CN202471742U - Automatic loading and unloading device for non-rotor rheometer sample - Google Patents

Automatic loading and unloading device for non-rotor rheometer sample Download PDF

Info

Publication number
CN202471742U
CN202471742U CN2012200338758U CN201220033875U CN202471742U CN 202471742 U CN202471742 U CN 202471742U CN 2012200338758 U CN2012200338758 U CN 2012200338758U CN 201220033875 U CN201220033875 U CN 201220033875U CN 202471742 U CN202471742 U CN 202471742U
Authority
CN
China
Prior art keywords
sample
film
press mold
slide block
planker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2012200338758U
Other languages
Chinese (zh)
Inventor
张嵘
梅丰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NORKA INSTRUMENT (SHANGHAI) CO Ltd
Original Assignee
NORKA INSTRUMENT (SHANGHAI) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NORKA INSTRUMENT (SHANGHAI) CO Ltd filed Critical NORKA INSTRUMENT (SHANGHAI) CO Ltd
Priority to CN2012200338758U priority Critical patent/CN202471742U/en
Application granted granted Critical
Publication of CN202471742U publication Critical patent/CN202471742U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model discloses an automatic loading and unloading device for a non-rotor rheometer sample. The automatic loading and unloading device comprises a bottom plate which is sequentially connected with a film dragging mechanism, a die cavity, a sample confirming detection device and a sample queue bracket from the left to the right; the film dragging mechanism is connected with a sample shoveling mechanism; and a film tension force control mechanism and a film exhaust detection mechanism are symmetrically connected onto the sample queue bracket in an up and down manner. The rheometer experiment originally completed by hands realizes the automation and continuity, the errors caused by manual operation are reduced, the labor intensity is alleviated, and the test efficiency is improved.

