CN202416300U - 一种混凝土预制桩快速接头 - Google Patents

一种混凝土预制桩快速接头 Download PDF

Info

Publication number
CN202416300U
CN202416300U CN 201120545962 CN201120545962U CN202416300U CN 202416300 U CN202416300 U CN 202416300U CN 201120545962 CN201120545962 CN 201120545962 CN 201120545962 U CN201120545962 U CN 201120545962U CN 202416300 U CN202416300 U CN 202416300U
Authority
CN
China
Prior art keywords
pile
lock dog
locking blocks
connector
end plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120545962
Other languages
English (en)
Inventor
洪良华
张雪丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhongji Pile Industry Co Ltd
Original Assignee
Shanghai Zhongji Pile Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhongji Pile Industry Co Ltd filed Critical Shanghai Zhongji Pile Industry Co Ltd
Priority to CN 201120545962 priority Critical patent/CN202416300U/zh
Application granted granted Critical
Publication of CN202416300U publication Critical patent/CN202416300U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型公开了一种混凝土预制桩快速接头,由设置在上桩底部的上连接体及设置在下桩顶部的下连接体相接构成,所述上连接体包括与上桩同轴设置的上端板,所述上端板径向侧壁上对称固定有上锁块,所述的下连接体对应于上锁块设有设置在下端板径向侧壁上的下锁块,所述上锁块与下锁块相扣合;所述上、下锁块的扣合端呈契型或圆弧形。本实用新型在不改变现有制桩和施工工艺的基础上,大幅度提高了接桩效率,同时避免了焊接造成的事故隐患和对焊接操作人员技术水平的要求,而且具有接桩成本低,接桩质量好的优势。

Description

一种混凝土预制桩快速接头
技术领域
本实用新型涉及土建基础工程中使用的一种预制桩连接装置,具体涉及一种混凝土预制桩快速接头。
背景技术
混凝土预制桩因其质量稳定、施工方便等优点得到广泛应用。打桩时,会出现因地质问题或桩长不足等原因造成,桩尖进入不了持力层,桩顶也在基底标高以下的情况,这时候就需要进行接桩。传统的管桩联接大多采用人工焊接,焊接质量受人为因素和天气条件影响,焊缝质量难以控制,费时费力,同时抗拉性能也难以完全保证,进而影响到整个施工工程的质量。
发明内容
本实用新型的目的在于克服上述现有技术的不足,提供一种在接桩过程中可以提高接桩效率及质量的混凝土预制桩快速接头。
一种混凝土预制桩快速接头,由设置在上桩底部的上连接体及设置在下桩顶部的下连接体相接构成,所述上连接体包括与上桩同轴设置的上端板,所述上端板径向侧壁上对称固定有上锁块,所述的下连接体对应于上锁块设有设置在下端板径向侧壁上的下锁块,所述上锁块与下锁块相扣合。
所述上、下锁块通过螺栓固定在上、下端板上。
所述上、下锁块的扣合端呈契型或圆弧形。
所述上、下锁块的材质为弹性钢材。
本实用新型在不改变现有制桩和施工工艺的基础上,大幅度提高了接桩效率,同时避免了焊接造成的事故隐患和对焊接操作人员技术水平的要求,而且具有接桩成本低,接桩质量好的优势。
附图说明
图1是本实用新型的结构示意图。
具体实施方式
以下结合具体实施例,对本实用新型做进一步说明。应理解,以下实施例仅用于说明本实用新型而非用于限制本实用新型的范围。
参见图1,本实用新型提供的一种混凝土预制桩快速接头,由设置在上桩1底部的上连接体2及设置在下桩3顶部的下连接体4相接构成,所述上连接体2包括与上桩同轴设置的上端板2-1,所述上端板2-1径向侧壁上对称固定有契型上锁块2-2,所述的下连接体4对应于契型上锁块2-2设有设置在下端板4-1径向侧壁上的契型下锁块4-2,所述契型上锁块2-2与契型下锁块4-2相扣合。
操作时,首先用螺栓分别将锁块固定在预制桩的端板上,要求锁块的楔形部位交叉对应。调整两只预制桩慢慢至相接触位置,当锁块完全扣合时,可听到清脆的“啪嗒”声,说明预制桩接桩完成,可以继续打桩。
实际使用时,锁块的数量及形状可以根据预制桩特征进行调整,比如方桩,只需在两对边设置和方桩边长一样的锁块即可;圆形桩,需要将锁块加工成有一定弧度的形状。为了更好地起到加固作用,可以在方桩的四条边上都设置锁块,也可以将圆形桩的锁块加工成半圆形。

Claims (4)

