CN202363778U - Core hoisting tool for on-load tap-changer of transformer - Google Patents

Core hoisting tool for on-load tap-changer of transformer Download PDF

Info

Publication number
CN202363778U
CN202363778U CN2011205240323U CN201120524032U CN202363778U CN 202363778 U CN202363778 U CN 202363778U CN 2011205240323 U CN2011205240323 U CN 2011205240323U CN 201120524032 U CN201120524032 U CN 201120524032U CN 202363778 U CN202363778 U CN 202363778U
Authority
CN
China
Prior art keywords
pillar stand
load tap
vertical column
footing
changer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205240323U
Other languages
Chinese (zh)
Inventor
陈健
朱正康
刘鑫
席文兵
朱守红
刘其锋
王东阳
张文晖
卢旻
赵娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
HuaiAn Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
HuaiAn Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HuaiAn Power Supply Co of State Grid Jiangsu Electric Power Co Ltd filed Critical HuaiAn Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Priority to CN2011205240323U priority Critical patent/CN202363778U/en
Application granted granted Critical
Publication of CN202363778U publication Critical patent/CN202363778U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Housings And Mounting Of Transformers (AREA)

Abstract

The utility model discloses a core hoisting tool for an on-load tap-changer of a transformer, which is characterized in that two ends of each intermediate adjusting rod (5) are inserted into inner threaded holes (4) of an upper vertical column (3) and a lower vertical column (7) respectively, each intermediate adjusting rod (5) is fastened with the corresponding upper vertical column (3) and the corresponding lower vertical column (7) to form a perpendicular vertical column with fastening nuts (6) when being adjusted to a proper height, two ends of a beam (1) are fixed onto the two upper vertical columns (3) respectively to form a door-shaped frame through wing-shaped fixing screws (2), a suspension ring (11) is mounted on the beam (1), a chain block (12) is mounted on the suspension ring (11), each lower vertical column (7) is welded on a footing fixing plate (9), and each footing fixing plate (9) is fixed onto the upper end of a permanent magnetic sucker (10) through footing fixing bolts (8). The core hoisting tool can complete core hoisting of the on-load tap-changer of the transformer safely, reliably, simply and conveniently, and core hoisting overhaul time and cost for the on-load tap-changer can be saved.