Description

Be used to not have the robotization loading and the discharge mechanism of rotor rheometer sample
Technical field
The utility model belongs to rubber checkout equipment technical field, and is relevant with no rotor rheometer test, relates to a kind of robotization loading and discharge mechanism that is used to not have the rotor rheometer sample.
Background technology
At present, when the rubber checkout equipment that utilizes prior art does not have the rotor rheometer test, all need to carry out total man worker's operation according to following steps:
At first, the upper and lower surface with sample attaches with resistant to elevated temperatures film;
Then, with the upper and lower die cavity (comprising upper cavity and lower mode cavity) of all putting into checkout equipment with the sample of film;
After test is accomplished, also need sample to be removed from die cavity with instruments such as tweezers.
Although this traditional sample means of continuing to use for many years are uncomplicated, there are many defectives, mainly comprise:
Sample attaches film, loads sample, unloads complete manual the carrying out of sample, and is backward in technique;
The unavoidable existence such as leaking the pad film, filling up the mistake that film or film position are not just waiting human factor to cause more;
Because the test of each sample requires in 3~6 minutes short period, to accomplish usually, therefore, operating personnel must be on duty all the time by checkout equipment, so that test timely unloading sample and continue to load new sample when accomplishing;
Repeat shirtsleeve operation and be prone to make the staff to produce sense of fatigue, and full manual operations, inefficiency.
The utility model content
The purpose of the utility model is deficiency or the defective that overcomes prior art, and a kind of robotization loading and discharge mechanism that is used to not have the rotor rheometer sample is provided.Make the flow graph test that needs manual completion originally realize robotization and serialization, reduce mistake, reduction labour intensity, raising test efficiency that manually-operated brings.
To achieve these goals, the utility model has adopted following technical scheme:
Be used to not have the robotization loading and the discharge mechanism of rotor rheometer sample, it is characterized in that, it comprises a base plate, is connected with film tractor, die cavity, sample affirmation checkout equipment and sample queuing carriage on this base plate from left to right in turn;
Be connected with a sample on the described film tractor and shovel the structure of disembarking;
On the described sample queuing carriage, upper and lowerly be symmetrically connected with a film tensile force control gear, a film is used up testing agency.
Above-mentioned the robotization loading and the discharge mechanism that are used to not have the rotor rheometer sample, wherein,
Described film tractor comprises a planker; Planker is provided with one and is erected at the disjunctor underframe between both sides before and after it, is positioned at that horizontal symmetrical is provided with a pilot hole on the underframe of both sides before and after the planker, is equipped with one in the pilot hole and can makes the parallel mobile guidepost of planker; The external part of guidepost and the left end of planker are affixed;
Both sides, the front and back vertical symmetry of next-door neighbour's planker is provided with a back press mold slide block guide post on the described underframe, is equipped with a back press mold piece on the two back press mold slide block guide posts, and the top of two back press mold slide block guide posts connects a back press mold cylinder flange; The bottom of back press mold cylinder flange connects a back press mold cylinder;
Press mold slide block guide post before both sides, the front and back vertical symmetry of planker right-hand member is provided with one, press mold piece before being equipped with on the two preceding press mold slide block guide posts, press mold cylinder flange before the top of two preceding press mold slide block guide posts connects; Press mold cylinder before the bottom of preceding press mold cylinder flange connects one;
Described sample shovels the structure of disembarking and comprises sample shovel; This sample shovel is fixedly connected on the right-hand member side of said planker; Be positioned at the below of sample shovel and be provided with a twin shaft cylinder near the bottom of planker right-hand member, the left end of external part and planker that is connected two piston rods on the twin shaft cylinder is affixed.
Described die cavity comprises upper cavity and lower mode cavity;
Described lower mode cavity is connected the center of said base plate, and symmetria bilateralis vertically is provided with a upper cavity guide pillar before and after it;
The top of described upper cavity guide pillar is connected with a pressing mold cylinder flange and a pressing mold cylinder from bottom to up in turn;
Described upper cavity is set on the upper cavity guide pillar that is positioned at said pressing mold cylinder flange bottom; And under described pressing mold air cylinder driven, move along the upper cavity guide pillar is upper and lower.
