CN202359472U - Barrier-free urban road intersection - Google Patents

Barrier-free urban road intersection Download PDF

Info

Publication number
CN202359472U
CN202359472U CN2011204934341U CN201120493434U CN202359472U CN 202359472 U CN202359472 U CN 202359472U CN 2011204934341 U CN2011204934341 U CN 2011204934341U CN 201120493434 U CN201120493434 U CN 201120493434U CN 202359472 U CN202359472 U CN 202359472U
Authority
CN
China
Prior art keywords
road
barrier
intersection
trunk roads
major trunk
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204934341U
Other languages
Chinese (zh)
Inventor
陈硕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou Planning Design and Research Institute
Original Assignee
Fuzhou Planning Design and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou Planning Design and Research Institute filed Critical Fuzhou Planning Design and Research Institute
Priority to CN2011204934341U priority Critical patent/CN202359472U/en
Application granted granted Critical
Publication of CN202359472U publication Critical patent/CN202359472U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to a barrier-free urban road intersection, which comprises a main trunk road and a secondary trunk road which are crossed, wherein both the main trunk road and the secondary trunk road are provided with a middle partition fence for dividing the trunk roads into two-way streets. The barrier-free urban road intersection is characterized in that: the main trunk road is also provided with a middle partition fence for separating the secondary trunk road; the two ends of the middle partition fence of the main trunk road are provide with turns; and the main trunk road at least comprises two-way four lanes. According to the barrier-free urban road intersection, barrier-free accessibility for motor vehicles at the intersection can be realized, and signal lamp devices such as traffic lights are not required to be arranged, so that the maintenance workload of traffic facilities is reduced.

