CN202359830U - Novel power transmission tower reinforcing device - Google Patents

Novel power transmission tower reinforcing device Download PDF

Info

Publication number
CN202359830U
CN202359830U CN201120259033XU CN201120259033U CN202359830U CN 202359830 U CN202359830 U CN 202359830U CN 201120259033X U CN201120259033X U CN 201120259033XU CN 201120259033 U CN201120259033 U CN 201120259033U CN 202359830 U CN202359830 U CN 202359830U
Authority
CN
China
Prior art keywords
principal material
original
reinforcing
main material
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201120259033XU
Other languages
Chinese (zh)
Inventor
葛少云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN QIUSHI ELECTRIC POWER PLANNING DESIGN Co Ltd
Original Assignee
TIANJIN QIUSHI ELECTRIC POWER PLANNING DESIGN Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN QIUSHI ELECTRIC POWER PLANNING DESIGN Co Ltd filed Critical TIANJIN QIUSHI ELECTRIC POWER PLANNING DESIGN Co Ltd
Priority to CN201120259033XU priority Critical patent/CN202359830U/en
Application granted granted Critical
Publication of CN202359830U publication Critical patent/CN202359830U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The utility model provides a novel power transmission tower reinforcing device characterized by low cost, easy construction and strong reinforcement performance. The novel power transmission tower reinforcing device is formed by a connecting angle (1), a reinforcing principal material (2), nuts A (3), gusset plates (4), bolts B (5), and bracing channel beams (6) and is characterized in that: all the bolts B (5) on a principal material section with poor bearing capacity are provided with new nuts A (3), the newly added principal material is fixed to the original principal material through the bolts B (5); one side of each of the reinforcing channel beams (6) on the reinforcing principal material (2) is adhered with the original principal material through outdoor structural adhesive; and the bottom end of the newly added principal material is welded to a base board of a tower. The reinforcing device characterized by installing a novel special fixing nut on each existing bolt and fixing the newly added principal material to the original principal material in a parallel manner through the special nuts takes full advantages of the bolts on the original principal material, requires not drilling in the original principal material during installation, requires no replacement of the bolt structure on the original principal material, furthest maintains integrity and stability of the original structure and thus guarantees reinforcing performance of the power transmission tower.

