CN202338025U CN 201120437156 CN201120437156U CN202338025U CN 202338025 U CN202338025 U CN 202338025U CN 201120437156 CN201120437156 CN 201120437156 CN 201120437156 U CN201120437156 U CN 201120437156U CN 202338025 U CN202338025 U CN 202338025U
Authority
CN
China
Prior art keywords
chord member
grid
building
floor
horizontal chord
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201120437156
Other languages
Chinese (zh)
Inventor
马克俭
周观根
朱方正
程志敏
张晓楠
张华刚
周家干
李国强
肖建春
谈增辉
段渝忠
徐向东
覃士杰
覃亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUIYANG ARCHITECTURE DESIGN INSTITUTE Co Ltd
Guizhou University
Zhejiang Southeast Space Frame Co Ltd
Guizhou Huiton Shenfa Steel Structure Co Ltd
Original Assignee
GUIYANG ARCHITECTURE DESIGN INSTITUTE Co Ltd
Guizhou University
Zhejiang Southeast Space Frame Co Ltd
Guizhou Huiton Shenfa Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIYANG ARCHITECTURE DESIGN INSTITUTE Co Ltd, Guizhou University, Zhejiang Southeast Space Frame Co Ltd, Guizhou Huiton Shenfa Steel Structure Co Ltd filed Critical GUIYANG ARCHITECTURE DESIGN INSTITUTE Co Ltd
Priority to CN 201120437156 priority Critical patent/CN202338025U/en
Application granted granted Critical
Publication of CN202338025U publication Critical patent/CN202338025U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model relates to a bundled drum body structure, and in particular relates to a bundled drum body structure of a concrete core drum and assembling integral space steel grids. The bundled drum body structure comprises four steel-frame erecting columns which are distributed at the four corners; the central positions of the four steel-frame erecting columns are provided with steel-frame erecting beams; the steel-frame erecting columns are fixedly connected by a wall-frame unit; and the wall-frame unit and the steel-frame erecting beams are divided into eight drums by grid-wall units. The bundled drum body structure has the advantages that the structure is simple, the cost of ultrahigh buildings is reduced, the construction method of the ultrahigh buildings is improved, the construction progress is accelerated and the construction civilization is promoted.

Description

The bunchy tubular construction of concrete core tube and assembled integral spatial steel grid
Technical field
The utility model patent relates to a kind of bunchy tubular construction, relates in particular to the bunchy Tong body structure of a kind of superelevation stratotype steel concrete or steel concrete core Tong and assembled integral spatial steel grid.
Background technology
Modern its building height of highrise building is more and more high, as build " Shanghai " center " body height 580m building, overall height 632m, 570,000 squares of areas; Tianjin " high silver-colored mansion " body height 570m, 370,000 squares of areas, building general height 600m builds up " Shanghai World Financial Center " the body height 492m that comes into operation in the recent period; 37.86 ten thousand squares of building areas, building general height is 492m, 35.6 ten thousand squares of " ICC, Hong Kong " building areas; body height 471m, total building height 484m, 28.95 ten thousand squares of " Taibei 101 mansions " building areas that the beginning of this century, (2003) were built up; body height 448m, total building height 509m, these super highrise building body height all are more than 100 layers; its typical floor floor height is not waited by 3m, 4m, 5m, the number of plies expands to 124 layers by 101 layers, the development trend that its building general height constantly increases in addition; Meanwhile, the expenditure of construction of these super highrise buildings is surprisingly also high, like " 26316 yuan/m of Shanghai " center " 2, Tianjin " high silver-colored 117 mansions " 72972 yuan/m of construction cost 2, " Taibei 101 mansions " expenditure of construction is amounted to RMB and is also reached 41450 yuan/m 2, be general high-rise expenditure of construction (4~8) doubly, expenditure of construction have outside the close connection with this area's earthquake intensity; The selection of the structural system of high-rise buildings just is closely related with construction costs; Having still of these super highrise buildings stops, and in the combination construction system of " interior Tong housing ", it is master's mechanical model that the structural system of super highrise building still rests on " curved scissors distortion "; It is thick with post to cause housing to set a roof beam in place; Material usage is big, owing to adopt " frame, Tong structure " its anti-side rigidity 80% to be provided by core Tong, core Tong also is surprising big with material.Owing to structural element weighs greatly, expenditure of construction also exceeds more than the conventional highrise building several times.And " the capital fund melts " center " body height 439m; building general height 442m, 98 layers (floor height 4m), 500,000 squares of overall floorages; invest 5,000,000,000 RMB, owing to adopt type " bunchy Tong body structure " its unit price to be adjusted downward to 10000 yuan/m significantly in Shenzhen of building 2, visible high-rise buildings selects for use the rational structure system most important.