1.一种混凝土预制桩快速接头,由设置在上桩底部的上连接体及设置在下桩顶部的下连接体相接构成,其特征在于:所述上连接体包括与上桩同轴设置的上端板,所述上端板径向侧壁上对称固定有上锁块,所述的下连接体对应于上锁块设有设置在下端板径向侧壁上的下锁块,所述上锁块与下锁块相扣合。
2.根据权利要求1所述的一种混凝土预制桩快速接头,其特征在于:所述上、下锁块通过螺栓固定在上、下端板上。
3.根据权利要求1所述的一种混凝土预制桩快速接头,其特征在于:所述上、下锁块的扣合端呈契型或圆弧形。
4.根据权利要求1所述的一种混凝土预制桩快速接头,其特征在于:所述上、下锁块的材质为弹性钢材。
CN 201120545962 2011-12-23 2011-12-23 一种混凝土预制桩快速接头 Expired - Fee Related CN202416300U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120545962 CN202416300U (zh) 2011-12-23 2011-12-23 一种混凝土预制桩快速接头

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120545962 CN202416300U (zh) 2011-12-23 2011-12-23 一种混凝土预制桩快速接头

Publications (1)

Publication Number Publication Date
CN202416300U true CN202416300U (zh) 2012-09-05

Family

ID=46741079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120545962 Expired - Fee Related CN202416300U (zh) 2011-12-23 2011-12-23 一种混凝土预制桩快速接头

Country Status (1)

Country Link
CN (1) CN202416300U (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103541357A (zh) * 2013-10-31 2014-01-29 郭兆泉 预应力混凝土桩端板的刚性连接方法
CN103556632A (zh) * 2013-10-17 2014-02-05 林基 一种预制钢筋混凝土方桩机械快速接头连接装置
CN103953033A (zh) * 2014-04-30 2014-07-30 百盛联合建设集团有限公司 桩头锁接结构
CN104831698A (zh) * 2014-02-11 2015-08-12 天津市海王星海上工程技术股份有限公司 一种适用于桩腿与基盘连接的锁环装置
CN106836212A (zh) * 2017-03-29 2017-06-13 安徽理工大学 一种接桩端板及接桩工艺

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103556632A (zh) * 2013-10-17 2014-02-05 林基 一种预制钢筋混凝土方桩机械快速接头连接装置
CN103556632B (zh) * 2013-10-17 2018-01-02 林基 一种预制钢筋混凝土方桩机械快速接头连接装置
CN103541357A (zh) * 2013-10-31 2014-01-29 郭兆泉 预应力混凝土桩端板的刚性连接方法
CN104831698A (zh) * 2014-02-11 2015-08-12 天津市海王星海上工程技术股份有限公司 一种适用于桩腿与基盘连接的锁环装置
CN104831698B (zh) * 2014-02-11 2016-06-22 天津市海王星海上工程技术股份有限公司 一种适用于桩腿与基盘连接的锁环装置
CN103953033A (zh) * 2014-04-30 2014-07-30 百盛联合建设集团有限公司 桩头锁接结构
CN106836212A (zh) * 2017-03-29 2017-06-13 安徽理工大学 一种接桩端板及接桩工艺

Similar Documents

Publication Publication Date Title
CN202416300U (zh) 一种混凝土预制桩快速接头
CN202945591U (zh) Phc板桩
CN102912972B (zh) 一种多功能可抬升钢平台转换胎架及施工方法
CN201826325U (zh) 一种塔吊基础结构
CN107386434A (zh) 一种混凝土柱与混凝土柱的新型装配式连接结构
CN102518120A (zh) 一种预应力和非预应力结合的h型钢筋砼板桩及制造方法
CN203229943U (zh) 桩基井挤扩承力盘钢筋布设结构
CN202865845U (zh) 一种辅助插打钢板桩的“水刀”结构
CN203096730U (zh) 混凝土预制方桩接头
CN102061702A (zh) 一种带有抗震槽的混凝土预制桩接头
CN203007935U (zh) 一种变截面混凝土桩接头
CN201981549U (zh) 预制电杆桩
CN104196023A (zh) 一种带机械连接装置的混凝土预制管桩桩尖及其使用方法
CN103556632B (zh) 一种预制钢筋混凝土方桩机械快速接头连接装置
CN208363078U (zh) 一种装配式钢桩帽
CN103790157A (zh) 一种用于预制管桩的圆形凹凸板机械接桩方法
CN203546601U (zh) 钢桁梁拼装支架
CN202148523U (zh) 高喷插芯组合桩
CN203640375U (zh) 一种不同塔吊基座的转换结构
CN203530959U (zh) 一种高强度的地下连续墙
CN202401384U (zh) 钢桁斜拉桥压重构造
CN106480906B (zh) 投料仓与标准单元管节的连接结构及截面变化的综合管廊
CN202925975U (zh) 一种配煤仓钢漏斗
CN204531575U (zh) 水泥杆加固治理钢砼结构
CN102155015A (zh) 一种带刺的植入式钢管锚杆

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: HUAI'AN ZHONGJI CONSTRUCTION CO., LTD.

Assignor: Shanghai Zhongji Pile Industry Co., Ltd.

Contract record no.: 2013320000462

Denomination of utility model: Quick coupling of prefabricated concrete pile

Granted publication date: 20120905

License type: Exclusive License

Record date: 20130524

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120905

Termination date: 20181223

CF01 Termination of patent right due to non-payment of annual fee