Description

The bracing means of novel electric power pylon
Technical field
The utility model relates to a kind of bracing means, particularly a kind of bracing means of novel electric power pylon.
Background technology
Electric power pylon is the visual plant in the electric power transfer engineering; In recent years because significantly improving to power requirement; Need on iron tower, increase more insulator string and sensor; Increased the load that iron tower will bear, because many towers manufacture and design according to the old edition standard, its performance indications also can not adapt to now the more and more needs of rugged environment again.Old electric power pylon can be strengthened through increasing new member; Make it can bear bigger load action; Thereby spend less expense and just can realize the reinforcing upgrading to iron tower, this will save a lot of costs than building a new tower line again, and present reinforcing mode mainly contains two kinds: the one, through increase the tabula device in the iron tower relevant position; Realization is to the reinforcing of iron tower; The problem that this device exists is that the scope of application is narrower, and construction inconvenience is when especially reinforcing the iron tower of existing circuit.Second method is through additional newly-increased main material device on original main material; Newly-increased main material is connected with original main material through connecting angle; This kind device applicability is wide, and it is also more convenient to construct, but its shortcoming is in reinforcing process, need change bolt B; Also not too be fit to the iron tower on the existing circuit is reinforced, especially to angle tower and terminal tower.
Summary of the invention
According to above technical problem; The utility model technical problem to be solved provides the bracing means of the high novel electric power pylon of a kind of with low cost, easy construction and reinforcement performance; By connecting angle (1), reinforce main material (2), bolt A (3), gusset plate (4), bolt B (5), the channel-section steel of putting more energy into (6) and form; By connecting angle (1), reinforce main material (2), bolt A (3), gusset plate (4), bolt B (5), the channel-section steel of putting more energy into (6) and form; It is characterized in that: all bolt B (5) on the main material section that will need reinforcement go up erection bolt A (3); To reinforce main material (2) and be installed on original main material through bolt A (3), a side user external structure glue and the original main material that will reinforce the channel-section steel of putting more energy into (6) on the main material (2) carries out bonding, and the bottom that will reinforce main material (2) is welded on the column foot plate.
The beneficial effect of the utility model is: this kind setting can make full use of the bolt on original main material; A bolt A is installed on each bolt; To reinforce through bolt A that main material is parallel to be installed on original main material, this bracing means need not on original main material, to punch, and also need not to change the bolt on original main material again; The globality that has kept original structure has to greatest extent guaranteed the reinforcement performance of electric power pylon.Only need utilize original bolt installation reinforcing angle on the iron tower; Its advantage is a lower cost; Advantages such as construction is simple, and the duration is short change original iron tower structure because almost need not; So especially be fit to be applied to the reinforcing to the iron tower that has moved, this also is the most outstanding advantage of the utility model.
Description of drawings
Fig. 1 is a partial sectional view;
Fig. 2 is a partial sectional view;
Fig. 3 is the connecting angle partial enlarged drawing;
Fig. 4 is the connecting bolt partial enlarged drawing.
The specific embodiment
Shown in Fig. 1-4, below in conjunction with accompanying drawing this bracing means embodiment is detailed: the utility model is that existing iron tower is reinforced, be particularly suitable for existing iron tower in service is reinforced, and be that example is explained with the 35JGu33 electric power pylon below.Existing iron tower is made up of body of the tower, cross-arm, tower angle and basis; Body of the tower is the tower frame structure that is made up of four main materials and horizontal material, oblique material and auxiliary material; At main material and horizontal material, tiltedly a plurality of nodes place of being constituted of material joint all is equipped with gusset plate (4), through this gusset plate (4) above-mentioned three is fixedly installed to together with bolt B (5), every main material constitutes by multistage connecting angle (1) and is installed in junction plate and gusset plate (4) inboard; Main material and horizontal material; Intersection point between main material and the oblique material installs through intersection point bolt B (5), and the bottom of body of the tower is installed on the column foot plate on the basis through bolt B (5), and the body of the tower upper level is equipped with cross-arm.This reinforcement means mainly is original bolt B (5) of utilizing on original main material; Through fixedly mounting bolt A (3) above that; To newly reinforce main material (2) secured in parallel again on original main material; The practical implementation method is: a fixed installation bolt A (3) on each original bolt; To reinforce main material (2) then and be fixedly mounted on again on the bolt A (3), will reinforce main material (2) at last and be fixed on the column foot plate, a side user external structure glue and the original main material of reinforcing the channel-section steel of putting more energy into (6) on the main material will be carried out the bonding reinforcing of promptly accomplishing iron tower through welding manner.
With 35JGu33 sections tower is that example describes, the preparation that before reinforcing, needs:
Bolt B (5) quantity that at first needs reinforcement on the original main material of part according to iron tower produces the bolt A (3) of equivalent amount, because need go up erection bolt A (3) in each original bolt B (5), so quantity should be identical.Prepare then and the identical material of original main material; But specification is wanted the big main material of reinforcing (2); Each connecting angle (1) two ends and middle part are provided with and the corresponding installing hole of original main material, and it is identical with former main material material that this reinforces main material (2) requirement, and specification suitably improves than original main material; Choice criteria is the limb limit alignment of reinforcing post-reinforcing master's material (2) limb limit and original main material, could the most effectively guarantee reinforcement performance like this.

Claims (1)

1. the bracing means of a novel electric power pylon; By connecting angle (1), reinforce main material (2), bolt A (3), gusset plate (4), bolt B (5), the channel-section steel of putting more energy into (6) and form; It is characterized in that: all bolt B (5) on the main material section that will need reinforcement go up erection bolt A (3); To reinforce main material (2) is installed on original main material through bolt A (3); A side user external structure glue and the original main material that to reinforce the channel-section steel of putting more energy into (6) on the main material (2) carries out bonding, and the bottom that will reinforce main material (2) is welded on the column foot plate.
CN201120259033XU 2011-07-21 2011-07-21 Novel power transmission tower reinforcing device Expired - Lifetime CN202359830U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120259033XU CN202359830U (en) 2011-07-21 2011-07-21 Novel power transmission tower reinforcing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120259033XU CN202359830U (en) 2011-07-21 2011-07-21 Novel power transmission tower reinforcing device

