CN202393377U - 水电站基础建设工程的分层式沉降监测仪器 - Google Patents

水电站基础建设工程的分层式沉降监测仪器 Download PDF

Info

Publication number
CN202393377U
CN202393377U CN2011205168918U CN201120516891U CN202393377U CN 202393377 U CN202393377 U CN 202393377U CN 2011205168918 U CN2011205168918 U CN 2011205168918U CN 201120516891 U CN201120516891 U CN 201120516891U CN 202393377 U CN202393377 U CN 202393377U
Authority
CN
China
Prior art keywords
sensor
pvc protection
pvc
pipe
displacement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011205168918U
Other languages
English (en)
Inventor
张宗亮
刘兴宁
谭志伟
邹青
蔡莹冰
刘伟
赵志勇
张礼兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Kunming Engineering Corp Ltd
Hydrochina Kunming Engineering Corp
Original Assignee
Hydrochina Kunming Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Kunming Engineering Corp filed Critical Hydrochina Kunming Engineering Corp
Priority to CN2011205168918U priority Critical patent/CN202393377U/zh
Application granted granted Critical
Publication of CN202393377U publication Critical patent/CN202393377U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

本实用新型是一种水电站基础建设工程的分层式沉降监测仪器,其特征在于在大坝沉降层顶部和底部分别设置上沉降板和下沉降板,上下沉降板之间设置传感器、PVC保护外管、伸缩节、传递杆、PVC保护内管,上下沉降板之间用传感器和传递杆相连,传感器外有PVC保护外管,传递杆外有PVC保护内管,PVC保护内管和PVC保护外管在搭接处形成伸缩节。在上下沉降板之间发生相对位移时,沉降板的位移带动传感器和PVC保护管同时变形,PVC保护内、外管在搭接处形成的伸缩节消除了传感器与土体之间的摩擦,既保护了传感器,又保证了土体位移与传感器位移的同步性,实现分层位移监测。

Description

水电站基础建设工程的分层式沉降监测仪器
技术领域
    本实用新型涉及水利工程技术领域,具体说是水电站基础建设工程的分层式沉降监测仪器。
背景技术
近年来国内水电技术发展迅速,以鲁布革、小浪底、瀑布沟、糯扎渡水电站等为代表的一批典型工程将心墙堆石坝高度由100m级提升至300m级,使我国土石坝设计及施工技术达到国际先进水平。另一方面,心墙堆石坝监测技术发展大大滞后于筑坝技术的发展进程,监测仪器适应性、耐久性、抗冲击等性能仍停留在100m级坝高的水平,导致高心墙堆石坝仪器埋设成活率低,关键部位监测数据缺失率高,难以对大坝的工作性态作出全面、准确的评价。
传统心墙堆石坝沉降监测主要采用测斜暨电磁沉降仪,在心墙中部从坝基到坝顶布置一条连续测线,通过人工放入电磁沉降探头感应埋入周围土体的钢环或磁环实现位移监测。该方法在低坝中应用情况较好,但对于坝高超过150m的高坝难以适应,其原因主要在于该方法成功的前提是从坝体至坝顶埋设一根测斜管,该埋设过程贯穿于整个大坝的填筑期,施工干扰大,任一细小的误差放大到150m以上坝高都可导致测斜管变形过大、探头难以下放。另一方面,管线越长,测斜管接头就越多,由于接头是现场连接,施工质量往往难以保证,任一接头没处理好都可导致测斜管异常。传统方法受制约因素较多,埋设风险大,难以完全适应高坝对沉降监测的需求。
发明内容
本实用新型的目的是提供一种水电站基础建设工程中分层式沉降监测仪器,可较好的解决此现有技术中存在的问题。
本实用新型的技术方案为:在大坝沉降层顶部和底部分别设置上沉降板和下沉降板,上下沉降板之间设置传感器、PVC保护外管、伸缩节、传递杆、PVC保护内管,上下沉降板之间用传感器和传递杆相连,传感器外有PVC保护外管,传递杆外有PVC保护内管,PVC保护内管和PVC保护外管在搭接处形成伸缩节。
本实用新型的上下沉降板之间采用传感器和传递杆相连,PVC保护内、外管在搭接处形成伸缩节,传感器和传递杆外采用有伸缩节的PVC管进行保护。上下沉降板之间发生相对位移时,沉降板的位移带动传感器和PVC保护管同时变形,PVC保护内、外管在搭接处形成的伸缩节消除了传感器与土体之间的摩擦,既保护了传感器,又保证了土体位移与传感器位移的同步性,实现分层位移监测。
附图说明
图1为本实用新型的心墙堆石坝分层式沉降监测仪器结构示意图。
图中,1-上沉降板,2-传感器,3-PVC保护外管,4-伸缩节,5-传递杆,6-PVC保护内管,7-下沉降板。
具体实施方式
如图1所示,将大坝沉降范围划分成若干层,每层顶部和底部分别设置上沉降板1和下沉降板7,上下沉降板之间设置传感器2、PVC保护外管3、伸缩节4、传递杆5、PVC保护内管6,上下沉降板之间用传感器2和传递杆5相连,传感器2外有PVC保护外管3,传递杆5外有PVC保护内管6,PVC保护内管6和PVC保护外管3在搭接处形成伸缩节4。
当沉降发生时,上下沉降板之间发生相对位移,降板的位移带动传感器和PVC保护管同时变形,PVC保护内、外管在搭接处形成的伸缩节消除了传感器与周围介质之间的摩擦,保护了传感器,同时保证了周围介质位移与传感器位移的同步性,使得PVC保护管位移量之和等于传感器位移量,传感器位移量等于上下沉降板之间位移量,实现分层位移监测。 