The utility model content
The utility model mainly is to solve the deficiency that exists in the prior art, provides a kind of when increasing substantially the structure bending rigidity, and its shear stiffness also is significantly improved; Thereby reduce structure shear strain influence significantly; Make tall and slender structure be close to " flexure type ", owing to adopt plant-manufactured steel lattice framework, the framework size is less; Weight is conventional frame Tong structural element (1/4~1/6); Transporting and hoisting is also avoided the building-site welding simultaneously easily, stops fire and suffers from generation; And when improving construction speed, promote construction civilization and the bunchy tubular construction that reduces the steel concrete core tube and the assembled integral spatial steel grid of construction costs significantly.
The above-mentioned technical problem of the utility model mainly is able to solve through following technical proposals:
The bunchy tubular construction of a kind of concrete core tube and assembled integral spatial steel grid; Comprise and be four jiaos of 4 Steel Frame Column that distribute; The centre bit of described 4 Steel Frame Column is provided with steel-frame beam; Be connected to a fixed through wall frame unit between described Steel Frame Column, described wall frame unit and steel-frame beam are divided into 8 tubes through grid wall unit, and described wall frame unit comprises that wall frame floor part and wall frame building are at a distance from part; Described wall frame floor part and wall frame building are at a distance from part assembly unit continuously up and down successively; Described wall frame floor partly comprises on the floor horizontal chord member under horizontal chord member, the floor, the perpendicular chord member of floor and floor plates, on the described floor under horizontal chord member and the floor horizontal chord member and floor erect the mutual vertical fixing of chord member, horizontal chord member is provided with floor plates on the described floor; Be provided with steel column in the perpendicular chord member of floor between horizontal chord member under horizontal chord member and the floor on the described floor; Described wall frame building comprises the separated horizontal chord member in building, the separated horizontal chord member down in building and building at a distance from perpendicular chord member at a distance from part, and separated horizontal chord member down in separated horizontal chord member in described building and building and building are at a distance from the perpendicular mutual vertical fixing of chord member, and described floor erects chord member and fixes with separated perpendicular symmetrical butt joint of chord member in building; Described grid wall unit comprises that grid floor part and grid building are at a distance from part; Described grid floor partly comprises on the grid horizontal chord member, grid montant and grid floor plates under horizontal chord member, the grid; Horizontal chord member and the mutual vertical fixing of grid montant under horizontal chord member and the grid on the described grid; Horizontal chord member is provided with the grid floor plates on the described grid; Described grid floor plates and floor plates are connected on the same horizontal plane; Described grid building at a distance from part comprise the grid building at a distance from last horizontal chord member, grid building at a distance from horizontal chord member and grid building down at a distance from montant, at a distance from horizontal chord member and grid building are at a distance from the mutual vertical fixing of montant down, described grid building connects fixing at a distance from montant and grid montant at a distance from last horizontal chord member, grid building in described grid building.
Interior Tong is a steel-frame beam; Housing Tong is a Steel Frame Column; Interior Tong and housing Tong bear jointly horizontal loads (wind and earthquake) inside and outside link body, steel on an empty stomach waffle slab superstructure is to guarantee the inside and outside cooperative key position of Tong body, promptly the steel lattice superstructure not only transmits each layer vertical load on an empty stomach; It makes inside and outside Tong be linked as body through superstructure shear strain; Make structure form the integral body of lateral resisting structure jointly, and be different from conventional interior Tong frame structure, it makes inner core and outer Tong bear horizontal loads jointly.Make structure stress even; Reduce the influence of shear lag significantly; This is Tong structural advantage place among the Tong, but super highrise building is typical lateral resisting structure, and its shear stiffness of steel lattice superstructure is limited on an empty stomach; Excessive shear strain will cause excessive sidesway of top of high-rise buildings and relative storey displacement, this be standard do not allow to take place.When building height further increases, for excessive summit sidesway and relative storey displacement do not appear in super highrise building, guarantee the comfort level requirement of high-rise buildings, still to guarantee to reach simultaneously factory's welding and make, on-the-spot high-strength bolts etc. are connected to form steel lattice integral body by force.