Description

A kind of barrier-free city intersection
Technical field
The utility model relates to a kind of barrier-free city intersection, is specially adapted to the medium and small traffic intersection in city.
Background technology
Along with progress of science and technology and development and national economy, people's living standard also improves greatly, and the motor vehicle particularly quantity of car also skyrockets, and makes to cause serious social resources loss and environment pollution by urban road traffic congestion.The medium and small traffic intersection in the city; The little non-main traffic intersection of some magnitudes of traffic flow particularly; Though be provided with recoil simulators such as traffic lights, but often have motor vehicle rapidly to make a dash across the red light, not only the means of transportation maintenance workload is big; Need police of association and traffic-police to direct traffic, and serious threat is to other people life security.So be necessary to invent a kind of under no lights state the intersection of guarantee motor vehicle barrier free accessibility.
Summary of the invention
In view of the deficiency of prior art, the purpose of the utility model is to provide a kind of barrier-free city intersection that need not traffic lights.
To achieve these goals; The technical scheme of the utility model is: a kind of barrier-free city intersection; The major trunk roads and the subsidiary road that comprise right-angled intersection, said major trunk roads and subsidiary road are provided with the intermediate isolating hurdle that the arterial highway is divided into two-way street, it is characterized in that: said major trunk roads also are provided with the intermediate isolating hurdle that subsidiary road is cut off; The two ends, intermediate isolating hurdle of said major trunk roads are provided with the place of turning around of turning round, and said major trunk roads are two-way Four-Lane Road at least.
Preferably, said major trunk roads are two-way Four-Lane Road, and said subsidiary road is two-way two lane highways.
Preferably, said major trunk roads are two-way Four-Lane Road, and said subsidiary road is two-way Four-Lane Road.
Preferably, said major trunk roads are two-way eight tracks, and said subsidiary road is two-way Four-Lane Road.
Preferably, this barrier-free city intersection also comprises the annular overline bridge that is positioned at the top, intersection, and said annular overline bridge is connected with the both sides of major trunk roads and the both sides of subsidiary road respectively.
Compared with prior art, the utlity model has following advantage: this barrier-free city intersection need not to be provided with signal lamp devices such as traffic lights, also need not the alert and traffic police's floor manager of association, significantly reduces the means of transportation maintenance workload; This barrier-free city intersection ensures the barrier free accessibility of motor vehicle, is specially adapted to the little non-main traffic intersection of the magnitude of traffic flow in the city.
Description of drawings
Fig. 1 is the major trunk roads motor-driven vehicle going route map of the utility model embodiment.
Fig. 2 is the subsidiary road motor-driven vehicle going route map of the utility model embodiment.
Among the figure: AB-major trunk roads, CD-subsidiary road, E-intermediate isolating hurdle, the F-place of turning around of turning round, 1,2,3,4,1 ', 2 ', 3 ', 4 '-track, a, b, c, d, e, f, g, h-route.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is done further elaboration.
With reference to figure 1 ~ 2; A kind of barrier-free city intersection; The major trunk roads AB and the subsidiary road CD that comprise right-angled intersection, said major trunk roads AB and subsidiary road CD are provided with the intermediate isolating hurdle E that the arterial highway is divided into two-way street, and said major trunk roads AB also is provided with the intermediate isolating hurdle E that subsidiary road CD is cut off; The E two ends, intermediate isolating hurdle of said major trunk roads AB are provided with to turn round turns around to locate F, and said major trunk roads AB is two-way Four-Lane Road at least.
In the present embodiment; Said major trunk roads AB is two-way eight tracks; The limit of turning right from the centre respectively is track 1, track 2, track 3 and track 4, and the limit of turning left from the centre respectively is track 1 ', track 2 ', track 3 ' and track 4 ', and said subsidiary road CD is two-way Four-Lane Road.Certainly, along with reducing of the magnitude of traffic flow, said major trunk roads AB can also be a two-way Four-Lane Road etc., and said subsidiary road CD can also be two-way two lane highways or two-way four-way etc.In addition, the top of this barrier-free city intersection can also be provided with annular overline bridge, and said annular overline bridge is connected with the both sides of major trunk roads AB and the both sides of subsidiary road CD respectively, extends in all direction, and makes things convenient for the current of pedestrian and non motorized vehicle.
With reference to figure 1, (1) route a is the travel route of major trunk roads AB through vehicles: the vehicle in track 1,2,3,4 is kept straight on through 1,2 backs, lane change to track; (2) route b is the travel route of major trunk roads AB right-hand rotation vehicle: the vehicle in track 1,2,3,4 is turned right to go through 3,4 backs, lane change to track and is got into subsidiary road CD; (3) route c is the travel route of major trunk roads AB left turning vehicle: the vehicle in track 1,2,3,4 through lane change to track 1 after; The F of the place of turning around that turns round at the A end turns around; Turning right to go through lane change to track 3 ', 4 ' back then gets into subsidiary road CD, thereby realizes that major trunk roads AB goes up vehicle and turns left to go; (4) route 4 travel route of vehicle that turns around for major trunk roads AB turns left: the vehicle in track 1,2,3,4 through lane change to track 1 after; The F of the place of turning around that turns round at the A end turns around; Then through going behind lane change to the track 1 ', 2 ', thereby realize that major trunk roads AB goes up vehicle and turns left to turn around to go.
With reference to figure 2; (1) route e is the travel route of subsidiary road CD through vehicles: after subsidiary road CD through vehicles gets into the track 3,4 of major trunk roads AB through turning right; Through lane change to track 1; The F of the place of turning around that turns round at the A end turns around, and turning right to go through lane change to track 3 ', 4 ' back then gets into subsidiary road CD, thereby realizes that subsidiary road CD goes up vehicle and goes; (2) route f is the travel route of subsidiary road CD right-hand rotation vehicle: track 3, the 4 realization vehicles that subsidiary road CD vehicle gets into major trunk roads AB through turning right are turned right and are gone; (3) route g is the travel route of subsidiary road CD left turning vehicle: after subsidiary road CD vehicle gets into the track 3,4 of major trunk roads AB through turning right; Through lane change to track 1; The F of the place of turning around that turns round at the A end turns around; Keep straight on through 3 ' back, lane change to track then, thereby realize that subsidiary road CD goes up vehicle and turns left to go; (4) the route h travel route of vehicle that turns around for subsidiary road CD turns left: after subsidiary road CD vehicle gets into the track 3,4 of major trunk roads AB through turning right; Through lane change to track 1; Keep straight in the F of the place of turning around that turns round of the A end back of turning around, then through lane change to track 4 ', the F of the place of turning around that turns round that holds at B turns around; Get into subsidiary road CD through 3, the 4 back right-hand rotations of lane change to track, thereby realize that subsidiary road CD goes up vehicle and turns left to turn around to go.
The above is merely the preferred embodiment of the utility model, and all equalizations of being done according to the utility model claim change and modify, and all should belong to the covering scope of the utility model.