Described sample confirms that checkout equipment comprises a base; The two ends symmetry that base top surface is positioned at its length direction connects fixedly slide block guide post of a sample; Two fixedly are arranged with fixedly slide block of a sample on the slide block guide post, and sample fixedly slide block guide post top connects fixedly cylinder flange of a sample, and the sample fixedly bottom of cylinder flange connects fixedly cylinder of a sample; The sample fixedly top connection one of cylinder flange stretches out in the outer support of flange, connects a vision sensor on the support;
Described center position be provided with one can receive visual sensor signal reflective sticker.
Described sample queuing carriage comprise a horizontal panel with one with this horizontal panel vertical vertical panel that links to each other placed in the middle;
The first-class sample that is interval with of described horizontal panel is placed sign;
On the described vertical panel, upper and lowerly be arranged with a membrane tension control gear and a film is used up testing agency;
Wherein, upper and lower membrane tension control gear is separately positioned on the position near said vertical panel two ends;
Upper and lower film is used up the inboard setting that testing agency is close to upper and lower membrane tension control gear.
Described film tensile force control gear comprises that one has the film rolling of middle blank coil core; The blank coil in-core axially is arranged with a top along it and is located at the friction block on its inwall in described, and the footpath of two friction blocks is arranged with the curved friction block retainer in a cross section up and down;
A relative side of said two friction blocks is arranged with several spring pilot holes at interval, is embedded with tension force in the spring pilot hole and keeps spring.
Described film is used up testing agency and is comprised the first film turning-bar, detection fork, baffle plate rotating shaft and the second film turning-bar that is horizontally set on the vertical panel front successively;
Also comprise the optoelectronic switch and the optoelectronic switch baffle plate that vertically are arranged on the vertical panel back side;
Described first, second film turning-bar is fixed in the left and right sides that vertical panel is positioned at the rotating shaft of optoelectronic switch plate washer.
Described baffle plate rotating shaft activity is located in the circular axis hole that is provided with on the vertical panel; The optoelectronic switch baffle plate is fixedly connected in this baffle plate rotating shaft;
Pass in the arcuate socket that described detection fork is provided with from vertical panel, its rear end is fixed on the end that the optoelectronic switch baffle plate is positioned at arcuate socket.
Described sample queuing carriage end also is connected with a detachable extending bracket; This extending bracket is provided with at least one sample placing space.
The centre distance up and down of described two film turning-bars equals the diameter of film turning-bar.
The spacing that adjacent two samples are placed sign on the described horizontal panel equals the range of said twin shaft cylinder.
Owing to adopted above-mentioned technical scheme, the utility model compared with prior art has following advantage and good effect:
1. the utility model has made full use of the film tractor that is provided with on the package unit, die cavity, sample and has confirmed that disembark structure, film tensile force control gear and film of checkout equipment, sample queuing carriage, sample shovel use up testing agency, has realized full automation and serialization that no rotor rheometer is tested;
2. owing to realized the robotization and the serialization of test, therefore, reduce operating personnel's time on duty effectively, reduced personnel labor, reduced the human error;
3. compared with prior art, improved test efficiency significantly;
4. this device simplicity of design, reliable, simple to operate especially is fit to the application under the environment of plant.
Description of drawings
Through following examples and combine the description of its accompanying drawing, can further understand and use novel purpose, specific structural features and advantage in fact.
Description of drawings:
Fig. 1 does not have the Facad structure synoptic diagram of robotization loading of rotor rheometer sample and discharge mechanism for the utility model;
Fig. 2 is the plan structure synoptic diagram of Fig. 1;
Fig. 3 does not have the perspective view of robotization loading of rotor rheometer sample and discharge mechanism for the utility model;
Fig. 4 is that membrane tension control gear among Fig. 5 is along the cross-sectional view of A-A line;
Fig. 5 is the cross-sectional view along B-B line among Fig. 4;
Fig. 6 uses up the front structure for amplifying synoptic diagram of testing agency for upper film tension control mechanism among Fig. 1 and upper film;
Fig. 7 uses up the perspective view of testing agency for upper film tension control mechanism and upper film among Fig. 1 among Fig. 6;
Fig. 8 is Fig. 7 rear perspective structural representation;
Fig. 9 confirms the perspective view of checkout equipment C for sample;
Figure 10 is the left TV structure synoptic diagram of Fig. 9;
Figure 11 is the structural representation of looking up of Figure 10;
Figure 12 is the perspective view of film tractor
The perspective view that Figure 13 upwards flips an angle for Figure 12;
Figure 14 is the front projection structural representation of Figure 12;
Figure 15 is the structural representation of looking up of Figure 14;
Figure 16 is the perspective view of sample queuing carriage;
The perspective view that Figure 17 upwards flips an angle for Figure 16;