Claims (1)

1.一种水电站基础建设工程的分层式沉降监测仪器,其特征在于在大坝沉降层顶部和底部分别设置上沉降板和下沉降板,上下沉降板之间设置传感器、PVC保护外管、伸缩节、传递杆、PVC保护内管,上下沉降板之间用传感器和传递杆相连,传感器外有PVC保护外管,传递杆外有PVC保护内管,PVC保护内管和PVC保护外管在搭接处形成伸缩节。
CN2011205168918U 2011-12-13 2011-12-13 水电站基础建设工程的分层式沉降监测仪器 Expired - Lifetime CN202393377U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205168918U CN202393377U (zh) 2011-12-13 2011-12-13 水电站基础建设工程的分层式沉降监测仪器

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205168918U CN202393377U (zh) 2011-12-13 2011-12-13 水电站基础建设工程的分层式沉降监测仪器

Publications (1)

Publication Number Publication Date
CN202393377U true CN202393377U (zh) 2012-08-22

Family

ID=46668295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205168918U Expired - Lifetime CN202393377U (zh) 2011-12-13 2011-12-13 水电站基础建设工程的分层式沉降监测仪器

Country Status (1)

Country Link
CN (1) CN202393377U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103981849A (zh) * 2014-05-20 2014-08-13 浙江省水利水电勘测设计院 一种水下测斜管方向限位器
CN105318859A (zh) * 2014-08-01 2016-02-10 上海凯盾工程技术有限公司 直接测量监控地下管线和建筑结构沉降变形方法及其装置
CN110849323A (zh) * 2019-12-12 2020-02-28 中国电建集团成都勘测设计研究院有限公司 一种伸缩沉降管、沉降变形监测系统及方法
CN111364971A (zh) * 2020-04-14 2020-07-03 中国电建集团贵阳勘测设计研究院有限公司 一种用于监测隧道开挖地表脱空的装置及安装方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103981849A (zh) * 2014-05-20 2014-08-13 浙江省水利水电勘测设计院 一种水下测斜管方向限位器
CN105318859A (zh) * 2014-08-01 2016-02-10 上海凯盾工程技术有限公司 直接测量监控地下管线和建筑结构沉降变形方法及其装置
CN105318859B (zh) * 2014-08-01 2019-06-25 上海凯盾工程技术有限公司 直接测量监控地下管线和建筑结构沉降变形方法及其装置
CN110849323A (zh) * 2019-12-12 2020-02-28 中国电建集团成都勘测设计研究院有限公司 一种伸缩沉降管、沉降变形监测系统及方法
CN111364971A (zh) * 2020-04-14 2020-07-03 中国电建集团贵阳勘测设计研究院有限公司 一种用于监测隧道开挖地表脱空的装置及安装方法
CN111364971B (zh) * 2020-04-14 2023-11-21 中国电建集团贵阳勘测设计研究院有限公司 一种用于监测隧道开挖地表脱空的装置及安装方法

Similar Documents

Publication Publication Date Title