Publications (1)

Publication Number Publication Date
CN202359830U true CN202359830U (en) 2012-08-01

Family

ID=46571025

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120259033XU Expired - Lifetime CN202359830U (en) 2011-07-21 2011-07-21 Novel power transmission tower reinforcing device

Country Status (1)

Country Link
CN (1) CN202359830U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104775628A (en) * 2015-04-15 2015-07-15 华北水利水电大学 Building structure reinforcing and connecting device and connecting method thereof
CN112189076A (en) * 2018-11-01 2021-01-05 株式会社Itc咨询 Reinforcing device for existing structure and accessory equipment mounting device
CN112922385A (en) * 2021-04-01 2021-06-08 大连理工大学 Porous steel-clad transmission tower main material uninterrupted power reinforcing device
CN114233036A (en) * 2021-12-10 2022-03-25 南方电网科学研究院有限责任公司 Through-type angle steel transmission tower reinforcing apparatus

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104775628A (en) * 2015-04-15 2015-07-15 华北水利水电大学 Building structure reinforcing and connecting device and connecting method thereof
CN104775628B (en) * 2015-04-15 2016-08-31 华北水利水电大学 A kind of building structure strengthening attachment means and attaching method thereof
CN112189076A (en) * 2018-11-01 2021-01-05 株式会社Itc咨询 Reinforcing device for existing structure and accessory equipment mounting device
CN112922385A (en) * 2021-04-01 2021-06-08 大连理工大学 Porous steel-clad transmission tower main material uninterrupted power reinforcing device
CN114233036A (en) * 2021-12-10 2022-03-25 南方电网科学研究院有限责任公司 Through-type angle steel transmission tower reinforcing apparatus

Similar Documents

Publication Publication Date Title
CN202164830U (en) Reinforcing device of transmission iron tower
CN101463667A (en) Reinforcing means for power transmission iron tower
CN202359830U (en) Novel power transmission tower reinforcing device
CN201362979Y (en) Reinforcing structure for power transmission iron tower
CN202627215U (en) Major axis variable beam height assembling type node of H steel beam and H steel column
CN105064759A (en) GFRP (glass fiber reinforced plastic) tubed reinforced concrete combination multi-circuit transmission pole
CN202520043U (en) Transmission tower
CN203669323U (en) Telescopic assembling work platform support
CN110805141B (en) Connecting device and method for steel pipe column and shock insulation support after jacking of building
CN210396223U (en) Photovoltaic power plant shaft tower reinforcing apparatus
CN204850639U (en) GFRP pipe reinforced concrete combined member multiloop transmission of electricity pole
CN203066258U (en) Ridge beam column node connection of recombinant bamboo frame structure
CN204356793U (en) A kind of assembling hollow reinforced concrete independent foundation
CN203412111U (en) Straight threaded sleeve connecting structure at stiffness steel girder node
CN203129565U (en) Floor connecting device of external scaffolding rigid wall connecting piece
CN202321919U (en) Metallic framework structure of escalator
CN205039496U (en) Whole prefabricated cable support
CN203175134U (en) Truss used for lifting electric transmission line tower connecting legs
CN203792514U (en) Construction positioning system for prestressed steel corrugated pipes
CN202705936U (en) Windproof prefabricated part assembly and connection device
CN203729653U (en) Wind-resistant reinforced type iron tower
CN204001192U (en) Three-dimensional intersection truss conversion layer structure
CN213806609U (en) Movable connecting rod structure
CN202826071U (en) Combined supporting structure of concrete mixing plant and floor powder storage bin
CN207211913U (en) A kind of photovoltaic generation pylon and its connecting plate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20120801

CX01 Expiry of patent term
DD01 Delivery of document by public notice

Addressee: Patent of Tianjin Qiushi electric power planning and Design Co.,Ltd. The person in charge

Document name: Notice of expiration and termination of patent right

DD01 Delivery of document by public notice