As shown in Figure 1, grid wall unit is divided into 8 tubes and is respectively an A tube, three B tubes and three C tubes.
As preferably, horizontal chord member under horizontal chord member, the floor on the described floor, building are respectively post plug-in type node at a distance from last horizontal chord member and building at a distance from the two ends of horizontal chord member down, and the perpendicular chord member of described floor is evenly equipped with formula node outside the beam with the building respectively at a distance from the sidewall of perpendicular chord member; Be provided with ribs between horizontal chord member under horizontal chord member and the grid on the described grid, described ribs and grid montant socket-connect.
Post plug-in type node:
The outer formula node of beam:
As preferably, described grid floor part and grid building at a distance from part by A unit, B unit, C unit, D unit, E unit, A1 unit and B1 unit through high-strength bolt etc. strong be connected mutually assembled.
As preferably; Horizontal chord member under horizontal chord member, the floor on the described floor, building are respectively H shaped steel cross section at a distance from last horizontal chord member and building at a distance from the cross section of horizontal chord member down, on the described grid under horizontal chord member and the grid horizontal chord member cross section be respectively H shaped steel cross section or square shape steel tube cross section.
The bunchy tubular construction of the utility model concrete core tube and assembled integral spatial steel grid, simple in structure, reduce the super highrise building cost, improve and improve the construction and raising construction speed and promotion construction civilization of super highrise building.
Description of drawings
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the structural representation of wall frame unit in the utility model;
Fig. 3 is the structural representation of grid wall unit in the utility model;
Fig. 4 is the structural representation of A unit among Fig. 3.
The specific embodiment
Below by embodiment, and in conjunction with the accompanying drawings, do further bright specifically to the technical scheme of the utility model.
Embodiment 1: like Fig. 1, Fig. 2, Fig. 3 and shown in Figure 4; The bunchy tubular construction of a kind of concrete core tube and assembled integral spatial steel grid; Comprise and be four jiaos of 4 Steel Frame Column 1 that distribute; The centre bit of described 4 Steel Frame Column 1 is provided with steel-frame beam 2; 1 of described Steel Frame Column is connected to a fixed through wall frame unit 3, and described wall frame unit 3 is divided into 8 tubes with steel-frame beam 2 through grid wall unit 4, and described wall frame unit 3 comprises the separated part in wall frame floor part and wall frame building; Described wall frame floor part and wall frame building are at a distance from part assembly unit continuously up and down successively; Described wall frame floor partly comprises on the floor horizontal chord member 6, the perpendicular chord member 7 of floor and floor plates 8 under horizontal chord member 5, the floor, horizontal chord member 6 and the perpendicular chord member 7 mutual vertical fixing of floor under horizontal chord member 5 and the floor on the described floor, and horizontal chord member 5 is provided with floor plates 8 on the described floor; Be provided with steel column 9 in the perpendicular chord member 7 of the floor of 6 of horizontal chord members under horizontal chord member 5 and the floor on the described floor; Described wall frame building at a distance from part comprise the building at a distance from last horizontal chord member 10, building at a distance from horizontal chord member 11 and building down at a distance from perpendicular chord member 12, described building at a distance from last horizontal chord member 10 and building at a distance from down horizontal chord member 11 and building at a distance from perpendicular chord member 12 mutual vertical fixing, the perpendicular chord member 7 of described floor and building be separated to be erected chord member 12 symmetrical butt joints and fixes; Described grid wall unit comprises that grid floor part and grid building are at a distance from part; Described grid floor partly comprises on the grid horizontal chord member 14, grid montant 15 and grid floor plates 16 under horizontal chord member 13, the grid; Horizontal chord member 14 and grid montant 15 mutual vertical fixing under horizontal chord member 13 and the grid on the described grid; Horizontal chord member 13 is provided with grid floor plates 16 on the described grid; Described grid floor plates 16 is connected on the same horizontal plane with floor plates 8; Described grid building at a distance from part comprise the grid building at a distance from last horizontal chord member 17, grid building at a distance from horizontal chord member 18 and grid building down at a distance from montant 19; Described grid building at a distance from last horizontal chord member 