Figure 18 is the front projection structural representation of Figure 16;
Figure 19 is the plan structure synoptic diagram of Figure 18.
Among the figure:
Membrane tension control gear under the A1-; A2-upper film tension control mechanism; Film is used up testing agency under the B1-; Film is used up testing agency under the B2-; The C-sample is confirmed checkout equipment; D-film tractor; E-sample queuing carriage; The M-die cavity; But K-extending bracket;
Film rolling under the 1-; 2-upper film volume; The 3-sample; The 4-lower mode cavity; The 5-upper cavity; 6-sample shovel; 7-spring pilot hole; Film roller under the 8-; 9-pressing mold cylinder; 10-pressing mold cylinder flange; 11-upper cavity guide pillar; The 12-base plate; The right friction block of 13-; 14-left side friction block; 15-friction block retainer; The 16-tensile force keeps spring; 17-friction block retainer end cap; The 18-rubbing surface; 19-film roll core; The 20-optoelectronic switch; 21-the first film turning-bar; 21 '-the second film turning-bars; The 22-film detects fork; 23-optoelectronic switch plate washer; The rotating shaft of 24-optoelectronic switch plate washer; 25-machine vision sensor; The 26-sample is the cylinder flange fixedly; The 27-sample is cylinder fixedly; The 28-sample is slide block guide post fixedly; The 29-sample is slide block fixedly; The 30-base; The 31-light path; 32-machine vision sensor stand; The 33-reflective sticker; Press mold cylinder before the 34-; Press mold cylinder flange before the 35-; Press mold cylinder flange behind the 36-; Press mold cylinder behind the 37-; Press mold slide block behind the 38-; Press mold slide block before the 39-; Press mold slide block guide post behind the 40-; Press mold slide block guide post before the 41-; 42-planker guide pillar; 43-twin shaft cylinder piston rod; 44-twin shaft cylinder; The 45-underframe; The 46-planker; The 47-sample is placed sign; 48-sample queuing carriage horizontal panel; 49-sample queuing carriage vertical panel; Circular axis hole on the 49a-vertical panel; Arcuate socket on the 49b-vertical panel; Film under the 50-; The 51-upper film.
Embodiment
Referring to Fig. 1~Fig. 3; Cooperation is referring to Fig. 4~Figure 19; The robotization loading and the discharge mechanism that are used to not have the rotor rheometer sample that relate to for the utility model shown in the figure; Comprise a base plate 12 as whole device basic spare, be connected with film tractor D, die cavity M, sample affirmation checkout equipment C and sample queuing carriage E on this base plate 12 from left to right in turn; Be connected with a sample on the film tractor D and shovel the structure of disembarking; Sample queuing carriage E upper and lower is symmetrically connected with a film tensile force control gear and a film is used up testing agency.
Shown in Fig. 1~3, sample queuing carriage E is installed in the right side of base plate 12.Shown in Figure 16~19, sample queuing carriage comprise a horizontal panel 48 with one with these horizontal panel 48 vertical vertical panels that link to each other 49 placed in the middle; The horizontal panel 48 first-class samples that are interval with are placed sign 47;
Two cover membrane tension control gears and two cover films are used up on the vertical panel 49 that the upper and lower symmetry of testing agency is installed in sample queuing carriage E, and wherein, upper and lower membrane tension control gear A2, A1 are separately positioned on the position near vertical panel 49 two ends; Upper and lower film is used up the inboard that the B2 of testing agency, B1 be close to upper and lower membrane tension control gear A2, A1 and is provided with.
Following film rolling 1 is installed in down on the membrane tension control gear A1, and upper film volume 2 is installed on the upper film tension control mechanism A2, and will descend film 50 to be wrapped in down film according to direction as shown in fig. 1 and use up on the B2 of testing agency.Following film roller 8 is directly installed on the right-hand member of sample queuing carriage E or extending bracket K.After the following film 50 of from following film rolling 1, hauling out is walked around down film roller 8; Then be tiled on the horizontal panel 48 of sample queuing carriage E; 3 on sample subsequently is placed on down on the film 50 by horizontal pendulum; And the described sample placement sign (not shown) of aliging, make that film 50 is sticked in the bottom surface of sample 3 down, carried out the preceding preliminary work of test thus.
Shown in Fig. 1~3, die cavity M is installed in the center of base plate 12, and die cavity M comprises upper cavity 5 and lower mode cavity 4; Lower mode cavity 4 is connected the center of base plate 12, and symmetria bilateralis vertically is provided with a upper cavity guide pillar 11 before and after it; The top of upper cavity guide pillar 11 is connected with a pressing mold cylinder flange 10 and a pressing mold cylinder 9 from bottom to up in turn; Upper cavity 5 is set on the upper cavity guide pillar 11 that is positioned at pressing mold cylinder flange 10 bottoms; And under the driving of pressing mold cylinder 9, along upper cavity guide pillar 11 upper and lower moving.
