CN202482392U - Three-dimensional lixivium gathering system with bottom anti-seepage for mine dump leaching field - Google Patents

Three-dimensional lixivium gathering system with bottom anti-seepage for mine dump leaching field Download PDF

Info

Publication number
CN202482392U
CN202482392U CN2011205681082U CN201120568108U CN202482392U CN 202482392 U CN202482392 U CN 202482392U CN 2011205681082 U CN2011205681082 U CN 2011205681082U CN 201120568108 U CN201120568108 U CN 201120568108U CN 202482392 U CN202482392 U CN 202482392U
Authority
CN
China
Prior art keywords
gathering system
dump leaching
mine
leaching field
antiseepage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011205681082U
Other languages
Chinese (zh)
Inventor
袁永强
罗敏杰
曾宪坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nerin Engineering Co Ltd
Original Assignee
China Nerin Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nerin Engineering Co Ltd filed Critical China Nerin Engineering Co Ltd
Priority to CN2011205681082U priority Critical patent/CN202482392U/en
Application granted granted Critical
Publication of CN202482392U publication Critical patent/CN202482392U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Abstract

The utility model discloses a three-dimensional lixivium gathering system with bottom anti-seepage for a mine dump leaching field. The system comprises a partition embankment, a claypan, a composite impermeable layer, a coarse sand layer, a gravel layer, high-density polyethylene (HDPE) pipes with holes on pipe walls buried in the gravel layer, and cylindrical vertical gabion wells distributing at intervals, wherein the claypan, the composite impermeable layer, the coarse sand layer and the gravel layer are located at the bottom and paved in sequence from bottom to top. The partition embankment separates a gathering system into a plurality of units. HDPE pipes with holes on pipe walls are arranged in vertical gabion wells and connected with the HDPE pipes buried in the gravel layer. The lixivium gathering system can achieve three-dimensional partition gathering, gather lixivium to the maximum level, increase output of metal products and create good economic benefit. Simultaneously, the composite impermeable layer at the bottom has strong impermeable function, can avoid contaminating underground water and soil beneath the dump leaching field to the maximum extent, and therefore protects the environment.

