CN202359714U - Installing structure for concealed frame glass curtain wall - Google Patents

Installing structure for concealed frame glass curtain wall Download PDF

Info

Publication number
CN202359714U
CN202359714U CN2011204789615U CN201120478961U CN202359714U CN 202359714 U CN202359714 U CN 202359714U CN 2011204789615 U CN2011204789615 U CN 2011204789615U CN 201120478961 U CN201120478961 U CN 201120478961U CN 202359714 U CN202359714 U CN 202359714U
Authority
CN
China
Prior art keywords
hollow glass
curtain wall
aluminum alloy
aluminium alloys
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204789615U
Other languages
Chinese (zh)
Inventor
张保明
陈研
林春丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRSC Construction Group Co Ltd
Original Assignee
Shenzhen Deep Fitted Total Decoration Engineering Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Deep Fitted Total Decoration Engineering Industry Co Ltd filed Critical Shenzhen Deep Fitted Total Decoration Engineering Industry Co Ltd
Priority to CN2011204789615U priority Critical patent/CN202359714U/en
Application granted granted Critical
Publication of CN202359714U publication Critical patent/CN202359714U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

An installing structure for a concealed frame glass curtain wall comprises a structure bracket composed of hollow glass (71), a beam (21) and a stand column (11). A press edge of an aluminum alloy press block (61) is pressed into an aluminum alloy slot (31) which is inserted into the edge of the hollow glass, the end of a guide groove of the aluminum alloy press block is connected with the beam or the stand column in an abutting mode, and a bolt (101) penetrates through the aluminum alloy press block to be threaded with the beam or the stand column; a groove is arranged on the side surface of the structure bracket, which is near the hollow glass, an elastic stepping bar (41) is accommodated in the groove, and the portion of the elastic stepping bar, which is exposed out of the groove, is connected with the hollow glass in an abutting mode; and elastic sheet (81) are disposed between the guide groove of the aluminum alloy press block and the hollow glass. Compared with installing structures in prior art, under the condition of achieving the equal curtain wall effect, the installing structure is capable of saving building materials and labors due to the fact that the aluminum alloy sub-frame and a gluer are not required, the construction efficiency is improved greatly, and the construction time is shortened.