Description

On-load tap changers of transformers suspended core instrument
Technical field
The utility model includes load switch suspended core instrument, is specifically related to 110kV and 35kV substation transformer on load tap changer suspended core instrument.
Background technology
At present; In the 110kV of Huaian electric company operation, the 35kV transformer station; Major part is distributed in grass roots; As the on load tap changer of 110kV, the important auxiliary device of 35kV main transformer, be that transformer carries out the gear conversion operations under load condition, change the device of transformer secondary output voltage.110KV of Huaian electric company and following transformer adopt SYJ (X) ZZ type on load tap changer, the about 100kg of weight, the about 50cm of diameter, highly about 100cm more at present.On load tap changer needs regular suspended core maintenance, and owing to the mechanical connection reason, contact has just separated in the suspended core process a moment, the strength of needs was bigger, simultaneously, because of the service work requirement, need hover for a long time after on load tap changer hangs out.The present suspended core of company all adopts crane to carry out, and owing to the reason crane Chang Wufa of charged distance construction, has caused the difficulty of suspended core and with the danger of manpower suspended core for old transformer station.And mostly newly-built transformer station is indoor substation, and crane more can't be constructed.
Summary of the invention
The purpose of the utility model is: a kind of on-load tap changers of transformers suspended core instrument is provided; This instrument simple light; Be applicable to the suspended core service work of 110kV, 35kV main transformer on load tap changer; The repair method that replaces traditional use crane suspended core is practiced thrift the repair time and the cost of on load tap changer greatly, makes original heavy service work become simple.
The utility model solves the technical scheme that its technical problem adopted: this instrument comprises crossbeam, upper pillar stand, middle tone pole, lower pillar stand, footing fixed head, permanent magnetic chuck, suspension ring and chain block; The position up and down of middle tone pole respectively has regulates outer silk; All there is the endoporus silk lower end of upper pillar stand and the upper end of lower pillar stand; Insert respectively in the endoporus silk of upper pillar stand, lower pillar stand at middle tone pole two, is adjusted to suitable height and with clamp nut upper pillar stand, lower pillar stand and middle tone pole is tightened to vertical pillars again; Through wing hold-down screw the two ends of crossbeam 1 are separately fixed at and form a door type framework on two upper pillar stands, suspension ring are installed on the crossbeam, and chain block is installed on the suspension ring; Lower pillar stand is welded on the footing fixed head, through the footing set bolt footing fixed head is fixed on the permanent magnetic chuck upper end.
During work, permanent magnetic chuck is adsorbed on the transformer body consumingly, and the suction of permanent magnetic chuck reaches 600kg and plays fixation; The chain block lower end is connected with on the on-load shunting switch, utilizes chain block like a cork on load tap changer to be sling; Utilize the middle part adjusting rod to regulate the height and the levelness of vertical pillars, be applicable to the on load tap changer of different size.
The utlity model has following advantage: 1, hoisting ring penetrates crossbeam; Regulate the lifting center, the middle tone pole inserts in upper pillar stand and the lower pillar stand, regulates height and levelness through the endoporus silk of column and the outer silk of adjusting rod; Maximum height can reach 2.3m, and width is 1.5m; 2, the PML-0.6 type permanent magnetic chuck of the utility model utilization with 600kg suction is fixed on the transformer body, and maximum hoisting weight 400kg can satisfy present 110kV, all the main transformer on load tap changer suspended core job requirements of 35kV electric pressure; 3, split type assembling is simple in structure, and is easy to carry, safe and reliable, can in little space, put to good use, practices thrift on load tap changer suspended core repair time and cost greatly.
Description of drawings
Fig. 1 is the mounting structure sketch map of the utility model.
Among the figure: 1 crossbeam, 2 wing hold-down screws, 3 upper pillar stands, 4 endoporus silks, 5 middle tone poles, 6 clamp nuts, 7 lower pillar stands, 8 footing set bolts, 9 footing fixed heads, 10 permanent magnetic chucks, 11 suspension ring, 12 chain blocks.
Embodiment
As shown in Figure 1; This instrument comprises crossbeam 1, upper pillar stand 3, middle tone pole 5, lower pillar stand 7, footing fixed head 9, permanent magnetic chuck 10, suspension ring 11 and chain block 12; The position up and down of middle tone pole 5 respectively has regulates outer silk; All there is endoporus silk 4 upper end of the lower end of upper pillar stand 3 and lower pillar stand 7; Insert respectively in the endoporus silk 4 of upper pillar stand 3, lower pillar stand 7 at middle tone pole 5 two, is adjusted to suitable height and with clamp nut 6 upper pillar stand 3, lower pillar stand 7 and middle tone pole 5 is tightened to vertical pillars again; Through wing hold-down screw 2 two ends of crossbeam 1 are separately fixed at and form a door type framework on two upper pillar stands 3, suspension ring 11 are installed on the crossbeam 1, and chain block 12 is installed on the suspension ring 11; Lower pillar stand 7 is welded on the footing fixed head 9, through footing set bolt 8 footing fixed head 9 is fixed on permanent magnetic chuck 10 upper ends.
During work, permanent magnetic chuck 10 is adsorbed on the transformer body consumingly, and the suction of permanent magnetic chuck reaches 600kg and plays fixation; Chain block 12 lower ends are connected with on the on-load shunting switch, utilize chain block 12 like a cork on load tap changer to be sling; Utilize middle part adjusting rod 5 to regulate the height and the levelness of vertical pillars, so that be applicable to the on load tap changer of different size.

Claims (1)

1. on-load tap changers of transformers suspended core instrument; It is characterized in that: this instrument comprises crossbeam (1), upper pillar stand (3), middle tone pole (5), lower pillar stand (7), footing fixed head (9), permanent magnetic chuck (10), suspension ring (11) and chain block (12); The position up and down of middle tone pole (5) respectively has regulates outer silk; All there is endoporus silk (4) upper end of the lower end of upper pillar stand (3) and lower pillar stand (7); Insert respectively in the endoporus silk (4) of upper pillar stand (3), lower pillar stand (7) at middle tone pole (5) two, is adjusted to suitable height and uses clamp nut (6) that upper pillar stand (3), lower pillar stand (7) and middle tone pole (5) are tightened to vertical pillars again; Through wing hold-down screw (2) two ends of crossbeam (1) are separately fixed at two upper pillar stands (3) and go up and form a door type framework, suspension ring (11) are installed on the crossbeam (1), and suspension ring (11) are gone up chain block (12) is installed; Lower pillar stand (7) is welded on the footing fixed head (9), through footing set bolt (8) footing fixed head (9) is fixed on permanent magnetic chuck (10) upper end.
CN2011205240323U 2011-12-15 2011-12-15 Core hoisting tool for on-load tap-changer of transformer Expired - Fee Related CN202363778U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205240323U CN202363778U (en) 2011-12-15 2011-12-15 Core hoisting tool for on-load tap-changer of transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205240323U CN202363778U (en) 2011-12-15 2011-12-15 Core hoisting tool for on-load tap-changer of transformer

