CN202359502U - 液压穿心式千斤顶顶压器 - Google Patents
液压穿心式千斤顶顶压器 Download PDFInfo
- Publication number
- CN202359502U CN202359502U CN2011205067442U CN201120506744U CN202359502U CN 202359502 U CN202359502 U CN 202359502U CN 2011205067442 U CN2011205067442 U CN 2011205067442U CN 201120506744 U CN201120506744 U CN 201120506744U CN 202359502 U CN202359502 U CN 202359502U
- Authority
- CN
- China
- Prior art keywords
- cylinder body
- end cover
- rear end
- jacking device
- pressing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型提供了一种液压穿心式千斤顶顶压器,包括位于前端盖、后端盖、大缸缸体、限位板和内活塞,所说的大缸缸体位于前端盖和后端盖之间,所说的限位板位于后端盖内侧,所说的内活塞位于前端盖内侧,所说的限位板、大缸缸体均与内内活塞相连,所说的内活塞和大缸缸体之间设有油封。本实用新型的顶压器可以广泛应用于大跨度预应力混凝土连续梁、连续钢构等桥梁的坚向预应力结构,还可以应用于铁路梁横向预应力结构、斜拉桥塔身周向、横向预应力结构、边坡锚固预应力结构及各种较短预应力筋结构中。
Description
技术领域
本实用新型涉及一种用于钢绞线张拉的液压穿心式千斤顶顶压器,属于工程设备技术领域。
背景技术
低回缩量锚固是针对短预应力束锚用传统的张拉工艺张拉、放张时,回缩量相对比较大,导致预应力永久损失大。而使用低回缩量锚具,存在成本高,张拉操作困难,并且张拉用时比较长,有时低回缩量锚具外的螺螺母调节不到位,从而导致预应力永久损失。张拉时夹片对钢绞线有刮伤的现象。
发明内容
本实用新型的目的是克服现有技术的不足之处,提供一种液压穿心式千斤顶顶压器。
本实用新型的液压穿心式千斤顶顶压器,包括位于前端盖、后端盖、大缸缸体、限位板和内活塞,所说的大缸缸体位于前端盖和后端盖之间,所说的限位板位于后端盖内侧,所说的内活塞位于前端盖内侧,所说的限位板、大缸缸体均与内活塞相连,所说的内活塞和大缸缸体之间设有油封。
本实用新型的液压穿心式千斤顶顶压器的原理在于:改进了张拉工艺,把调节低回缩量锚具处的调节螺母来销除张拉时的回缩量,改成用顶压器把工作夹片推进的方法销除张拉时的回缩量。
本实用新型的顶压器可以广泛应用于大跨度预应力混凝土连续梁、连续钢构等桥梁的坚向预应力结构,还可以应用于铁路梁横向预应力结构、斜拉桥塔身周向、横向预应力结构、边坡锚固预应力结构及各种较短预应力筋结构中。
附图说明
图1是本实用新型的结构示意图;顶压器是全新设计。
图2是本实用新型的工作流程示意图。
其中,1为前端盖,2为后端盖,3为大缸缸体,4为限位板,5为内活塞,6为油封,7为工作锚具,8为千斤顶。9为工具锚具。
具体实施方式
如图1所示,本实用新型的液压穿心式千斤顶顶压器,包括位于前端盖1、后端盖2、大缸缸体3、限位板4和内活塞5,大缸缸体3位于前端盖1和后端盖2之间,限位板4位于后端盖2内侧,内活塞5位于前端盖1和大缸缸体3内侧,限位板4与内活塞5相连,内活塞5和大缸缸体3之间设有两个油封6。
如图2所示, 本实用新型的液压穿心式千斤顶顶压器的具体的工作流程如下:
张拉时,把顶压器安装在千斤顶8的后面,和千斤顶8配套使用。
1、张拉前的准备工作:
1)梁体达到张拉强度要求时,清理锚垫板上的砼和压浆嘴及钢绞线表面;
2)安装工作锚具7和夹片;
3)安装顶压器、千斤顶8、工具锚具9和工具夹片(或张拉杆),油泵与千斤顶、顶压器用油管连接好。
2、张拉
按照钢绞线张拉工艺要求进行张拉:
1)施加预应力:
A.施加预应力的工具锚具、夹片,按照JTG/T50—2011《公路桥梁施工技术规范》之7.3.1、7.3.2、7.3.3、7.3.6执行;机具设备按照7.6.1执行。
B.第一次张拉控制应宜按设计张拉控制应力超张3%至5%,第二次张拉控制应符合设计要求;
C.钢绞线张拉采用应力控制法,以伸长值进行校核;
D.张拉前应对构件进行检验,构建的混凝土强度应符合设计要求;
2)张拉程序
如图2所示,包括如下步骤:
A.安装工作锚板,工作夹片:
安装前清理平整锚垫板端面及钢绞线表面,工作锚板的锥孔穿入钢绞线后推至锚垫板端面的凹槽的止口内,拆开工作夹片表面的油纸即可安装到工作锚板的锥孔内,甲片安装应平齐各片之间的间隙均匀,必要时可用专用工具轻敲;
B.安装顶压器、千斤顶8、工具锚具9及工具夹片(钢绞线不够长无法安装工具锚时可用张拉杆代替工具锚使用。)
C.第一次张拉
顺序:0→初应力→1.03(1.05)σ.com→持压5min→放张锚固(此时的顶压器不工作,代限位板4用)
D.第二次张拉
顺序:0→1.0σ.com→持压5min→开动顶压器油泵阀,推动内活塞5及限位板4向后移动,推进夹片锚固→放张
(a)第二次张拉时间应符合设计要求;
(b)按照图2安装顶压器、千斤顶8及张拉工作锚具7和夹片或张拉杆,顶压器的限位板4上的孔要与工作锚具7上的锥孔同心,用张拉杆时,要保持张拉杆的连接头与工作锚具7上段的钢绞线连接到位;
(c)第二次张拉到1.0σ.com(应力要求值)时,持压5min后,开动顶压器油泵阀推动顶压器内活塞5及限位板4向后移动,限位板4向后移动的同时,把工作锚具7上锥孔内的夹片推进锥孔深处,夹片推到一定量时,夹片夹紧钢绞线时,顶压器内活塞5不再向前移动,顶压器的油表读数就会突然上升,当上升到一定数值时,停止顶压,夹片已夹紧钢绞线,完成工作锚具7张拉任务,而后放张。完成张拉工艺过程。