Description

The mounting structure of concealed frame glass curtain wall
Technical field
The utility model relates to a kind of constructure screen wall, particularly a kind of mounting structure of concealed frame glass curtain wall.
Background technology
As shown in Figure 1, the cross-sectional node diagram of frame concealed curtain wall standard.Hollow glass 7 is connected with column 1, crossbeam 2, be earlier by the secondary frame 3 of aluminium alloys through double-sided tape 4 with break glue 5 and hollow glass 7 and carry out bondingly, the more secondary frame of aluminium alloys is connected on the column 1 with briquetting 6 and the illustrated structure of screw 10 employings; The junction liner of crossbeam 2 and column 1 has the elastomeric pad 9 of 1mm.
As shown in Figure 2, the perpendicular node diagram that cuts open of frame concealed curtain wall standard.Hollow glass 7 is connected with column 1, crossbeam 2, be earlier by the secondary frame 3 of aluminium alloys through double-sided tape 4 with break glue 5 and hollow glass 7 and carry out bondingly, the more secondary frame of aluminium alloys is connected on the crossbeam 2 in order to briquetting 6 and screw 10.
This structure must be in factory with the secondary frame 3 of aluminium alloys and hollow glass 7 through beating gluing connecing, treat that maintenance is accomplished after, can be transported to the building site installation; Installation is usually with silicone weather resistant fluid sealant and foam rods 8 shutoff installing holes.
Along with the development of society, the use amount of building curtain wall is more and more, and building materials and manpower consumption amount are also just increasing; Domestic building resource and recruitment shortage will be big problems from now on, so be that building materials or artificial saving all are the problems that the modern architecture industry should be considered.
Summary of the invention
The technical problem that the utility model will solve provides a kind of mounting structure of concealed frame glass curtain wall, and this structure is being saved the secondary mount structure of aluminium alloys and beaten under the prerequisite of adhesive process, has guaranteed the effect identical with existing frame concealed curtain wall.
In order to solve the problems of the technologies described above; The utility model provides a kind of mounting structure of concealed frame glass curtain wall; Comprise the structure stand that is connected with hollow glass that hollow glass, crossbeam and column are formed; It is characterized in that: the pressure edge of aluminium alloys briquetting is pressed in the aluminum alloy trough that embeds the hollow glass edge, and the termination of the gathering sill of aluminium alloys briquetting and said structure stand connect, and bolt is connected the aluminium alloys briquetting with said structure stand; The side of closing on hollow glass on the said structure stand is provided with groove, is equipped with elastic spacer in it, and this elastic spacer exposes the outer part of said groove and connects with said hollow glass; Between the gathering sill of said aluminium alloys briquetting and the hollow glass flexure strip is installed.
The termination of said gathering sill and said column connect; Said hollow glass is connected with said column with the aluminium alloys briquetting through bolt.
The termination of said gathering sill and said crossbeam connect; Said hollow glass is connected with said crossbeam with the aluminium alloys briquetting through bolt.
Said aluminum alloy trough is placed in the hollow glass edge in the silicone weather resistant fluid sealant, bonds together with the silicone weather resistant fluid sealant with hollow glass.
The hole of said aluminium alloys briquetting also can be screwed hole.
Said elastic spacer and groove are that the center is symmetrical set with the center line of bolt.
Said aluminum alloy trough is that cross section is the groove of rectangle.
Said elastomeric pad, elastic spacer and flexure strip are processed with elastomeric material.
Said elastic spacer and groove are that the center is symmetrical set with the center line of bolt.
Said elastic spacer and groove are that the center is symmetrical set with the center line of bolt.
Compared with prior art, the utility model owing to do not need the secondary frame of aluminium alloys and play glue, is not only practiced thrift constructional materials, and has been saved manual work under the situation of accomplishing equal facade effect; Also improve efficiency of construction to a great extent, shortened the engineering time.
Description of drawings
Below in conjunction with the accompanying drawing and the specific embodiment, the utility model is done to specify further:
Fig. 1 is the cross-sectional node diagram of frame concealed curtain wall standard in the background technology.
Fig. 2 cuts open node diagram for frame concealed curtain wall standard in the background technology is perpendicular.
Fig. 3 is the cross-sectional node diagram of frame concealed curtain wall standard of the utility model.
Fig. 4 is the A portion enlarged drawing of Fig. 3.
Fig. 5 is the perpendicular node diagram that cuts open of the frame concealed curtain wall standard of the utility model.
Fig. 6 is the B portion enlarged drawing of Fig. 5.
Fig. 7 is the schematic perspective view of aluminium alloys briquetting 61.
The specific embodiment
Save the secondary mount structure of aluminium alloys and beat under the prerequisite of adhesive process for being implemented in, guaranteed and the existing identical effect of equal curtain wall.The utility model adopts following scheme to implement:
Please with reference to Fig. 3 to Fig. 6, the cross-sectional and perpendicular node diagram that cuts open of the frame concealed curtain wall standard of the utility model reaches partial enlarged drawing separately.
The mounting structure of concealed frame glass curtain wall comprises hollow glass 71, the structure stand that column 11 and crossbeam 21 are formed; The pressure edge 611 of aluminium alloys briquetting 61 is pressed on the aluminum alloy trough 31 that embeds hollow glass 71 edges, and bolt 101 passes the aluminium alloys briquetting and is threaded with the column of structure stand, perhaps is threaded with the crossbeam of structure stand.
For realizing such scheme, following two embodiment are provided.
Embodiment 1
Like Fig. 3, shown in 4, the cross-sectional node diagram of frame concealed curtain wall standard of the utility model.The mounting structure of concealed frame glass curtain wall comprises column 11 and crossbeam 21, and liner has the elastomeric pad 91 of 1mm in the joint gap of crossbeam 21 and column 11; The pressure edge 611 of aluminium alloys briquetting 61 is pressed on the aluminum alloy trough 31 that embeds hollow glass 71 edges; Aluminum alloy trough is a rectangular channel; The termination and the column 11 of the gathering sill 612 of aluminium alloys briquetting 61 (seeing also shown in Figure 7) connect; Bolt 101 passes aluminium alloys briquetting and column 11 through being threaded, and with this aluminium alloys briquetting and column is linked together.Column 11 is provided with groove 111 with the side that hollow glass 71 closes on, and is equipped with elastic spacer 41 in it, and this elastic spacer 41 exposes groove 111 outer parts and connects with hollow glass 71; Between the gathering sill 612 of aluminium alloys briquetting 61 and the hollow glass 71 flexure strip 81 is installed.
The flexure strip of installing between gathering sill 612 and the hollow glass 71 of elastomeric pad 91, column 11 and the elastic spacer 41 in the hollow glass 71 adjacent end grooves 111, aluminium alloys briquetting 61 of 1mm 81 is arranged can be that elastomeric material is processed to liner in the joint gap of crossbeam 21 and column 11, and the flexure strip 81 of installation can avoid hollow glass directly to contact, break with metal material between the elastic spacer 41 in the hollow glass 71 adjacent end grooves 111, the gathering sill 612 of aluminium alloys briquetting 61 and the hollow glass 71.
Elastic spacer 41 and groove 111 are that the center is symmetrical set with the center line of bolt.
Elastomeric pad 91, elastic spacer 41 and flexure strip 81 are processed with elastomeric material.
In hollow glass 71 processing, an aluminum alloy trough 31 must be embedded in advance at hollow glass 71 edges, so that hollow glass 71 utilizes aluminium alloys briquetting 61 to be connected with column 11.This aluminum alloy trough 31 preferably is placed in the silicone weather resistant fluid sealant 711, bonds together with silicone weather resistant fluid sealant 711 with hollow glass 71.
Embodiment 2
Like Fig. 5, shown in 6, the perpendicular node diagram that cuts open of the frame concealed curtain wall standard of the utility model.The mounting structure of concealed frame glass curtain wall comprises column 11 and crossbeam 21; The pressure edge 611 of aluminium alloys briquetting 61 is pressed on the aluminum alloy trough 31 that embeds the rectangular cross section in the hollow glass 71 edge silicone weather resistant fluid sealants 711; And the termination of the gathering sill 612 of aluminium alloys briquetting 61 and crossbeam 21 connect; Bolt 101 passes aluminium alloys briquetting 61 and is threaded with crossbeam 21, with this aluminium alloys briquetting and column is linked together; Referring to Fig. 5, the B portion enlarged drawing of Fig. 6.Crossbeam 21 is provided with groove 111 with the side that hollow glass 71 closes on, and is equipped with elastic spacer 41 in it, and this elastic spacer 41 exposes groove 111 outer parts and connects with hollow glass 71; Between the gathering sill 612 of aluminium alloys briquetting 61 and the hollow glass 71 flexure strip 81 is installed.
Compare with embodiment 1, except hollow glass 71 and crossbeam 21 usefulness being threaded with bolt 101 through aluminium alloys briquetting 61, all the other structures are all closely similar, repeat no more.
Above two embodiment are compared with background technology and can know: the utility model saves the secondary frame of aluminium alloys and plays glue.Under the situation of accomplishing equal facade effect, practice thrift constructional materials, and saved manual work, improved efficiency of construction to a great extent, shortened the engineering time.

