CN202346262U - Trolley transporting system for transporting unloaded hot roll into high rack warehouse - Google Patents

Trolley transporting system for transporting unloaded hot roll into high rack warehouse Download PDF

Info

Publication number
CN202346262U
CN202346262U CN2011204168516U CN201120416851U CN202346262U CN 202346262 U CN202346262 U CN 202346262U CN 2011204168516 U CN2011204168516 U CN 2011204168516U CN 201120416851 U CN201120416851 U CN 201120416851U CN 202346262 U CN202346262 U CN 202346262U
Authority
CN
China
Prior art keywords
transporting
rack warehouse
high rack
roll
hot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204168516U
Other languages
Chinese (zh)
Inventor
顾洪文
陈策
苏小新
李冰峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nonferrous Metals Processing Technology Co Ltd
Original Assignee
China Nonferrous Metals Processing Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nonferrous Metals Processing Technology Co Ltd filed Critical China Nonferrous Metals Processing Technology Co Ltd
Priority to CN2011204168516U priority Critical patent/CN202346262U/en
Application granted granted Critical
Publication of CN202346262U publication Critical patent/CN202346262U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Warehouses Or Storage Devices (AREA)

Abstract

The utility model discloses a trolley transporting system for transporting unloaded hot roll into a high rack warehouse. The trolley transporting system is arranged between a hot rolling unit and the high rack warehouse and is used for transporting the hot roll unloaded from an unloading position of a coiling machine in a hot rolling shop to the high rack warehouse. The trolley transporting system comprises a roll transporting orbit A with a roll transporting trolley A and a roll transporting orbit B with a roll transporting trolley B; one end of the roll transporting orbit A is correspondingly connected with the roll unloading position of the coiling machine and the other end is correspondingly connected with one end of the roll transporting orbit B; and the other end of the roll transporting orbit B extends from the side of the high rack warehouse into the high rack warehouse. The transporting system directly links the high rack warehouse with the hot roll production line instead of using a shop crown block, thus the transporting time of the hot roll is greatly shortened; besides, the potential risk in the lifting process of the shop traveler is avoided.