Description

A kind ofly be used for the three-dimensional gathering system of leach liquor that dump leaching field, mine has the bottom antiseepage
Technical field
The utility model relates to a kind of leach liquor gathering system that is used for dump leaching field, mine, and dump leaching field, particularly a kind of mine has the three-dimensional gathering system of leach liquor of bottom antiseepage.
Background technology
After exploitation for many years, the high grade ore in the mine of China is fewer and feweri, and the raising of nonferrous metal price makes low grade ore progress into the commercial value scope, and the metal of low grade ore is collected a lot of dump leaching modes that adopt; With the copper mine is example, and copper mine stone is built heap and formed the dump leaching field, adopts the dilute sulphuric acid of ability dissolution of metals to drip pouring on ore body, and sulphuric acid soln utilizes under the gravity and oozes; React gradually with copper mine stone, form the copper sulfate infusion solution, contain a large amount of cupric ions and unreacted sulfuric acid completely in the solution; Being valuable intermediates, if the solution seepage runs off, is the tremendous economic loss to enterprise not only; To also causing very big destruction in the natural ecological environment, therefore, the impervious lining of dump leaching field, mine is indispensable; It should be noted that the general bulky in stockyard, mine, the heap process of building is slowly piled according to the speed of digging the ore deposit and is built; One of a spray is built in similar paving brick, heap, advances one by one; 3~4 sprays are at the same time often arranged, and those go through the heap body that has sprayed one period then becomes the hillock body, is similar to people's life cycle.Because the speed of response characteristic of sulfuric acid and ore: beginning is fast, so the strength of solution of beginning is high, slow afterwards; Strength of solution decreases; Therefore the dump leaching field strength of solution of different times, different blocks is different, and concentration reaches certain value, then can be used for electrolysis and obtains metal product; Low concentration solution then is used to loop back spray, so enterprise can hope to obtain more high density leach liquor.
Traditional dump leaching field gasket construction often is arranged to the plane; Be the seepage prevention that adopts one deck clay to form on the highdensity Vilaterm of one deck (High Density Polyethylene is designated hereinafter simply as " the HDPE ") film, and in the heap body facility of any vertical collection leach liquor be not set as the auxiliary seepage proof layer; Relying on space between the ore let oozes under the solution; The shortcoming of this structure is: the solution of different times, different blocks flows in the liner plane and mixes, and causes the solution of high density to be diluted by low concentration solution, and actual available highly concentrated solution reduces on the contrary; In a word, collection effciency is low; Though the clay resist has the auxiliary seepage proof function on the film, make copper-containing solution become muddy, electrolytic metal product quality reduces.And the HDPE film seepage prevention layer safety assurance of individual layer is smaller; Simultaneously owing to must contain the powder of some fine ore and the disintegration in acidization in the ore; Form the mud layer that hardens along with oozing under the solution; Stop up the space between the ore gradually, even stop up drainage pipe, thereby make solution capacity gauge complete failure.
Summary of the invention
Being directed to existing clay class impervious lining, be prone to make leach to collect solution becomes muddy, and electrolytic metal product quality reduces and collection tube only is set in the bottom makes shortcomings such as can't obtaining more high density leach liquor.The utility model purpose is to provide a kind of three-dimensional gathering system of leach liquor that dump leaching field, mine has the bottom antiseepage that is used for; Can guarantee that dump leaching field, mine leach liquor can isolate fully with physical environment (underground water and subsoil earth), each unit leach liquor is carried out efficiently subregion collect; Particularly gabion vertical shaft and end metalling; The 3 D stereo gathering system that forms has improved the leach liquor capacity gauge of heap body greatly, thereby improves the output of dump leaching field highly concentrated solution; Increase the output of metal product, have good economic benefits.
The technical scheme of the utility model: a kind ofly be used for the three-dimensional gathering system of leach liquor that dump leaching field, mine has the bottom antiseepage; It is characterized in that comprising the branch separation levee, be positioned at clay seam, compound impervious barrier, coarse sands layer, the metalling of laying from the bottom to top successively the bottom, the HDPE pipe that is embedded in metalling intermediary tube wall belt hole, vertical gabion well spaced apart; Separation levee was divided into a plurality of unit with gathering system in said minute, vertically bury underground in the said gabion well tube wall belt hole HDPE pipe and be embedded in metalling intermediary HDPE pipe and link to each other.
As the optimal way of the utility model, said compound impervious barrier constitutes by laying antiseepage soil between the double-deck HDPE anti seepage membrane.The antiseepage soil of said compound impervious barrier is clay seam or bentonite bed.Said gabion well is made up of geotechnological grille network parcel rubble.Said gabion well diameter is 80~200cm.
The advantage of the utility model is:
1, two-layer HDPE film anti-seepage effect is outstanding; When one deck wherein suffers breakage, still can rely on another layer, and bentonite bed between the two membranes or clay seam has the function of automatic patching bugs; Make this compound impervious barrier have powerful antiseepage ability, the environment protection function is outstanding; Especially for the such bottom cushion in dump leaching field, mine, after ore was built heap, the antiseepage bed course promptly was under the state that can't repair, and the advantage of double-deck HDPE seepage prevention is outstanding;
2, the gabion vertical shaft collection tube that is provided with in the heap body is connected with the collection tube of bottom broken stone layer, has formed the compound gathering system of 3 D stereo, has improved the solution collecting effect of heap body greatly.
2 and the setting of zoning unit, after oozing under the leach liquor in favourable each unit, because the barriering effect of separation levee; Can only discharge by this unitary collection tube; Help partition management, the collection of solution in the unit, keep the output of the solution of high density as far as possible, improve metal product output.
3, the total system structural safety is reliable, good environmental protection, good in economic efficiency, and management maintenance simply waits to have and promotes the use value preferably.
Description of drawings
Fig. 1 is the floor map that the utlity model has the three-dimensional gathering system of leach liquor of bottom antiseepage;
Fig. 2 is accompanying drawing 1 an A-A portion cut-away view;
Fig. 3 is the partial enlarged drawing of E portion among Fig. 2;
Fig. 4 is accompanying drawing 3 B-B portion cut-away views;
Fig. 5 is the sectional view that is used for the three-dimensional gathering system of dump leaching field, mine leach liquor of the utility model embodiment;
1, divides separation levee 2, clay seam 3, compound impervious barrier 4, coarse sands layer 5, rubble 6, gabion well 7, HDPE pipe 8, geotechnological grille network 9, ore 10, embankment 11, anchoring ditch.
Embodiment
The dump leaching field is gone up embankment 10 all around; On embankment, establish anchoring ditch 11 and be used to reinforce embankment 10; Utilize the surplus mound of the clear base in place to build up a plurality of minutes separation levees 1 in the dump leaching field, form dump leaching field collector unit I, unit II, unit III one by one ... Etc. a plurality of collector units, so that operation is rotated in the unit; And then the bed course of laying type clay behind the flat base in the above is a clay seam 2; Again and lay double-deck highdensity Vilaterm (High Density Polyethylene abbreviates " HDPE " as) anti seepage membrane sandwich structure, lay clay seam between this bilayer HDPE anti seepage membrane or bentonite bed forms a compound impervious barrier 3; These compound impervious barrier 3 obstruct stockyards include getting in touch of acid and heavy metal ion solution and extraneous water body, soil; Seepy materials such as coarse sands layer 4 that laying coarse sand and rubble 5 constitute on the HDPE anti seepage membrane and metalling, rubble 5 midfeathers are buried the HDPE pipe 7 of tube wall belt hole underground, simultaneously for guaranteeing vertical permeable capacity gauge; Geotechnological grille network 8 parcel rubbles are set; The HDPE pipe 7 that rubble 5 midfeathers are buried the tube wall belt hole of collecting solution underground forms vertical gabion well 6, and these gabion well 6 diameters are 80-200cm, and HDPE pipe 7 and bottom rubble 5 midfeathers that gabion well 6 rubbles 5 midfeathers are buried underground are buried HDPE pipe 7 underground and are connected to form the compound gathering system of 3 D stereo; After will being used for the three-dimensional gathering system of leach liquor that dump leaching field, mine has the bottom antiseepage and arranging; In each collector unit, put into the ore 9 that needs dump leaching, the top leach liquor can and ooze at present through above-mentioned gathering system and filters clarification, collects through the HDPE pipe of bottom at last and discharges.Be provided with two-layerly as the HDPE anti seepage membrane of the main antiseepage effect of compound impervious barrier 3, strengthened the effect of antiseepage heelpiece, and clay or the bentonite bed laid in the middle of the double-deck HDPE; Itself has stronger antiseepage ability; Can be used as the auxiliary seepage proof layer, the coarse sands layer 4 on the compound impervious barrier 3 has the effect that the protection anti seepage membrane is not punctured by the rubble corner angle of top accumulation; Clay seam 2 under the compound impervious barrier 3; Have isolation on the one hand, protect anti seepage membrane not punctured, utilize its barrier performance on the other hand, as the auxiliary seepage proof layer by the rubble of ground.Owing to divide the effect of separation levee 1; Solution can not be free between different units mixed flow; The subregion piecemeal be can carry out for dump leaching field, mine and dump leaching operation and spray rotated; The leach liquor concentration of every block is different (acid and the heavy metal ion that contain high density in the solution) all, can this unitary solution of very effective collection and do not mix with the unit that closes on, can collect dump leaching field solution leach liquor efficiently.
Above content is the further explain that the utility model is done; The practical implementation that can not assert the utility model is confined to these; Those of ordinary skill for technical field under the utility model; Make some being equal under the prerequisite of the utility model design and substitute or obvious modification not breaking away from, and performance or purposes are identical, then should be regarded as belonging to the scope that the utility model is protected.