Claims (7)

1. the mounting structure of a concealed frame glass curtain wall; Comprise the structure stand that is connected with hollow glass that hollow glass, crossbeam and column are formed; It is characterized in that: the pressure edge of aluminium alloys briquetting is pressed in the aluminum alloy trough that embeds the hollow glass edge; And the termination of the gathering sill of aluminium alloys briquetting and said structure stand connect, and bolt is connected the aluminium alloys briquetting with said structure stand; The side of closing on hollow glass on the said structure stand is provided with groove, is equipped with elastic spacer in it, and this elastic spacer exposes the outer part of said groove and connects with said hollow glass; Between the gathering sill of said aluminium alloys briquetting and the hollow glass flexure strip is installed.
2. the mounting structure of concealed frame glass curtain wall according to claim 1 is characterized in that, the termination of said gathering sill and said column connect; Said hollow glass is connected with said column with the aluminium alloys briquetting through bolt.
3. the mounting structure of concealed frame glass curtain wall according to claim 1 is characterized in that, the termination of said gathering sill and said crossbeam connect; Said hollow glass is connected with said crossbeam with the aluminium alloys briquetting through bolt.
4. according to the mounting structure of claim 1,2 and 3 any one described concealed frame glass curtain wall, it is characterized in that said aluminum alloy trough is placed in the hollow glass edge in the silicone weather resistant fluid sealant, bonds together with the silicone weather resistant fluid sealant with hollow glass.
5. the mounting structure of concealed frame glass curtain wall according to claim 4 is characterized in that, said elastic spacer and groove are that the center is symmetrical set with the center line of bolt.
6. according to the mounting structure of each described concealed frame glass curtain wall of claim 1-3, it is characterized in that said aluminum alloy trough is that cross section is the groove of rectangle.
7. the mounting structure of concealed frame glass curtain wall according to claim 4 is characterized in that, said elastomeric pad, elastic spacer and flexure strip are processed with elastomeric material.
CN2011204789615U 2011-11-25 2011-11-25 Installing structure for concealed frame glass curtain wall Expired - Fee Related CN202359714U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204789615U CN202359714U (en) 2011-11-25 2011-11-25 Installing structure for concealed frame glass curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204789615U CN202359714U (en) 2011-11-25 2011-11-25 Installing structure for concealed frame glass curtain wall