Description

A kind of hot rolled coil unloads the dolly transport systems that the volume back gets into high rack warehouse
Technical field
The utility model belongs to aluminium sheet band production facilities technical field, relates in particular to a kind of hot rolled coil and unloads the dolly transport systems that the volume back gets into high rack warehouse.
Background technology
Hot rolling workshop is the place of production hot rolled aluminium carries product, and in the whole process of production of rolling aluminum strip, from ingot casting heating → hot roughing → hot finishing → batch → check → put in storage, the stacking of its production facilities and material etc. all concentrates in the hot rolling workshop.
At hot rolling line, when hot finishing mill was rolled down to the end product passage, reeler batched, and made hot-rolled band become hot rolled coil, and hot rolled coil carries out stock, cooling to the hot rolled coil handling to high rack warehouse by the hot rolling workshop overhead traveling crane from the volume position of unloading of reeler usually; If hot rolled coil is transported to different transregional high rack warehouse stock, coolings, be to be transported to the electric flatbed tricycle corresponding transregionally earlier by the overhead traveling crane handling, and then hang onto high rack warehouse by sky handlebar hot rolled coil and deposit, cool off.But; Along with the hot finishing mill especially raising of continuous hot-rolling mill productive capacity; Adopt the transportation mode of workshop overhead traveling crane handling hot rolled coil to satisfy not hot finishing high efficiency, allegro production demand far away; The hot rolled coil fast traffic has been become the bottleneck of restriction production development to high rack warehouse, and can there be potential safety hazard in overhead traveling crane in the process of handling hot rolled coil.Therefore, how utilizing high rack warehouse directly to dock with hot rolling line, realize that hot rolled coil automatically, fast, efficiently is transported to high rack warehouse and deposits, cools off, is a difficult problem that needs to be resolved hurrily.
Summary of the invention
For addressing the above problem; The purpose of the utility model has provided a kind of hot rolled coil and has unloaded the dolly transport systems that the volume back gets into high rack warehouse, and this transport systems directly docks high rack warehouse with hot rolling line, does not re-use the mode of overhead traveling crane handling; Can shorten the haulage time that hot rolling is involved in the storehouse greatly; Quickness and high efficiency, and, the potential safety hazard that exists in the overhead traveling crane handling process avoided.
For realizing the foregoing invention purpose, the utility model adopts following technical scheme:
A kind of hot rolled coil unloads the dolly transport systems that the volume back gets into high rack warehouse; Described dolly transport systems is arranged between hot rolling unit and the high rack warehouse; The hot rolled coil that is used in the hot rolling workshop unloads the volume back to the transportation the high rack warehouse from the volume position of unloading of reeler; It comprises fortune volume track A that disposes fortune volume dolly A and the fortune volume track B that disposes fortune volume track B; The end of described fortune volume track A is rolled up the corresponding connection in position with unloading of reeler, the corresponding connection of an end of the other end and fortune volume track B, and the other end of described fortune volume track B extends into high rack warehouse inside from the side of high rack warehouse; And fortune volume track B other end end is provided with deposits the volume position, and the corresponding junction of described fortune volume track A and fortune volume track B is provided with rotation and deposits the position.
Because adopt aforesaid technical scheme, the utility model produces following good effect:
1, this transport systems directly docks high rack warehouse with hot rolling line; Realized online transmission transportation, made hot rolled coil unload the volume back and directly send into high rack warehouse and deposit, cool off, shortened the entry time of hot rolled coil greatly from the side of high rack warehouse from reeler; Can satisfy hot finishing high efficiency, allegro production demand; Can give full play to the productive capacity of hot finishing mill, expand the scale of production, improve economic benefit of enterprises.
2, the utility model has been given up the round handling hot rolled coil warehouse-in of the overhead traveling crane cooling of conventional employing, the process of stacking, and has saved manual work and has looked for the volume time, has shortened the haul time, and is energy-saving and cost-reducing, reduction production and operation cost.
3, adopt conventional overhead traveling crane to come and go the handling hot rolled coil, because hot rolled coil rolls off the production line, hot rolled coil gets into the message interrupts of next procedure, can not participate in automatic management directly; Adopt this transport systems,, be convenient to the job-shop automation management because hot rolled coil is that all information of hot rolled coil have also directly got into high rack warehouse control system and job-shop automation management system from the online direct entering high rack warehouse of hot rolling line.
5,,, can hang from the hot rolled coil lane of traffic by sky, workshop handlebar hot rolled coil and roll off the production line if the hot rolled coil outward transport need not get into high rack warehouse according to the production needs.The workshop tissue is produced maneuverability.
Description of drawings
Fig. 1 is the structural representation of the utility model;
Among the figure: 1-hot rolling unit; 2-reeler; 3-coil stripping car; 4-unload and roll up the position; 5-fortune volume dolly A; 6-fortune volume track A; The position is deposited in 7-rotation; 8-fortune volume dolly B; 9-fortune volume track B; 10-deposit the position; 11-high rack warehouse; 12-hot rolled coil is deposited the position; 13-stacking dolly.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is further specified.
As shown in Figure 1, a kind of hot rolled coil unloads the dolly transport systems that the volume back gets into high rack warehouse,
Described dolly transport systems is arranged between hot rolling unit 1 and the high rack warehouse 11; The hot rolled coil that is used in the hot rolling workshop unloads the volume back to the transportation the high rack warehouse 11 from the volume position 4 of unloading of reeler 2; It comprises fortune volume track A 6 that disposes fortune volume dolly A 5 and the fortune volume track B 9 that disposes fortune volume dolly B 8; The end of described fortune volume track A 5 is rolled up position 4 corresponding connections with unloading of reeler; The other end and the corresponding connection of an end of transporting volume track B 9; The other end of described fortune volume track B extends into high rack warehouse inside from the side of high rack warehouse 11, and fortune volume track B 9 other end ends are provided with and deposit the volume position, and the corresponding junction of described fortune volume track A 6 and fortune volume track B 9 is provided with rotation and deposits position 7.
The transportation of hot rolled coil between from the hot rolling line to the high rack warehouse is: at first; Take out hot rolled coil and be transported to from reeler 2 by coil stripping car 3 and unload on the volume position 4; Then take out hot rolled coil and be transported to rotation and deposit on the position 7 from unloading the volume position along fortune volume track A 6 by fortune volume dolly A 5; Fortune volume dolly A 5 turns back to and unloads 4 places, volume position then, waits for receiving next hot rolled coil; Hot rolled coil is deposited the position in rotation and is revolved on 7 to be taken out and be transported to along fortune volume track B 9 by fortune volume dolly B 8 after turning 90 degrees and deposit on the position 10, and fortune volume dolly B turns back to rotation and deposits 7 places, position then, waits for the next hot rolled coil of reception; And hot rolled coil is deposited position 12 by the stacking dolly 13 that disposes in the high rack warehouse from the hot rolled coil depositing the position and take out and transport to high rack warehouse and is deposited, cools off, and so far accomplishes the haul-cycle time that a hot rolled coil gets into high rack warehouse.
The transport systems that described hot rolled coil unloads volume back entering high rack warehouse can be arranged on the ground in workshop, carries out the transportation of hot rolled coil; Also can be through offering passage at subsurface, and then be arranged in the transportation that comes hot rolled coil in the passage, can save floor area greatly like this, be convenient to the organization of production management in the workshop.

