Prior art keywords
concrete
slope retaining
composite construction
anchor
retaining composite
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012201279507U
Other languages
Chinese (zh)
Inventor
叶长青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2012201279507U priority Critical patent/CN202482878U/en
Application granted granted Critical
Publication of CN202482878U publication Critical patent/CN202482878U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a slope retaining composite construction. The slope retaining composite construction is characterized by comprising soil nails, anchor rods, a concrete pile, a concrete enclosing purlin and spray-anchor concrete. The slope retaining composite construction uses a form that the concrete pile is combined with the spray-anchor concrete. An upper one-third part of an overhanging section of the slope retaining composite construction is the spray-anchor concrete, and a lower two-thirds part of the overhanging section of the slope retaining composite construction is the concrete pile. The upper one-third part of the overhanging section of the slope retaining composite construction is provided with the soil nails, and intervals between the soil nails are 0.5-0.7 meter. The lower two-thirds part of the overhanging section of the slope retaining composite construction is provided with the anchor rods, and intervals between the anchor rods are 1.5-1.8 meters. The top of the concrete pile is provided with the concrete enclosing purlin with 40-50 centimeters in height and 0.8-1.2 meters in width. Concrete strength of the concrete enclosing purlin is C 25, and the spray-anchor concrete is 6-8 centimeters in thickness and C 30 in the concrete strength. The slope retaining composite construction is good in safety performance.

Description

A kind of slope retaining composite construction
Technical field
The utility model relates to a kind of slope retaining composite construction, is applicable to the ground field.
Background technology
Usually have various structure such as traffic main artery, built construction or pipeline around the slope retaining, this just relates to one of slope retaining very important content, protect the safe handling of its peripheral structure.And general slope retaining be mostly temporary structure, the investment too greatly also be prone to cause waste, will certainly cause engineering accident again but supporting and protection structure is dangerous.Therefore, how safety, reasonably select suitable supporting and protection structure and be the main contents that base pit engineering will solve according to the design that the characteristics of slope support engineering are carried out science.
The utility model content
The technical problem that the utility model solves provides a kind of slope retaining composite construction, solves the bad problem of traditional slope retaining safety of structure.
The utility model comprises soil nailing, anchor pole, concrete pile, coagulation fortifield village purlin, spray anchor concrete.The slope retaining structure adopts the form of concrete pile and the combination of spray anchor concrete, and spray anchor concrete is done at slope retaining structure 1/3 position, part top of encorbelmenting, and concrete pile is made at 2/3 position, bottom; 1/3 position, top is provided with soil nailing, and the soil nailing spacing is 0.5~0.7m, and 2/3 position, bottom is provided with anchor pole; The anchor pole spacing is 1.5~1.8m, and the concrete pile top is provided with coagulation fortifield village purlin, and coagulation fortifield village purlin height is 40~50cm; Width is 0.8~1.2m; Coagulation fortifield village purlin concrete strength is C25, and spray anchor concrete thickness is 6~8cm, and concrete strength is C30.Adopt concrete pile and spray anchor composite concrete structure, anchor pole and soil nailing play the purpose of consolidated subsoil, and anchor pole and soil nailing stone group have improved the mechanical property of ground, and have strengthened the stability of ground.
The utility model security performance is good.
Description of drawings
Fig. 1 slope retaining composite construction sketch map.
Reference numeral: 1, soil nailing, 2, anchor pole, 3, concrete pile, 4, coagulation fortifield village purlin, 5, spray anchor concrete.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described in detail.
Fig. 1 is a slope retaining composite construction sketch map.The utility model comprises soil nailing 1, anchor pole 2, concrete pile 3, coagulation fortifield village purlin 4, spray anchor concrete 5.The slope retaining structure adopts the form of concrete pile 3 and 5 combinations of spray anchor concrete, and the slope retaining structure part top 1.8m that encorbelments does spray anchor concrete 5, and concrete pile 3 is made at 3.6m position, bottom; 1.8m position, top is provided with soil nailing 1, and soil nailing 1 spacing is 0.5m, and 3.6m position, bottom is provided with anchor pole 2; Anchor pole 2 spacings are 1.8m, and concrete pile 3 tops are provided with coagulation fortifield village purlin 4, and coagulation fortifield village purlin 4 highly is 50cm; Width is 1m; Coagulation fortifield village purlin 4 concrete strengths are C25, and spray anchor concrete 5 thickness are 7cm, and concrete strength is C30.

