12 cradle devices
Technical field
The utility model relates to steel cord double twisting device field, particularly a kind of cradle device that is used for double twisting device, especially a kind of 12 cradle devices.
Background technology
The steel cord is the product of high technology content in the wire fabrication.Since nineteen forty-six by French Michelin (Michelin) initiative, because of it has very high TENSILE STRENGTH, outstanding heat resistance and resistance to impact, be used as framework material and be widely used in the rubbers such as tire, sebific duct, transportation.
At present, when traditional steel cord double twisting device is twisted with the fingers thigh at unwrapping wire, generally be to realize interior unwrapping wire and to make the compact more function of interior unwrapping wire structure through existing two cradle devices, four cradle devices, six cradle devices, nine cradle devices and 15 cradle devices.When needs are produced extraordinary gauge steel cord, then be to need to adopt the wet mariages explained hereafter of drawing, must wetly draw the main frame operation that matches with an admission machine through two, nine cradle devices in the process double twisting device are twisted with the fingers a burst moulding more at last.Yet,, therefore, can't produce the steel cord of other specification because the specificity of above-mentioned a whole set of production equipment is extremely strong.In addition, because existing production technology is comparatively complicated, and invest hugely, this just causes the increasing of the maintenance of equipment and corresponding producers' quantity, thereby causes great waste, has also reduced the yield rate of product, for enterprise brings tremendous loss.
Summary of the invention
To the weak point in the above-mentioned technology, the utility model provides a kind of versatility good, and need not use wets draws mariages steel cord equipment, can produce 12 cradle devices of extraordinary gauge steel cord and common gauge steel cord as required.
For realizing above-mentioned purpose; The utility model provides a kind of 12 cradle devices; Comprise frame, flywheel ring, lead-in guide roller, single steel wire conveying mechanism and outlet deflector roll; Said flywheel ring and said single steel wire conveying mechanism are installed on the said frame, and said lead-in guide roller and said outlet deflector roll are installed in the end of incoming cables and the leading-out terminal of said frame respectively, also comprise the sth. made by twisting thigh silk conveying mechanism, press mold adjusting bracket, noseplate, the changed course guide wheel assembly and rotation aluminium dish that are installed on the said frame; Said rotation aluminium dish is installed in respectively on the end of incoming cables and leading-out terminal of said frame, and is connected with said flywheel ring respectively.
A said sth. made by twisting strand silk conveying mechanism is made up of main shaft a, I-beam wheel a, deflector roll a, swinging arm device a and brake gear a; Said I-beam wheel a is set in the outside of said main shaft a; Said brake gear a is connected with said main shaft a; Said deflector roll a and said swinging arm device a all are arranged on the outside of said I-beam wheel a, and said main shaft a adopts the bearing ways of connecting to be installed on the spindle mounting hole position a on the said frame, and said swinging arm device a is installed on the swinging arm device mounting hole site a on the said frame.
Said brake gear a is made up of brake ribbon a that is connected and spring a, and said brake ribbon a is set on the said main shaft a.
Said single steel wire conveying mechanism is made up of main shaft b, I-beam wheel b, deflector roll b, swinging arm device b and brake gear b; The quantity of said main shaft b, said I-beam wheel b, said brake gear b, said deflector roll b and said swinging arm device b is six; Said main shaft b adopts the bearing ways of connecting to be installed on the spindle mounting hole position b on the said frame; Said swinging arm device b is installed on the swinging arm device mounting hole site b on the said frame; Said I-beam wheel b is set in the outside of said main shaft b, and said brake gear b is connected with said main shaft b, and said deflector roll b and said swinging arm device b all are arranged on the outside of said I-beam wheel b.
Said brake gear b is made up of brake ribbon b that is connected and spring b, and said brake ribbon b is set on the said main shaft b.
Be installed in the edge of said frame at said flywheel ring, on said torus, be distributed with a plurality of wire guides.
On the end of incoming cables of said frame and leading-out terminal, also be separately installed with bearing block, said bearing block adopt the bearing ways of connecting install double twisting device on the line main shaft.
Compared with prior art, the utlity model has following advantage:
The utility model versatility is good, can improve the yield rate and the production efficiency of product, produces the steel cord of common specification through the single steel wire conveyer, through twisting with the fingers strand steel cord that the silk conveying mechanism combines and can produce extraordinary specification with the single steel wire conveyer.In addition; When the multiple tracks of being produced by conventional equipment when direct employing is twisted with the fingers strand silk, can avoid the normal drawing fracture of wire phenomenon that occurs in wet drawing process, owing to need not to use the wet mariages steel cord equipment that draws; Can also reduce equipment and personnel's investment, for enterprise brings huge interests.
When producing the steel cord of extraordinary specification, can the sth. made by twisting thigh silk cloth of multiple tracks sth. made by twisting strand silk and other specifications be placed in the I-beam wheel of twisting with the fingers in strand conveying mechanism, need not to adopt again the wet mariages explained hereafter of drawing.At first; The single steel wire that is got into by the outer shroud pilot hole of noseplate is evenly distributed in the multiple tracks that is got into by the noseplate centre bore, and to twist with the fingers strand silk peripheral; Then, single steel wire and multiple tracks are twisted with the fingers the common press mold adjusting bracket that gets into of strand silk, get into the outlet main shaft of steel cord double twisting device through the outlet deflector roll; At last, the rotation aluminium dish by driven by motor rotates the sth. made by twisting thigh moulding process of accomplishing extraordinary gauge steel cord at a high speed.
Description of drawings
Fig. 1 is the structure chart of the utility model.
Main symbol description is following:
The specific embodiment
Below with embodiment the technical scheme of the utility model is further described, will help advantage to the technical scheme of the utility model, effect has understanding further.
