CN202467153U - Suspension scaffold steel girder anchor device - Google Patents

Suspension scaffold steel girder anchor device Download PDF

Info

Publication number
CN202467153U
CN202467153U CN2012200907852U CN201220090785U CN202467153U CN 202467153 U CN202467153 U CN 202467153U CN 2012200907852 U CN2012200907852 U CN 2012200907852U CN 201220090785 U CN201220090785 U CN 201220090785U CN 202467153 U CN202467153 U CN 202467153U
Authority
CN
China
Prior art keywords
girder steel
anchor device
bolt
floor
cover plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200907852U
Other languages
Chinese (zh)
Inventor
裘晓春
陈万里
王大钢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN2012200907852U priority Critical patent/CN202467153U/en
Application granted granted Critical
Publication of CN202467153U publication Critical patent/CN202467153U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a suspension scaffold steel girder anchor device. The suspension scaffold steel girder anchor device comprises a base plate and at least a cover plate, wherein the base plate is disposed at the bottom of a floor. The cover plate is mounted at the top of a steel girder at the top of the floor. A bolt is respectively installed on the base plate which is at two sides of the steel girder, and connected with the cover plate in a penetrating mode. The cover plate is compressed tightly with the floor through coordination of nuts and bolts. Problems of inaccurate positioning and waste of materials in adopting a built-in fitting method can be resolved effectively, and the suspension scaffold steel girder anchor device can be recycled and reused.

Description

A kind of builder's jack girder steel anchor device
Technical field
The utility model relates to the realm of building construction, is specifically related to a kind of builder's jack girder steel anchor device.
Background technology
The method of pre-buried U type draw ring or bolt is adopted in the girder steel anchoring of builder's jack usually.The pre-buried location of U type draw ring or bolt is not easily, and easy positioning in concreting, makes troubles for the girder steel installation of back.Built-in fitting can't reclaim simultaneously, causes waste of material.Therefore,, improve and innovate, invented this anchor device to the shortcoming of using built-in fitting to exist.
Summary of the invention
The utility model technical problem to be solved is to provide a kind of builder's jack girder steel anchor device, can effectively solve to adopt that the location that exists in the built-in fitting method is inaccurate, the problem of waste of material recyclable repeated use.
For solving above-mentioned existing technical problem; The utility model adopts following scheme: a kind of builder's jack girder steel anchor device; Comprise the backing plate that is located at floor slab bottoms, at least one cover plate that is located at the girder steel top on the floor top; The both sides that are positioned at girder steel on the said backing plate are respectively equipped with cross-under bolt on the cover board, and said cover plate cooperates with bolt through nut girder steel and floor are compressed.
As preferably, the bottom of said bolt is with the sleeve pipe of length greater than slab thickness.Make between bolt and the concrete and leave the space, after the frame of encorbelmenting was removed, whole device can intactly reclaim.
As preferably, be provided with the wedging timber wedge in space between the two between said bolt and the girder steel.Avoid girder steel to move, good stability, it is more accurate to locate.
As preferably, said cover plate adopts two, 4 of the corresponding employings of said bolt.It is more firm to adopt 4 bolts that girder steel is connected, and stability is better.
Beneficial effect:
A kind of builder's jack girder steel anchor device that the utility model adopts technique scheme to provide can effectively solve and adopt that the location that exists in the built-in fitting method is inaccurate, the problem of waste of material, and is reusable.
Description of drawings
Fig. 1 is the organigram of the utility model;
Fig. 2 is the utility model sectional elevation drawing in use;
Fig. 3 for the utility model in use analyse and observe profile.
The specific embodiment
Extremely shown in Figure 3 like Fig. 1; A kind of builder's jack girder steel anchor device; Comprise the backing plate 2 that is located at floor 8 bottoms, at least one cover plate 1 that is located at girder steel 6 tops on floor 8 tops; The both sides that are positioned at girder steel 6 on the said backing plate 2 are respectively equipped with the bolt 3 of a cross-under on cover plate 1, and said cover plate 1 cooperates with bolt 3 through nut 4 girder steel 6 and floor 8 are compressed.The bottom of said bolt 3 is with the sleeve pipe 5 of length greater than floor 8 thickness.Be provided with the wedging timber wedge 7 in space between the two between said bolt 3 and the girder steel 6.Said cover plate 1 adopts two, 4 of the employings of said bolt 3 correspondences.
In the utility model, the position of bolt 3 and spacing are connected firmly by design size and backing plate, and its spacing must be greater than the width of girder steel; Sleeve pipe 5 adopts pvc pipe; Cover plate 1 adopts two, 4 of the employings of said bolt 3 correspondences, and two cover plates 1 and 4 bolts 3 form an integral body according to spacing that designs and backing plate welding, are using the back as a recycled in its entirety repeated use.It uses step following: on the slab form of setting up, set up scheme according to external scaffolding and carry out setting-out earlier, confirm the position of girder steel; Be placed on backing plate on the slab form then and be fixed in and survey on the measured position; Colligation floor bar again, concreting build the back cantilever steel girder 6 is installed and regulate bolt 3 and nut 4 with girder steel 6 with build after floor 8 compress, set up external scaffolding afterwards.After builder's jack is removed, with hammer gently knock bolt 3, bolt 3 promptly breaks away from floor, it is reusable to reclaim the back, practices thrift cost.