Claims (1)

1. a hot rolled coil unloads the dolly transport systems that the volume back gets into high rack warehouse; Described dolly transport systems is arranged between hot rolling unit (1) and the high rack warehouse (11); It is characterized in that: comprise fortune volume track A6 that disposes fortune volume dolly A (5) and the fortune volume track B (9) that disposes fortune volume dolly B (8); The end of described fortune volume track A (5) is rolled up position (4) corresponding connection with unloading of reeler; The other end and the corresponding connection of an end of transporting volume track B (9); The other end of described fortune volume track B (9) extends into high rack warehouse inside from the side of high rack warehouse (11), and fortune volume track B (9) other end end is provided with and deposits the volume position, and the corresponding junction of described fortune volume track A (6) and fortune volume track B (9) is provided with rotation and deposits (7).
CN2011204168516U 2011-10-28 2011-10-28 Trolley transporting system for transporting unloaded hot roll into high rack warehouse Expired - Fee Related CN202346262U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204168516U CN202346262U (en) 2011-10-28 2011-10-28 Trolley transporting system for transporting unloaded hot roll into high rack warehouse

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204168516U CN202346262U (en) 2011-10-28 2011-10-28 Trolley transporting system for transporting unloaded hot roll into high rack warehouse

Publications (1)

Publication Number Publication Date
CN202346262U true CN202346262U (en) 2012-07-25

Family

ID=46535283

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204168516U Expired - Fee Related CN202346262U (en) 2011-10-28 2011-10-28 Trolley transporting system for transporting unloaded hot roll into high rack warehouse

Country Status (1)

Country Link
CN (1) CN202346262U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103939160A (en) * 2014-03-27 2014-07-23 鞍山千钢机械制造有限公司 Device and method for recycling waste heat of hot rolled strips off line
CN113060461A (en) * 2021-03-23 2021-07-02 中铝瑞闽股份有限公司 Device and method applied to stacker and wharf coil storage and withdrawal of large-scale coiled material stereoscopic warehouse

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103939160A (en) * 2014-03-27 2014-07-23 鞍山千钢机械制造有限公司 Device and method for recycling waste heat of hot rolled strips off line
CN113060461A (en) * 2021-03-23 2021-07-02 中铝瑞闽股份有限公司 Device and method applied to stacker and wharf coil storage and withdrawal of large-scale coiled material stereoscopic warehouse

Similar Documents

Publication Publication Date Title
CN102431756A (en) Transportation system of hot rolled coil entering high rack warehouse after coil discharge
CN100431776C (en) Automatic production line for producing high-strength color coated package steel strip by utilizing non-tempering process
CN1189256C (en) Method for continuous casting, continuoccs rolling intermediate and thin sheet blanket
CN112247091B (en) Casting blank conveying system and casting blank double-line hot conveying, single-line hot conveying and cold conveying method
CN109533834B (en) Steel coil transferring device between tray and tray truck conveying system
CN106915610A (en) Intelligent four-way railcar coil conveying system
CN108796412B (en) Workshop convenient for internal circulation of hot galvanizing tooling hanger and internal circulation method of hanger
CN110576047B (en) Control method and control system for full-automatic production of pickled plate by cold rolling unit
CN103433474A (en) Two-way conveying system for blast furnace molten iron conveying process of conveying ladle to bottom without stopping
CN207829546U (en) A kind of transmission device and the stereo garage including the transmission device
CN106269895A (en) A kind of control method of hot rolling rolling line coil of strip multipath warehouse-in
CN112122344B (en) System platform for hot charging of large-section casting blank through hot conveying
CN202346262U (en) Trolley transporting system for transporting unloaded hot roll into high rack warehouse
CN202346407U (en) Pallet transportation system for transporting hot-rolled coil into high-rack storage after coil stripping
CN202346261U (en) Tray transportation device for transporting hot rolling roller to high rack warehouse after discharging
CN112122343B (en) Quick direct-feeding system platform for small-section casting blank
CN202945292U (en) Arrangement structure of controllable atmosphere continuous heat treating furnace in cold-rolling workshop
CN102745243A (en) Heavy-load hydraulic lifting transport vehicle
CN202594458U (en) Auxiliary device for unloading small coils and installing sleeve on coiling machine
CA2715545A1 (en) Rolling installation for the rolling of in-process stock in the form of strip
CN203712855U (en) Automatic board transporting system for wallboard production line
CN103449085B (en) A kind of high rack warehouse realizing aluminium strip Juan Huan district and deposit
CN201753230U (en) Anti-scratching hoisting device for finished wire rod
CN103786253B (en) Wallboard production line transports plate system automatically
CN210972772U (en) Steel coil transportation system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120725

Termination date: 20161028