As shown in Figure 1; The utility model provides a kind of 12 cradle devices, by frame and be installed in sth. made by twisting thigh silk conveying mechanism on the frame 1, single steel wire conveying mechanism, press mold adjusting bracket 8, noseplate 9, outlet deflector roll 10, changed course guide wheel assembly 13, flywheel ring 17, lead-in guide roller 18 and constitute with rotation aluminium dish 19.On the end of incoming cables of frame 1 and leading-out terminal, also being welded with 7, two bearing blocks of bearing block respectively adopts the bearing ways of connecting to install respectively on the inlet wire main shaft and outlet main shaft of double twisting device.Lead-in guide roller 18 and outlet deflector roll 10 are installed in the end of incoming cables and the leading-out terminal of frame 1 respectively, and two rotation aluminium dishes are installed in respectively on the end of incoming cables and leading-out terminal of frame, and are connected with flywheel ring 17 respectively.Flywheel ring 17 is installed on the edge in frame 1 outside, on flywheel ring 17, is distributed with a plurality of wire guides that are used for lead.
Twisting with the fingers a strand silk conveying mechanism is made up of deflector roll a2, swinging arm device a3, I-beam wheel a4, main shaft a5 and brake gear a6.Wherein, deflector roll a2 and swinging arm device a3 all are arranged on the outside of I-beam wheel a4, and deflector roll a2 is used to change multiply and twists with the fingers strand direction of routing of silk.Swinging arm device a3 is installed on the swinging arm device mounting hole site a on the frame 1, in whole unwrapping wire production process, plays cushioning effect and twists with the fingers the rigid fracture of sth. made by twisting thigh silk of strand silk and other specifications to avoid multiply in the extraordinary gauge steel cord.Main shaft a5 adopts the bearing ways of connecting to be installed on the spindle mounting hole position a on the frame 1, and I-beam wheel a4 is set in the outside of main shaft a5, is used for laying the multiply sth. made by twisting strand silk of extraordinary gauge steel cord and the sth. made by twisting thigh silk of other specifications.Brake gear a6 is connected with main shaft a5, is used to regulate the rotating speed of main shaft a5 and the payingoff speed of I-beam wheel a4.Wherein, brake gear a5 is made up of brake ribbon a that is connected and spring a, and brake ribbon a is set on the main shaft a5.The multiple tracks of the sth. made by twisting thigh moulding that on I-beam wheel a, lays twist with the fingers strand silk through swinging arm device a, deflector roll a and adopt the changed course guide wheel assembly and certain wire winding and changed course to get into the centre bore of noseplate.
The single steel wire conveying mechanism is made up of swinging arm device b11, main shaft b12, brake gear b14, I-beam wheel b15 and deflector roll b16, and wherein, the quantity of swinging arm device b11, main shaft b12, brake gear b14, I-beam wheel b15 and deflector roll b16 is six.Deflector roll b16 and swinging arm device b11 all are arranged on the outside of I-beam wheel b15, and deflector roll b16 is used for changing the direction of routing of steel cord of single steel wire or the common specification of extraordinary gauge steel cord.Swinging arm device b11 is installed on the swinging arm device mounting hole site b on the frame 1, in whole unwrapping wire production process, plays cushioning effect and avoids single steel wire or the rigid fracture of steel cord of common specification in the extraordinary gauge steel cord.Main shaft b12 adopts the bearing ways of connecting to be installed on the spindle mounting hole position b on the frame 1.I-beam wheel b15 is set in the outside of main shaft b12, is used for laying the steel cord of the single steel wire or the common specification of extraordinary gauge steel cord.Brake gear b14 is connected with main shaft b12, is used to regulate the rotating speed of main shaft b12 and the payingoff speed of I-beam wheel b15.Brake gear b14 is made up of brake ribbon b that is connected and spring b, and brake ribbon b is set on the main shaft b.The single steel wire that lays on the I-beam wheel b through swinging arm device b, deflector roll b, alter course guide wheel assembly and adopt certain wire winding and changed course to get into the outer shroud pilot hole of noseplate.
When producing the steel cord of extraordinary specification; At first; Single steel wire is got among the I-beam wheel b in the single steel wire conveying mechanism by lead-in guide roller, flywheel ring and noseplate successively, and multiply is twisted with the fingers strand silk and got among the I-beam wheel a that twists with the fingers in strand silk conveying mechanism by lead-in guide roller, flywheel ring and noseplate successively; Then; Be evenly distributed on the multiply that gets on the I-beam wheel a by the noseplate centre bore by the single steel wire on the outer shroud pilot hole entering I-beam wheel b of noseplate and twist with the fingers a burst silk periphery; Single steel wire and multiply are twisted with the fingers the common press mold adjusting bracket that gets into of strand silk, get into the outlet main shaft of steel cord double twisting device through the outlet deflector roll; At last, the rotation aluminium dish by driven by motor rotates the sth. made by twisting thigh moulding process of accomplishing extraordinary gauge steel cord at a high speed.
In addition, 12 cradle devices that the utility model provides then need not use when producing the steel cord of common specification twists with the fingers a strand silk conveying mechanism, and directly adopts the single steel wire conveying mechanism to accomplish the production to common gauge steel cord.
12 cradle devices that the utility model provides can replace the wet steel cord equipment of mariages explained hereafter that draws; Make it when producing extraordinary gauge steel cord and common gauge steel cord; Have good versatility, can reduce equipment and personnel's investment, improve the yield rate and the production efficiency of product.
The above is merely preferred embodiment of the present invention, and is in order to restriction the present invention, not all within spirit of the present invention and principle, any modification of being done, is equal to replacement, improvement etc., all should be included within the protection domain of the utility model.