Claims (5)

1. one kind is used for the three-dimensional gathering system of leach liquor that dump leaching field, mine has the bottom antiseepage; It is characterized in that comprising the branch separation levee, be positioned at clay seam, compound impervious barrier, coarse sands layer, the metalling of laying from the bottom to top successively the bottom, the HDPE pipe that is embedded in metalling intermediary tube wall belt hole, vertical gabion well spaced apart; Separation levee was divided into a plurality of unit with gathering system in said minute, vertically bury underground in the said gabion well tube wall belt hole HDPE pipe and be embedded in metalling intermediary HDPE pipe and link to each other.
2. a kind of three-dimensional gathering system of leach liquor that dump leaching field, mine has the bottom antiseepage that is used for according to claim 1, it is characterized in that: said compound impervious barrier constitutes by laying antiseepage soil between the double-deck HDPE anti seepage membrane.
3. according to the said a kind of three-dimensional gathering system of leach liquor that dump leaching field, mine has the bottom antiseepage that is used for of claim 2, it is characterized in that: the antiseepage soil of said compound impervious barrier is clay seam or bentonite bed.
4. a kind of three-dimensional gathering system of leach liquor that dump leaching field, mine has the bottom antiseepage that is used for according to claim 1, it is characterized in that: said gabion well is made up of geotechnological grille network parcel rubble.
5. according to one of any described a kind of three-dimensional gathering system of leach liquor that dump leaching field, mine has the bottom antiseepage that is used for of claim 1-4, it is characterized in that: said gabion well diameter is 80~200cm.
CN2011205681082U 2011-12-31 2011-12-31 Three-dimensional lixivium gathering system with bottom anti-seepage for mine dump leaching field Expired - Lifetime CN202482392U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205681082U CN202482392U (en) 2011-12-31 2011-12-31 Three-dimensional lixivium gathering system with bottom anti-seepage for mine dump leaching field

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205681082U CN202482392U (en) 2011-12-31 2011-12-31 Three-dimensional lixivium gathering system with bottom anti-seepage for mine dump leaching field

Publications (1)

Publication Number Publication Date
CN202482392U true CN202482392U (en) 2012-10-10

Family

ID=46956829

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205681082U Expired - Lifetime CN202482392U (en) 2011-12-31 2011-12-31 Three-dimensional lixivium gathering system with bottom anti-seepage for mine dump leaching field

Country Status (1)

Country Link
CN (1) CN202482392U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103321256A (en) * 2013-07-09 2013-09-25 中国瑞林工程技术有限公司 Anti-pollution three-dimensional composite seepage-proofing barrier system
CN105332392A (en) * 2015-11-17 2016-02-17 安徽马钢工程技术集团有限公司 Anti-seepage structure and anti-seepage treatment method for surface mine pit bottom
CN105861820A (en) * 2016-04-01 2016-08-17 李强 Technique for recycling precious metal from factory lean ore through dump leaching and ore dressing device
CN106345801A (en) * 2016-11-18 2017-01-25 北京高能时代环境技术股份有限公司 Dump leaching restoration system and restoration process of chromium pollution soil
CN106734167A (en) * 2016-12-26 2017-05-31 北京高能时代环境技术股份有限公司 Strengthen repair system and technique in a kind of organic contamination place
CN108687096A (en) * 2018-04-03 2018-10-23 中国瑞林工程技术有限公司 A kind of underground sewage collects interception system and its construction method
CN108929959A (en) * 2017-05-26 2018-12-04 中核第四研究设计工程有限公司 Heap leaching technique is built in a kind of uranium ore underground goaf
CN110804694A (en) * 2019-11-15 2020-02-18 万宝矿产有限公司 Biological heap leaching W solution ditch protection and leakage monitoring system
CN112899474A (en) * 2021-03-25 2021-06-04 长沙矿山研究院有限责任公司 Device and method for collecting mineral leaching liquid at upper, middle and lower three positions of mineral leaching liquid in heap leaching field

