CN202360142U - Diagonally-drawn hanging device for wind and water pipes - Google Patents
Diagonally-drawn hanging device for wind and water pipes Download PDFInfo
- Publication number
- CN202360142U CN202360142U CN2011205053948U CN201120505394U CN202360142U CN 202360142 U CN202360142 U CN 202360142U CN 2011205053948 U CN2011205053948 U CN 2011205053948U CN 201120505394 U CN201120505394 U CN 201120505394U CN 202360142 U CN202360142 U CN 202360142U
- Authority
- CN
- China
- Prior art keywords
- cantilever beam
- wind
- diagonally
- saving
- semi girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a diagonally-drawn hanging device for wind and water pipes, which comprises a cantilever beam, one end of the cantilever beam is fixed on a roadside of an underground stone roadway, the upper part of the other end of the cantilever beam is fixed on the roadside by a turn buckle, an inclined angle is formed between the turn buckle and the cantilever beam, and the inclined angle is an acute angle less than 90 degrees; and a U-shaped clamp for a wind pipe and a water pipe is fixedly connected with the cantilever beam. The diagonally-drawn hanging device disclosed by the utility model is simple in structure, easy to operate, safe, reliable, flexible in adjustment, time-saving and labor-saving and high in working efficiency; by adoption of the device, operators can check and maintain wind and water pipes conveniently in a time-saving and labor-saving manner, the labor intensity can be reduced and working efficiency can be improved.
Description
Technical field
The utility model relates to a kind of erecting by overhang, especially relates to the geomantic omen pipeline cable-stayed type erecting by overhang of stone head under a kind of coal mine.
Background technology
The steady-state growth of China's coal-mine economic benefit, the tunnel construction quality requires more and more high, and the construction standard tunnel has become the fast-developing theme in colliery.At present, the geomantic omen pipeline under the coal mine in the stone head generally adopts the dedicated line supporting plate to hang, and the pipeline supporting plate uses expansion bolt to be fixed on the lane and helps, and uses the U-shaped card that the geomantic omen pipeline is fixed on the supporting plate.But, during to geomantic omen pipeline maintenance and inspection, need many people to lift jointly to shoulder just and can unload the geomantic omen pipeline, to waste time and energy, labour intensity is big, and operating efficiency is not high.
Summary of the invention
For addressing the above problem, the purpose of the utility model provides a kind of simple in structure, easy to operate, safe and reliable geomantic omen pipeline cable-stayed type erecting by overhang.
For realizing the foregoing invention purpose, the utility model adopts following technical scheme:
A kind of geomantic omen pipeline cable-stayed type erecting by overhang; It comprises a semi girder, and semi girder one end is fixed on stone head lane, down-hole and helps, and other end top is fixed on the lane through a flower basket bolt and helps; Flower basket bolt and semi girder are an angle of inclination, and the angle of inclination is the acute angle less than 90 °; Be fixedly connected with the U-shaped card of suspension airduct, water pipe on the semi girder.
Owing to adopt aforesaid technical scheme, the utlity model has following superiority:
This geomantic omen pipeline cable-stayed type erecting by overhang, it is simple in structure, and is easy and simple to handle, safe and reliable, uses the convenient adjusting tensioner to semi girder of flower basket bolt, and adjustment is flexibly; Suspension geomantic omen, semi girder bottom pipeline, the handled easily personnel are to the maintenance and inspection of geomantic omen pipeline, and a people can unload lower air conduit, water pipe through regulating flower basket bolt, and is time saving and energy saving, reduces labour intensity, high efficiency.
Description of drawings
Fig. 1 is the structural representation of the utility model;
Among the figure: the 1-hook; The 2-flower basket bolt; The 3-semi girder; 4 (a, b)-U-shaped cards; The 5-water pipe; The 6-airduct; The 7-suspension ring.
The specific embodiment
Below in conjunction with accompanying drawing and specific embodiment the technical scheme of the utility model is done further explain.