Fig. 4, the 5th, the structural representation of upper film tension control mechanism A2 among Fig. 1.Shown in figure; Upper film tensile force control gear A2 comprises that one has the upper film volume 2 of middle blank coil core; In the blank coil in-core be provided with the footpath that a top is located at friction block 14,13, two friction blocks 14,13 on its inwall along its axial left-right symmetric and be arranged with the curved friction block retainer 15 in a cross section up and down; A relative side of two friction blocks 14,13 is arranged with several spring pilot holes 7 at interval, is embedded with a tension force in the spring pilot hole 7 and keeps spring 16.
At first right friction block 13 is put into friction block retainer 15 with left friction block 14, and put into tensile force maintenance spring 16 at least in 3 spring pilot holes 7 that are uniformly distributed with on two friction blocks 14,13 respectively.In the end of friction block retainer 15 end cap 17 is installed then, right friction block 13 is enclosed in the friction block retainer 15 with left friction block 14, it can't be moved forward and backward.Tensile force keeps spring 16 through the elasticity of self right friction block 13 tightly to be pressed on the inwall of film roll core 19 with left friction block 14; Constitute a rubbing surface 18 between the inwall of the outer arc face of two friction blocks and volume core; A constant friction force is provided on rubbing surface 18 thus; Make that when dragging upper film 51 upper film volume 2 can excessively not rotate because of inertia, thereby played the effect that keeps membrane tension.
In like manner, following membrane tension control gear A1 also is used to control down the tensile force of film rolling 2 simultaneously, repeats no more at this.
Fig. 6~Fig. 8 is the structural representation that upper film is used up the B2 of testing agency among Fig. 1.Film use up testing agency comprise the first film turning-bar 21 on vertical panel 49 fronts that are horizontally set at sample queuing carriage E successively, detect fork 22, baffle plate rotating shaft 24 and the second film turning-bar 22 ';
Also comprise the optoelectronic switch 20 and optoelectronic switch baffle plate 23 that vertically are arranged on vertical panel 49 back sides.
First, second film turning-bar 21,21 ' be fixed in left and right sides that vertical panel 49 is positioned at optoelectronic switch plate washer rotating shaft 24.Baffle plate rotating shaft 24 activities are located in the circular axis hole 49a who is provided with on the vertical panel 49; Optoelectronic switch baffle plate 23 is movably connected in this baffle plate rotating shaft 24; Detect fork 22 and in an arcuate socket 49b of vertical panel 49 settings, pass, its rear end is fixed on the end that optoelectronic switch baffle plate 23 is positioned at arcuate socket 49b.Shown in figure, two film turning-bars 21,22 ' centre distance up and down equal the diameter of turning-bar just.
The upper film 51 of from upper film volume 2, hauling out is wrapped in upper film with illustrated mode and uses up on the B2 of testing agency.When there was suitable tensile force in film 51, film detected fork 22 and is maintained at the film top, detected fork 22 23 of the fastening optoelectronic switch plate washers that link to each other with film and was maintained on the horizontal level.When upper film 51 is used up; Film detects the support that fork 22 loses film 51; Beginning is dropped downwards, and the right-hand member that drives optoelectronic switch plate washer 23 simultaneously is that circular motion is upwards done in the center of circle with optoelectronic switch plate washer rotating shaft 24, until blocking optoelectronic switch 20 (representing with dot-and-dash line among the figure).At this moment, optoelectronic switch 20 just can send a signal to the control system (not shown) of instrument exactly, just can occur pointing out the client information of " film is used up " on the display screen (not shown) of control system at this moment.
In like manner, whether following film is used up the B1 of testing agency and also is used to detect down film rolling 1 simultaneously and uses up, and it is identical that its working method and structure and upper film are used up the B2 of testing agency, repeats no more.
Fig. 9~Figure 11 is the structural representation that sample is confirmed checkout equipment C among Fig. 1.Sample confirms that checkout equipment C is installed in the position of base plate 12 between lower mode cavity 4 and sample queuing carriage E; Comprise a base 30; The two ends symmetry that the end face of base 30 is positioned at its length direction connects fixedly slide block guide post 28 of a sample; Two fixedly are arranged with fixedly slide block 29 of a sample on the slide block guide post 28, and the sample fixedly top of slide block guide post 28 connects fixedly cylinder flange 26 of a sample, and the sample fixedly bottom of cylinder flange 26 connects fixedly cylinder 27 of a sample; The sample fixedly top connection one of cylinder flange 26 stretches out in the outer support 32 of flange, connects a vision sensor 25 on the support 32; The centre of base 30 be provided with one can receive visual sensor signal reflective sticker 33.