(d)内活塞5回程,由下一次张拉工作夹片带回。回程量用限位板的厚度来调节。
(e)进行下一道工具孔道压浆。
Claims (1)
1.液压穿心式千斤顶顶压器,其特征在于,包括位于前端盖、后端盖、大缸缸体、限位板和内活塞,所说的大缸缸体位于前端盖和后端盖之间,所说的限位板位于后端盖内侧,所说的内活塞位于前端盖内侧,所说的限位板、大缸缸体均与内活塞相连,所说的内活塞和大缸缸体之间设有油封。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205067442U CN202359502U (zh) | 2011-12-08 | 2011-12-08 | 液压穿心式千斤顶顶压器 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011205067442U CN202359502U (zh) | 2011-12-08 | 2011-12-08 | 液压穿心式千斤顶顶压器 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202359502U true CN202359502U (zh) | 2012-08-01 |
Family
ID=46570697
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011205067442U Expired - Fee Related CN202359502U (zh) | 2011-12-08 | 2011-12-08 | 液压穿心式千斤顶顶压器 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202359502U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103174094A (zh) * | 2013-03-15 | 2013-06-26 | 合肥惠利普电机有限公司 | 防回弹桥梁预应力张拉装置 |
CN108468276A (zh) * | 2018-02-01 | 2018-08-31 | 重庆恒佳工程技术咨询有限公司 | 一种预应力智能张拉双向顶升系统 |
-
2011
- 2011-12-08 CN CN2011205067442U patent/CN202359502U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103174094A (zh) * | 2013-03-15 | 2013-06-26 | 合肥惠利普电机有限公司 | 防回弹桥梁预应力张拉装置 |
CN108468276A (zh) * | 2018-02-01 | 2018-08-31 | 重庆恒佳工程技术咨询有限公司 | 一种预应力智能张拉双向顶升系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101899907B (zh) | 钢筋混凝土柱置换加固方法和卸载钢筋混凝土柱负荷装置 | |
CN102154992B (zh) | 波形钢腹板错位安装方法 | |
CN105113425A (zh) | 一种新型高效装配式钢混组合梁的施工方法 | |
CN204491425U (zh) | 一种t型桥梁横隔板的体外预应力加固结构 | |
CN102605785A (zh) | 锚杆静压桩预加压力封桩装置 | |
CN107762145A (zh) | 梁结构预制模板固定构件 | |
CN202359502U (zh) | 液压穿心式千斤顶顶压器 | |
CN202899128U (zh) | 主承载锚杆应力可全过程调节的岩锚吊车梁 | |
CN202031027U (zh) | 整体可换式锚碇锚固体系 | |
CN202925767U (zh) | 低回缩预应力锚具 | |
CN206956519U (zh) | 一种钢箱梁桥铺装层预应力系统 | |
CN205501843U (zh) | 加固刚架拱桥 | |
CN102392416A (zh) | 墩梁临时固结后锚固体系施工方法 | |
CN101446113A (zh) | 后增钢梁与混凝土板组合的方法 | |
CN211312233U (zh) | 一种落梁施工用梁端辅助装置 | |
CN202689546U (zh) | 砌筑墙体圈梁模板专用紧固夹具 | |
CN201459723U (zh) | 回弹式可拆卸锚索 | |
CN112853947A (zh) | 一种铁路预制装配式桥墩的预应力连接装置 | |
CN202644531U (zh) | 锚杆静压桩预加压力封桩装置 | |
CN205242238U (zh) | 一种应用于自锚式悬索桥的主梁结构 | |
CN202337669U (zh) | 一种预应力内卡式千斤顶 | |
CN204876590U (zh) | 前夹千斤顶 | |
CN111021255B (zh) | 一种连续钢箱梁墩梁固结竖向预应力施工方法 | |
CN105196405B (zh) | 一种关于桥梁预制空心板侧模的支撑设备及使用方法 | |
CN1624248A (zh) | 陡倾角大直径长斜井混凝土衬砌滑模施工新技术 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120801 Termination date: 20141208 |
|
EXPY | Termination of patent right or utility model |