that: said ADG modular scaffold comprises the adjustable base (9) that is arranged on the bottom; Adjustable base (9) is provided with support body; The upper surface of support body is provided with main joist (7), and main joist (7) is provided with secondary joist (8); Said take-off skiing face, land skiing face and buffering chute surface are located at respectively on the upper surface of secondary joist (8).
4. according to the ski trail of building with scaffold described in the claim 3, it is characterized in that: said support body comprises vertical rod (5) and the cross bar (4) that connects successively, and the end of vertical rod (5) and cross bar (4) is provided with linkage (3); Said adjacent vertical rod (5) and cross bar (4) are gone up between unconnected two ends and are connected with diagonal member (6).
5. according to the ski trail of building with scaffold described in the claim 4; It is characterized in that: said linkage (3) comprises the U-shaped fastener (17) that is separately positioned on vertical rod (5) two ends and is arranged on the C shape fastener (16) of cross bar (4) end that U-shaped fastener (17) and C shape fastener (16) cooperatively interact.
6. according to the ski trail of building with scaffold described in the claim 5, it is characterized in that: said adjustable base (3) comprises base (15) and is threaded in the adjusting rod (14) on the base (15) that the top of adjusting rod (14) is threaded with vertical rod (5).
7. according to the ski trail of building with scaffold described in the claim 1, it is characterized in that: the left and right sides of said box, footprint and buffer area is respectively arranged with protective guard (19), and the end of buffer area is provided with and stops hurdle (13).
8. according to the ski trail of building with scaffold described in the claim 1, it is characterized in that: the front portion of said box is provided with elevator (1), and elevator (1) is connected with scaffold through fixed bar (2); The front portion of box and land ski trail face is provided with Stairs (18).
CN2012200328563U 2012-02-02 2012-02-02 Ski-run constructed by scaffold Expired - Fee Related CN202492780U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200328563U CN202492780U (en) 2012-02-02 2012-02-02 Ski-run constructed by scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200328563U CN202492780U (en) 2012-02-02 2012-02-02 Ski-run constructed by scaffold

Publications (1)

Publication Number Publication Date
CN202492780U true CN202492780U (en) 2012-10-17

Family

ID=46999015

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200328563U Expired - Fee Related CN202492780U (en) 2012-02-02 2012-02-02 Ski-run constructed by scaffold

Country Status (1)

Country Link
CN (1) CN202492780U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015077903A1 (en) * 2013-11-28 2015-06-04 北京夏雪科技有限公司 Artificial building structure having ski run
CN107191013A (en) * 2017-04-12 2017-09-22 刘全义 Ice and snow is travelled tower
CN107558762A (en) * 2017-08-22 2018-01-09 吉林市城通科技有限公司 A kind of module builds formula skifield and its building method
IT201800006060A1 (en) * 2018-06-06 2019-12-06 TEMPORARY ARTIFICIAL TRACK

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015077903A1 (en) * 2013-11-28 2015-06-04 北京夏雪科技有限公司 Artificial building structure having ski run
CN107191013A (en) * 2017-04-12 2017-09-22 刘全义 Ice and snow is travelled tower
CN107558762A (en) * 2017-08-22 2018-01-09 吉林市城通科技有限公司 A kind of module builds formula skifield and its building method
IT201800006060A1 (en) * 2018-06-06 2019-12-06 TEMPORARY ARTIFICIAL TRACK
EP3578715A1 (en) * 2018-06-06 2019-12-11 Sartoretto Group S.r.l. - Staging Company Artificial temporary slope

Similar Documents

Publication Publication Date Title
CN202492780U (en) Ski-run constructed by scaffold
CN201411627Y (en) Steel-concrete composite tower-beam consolidation kilometer grade multi-span suspension bridge
CN104532749A (en) Support used for construction of upper beam of main tower of suspension bridge
CN201406628Y (en) Large Spoke Cable Ferris Wheel Bridge
CN106968382A (en) A kind of many seat in the plane workover rig storehouse roof system sprit frame structural body systems of large-scale jumbo jet
CN204385629U (en) A kind of support for the construction of suspension bridge king-tower top rail
CN200999322Y (en) V-shaped rigid frame arc combined bridge
CN211798722U (en) Single-wheel veneer skiing balance training device
US20230160150A1 (en) Module for construction of recreation track, especially bicycle one
CN201953135U (en) Same tower dual loop linear tower for slope-shaped section
CN101555679A (en) Dual-layer steel truss-Ferris wheel combined bridge
CN203257133U (en) Arrangement structure of platform rainshed of railway station
WO2005035875A1 (en) Bridge structure comprising tower, bridge beam, main/suspension cable, suspending bars, and diagonal cable-stays
CN202755294U (en) Large-spread-wing type bridge section
CN217678623U (en) Anti-skid jacking device for formwork support arch frame
CN214831929U (en) Cable tower combining mechanics and aesthetics
CN204849647U (en) Prevent down isolated column
US20230181998A1 (en) A module for the construction of a recreational track, particularly a bicycle track
CN202519979U (en) Cast-in-place continuous beam combined frame
CN209787965U (en) A landscape design vegetation planting frame
CN209413381U (en) A kind of three-dimensional parking device support frame
CN221000574U (en) Camber asymmetric box arch bridge structure
CN205577280U (en) Ancient building balustrade
CN223255819U (en) A space-combined suspended landscape platform unit
CN221398805U (en) Temporary competition field for improving indoor skiing field

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Ski-run constructed by scaffold

Effective date of registration: 20131030

Granted publication date: 20121017

Pledgee: Haidian Beijing science and technology enterprise financing Company limited by guarantee

Pledgor: Beijing ADG Scaffolding Engineering Co., Ltd.

Registration number: 2013990000799

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121017

Termination date: 20180202

CF01 Termination of patent right due to non-payment of annual fee