Before in film tractor D is fed through sample 3 the die cavity M of no rotor rheometer, doing experiment; Sample confirms that checkout equipment C can judge the existence whether sample 3 is arranged on the ready position (being reflective sticker 33 positions) at sample 3 in advance, puts sample 3 in case the user is leaked.Vision sensor 25 during detection on the equipment can be pasted the reflective sticker 33 on base 30 with a branch of infrared external reflection light 31 directives; When reflection ray 31 turns back to 25 last times of machine vision sensor again; Sample confirms that checkout equipment C then can confirm not have in the die cavity M sample 3 to exist thus; Otherwise then confirming as has sample 3 to exist in the die cavity M.If sample 3 exists; Then through the fixedly action of cylinder 27 of sample; Promote sample fixedly slide block 29 along sample fixedly slide block guide post 28 move downward; Sample 3 tightly is folded in sample fixedly between slide block 29 and the base 30, preventing the sample accidental displacement, and waits for that film tractor E is fed through sample 3 in the die cavity M and make an experiment.If sample 3 does not exist, then sample confirms whether checkout equipment C can continue to drag film 51 with information feedback to film tractor D, exist to confirm next sample 3.
Figure 12~Figure 15 is the structural representation of film tractor D among Fig. 1.Film tractor D is installed in the right side of base plate 12, comprises a planker 46; Planker 46 is provided with one and is erected at the disjunctor underframe 45 between both sides before and after it, is positioned at that horizontal symmetrical is provided with a pilot hole 45a on the underframe 45 of both sides, planker 46 front and back, is equipped with one in the pilot hole 45a and can makes planker 46 parallel mobile guideposts 42; The left end of the external part of guidepost 42 and planker 46 is affixed;
Both sides, the front and back vertical symmetry that is close to planker 46 on the underframe 45 is provided with the top connection one back press mold cylinder flange 36 that is equipped with a back press mold piece 38, two back press mold slide block guide posts 40 on a back press mold slide block guide post 40, the two back press mold slide block guide posts 40; The bottom of back press mold cylinder flange 36 connects a back press mold cylinder 37;
Press mold cylinder flange 35 before the top of press mold slide block guide post 41 connected one before the press mold piece 39, two before both sides, the front and back vertical symmetry of planker 46 right-hand members was provided with and is equipped with on the press mold slide block guide post 41 before the press mold slide block guide post 41, two before one; Press mold cylinder 34 before the bottom of preceding press mold cylinder flange 35 connects one;
Sample shovels the structure of disembarking and comprises sample shovel 6; This sample shovel 6 is fixedly connected on the right-hand member side of planker 46; Be positioned at the below of sample shovel 6 and be provided with a twin shaft cylinder 44 near the bottom of planker 46 right-hand members, the left end of external part and planker 46 that is connected two piston rods 43 on the twin shaft cylinder 44 is affixed.
When needs drag upper film 51 when sending into sample 3 in the die cavity M, at first under the effect of back press mold cylinder 37, back press mold slide block 38 press mold slide block guide post 40 after two moves down clamping films, to prevent that film is by accidental displacement.Twin shaft cylinder 44 is done the motion of withdrawal twin shaft cylinder piston rod 43 then, and pulling planker 46 moves right (representing with dot-and-dash line among the figure), and the while gets in the die cavity M with the planker 46 fastening samples shovels 6 that link to each other, and sample 3 shovels that the last time test is stayed leave die cavity.Press mold slide block 39 moved downward along two preceding press mold slide block guide posts 41 and clamps upper and lower film 51,50 simultaneously before preceding subsequently press mold cylinder 34 promoted; This action provides and has dragged upper and lower film 51,50 needed friction force; Upwards withdrawal of back press mold cylinder 37 simultaneously makes back press mold slide block 38 unclamp upper and lower film 51,51.Last twin shaft cylinder 44 is done the motion of stretching out twin shaft cylinder piston rod 43, drags upper and lower film 51,50 to the left motion, and drives next sample 3 and get into and begin test in the die cavity M.When dragging upper and lower film 51,50, upper film 51 covers on the sample 3 because of action of gravity voluntarily, thereby has played the buffer action in detecting test, prevents that sample 3 from polluting die cavity M.
Figure 16~Figure 19 is the structural representation of sample queuing carriage E among Fig. 1.Shown in figure, sample queuing carriage E provides the placing space of 5 samples, makes the user can disposablely put into a plurality of samples, improves experiment work efficient.Simultaneously, sample queuing carriage E also provides the installed surface of other mechanism.Shown in figure, 49 of vertical panels on the sample queuing carriage E are membrane tension control gear A1, A2 and film to be installed use up the basic part of mechanisms such as the B1 of testing agency, B2.
Sample queuing carriage E is formed by the sheet metal component welding processing, and wherein, 5 samples that have been sticked on the horizontal panel 48 of sample queuing carriage are placed sign 47, and the spacing that adjacent two samples are placed sign 47 equals the range that film tractor D goes up twin shaft cylinder 44.In the present embodiment, the spacing that adjacent two samples are placed sign 47 is 100mm, accurately puts the position foundation of sample 3 as the client with this.
In addition, when the user hopes extending space, but the extending bracket K that is installed in sample queuing carriage E right-hand member also capable of using, in order to increase at least one extra sample 3 placing space.