Claims (4)

1. builder's jack girder steel anchor device; It is characterized in that: comprise the backing plate (2) that is located at floor (8) bottom, at least one cover plate (1) that is located at the top of the girder steel (6) on floor (8) top; The both sides that are positioned at girder steel (6) on the said backing plate (2) are respectively equipped with the bolt (3) of a cross-under on cover plate (1), and said cover plate (1) cooperates with bolt (3) through nut (4) girder steel (6) and floor (8) are compressed.
2. a kind of builder's jack girder steel anchor device according to claim 1 is characterized in that: the bottom of said bolt (3) is with the sleeve pipe (5) of length greater than floor (8) thickness.
3. a kind of builder's jack girder steel anchor device according to claim 1 is characterized in that: be provided with the wedging timber wedge in space (7) between the two between said bolt (3) and the girder steel (6).
4. a kind of builder's jack girder steel anchor device according to claim 1 is characterized in that: said cover plate (1) adopts two, 4 of the employings of said bolt (3) correspondence.
CN2012200907852U 2012-03-12 2012-03-12 Suspension scaffold steel girder anchor device Expired - Fee Related CN202467153U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200907852U CN202467153U (en) 2012-03-12 2012-03-12 Suspension scaffold steel girder anchor device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200907852U CN202467153U (en) 2012-03-12 2012-03-12 Suspension scaffold steel girder anchor device

Publications (1)

Publication Number Publication Date
CN202467153U true CN202467153U (en) 2012-10-03

Family

ID=46915320

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200907852U Expired - Fee Related CN202467153U (en) 2012-03-12 2012-03-12 Suspension scaffold steel girder anchor device

Country Status (1)

Country Link
CN (1) CN202467153U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587638A (en) * 2012-03-12 2012-07-18 中天建设集团有限公司 Steel girder anchoring device of overhanging scaffold

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587638A (en) * 2012-03-12 2012-07-18 中天建设集团有限公司 Steel girder anchoring device of overhanging scaffold

Similar Documents

Publication Publication Date Title
CN102995571B (en) Method for prepressing single large-tonnage temporary steel pipe support and then resisting beam bottom during dismantling bridge beam body, and device thereof
CN103422512B (en) Replaceable pre-embedded bolt formula wind generation set concrete foundation and construction method thereof
CN202937005U (en) Cast-in-situ concrete beam lateral template reinforcement device
CN104264706B (en) External elevator steel beam foundation structure and construction method thereof
CN203475806U (en) Tool type anchoring bolt assembly used for fixing shape steel cantilever beam in construction sites
CN102587638A (en) Steel girder anchoring device of overhanging scaffold
CN103835527A (en) Detachable shoring device and application thereof
CN202787926U (en) Overhanging scaffold simple and convenient to disassemble and assemble
CN202047591U (en) Reinforcing steel bar truss template
CN204960289U (en) Builder's jack is encorbelmented whole combination of girder steel and can be had enough to meet need anchor assembly
CN202467153U (en) Suspension scaffold steel girder anchor device
CN202596148U (en) Reusable cantilever scaffold anchoring compression ring
CN206308702U (en) A kind of portable basis of derrick crane
CN203889454U (en) Integrated moving device of construction formwork of culvert wall
CN203834906U (en) Triangular operation platform used for capital construction slope face
CN204266571U (en) A kind of builder's jack i iron pre-embedded device
CN101575875A (en) Construction method of cantilever steel girder
CN204163104U (en) External elevator steel beam foundation constructs
CN203145430U (en) Detachable anchor ring structure for fixing cantilever beam
CN102650157A (en) Detachable anchor device for cantilever section steel beam
CN202990415U (en) Nuclear power plant four tubular post early detaching supporting device
CN202559710U (en) Dismountable anchoring device for overhanging type steel-steel beam
CN204386139U (en) Detachable structural steel anchor device
CN204571265U (en) A kind of reusable pre-buried anchor ring
CN203961258U (en) Builder's jack foot guard structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121003

Termination date: 20130312