Publications (1)

Publication Number Publication Date
CN202363778U true CN202363778U (en) 2012-08-01

Family

ID=46574934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205240323U Expired - Fee Related CN202363778U (en) 2011-12-15 2011-12-15 Core hoisting tool for on-load tap-changer of transformer

Country Status (1)

Country Link
CN (1) CN202363778U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105098632A (en) * 2014-05-07 2015-11-25 武陟县电业总公司 Method for repairing core of rack transformer
CN105703247A (en) * 2014-11-24 2016-06-22 国家电网公司 Inspection device for transformer on-load voltage regulation switch
CN107720561A (en) * 2017-10-23 2018-02-23 国网四川省电力公司成都供电公司 A kind of indoor transformer loaded switch core body hangs detecting method and device
CN109279526A (en) * 2018-11-23 2019-01-29 国网青海省电力公司黄化供电公司 A kind of combined type hoisting of for transformer load ratio bridging switch
CN113006548A (en) * 2021-02-26 2021-06-22 上海电气风电集团股份有限公司 Factory building

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105098632A (en) * 2014-05-07 2015-11-25 武陟县电业总公司 Method for repairing core of rack transformer
CN105703247A (en) * 2014-11-24 2016-06-22 国家电网公司 Inspection device for transformer on-load voltage regulation switch
CN105703247B (en) * 2014-11-24 2023-11-24 国家电网公司 Transformer on-load voltage regulating switch overhauling device
CN107720561A (en) * 2017-10-23 2018-02-23 国网四川省电力公司成都供电公司 A kind of indoor transformer loaded switch core body hangs detecting method and device
CN109279526A (en) * 2018-11-23 2019-01-29 国网青海省电力公司黄化供电公司 A kind of combined type hoisting of for transformer load ratio bridging switch
CN113006548A (en) * 2021-02-26 2021-06-22 上海电气风电集团股份有限公司 Factory building

Similar Documents

Publication Publication Date Title
CN202363778U (en) Core hoisting tool for on-load tap-changer of transformer
CN103730231B (en) A kind of head cover of transformer lowering or hoisting gear
CN101546894B (en) Method for replacing 220KV steel pipe tower composite insulator electrifiedly
CN201817223U (en) Suspension device for on-load tapping switches of transformers
CN201673793U (en) Hoisting bracket for on-load voltage regulation switch of transformer
CN201656340U (en) Tool for replacing supporting insulator of high-voltage tube bus
CN201321352Y (en) Special lifting device for electrical equipment
CN102064485A (en) Portable overhead hoisting device special for transformer substation
CN216957646U (en) Pole-mounted transformer mounting device
CN101908731B (en) Hoisting device for on-load tap changers of transformers
CN203434492U (en) Combination-type electric hoisting apparatus
CN202940488U (en) Circuit breaker energy storage cylinder maintenance tool
CN203056428U (en) Transformer top cover opening device
CN201893509U (en) Portable overhead hoisting device special for transformer substation
CN108018795A (en) A kind of safety-type bridge adjusts height-limiting frame with auto-manual
CN107069508B (en) Auxiliary tool for replacing post insulator of isolating switch under 110kV
CN112265946A (en) Electric pole climbing device for field electric power overhaul
CN203746609U (en) Transformer top cover lifting device
CN202333524U (en) Hoisting support for overhaul of isolating switch
CN203939815U (en) Be used in the suspension centre fixing device on emergency first-aid repair tower
CN103956251A (en) Auxiliary oil feed device of oil-immersed current transformer
CN203812690U (en) Auxiliary oil recharging device of oil-immersed current transformer
CN203345912U (en) Portable special suspension tool
CN214879612U (en) Automatic safety positioning lifting equipment for electromechanical installation for urban construction
CN219991090U (en) Mobile electric power overhauling high-altitude hanging basket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIANGSU ELECTRIC POWER COMPANY STATE GRID CORPORAT

Effective date: 20121128

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121128

Address after: 223002 Huaian City, Jiangsu province Qingpu District No. 101 West (Huaian power supply company maintenance test area)

Patentee after: Huaian Power Supply Company of Jiangsu Electric Power Company

Patentee after: Jiangsu Electric Power Company

Patentee after: State Grid Corporation of China

Address before: 223002 Huaian City, Jiangsu province Qingpu District No. 101 West (Huaian power supply company maintenance test area)

Patentee before: Huaian Power Supply Company of Jiangsu Electric Power Company

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120801

Termination date: 20181215

CF01 Termination of patent right due to non-payment of annual fee