Claims (10)

1. be used to not have the robotization loading and the discharge mechanism of rotor rheometer sample, it is characterized in that, it comprises a base plate, is connected with film tractor, die cavity, sample affirmation checkout equipment and sample queuing carriage on this base plate from left to right in turn;
Be connected with a sample on the described film tractor and shovel the structure of disembarking;
On the described sample queuing carriage, upper and lowerly be symmetrically connected with a film tensile force control gear, a film is used up testing agency.
2. robotization loading and the discharge mechanism that is used to not have the rotor rheometer sample according to claim 1 is characterized in that,
Described film tractor comprises a planker; Planker is provided with one and is erected at the disjunctor underframe between both sides before and after it, is positioned at that horizontal symmetrical is provided with a pilot hole on the underframe of both sides before and after the planker, is equipped with one in the pilot hole and can makes the parallel mobile guidepost of planker; The external part of guidepost and the left end of planker are affixed;
Both sides, the front and back vertical symmetry of next-door neighbour's planker is provided with a back press mold slide block guide post on the described underframe, is equipped with a back press mold piece on the two back press mold slide block guide posts, and the top of two back press mold slide block guide posts connects a back press mold cylinder flange; The bottom of back press mold cylinder flange connects a back press mold cylinder;
Press mold slide block guide post before both sides, the front and back vertical symmetry of planker right-hand member is provided with one, press mold piece before being equipped with on the two preceding press mold slide block guide posts, press mold cylinder flange before the top of two preceding press mold slide block guide posts connects; Press mold cylinder before the bottom of preceding press mold cylinder flange connects one;
Described sample shovels the structure of disembarking and comprises sample shovel; This sample shovel is fixedly connected on the right-hand member side of said planker; Be positioned at the below of sample shovel and be provided with a twin shaft cylinder near the bottom of planker right-hand member, the left end of external part and planker that is connected two piston rods on the twin shaft cylinder is affixed.
3. robotization loading and the discharge mechanism that is used to not have the rotor rheometer sample according to claim 1 is characterized in that described die cavity comprises upper cavity and lower mode cavity;
Described lower mode cavity is connected the center of said base plate, and symmetria bilateralis vertically is provided with a upper cavity guide pillar before and after it;
The top of described upper cavity guide pillar is connected with a pressing mold cylinder flange and a pressing mold cylinder from bottom to up in turn;
Described upper cavity is set on the upper cavity guide pillar that is positioned at said pressing mold cylinder flange bottom; And under described pressing mold air cylinder driven, move along the upper cavity guide pillar is upper and lower.
4. robotization loading and the discharge mechanism that is used to not have the rotor rheometer sample according to claim 1 is characterized in that,
Described sample confirms that checkout equipment comprises a base; The two ends symmetry that base top surface is positioned at its length direction connects fixedly slide block guide post of a sample; Two fixedly are arranged with fixedly slide block of a sample on the slide block guide post, and sample fixedly slide block guide post top connects fixedly cylinder flange of a sample, and the sample fixedly bottom of cylinder flange connects fixedly cylinder of a sample; The sample fixedly top connection one of cylinder flange stretches out in the outer support of flange, connects a vision sensor on the support;
Described center position be provided with one can receive visual sensor signal reflective sticker.
5. robotization loading and the discharge mechanism that is used to not have the rotor rheometer sample according to claim 1 is characterized in that, described sample queuing carriage comprise a horizontal panel with one with this horizontal panel vertical vertical panel that links to each other placed in the middle;
The first-class sample that is interval with of described horizontal panel is placed sign;
On the described vertical panel, upper and lowerly be arranged with a membrane tension control gear and a film is used up testing agency;
Wherein, upper and lower membrane tension control gear is separately positioned on the position near said vertical panel two ends;
Upper and lower film is used up the inboard setting that testing agency is close to upper and lower membrane tension control gear.
6. according to claim 1 or 5 described robotization loading and the discharge mechanisms that are used to not have the rotor rheometer sample; It is characterized in that; Described film tensile force control gear comprises that one has the film rolling of middle blank coil core; The blank coil in-core axially is arranged with a top along it and is located at the friction block on its inwall in described, and the footpath of two friction blocks is arranged with the curved friction block retainer in a cross section up and down;
A relative side of said two friction blocks is arranged with several spring pilot holes at interval, is embedded with tension force in the spring pilot hole and keeps spring.
7. according to claim 1 or 5 described robotization loading and the discharge mechanisms that are used to not have the rotor rheometer sample, it is characterized in that,
Described film is used up testing agency and is comprised the first film turning-bar, detection fork, baffle plate rotating shaft and the second film turning-bar that is horizontally set on the vertical panel front successively;
Also comprise the optoelectronic switch and the optoelectronic switch baffle plate that vertically are arranged on the vertical panel back side;
Described first, second film turning-bar is fixed in the left and right sides that vertical panel is positioned at the rotating shaft of optoelectronic switch plate washer;
Described baffle plate rotating shaft activity is located in the circular axis hole that is provided with on the vertical panel; The optoelectronic switch baffle plate is fixedly connected in this baffle plate rotating shaft;
Pass in the arcuate socket that described detection fork is provided with from vertical panel, its rear end is fixed on the end that the optoelectronic switch baffle plate is positioned at arcuate socket.
8. robotization loading and the discharge mechanism that is used to not have the rotor rheometer sample according to claim 1 and 2 is characterized in that, described sample queuing carriage end also is connected with a detachable extending bracket; This extending bracket is provided with at least one sample placing space.
9. robotization loading and the discharge mechanism that is used to not have the rotor rheometer sample according to claim 7 is characterized in that, the centre distance up and down of described two film turning-bars equals the diameter of film turning-bar.
10. robotization loading and the discharge mechanism that is used to not have the rotor rheometer sample according to claim 5 is characterized in that, the spacing that adjacent two samples are placed sign on the described horizontal panel equals the range of said twin shaft cylinder.
CN2012200338758U 2012-02-03 2012-02-03 Automatic loading and unloading device for non-rotor rheometer sample Expired - Lifetime CN202471742U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200338758U CN202471742U (en) 2012-02-03 2012-02-03 Automatic loading and unloading device for non-rotor rheometer sample