As shown in Figure 1, this geomantic omen pipeline cable-stayed type erecting by overhang, it comprises a semi girder 3; Semi girder is an i iron, and semi girder 3 right-hand members are fixed on stone head lane, down-hole and help, and left end top is provided with suspension ring 7; The lane is helped and is installed with hook 1; Suspension ring 7 are connected a flower basket bolt 2 with hook between 1, and flower basket bolt and semi girder are an angle of inclination, and the angle of inclination is the acute angle less than 90 °; Be fixedly connected with suspension airduct 6, the U-shaped card 4b of water pipe 5, U-shaped card 4a on the semi girder 3.
During use, airduct 6, water pipe 5 are respectively installed in U-shaped card 4b, the U-shaped card 4a and get final product through nut is fastening.
According to the caliber size of airduct, water pipe, and the mechanics bearing, the model of i iron, the model of flower basket bolt rationally selected for use.
Claims (1)
1. geomantic omen pipeline cable-stayed type erecting by overhang; It is characterized in that: it comprises a semi girder (3); Semi girder one end is fixed on stone head lane, down-hole and helps; Other end top is fixed on the lane through a flower basket bolt (2) and helps, and flower basket bolt and semi girder are an angle of inclination, and the angle of inclination is the acute angle less than 90 °; Be fixedly connected with the U-shaped card of suspension airduct, water pipe on the semi girder.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205053948U CN202360142U (en) | 2011-12-07 | 2011-12-07 | Diagonally-drawn hanging device for wind and water pipes |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205053948U CN202360142U (en) | 2011-12-07 | 2011-12-07 | Diagonally-drawn hanging device for wind and water pipes |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202360142U true CN202360142U (en) | 2012-08-01 |
Family
ID=46571333
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011205053948U Expired - Fee Related CN202360142U (en) | 2011-12-07 | 2011-12-07 | Diagonally-drawn hanging device for wind and water pipes |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202360142U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111055263A (en) * | 2019-11-01 | 2020-04-24 | 山东康威通信技术股份有限公司 | Circular tube track hanging device for slope-shaped tunnel and working method |
-
2011
- 2011-12-07 CN CN2011205053948U patent/CN202360142U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111055263A (en) * | 2019-11-01 | 2020-04-24 | 山东康威通信技术股份有限公司 | Circular tube track hanging device for slope-shaped tunnel and working method |
CN111055263B (en) * | 2019-11-01 | 2021-04-23 | 康威通信技术股份有限公司 | Circular tube track hanging device for slope-shaped tunnel and working method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206341631U (en) | One kind suspension vertical greening device | |
CN101994343B (en) | Portable pipe workpiece clamping retractable device | |
CN202360142U (en) | Diagonally-drawn hanging device for wind and water pipes | |
CN201737459U (en) | Bastard coal separating device at belt transport transfer point | |
CN202090346U (en) | Movable combined type ground anchor | |
CN203022329U (en) | Nacelle frame without balancing weight | |
CN204588457U (en) | Self lighting type steel box column lifting tong device | |
CN205089338U (en) | Anchor utensils composite set goes up and down to move back | |
CN204276043U (en) | A kind of novel jaw of jaw crusher | |
CN203499724U (en) | Improved bracket for coal mine air-water pipelines | |
CN204212791U (en) | Driving face Novel front canopy hoisting ring device | |
CN203461774U (en) | Feeding device for garbage disposal machine | |
CN201980889U (en) | Underground crane trolley | |
CN202346715U (en) | Integral fast translation device for electric drilling machine | |
CN201206472Y (en) | Downhill excavation protection hanging beam | |
CN204267073U (en) | Rolling type Dust collecting net device | |
CN205464447U (en) | Rail ratchet drill fixed bolster | |
CN201111548Y (en) | Machine tail crossheading cable track device | |
CN211692520U (en) | Fully-mechanized mining face hydraulic support recovery device | |
CN204107584U (en) | The fittable slackening device of ball grinding machine lining board | |
CN202519590U (en) | Top mounting small hanging basket | |
CN201778827U (en) | Hydraulic support mounting truck | |
CN202055864U (en) | Swinging pipe clamp for wall hanging of digging and stacking pipeline of coal mine shaft | |
CN210103136U (en) | Mining electric train drags and moves cable device | |
CN202012296U (en) | Drilling floor surface buffering device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120801 Termination date: 20121207 |