Publications (1)

Publication Number Publication Date
CN202359714U true CN202359714U (en) 2012-08-01

Family

ID=46570909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204789615U Expired - Fee Related CN202359714U (en) 2011-11-25 2011-11-25 Installing structure for concealed frame glass curtain wall

Country Status (1)

Country Link
CN (1) CN202359714U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924719A (en) * 2014-03-28 2014-07-16 宣城徽铝铝业有限公司 Hidden-frame curtain wall assembly aluminum profile
CN105155743A (en) * 2015-09-21 2015-12-16 武汉丽岛科技有限公司 Frame-hidden glass curtain wall without auxiliary frame
CN107254928A (en) * 2017-07-31 2017-10-17 中国冶集团有限公司 A kind of hidden frame glass curtain and its method of construction without secondary frame and underframe
CN107299708A (en) * 2017-07-31 2017-10-27 中国冶集团有限公司 A kind of compound hidden curtain wall system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924719A (en) * 2014-03-28 2014-07-16 宣城徽铝铝业有限公司 Hidden-frame curtain wall assembly aluminum profile
CN103924719B (en) * 2014-03-28 2016-08-17 宣城徽铝铝业有限公司 Dark frame curtain wall assembling aluminium section bar
CN105155743A (en) * 2015-09-21 2015-12-16 武汉丽岛科技有限公司 Frame-hidden glass curtain wall without auxiliary frame
CN107254928A (en) * 2017-07-31 2017-10-17 中国冶集团有限公司 A kind of hidden frame glass curtain and its method of construction without secondary frame and underframe
CN107299708A (en) * 2017-07-31 2017-10-27 中国冶集团有限公司 A kind of compound hidden curtain wall system

Similar Documents

Publication Publication Date Title
CN202359714U (en) Installing structure for concealed frame glass curtain wall
CN207314597U (en) All steel section bar fastening piece type partition-type structures
CN112252579A (en) Energy-saving assembled building wall
CN202706273U (en) Installing structure of all-hidden frame glass curtain wall
CN103334523B (en) With the curtain wall of combined inserting part
CN212866507U (en) Energy-saving curtain wall with transverse and vertical keels on two sides
CN111851807B (en) Assembly type building curtain wall component connecting structure
CN103061433A (en) Replaceable unit curtain wall connection structure
CN208792583U (en) Hung type Curtain wall frame structure
CN202416637U (en) Corner connecting piece of unit curtain wall and unit curtain wall
CN211421531U (en) Exempt from glass curtain wall mounting structure that punches
CN210316143U (en) Pressing block type component curtain wall with auxiliary fixing piece
CN114108901A (en) Vertical glass wing system of frame curtain wall
CN210194968U (en) Mounting structure of gypsum board partition wall and timber
CN210369480U (en) Balcony curtain wall
CN212405804U (en) Stone toilet wall assembly
CN202731037U (en) Curtain wall framework structure
CN209145107U (en) Concealed frame glass curtain wall mounting structure
CN214615190U (en) Porcelain steel plate dry-hanging device
CN204703349U (en) The waterproof connecting device of cladding glass plane materiel
CN201148807Y (en) Buckled press type glass pressing bar door and window and pressing bar used thereby
CN212642012U (en) Building wall aluminium veneer connection structure
CN218233931U (en) Indoor dry-hanging stone curtain wall mounting structure
CN219011634U (en) Fixing structure of hollow glass of curtain wall
CN211257489U (en) Curtain wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 518029 Guangdong city of Shenzhen province Futian District Bagua road Shidong Arts crafts emporium decoration

Patentee after: SHENZHEN SHENZHUANGZONG DECORATION CO., LTD.

Address before: 518029 Guangdong city of Shenzhen province Futian District Bagua road Shidong Arts crafts emporium decoration

Patentee before: Shenzhen Deep Fitted Total Decoration Engineering Industry Co., Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 518029 Guangdong city of Shenzhen province Futian District Bagua road Shidong Arts crafts emporium decoration

Patentee after: General construction group Limited by Share Ltd

Address before: 518029 Guangdong city of Shenzhen province Futian District Bagua road Shidong Arts crafts emporium decoration

Patentee before: SHENZHEN SHENZHUANGZONG DECORATION CO., LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120801

Termination date: 20191125