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103321256A (en) * 2013-07-09 2013-09-25 中国瑞林工程技术有限公司 Anti-pollution three-dimensional composite seepage-proofing barrier system
CN103321256B (en) * 2013-07-09 2016-01-13 中国瑞林工程技术有限公司 Anti-pollution three-dimensional composite anti-penetrating barrier system
CN105332392A (en) * 2015-11-17 2016-02-17 安徽马钢工程技术集团有限公司 Anti-seepage structure and anti-seepage treatment method for surface mine pit bottom
CN105861820A (en) * 2016-04-01 2016-08-17 李强 Technique for recycling precious metal from factory lean ore through dump leaching and ore dressing device
CN106345801A (en) * 2016-11-18 2017-01-25 北京高能时代环境技术股份有限公司 Dump leaching restoration system and restoration process of chromium pollution soil
CN106734167A (en) * 2016-12-26 2017-05-31 北京高能时代环境技术股份有限公司 Strengthen repair system and technique in a kind of organic contamination place
CN108929959A (en) * 2017-05-26 2018-12-04 中核第四研究设计工程有限公司 Heap leaching technique is built in a kind of uranium ore underground goaf
CN108687096A (en) * 2018-04-03 2018-10-23 中国瑞林工程技术有限公司 A kind of underground sewage collects interception system and its construction method
CN110804694A (en) * 2019-11-15 2020-02-18 万宝矿产有限公司 Biological heap leaching W solution ditch protection and leakage monitoring system
CN112899474A (en) * 2021-03-25 2021-06-04 长沙矿山研究院有限责任公司 Device and method for collecting mineral leaching liquid at upper, middle and lower three positions of mineral leaching liquid in heap leaching field

Similar Documents

Publication Publication Date Title
CN202482392U (en) Three-dimensional lixivium gathering system with bottom anti-seepage for mine dump leaching field
CN102767302B (en) Distributed underground reservoir and construction method thereof
CN203603105U (en) Wall plate type ecological retaining wall bank protection structure
CN103590425B (en) A kind of Peaty soft soil stratum subway station construction technology
CN102383413B (en) Method for constructing strengthened saturated-flow plastic silt soft soil foundation
CN105714759B (en) The row that liquefaction collapse is taken precautions against in urban dregs blends reinforcement means
CN206752614U (en) A kind of sponge-type road sinks formula afforests dividing strip Rainwater collection system
CN112081144B (en) Bottom composite stable layer structure of heavy metal tailing pond and construction method
CN101881181A (en) Mine goaf tailing-filled concrete enclosing wall
CN113107061A (en) Stratum reconstruction method for near-urban abandoned strip mine
CN110777819A (en) High and steep mine mountain reconstruction ecological restoration method
CN113101789A (en) Method and structure for sealing carbon dioxide by utilizing open pit and mining method
CN106592756A (en) Karst region step-type basement water drainage structure and construction method thereof
CN111305211B (en) Method for heightening and expanding capacity of ultrafine particle tailing pond with one-time dam construction by adopting midline method
CN103061767B (en) Lower to horizontal slice Dry-placed fill mining
CN110374181A (en) A kind of rainwater collection pool and its construction method
CN207633496U (en) A kind of super large square sponge city Integral rain recycling system
CN210684945U (en) Rainwater collecting pool
CN206143806U (en) Novel prefabricated assembled retaining wall
CN211898541U (en) Guide wall structure for reinforced structure of air shaft initial end head
CN108086459A (en) A kind of construction method of sponge urban green space water storage system
CN208293588U (en) A kind of Cut Slopes of Expansive Soil reinforcement formula, which is changed, fills out compages
CN114032910B (en) Narrow foundation pit ramp structure and soil discharging method using same
CN212052857U (en) Concrete buttress formula retaining wall structure permeates water
CN211816750U (en) Sponge city rainwater recycling system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20121010

CX01 Expiry of patent term