CN202393377U (zh) 水电站基础建设工程的分层式沉降监测仪器
CN103603342B (zh) 大直径组合套管超长灌注桩施工方法
CN203177847U (zh) 沉降实时监测系统
CN203798629U (zh) 一种地下水分层采样装置
CN105318964A (zh) 一种海底管道悬跨涡激振动主动监测系统及其方法
CN205636838U (zh) 一种测斜管管口加固装置
CN104792452A (zh) 一种自动升降的无缆式深海底孔隙水压力长期观测装置
CN105544573A (zh) 一种降水管井的水压喷冲式成井施工方法
CN103899843B (zh) 一种海底管道承载装置
CN202228006U (zh) 夹持装置
CN205619918U (zh) 一种基于Cors基站的海底填土形变监测系统
CN103397659B (zh) 超深地下连续墙成槽垂直度控制工艺
CN102926368A (zh) 一种道路路基不均匀沉降的监测装置及监测方法
CN207215485U (zh) 一种海底机械式万米级轻型冲击地质取样装置
CN203757176U (zh) 非开挖式管道更换装置
CN202970581U (zh) 一种石油井下电缆打捞装置
CN205688464U (zh) 一种预制式高强防爆波井
CN109736285B (zh) 一种近海远程水下地基沉降自动监测系统
CN201866407U (zh) 海底pe管铸铁配重块
CN204510207U (zh) 变水位深水斜坡基底埋设用伸缩护筒
CN104005427B (zh) 一种用于深水组合基础的可协调变形的连接装置
CN106090460A (zh) 一种新型海底油气输送组合管
CN209323504U (zh) 一种地下连续墙结构
CN104963329A (zh) 一种软基孔压计埋设方法
CN108166543B (zh) 一种用于超声波检测、地下热交换和后注浆的桩基多功能管路装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: HYDROCHINA KUNMING ENGINEERING CORPORATION

Free format text: FORMER NAME: KUNMING HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF CHINA HYDROPOWER CONSULTING GROUP

Owner name: CHINESE ELECTRIC POWER CONSTRUCTION GROUP KUNMING

Free format text: FORMER NAME: HYDROCHINA KUNMING ENGINEERING CORPORATION

CP01 Change in the name or title of a patent holder

Address after: 650000 Kunming East Road, Yunnan, No. 115

Patentee after: HYDROCHINA KUNMING ENGINEERING Corp.

Address before: 650000 Kunming East Road, Yunnan, No. 115

Patentee before: Hydrochina Kunming Engineering Corp.

Address after: 650000 Kunming East Road, Yunnan, No. 115

Patentee after: POWERCHINA KUNMING ENGINEERING Corp.,Ltd.

Address before: 650000 Kunming East Road, Yunnan, No. 115

Patentee before: HYDROCHINA KUNMING ENGINEERING Corp.

CX01 Expiry of patent term

Granted publication date: 20120822

CX01 Expiry of patent term