Claims (1)

1. a slope retaining composite construction is characterized in that comprising soil nailing, anchor pole, concrete pile, coagulation fortifield village purlin, spray anchor concrete, and the slope retaining structure adopts the form of concrete pile and the combination of spray anchor concrete; Spray anchor concrete is done at slope retaining structure 1/3 position, part top of encorbelmenting, and concrete pile is made at 2/3 position, bottom, and 1/3 position, top is provided with soil nailing; The soil nailing spacing is 0.5~0.7m, and 2/3 position, bottom is provided with anchor pole, and the anchor pole spacing is 1.5~1.8m; The concrete pile top is provided with coagulation fortifield village purlin; Coagulation fortifield village purlin height is 40~50cm, and width is 0.8~1.2m, and coagulation fortifield village purlin concrete strength is C25; Spray anchor concrete thickness is 6~8cm, and concrete strength is C30.
CN2012201279507U 2012-03-20 2012-03-20 Slope retaining composite construction Expired - Fee Related CN202482878U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012201279507U CN202482878U (en) 2012-03-20 2012-03-20 Slope retaining composite construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012201279507U CN202482878U (en) 2012-03-20 2012-03-20 Slope retaining composite construction

Publications (1)

Publication Number Publication Date
CN202482878U true CN202482878U (en) 2012-10-10

Family

ID=46957308

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012201279507U Expired - Fee Related CN202482878U (en) 2012-03-20 2012-03-20 Slope retaining composite construction

Country Status (1)

Country Link
CN (1) CN202482878U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103031855A (en) * 2013-01-18 2013-04-10 中铁二院工程集团有限责任公司 Soil nail-type protective wall structure for hole digging piles
CN105649091A (en) * 2015-04-30 2016-06-08 中国建筑第四工程局有限公司 High slope support method and structure
CN106522235A (en) * 2016-11-01 2017-03-22 中化二建集团有限公司 Narrow site deep foundation pit excavation supporting construction method
CN106759405A (en) * 2017-03-06 2017-05-31 中国电建集团中南勘测设计研究院有限公司 A kind of soil-slope supporting construction and construction method
CN108301417A (en) * 2018-01-04 2018-07-20 刘动 Using the foundation pit supporting construction and construction method of mini pile
CN110835916A (en) * 2019-10-23 2020-02-25 江苏兴厦建设工程集团有限公司 Combined supporting structure and method for GFRP (glass fiber reinforced plastic) bars of row piles

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103031855A (en) * 2013-01-18 2013-04-10 中铁二院工程集团有限责任公司 Soil nail-type protective wall structure for hole digging piles
CN105649091A (en) * 2015-04-30 2016-06-08 中国建筑第四工程局有限公司 High slope support method and structure
CN106522235A (en) * 2016-11-01 2017-03-22 中化二建集团有限公司 Narrow site deep foundation pit excavation supporting construction method
CN106759405A (en) * 2017-03-06 2017-05-31 中国电建集团中南勘测设计研究院有限公司 A kind of soil-slope supporting construction and construction method
CN108301417A (en) * 2018-01-04 2018-07-20 刘动 Using the foundation pit supporting construction and construction method of mini pile
CN108301417B (en) * 2018-01-04 2019-08-30 深圳市岩土综合勘察设计有限公司 Using the foundation pit supporting construction and construction method of mini pile
CN110835916A (en) * 2019-10-23 2020-02-25 江苏兴厦建设工程集团有限公司 Combined supporting structure and method for GFRP (glass fiber reinforced plastic) bars of row piles

Similar Documents

Publication Publication Date Title
CN202482878U (en) Slope retaining composite construction
CN202012088U (en) Foundation structure of tower crane
CN201704636U (en) Novel active protecting net
CN202416328U (en) Green protective structure for side slope anchor cable wall
CN201865117U (en) Line terminal tower foundation with cable protecting pipe
CN203912761U (en) The cold-proof wind resistance fender bracket of a kind of nursery stock
CN203498844U (en) Green slope support structure provided with pre-reinforcement piles, front frame and anchor rod wall
CN202969387U (en) Pile hole lattice column locating device
CN204186086U (en) Movable plank house bracing means
CN203645252U (en) 10kV insulation span frame
CN202227354U (en) Greening structure for high and steep concrete slopes
CN202745459U (en) C80 high-intensity concrete large-top-diameter partially prestressed electric pole
CN202483084U (en) Reinforced cushion block
CN202466612U (en) Composite slag foundation
CN202007413U (en) Cross-based electric pile
CN201874010U (en) Arch-shaped steel structure cover plate for large-section surge shaft
CN202672174U (en) Cone-shaped upright foundation of frozen soil region
CN204875805U (en) Compound dark excavation supporting system
CN206267609U (en) A kind of shock insulation protector spacing based on multiple tracks
CN208363114U (en) Self-drilling pre-stress anchor rod support system
CN204174999U (en) A kind of electric pole polycrystalline substance with ground wire
CN202007565U (en) Lambdoidal foundation electric pile
CN204343700U (en) A kind of bracing means of grange
CN203452001U (en) Country foot bridge railing structure
CN203514346U (en) Single underground pipeline transverse lifting and longitudinal picking protection device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 325000 Jinchuan Road, Wenzhou economic and Technological Development Zone, Zhejiang, Tianhe Road, No. 4, No.

Patentee after: Ye Changqing

Address before: 325604 Zhejiang city of Wenzhou province Yueqing city town village Zhang Yan Dang

Patentee before: Ye Changqing

C56 Change in the name or address of the patentee
CP02 Change in the address of a patent holder

Address after: 325600 Zhejiang city of Wenzhou province Yueqing city street Meixi Road No. 70

Patentee after: Ye Changqing

Address before: 325000 Jinchuan Road, Wenzhou economic and Technological Development Zone, Zhejiang, Tianhe Road, No. 4, No.

Patentee before: Ye Changqing

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121010

Termination date: 20130320