CN202090346U - Movable combined type ground anchor - Google Patents
Movable combined type ground anchor Download PDFInfo
- Publication number
- CN202090346U CN202090346U CN2011201060069U CN201120106006U CN202090346U CN 202090346 U CN202090346 U CN 202090346U CN 2011201060069 U CN2011201060069 U CN 2011201060069U CN 201120106006 U CN201120106006 U CN 201120106006U CN 202090346 U CN202090346 U CN 202090346U
- Authority
- CN
- China
- Prior art keywords
- steel frame
- ground anchor
- balancing weights
- combined type
- balancing weight
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
A movable combined type ground anchor has the structure that a steel frame is connected with a steel pile, balancing weights are arranged on the steel frame, and a hanging ring is arranged on the steel frame; hoisting rings are arranged on the balancing weights; and the balancing weights are connected with the steel frame through the hoisting rings. Multiple balancing weights can be chosen and combined as required by construction and can be directly hung on the steel frame, and when the ground anchor is in use, the steel pile is punched underground and then fixed, so that the installation is convenient, the excavated surface is small, the subsequent repair is easy, and the construction quality is efficiently improved.
Description
Technical field
The utility model relates to a kind of mobile and combined earth anchor, is applied to small-sized transmission line construction field.
Background technology
In small-sized transmission line of electricity group tower and the payingoff construction, generally need to install a lot of temporary guy earth anchors, traditional earth anchor needs excavation, and backguy piece and stay rod are installed then.Excavation destroys anchor point ground repeatedly, makes troubles for follow-up repair, and work efficiency is not high.
Summary of the invention
Technical problem to be solved in the utility model provides a kind of mobile and combined earth anchor, overcomes to install earth anchor in the prior art to big, the follow-up repair inconvenience of anchor point excavation face, the problem that construction quality is not high.
For solving the problems of the technologies described above, the technical scheme that the utility model is taked is: a kind of mobile and combined earth anchor, and steel frame connects piling bar, and steel frame is provided with balancing weight, and steel frame is provided with link.
Balancing weight is provided with suspension ring, and balancing weight is connected with steel frame by suspension ring.
A kind of mobile and combined earth anchor of the utility model, balancing weight can need be selected the polylith combination by construction, directly is hung on the steel frame, during use piling bar is driven underground and fixes, and easy for installation, the excavation face is little, and follow-up reparation is easy, has effectively improved construction quality.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and Examples:
Fig. 1 is the utility model device front view;
Fig. 2 is the utility model device vertical view.
The specific embodiment
A kind of mobile and combined earth anchor, steel frame 4 connects piling bar 5, and steel frame 4 is provided with balancing weight 3, and steel frame 4 is provided with link 1.Balancing weight 3 is provided with suspension ring 2, and balancing weight 3 is connected with steel frame 4 by suspension ring 2.
The use formula is driven underground piling bar 5, and steel frame 4 and piling bar 5 welding are hung in precast concrete balancing weight 3 on the steel frame 4 then, and temporary guy is fixed on the backguy link 1 of steel frame 4.Balancing weight 3 can need to select the polylith combination by construction.After construction finishes, only need piling bar 5 extracted and get final product, the workload of repairing anchoring face is very little, and while the utility model earth anchor can be reused.
Claims (2)
1. mobile and combined earth anchor is characterized in that: steel frame (4) connects piling bar (5), and steel frame (4) is provided with balancing weight (3), and steel frame (4) is provided with link (1).
2. according to the described a kind of mobile and combined earth anchor of claim 1, it is characterized in that: balancing weight (3) is provided with suspension ring (2), and balancing weight (3) is connected with steel frame (4) by suspension ring (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201060069U CN202090346U (en) | 2011-04-13 | 2011-04-13 | Movable combined type ground anchor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201060069U CN202090346U (en) | 2011-04-13 | 2011-04-13 | Movable combined type ground anchor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202090346U true CN202090346U (en) | 2011-12-28 |
Family
ID=45365423
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201060069U Expired - Lifetime CN202090346U (en) | 2011-04-13 | 2011-04-13 | Movable combined type ground anchor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202090346U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105089047A (en) * | 2015-06-23 | 2015-11-25 | 苏州建鑫建设集团有限公司 | Anchor rod construction device for constructional engineering |
CN109555121A (en) * | 2017-09-25 | 2019-04-02 | 中石化重型起重运输工程有限责任公司 | Gate type hydraulic lifting system new earth anchor |
CN110621834A (en) * | 2017-05-24 | 2019-12-27 | 乔治洛德方法研究和开发液化空气有限公司 | Gas liquefaction or separation unit |
-
2011
- 2011-04-13 CN CN2011201060069U patent/CN202090346U/en not_active Expired - Lifetime
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105089047A (en) * | 2015-06-23 | 2015-11-25 | 苏州建鑫建设集团有限公司 | Anchor rod construction device for constructional engineering |
CN110621834A (en) * | 2017-05-24 | 2019-12-27 | 乔治洛德方法研究和开发液化空气有限公司 | Gas liquefaction or separation unit |
CN109555121A (en) * | 2017-09-25 | 2019-04-02 | 中石化重型起重运输工程有限责任公司 | Gate type hydraulic lifting system new earth anchor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101812842B (en) | Tensionless filling pile structure | |
CN204012119U (en) | A kind of simple type earth electrode with automatic strike function is installed power set | |
CN204225108U (en) | A kind of small-sized foundation pile driver | |
CN202090346U (en) | Movable combined type ground anchor | |
CN201647906U (en) | Artificial bored well pile earthwork hoister | |
CN204715393U (en) | The long anchor rod type foundation structure of rock | |
CN203716046U (en) | Steel trestle for earthwork transportation of foundation pit | |
CN201649071U (en) | Unstressing cast-in-place pile | |
CN103334433B (en) | A kind of construction method of pile pulling | |
CN203411988U (en) | Independent medium-sized pile foundation | |
CN203022329U (en) | Nacelle frame without balancing weight | |
CN202830960U (en) | Intelligent intermittent bailing type pumping unit steel structure foundations | |
CN201554033U (en) | Tower crane foundation for deep foundation ditch | |
CN205046569U (en) | Annular wind -powered electricity generation foundation structure based on shaping of two ripple steel cylinder | |
CN102383613B (en) | Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device | |
CN204517304U (en) | A kind of high-tension cable portable push pipe for limited road environment | |
CN102839652A (en) | Steel strand cast-in-place pile and construction method thereof | |
CN203383224U (en) | Tension-free cast-in-place pile structure | |
CN201626778U (en) | Sky anchor in grotto | |
CN102296610B (en) | Device for removing square pile and construction method thereof | |
CN204343777U (en) | A kind of convenient line bar base | |
CN204266270U (en) | A kind of trenching machine automatically | |
CN211692520U (en) | Fully-mechanized mining face hydraulic support recovery device | |
CN203247586U (en) | Mooring rope ground anchoring device | |
CN204676439U (en) | A kind of Bailey beam formula can be hung by supertronic tower top |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20111228 |