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200338758U CN202471742U (en) 2012-02-03 2012-02-03 Automatic loading and unloading device for non-rotor rheometer sample

Publications (1)

Publication Number Publication Date
CN202471742U true CN202471742U (en) 2012-10-03

Family

ID=46919894

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200338758U Expired - Lifetime CN202471742U (en) 2012-02-03 2012-02-03 Automatic loading and unloading device for non-rotor rheometer sample

Country Status (1)

Country Link
CN (1) CN202471742U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102539804A (en) * 2012-02-03 2012-07-04 上海诺甲仪器仪表有限公司 Automatic loading and unloading device for rheometer test sample without rotor
CN110376052A (en) * 2019-07-09 2019-10-25 东南大学 A kind of high-efficiency double-shaft test load sharing system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102539804A (en) * 2012-02-03 2012-07-04 上海诺甲仪器仪表有限公司 Automatic loading and unloading device for rheometer test sample without rotor
CN102539804B (en) * 2012-02-03 2013-12-11 上海诺甲仪器仪表有限公司 Automatic loading and unloading device for rheometer test sample without rotor
CN110376052A (en) * 2019-07-09 2019-10-25 东南大学 A kind of high-efficiency double-shaft test load sharing system

Similar Documents

Publication Publication Date Title
CN202471742U (en) Automatic loading and unloading device for non-rotor rheometer sample
CN109444442A (en) Sample caching and handling system with emergency treatment, repetition measurement function
CN209311503U (en) Sample caching and handling system with emergency treatment, repetition measurement function
CN205998638U (en) Fixture assembly and Material Transportation trailer
CN202830596U (en) Cloth inspecting machine
CN202485998U (en) Stepless variable energy pendulum impact tester
CN102539804A (en) Automatic loading and unloading device for rheometer test sample without rotor
CN108163557B (en) The tire positioning auxiliary device of robot stacking machine
CN108147138A (en) Tire stacking positioning auxiliary device
CN103344444A (en) Automatic tire feeding device and method of tire testing machine
CN207932591U (en) The tire positioning auxiliary device of robot stacking machine
CN217466649U (en) Large-scale ultra-thin glass stripe degree detection equipment
CN103103919A (en) Cable bent tower with self detection device and cable bent tower surface crack detection method
CN105523473B (en) The crane trolley of easy access
CN107795166B (en) A kind of intelligent three-dimensional parking apparatus and its control method
CN106644500A (en) Crash test dummy allocation and transportation equipment
CN203672588U (en) Automatic pendulum impact testing machine for fuel tank
CN206998197U (en) Automatically the equipment that centring ring is installed in automobile window motor gear fixing axle
CN206146651U (en) Highly reliable type random sampling detection device of automobile parts
CN202169593U (en) Mechanical arm
CN207759713U (en) Tire transplanting mechanism and tire stacking positioning auxiliary device
CN205222131U (en) Automatic skeleton filling device
CN202057577U (en) Plate/band steel inspection table
CN206871047U (en) A kind of foldable vehicle stopping means
CN205203585U (en) Automatic labeling device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20121003

CX01 Expiry of patent term