Claims (5)

1. barrier-free city intersection; The major trunk roads and the subsidiary road that comprise right-angled intersection; Said major trunk roads and subsidiary road are provided with the intermediate isolating hurdle that the arterial highway is divided into two-way street; It is characterized in that: said major trunk roads also are provided with the intermediate isolating hurdle that subsidiary road is cut off, and the two ends, intermediate isolating hurdle of said major trunk roads are provided with the place of turning around of turning round, and said major trunk roads are two-way Four-Lane Road at least.
2. a kind of barrier-free city according to claim 1 intersection is characterized in that: said major trunk roads are two-way Four-Lane Road, and said subsidiary road is two-way two lane highways.
3. a kind of barrier-free city according to claim 1 intersection is characterized in that: said major trunk roads are two-way Four-Lane Road, and said subsidiary road is two-way Four-Lane Road.
4. a kind of barrier-free city according to claim 1 intersection is characterized in that: said major trunk roads are two-way eight tracks, and said subsidiary road is two-way Four-Lane Road.
5. a kind of barrier-free city according to claim 1 intersection is characterized in that: also comprise the annular overline bridge that is positioned at the top, intersection, said annular overline bridge is connected with the both sides of major trunk roads and the both sides of subsidiary road respectively.
CN2011204934341U 2011-12-02 2011-12-02 Barrier-free urban road intersection Expired - Fee Related CN202359472U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204934341U CN202359472U (en) 2011-12-02 2011-12-02 Barrier-free urban road intersection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204934341U CN202359472U (en) 2011-12-02 2011-12-02 Barrier-free urban road intersection

Publications (1)

Publication Number Publication Date
CN202359472U true CN202359472U (en) 2012-08-01

Family

ID=46570669

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204934341U Expired - Fee Related CN202359472U (en) 2011-12-02 2011-12-02 Barrier-free urban road intersection

Country Status (1)

Country Link
CN (1) CN202359472U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103031789A (en) * 2013-01-04 2013-04-10 石少伟 Planar traffic system
CN103778777A (en) * 2013-07-26 2014-05-07 张希亮 Traffic method for guiding motor vehicles to pass crossroads and T-junctions smoothly
CN107313317A (en) * 2017-08-18 2017-11-03 徐建军 Without hindrance express lane structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103031789A (en) * 2013-01-04 2013-04-10 石少伟 Planar traffic system
CN103778777A (en) * 2013-07-26 2014-05-07 张希亮 Traffic method for guiding motor vehicles to pass crossroads and T-junctions smoothly
CN107313317A (en) * 2017-08-18 2017-11-03 徐建军 Without hindrance express lane structure

Similar Documents

Publication Publication Date Title
CN202090252U (en) Road structure for relieving urban traffic jam
CN103132741A (en) Stereo garage stretching over road and enabling person to directly drive automobile into parking space through self-actuated driving
CN101781873A (en) Convenient and smooth flyover crossroad traffic building without traffic light
CN102646331A (en) Design method for cooperating street crossing of opposite-angle pedestrians and left turning of motor vehicles at intersection
CN102268852A (en) Two-phase implementation method of urban road transport system
CN103498394B (en) A kind of automobile-use planar road net system
CN202359472U (en) Barrier-free urban road intersection
CN102747661B (en) Based on the structure and uses thereof of the torsional mode overpass bridge in urban road
CN202247573U (en) Urban crossroad flyover
CN102392401A (en) Method and bridge for realizing continuous passing of vehicles at level crossing by utilizing U-shaped rotary bridges
CN103886740A (en) Efficient traffic control system
CN101492904B (en) Traffic road junction roadway
CN105239479A (en) City multilayer-rotary-island-type overpass
CN202466336U (en) Interchange overpass without traffic light
CN202202220U (en) Crossroad with disc
CN104195909A (en) Non-elevated tiny urban cross overpass
CN101177927A (en) Rapid passing road system
CN101949118A (en) Omnibearing full double-deck overpass bridge at intersection
CN208649818U (en) A kind of crossroad Wheelchair Accessible structure
CN204959529U (en) Fast -slow separation grade separation system
Ewing New traffic calming device of choice
CN202626783U (en) Multilayer roundabout flyover
CN105002796A (en) Single-layer overpass without traffic lights on crossroads
CN201132919Y (en) Single-layer all-communicated crossroads
CN205501746U (en) Light automobile steel of highway T crossing constructs overpass structures

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120801

Termination date: 20171202