17, grid building at a distance from horizontal chord member 18 and grid building down at a distance from montant 19 mutual vertical fixing; Described grid building connects fixing at a distance from montant 19 and grid montant 15, horizontal chord member 6 under horizontal chord member 5, the floor on the described floor, building are respectively post plug-in type node 20 at a distance from last horizontal chord member 10 and building at a distance from the two ends of horizontal chord member 11 down, and the perpendicular chord member 7 of described floor is evenly equipped with the outer formula node 21 of beam with the building respectively at a distance from the sidewall of perpendicular chord member 12; On the described grid under horizontal chord member 13 and the grid 14 of horizontal chord members be provided with ribs 22; Described ribs 22 socket-connects with grid montant 15; Described grid floor part and grid building at a distance from part by A unit 23, B unit 24, C unit 25, D unit 26, E unit 27, A1 unit 28 and B1 unit 29 through high-strength bolt 30 etc. strong be connected mutually assembled; Horizontal chord member 6 under horizontal chord member 5, the floor on the described floor, building are respectively H shaped steel cross section at a distance from last horizontal chord member 10 and building at a distance from the cross section of horizontal chord member 11 down, on the described grid under horizontal chord member 13 and the grid horizontal chord member 14 cross sections be respectively H shaped steel cross section or square shape steel tube cross section.
Black point shown in Fig. 3 is strong link nodes such as high-strength bolt.

Claims (4)

1. the bunchy tubular construction of concrete core tube and assembled integral spatial steel grid; It is characterized in that: comprise being four jiaos of 4 Steel Frame Column (1) that distribute; The centre bit of described 4 Steel Frame Column (1) is provided with steel-frame beam (2); Be connected to a fixed through wall frame unit (3) between described Steel Frame Column (1); Described wall frame unit (3) is divided into 8 tubes with steel-frame beam (2) through grid wall unit (4); Described wall frame unit (3) comprises that wall frame floor part and wall frame building are at a distance from part; Described wall frame floor part and wall frame building are at a distance from part assembly unit continuously up and down successively; Described wall frame floor partly comprises on the floor horizontal chord member (6) under horizontal chord member (5), the floor, perpendicular chord member (7) of floor and floor plates (8), on the described floor under horizontal chord member (5) and the floor horizontal chord member (6) erect the mutual vertical fixing of chord member (7) with floor, horizontal chord member (5) is provided with floor plates (8) on the described floor; Be provided with steel column (9) in the perpendicular chord member (7) of floor between horizontal chord member (6) under horizontal chord member (5) and the floor on the described floor; The separated part in described wall frame building comprises the separated horizontal chord member (10) in building, the separated perpendicular chord member (12) of separated horizontal chord member (11) down in building and building, and separated horizontal chord member (11) down in separated horizontal chord member (10) in described building and building and building are at a distance from erecting the mutual vertical fixing of chord member (12), and described floor erects chord member (7) and fixes at a distance from erecting symmetrical butt joint of chord member (12) with the building; Described grid wall unit comprises that grid floor part and grid building are at a distance from part; Described grid floor partly comprises on the grid horizontal chord member (14), grid montant (15) and grid floor plates (16) under horizontal chord member (13), the grid; Horizontal chord member (14) and grid montant (15) vertical fixing each other under horizontal chord member (13) and the grid on the described grid; Horizontal chord member (13) is provided with grid floor plates (16) on the described grid; Described grid floor plates (16) is connected on the same horizontal plane with floor plates (8); Described grid building comprises that at a distance from part the separated horizontal chord member (17) in grid building, the separated horizontal chord member (18) down in grid building and grid building are at a distance from montant (19); At a distance from the mutual vertical fixing of montant (19), described grid building connects fixing at a distance from montant (19) and grid montant (15) at a distance from last horizontal chord member (17), the separated horizontal chord member (18) down in grid building and grid building in described grid building.
2. the bunchy tubular construction of concrete core tube according to claim 1 and assembled integral spatial steel grid; It is characterized in that: horizontal chord member (6) under horizontal chord member (5), the floor on the described floor, building are respectively post plug-in type node (20) at a distance from last horizontal chord member (10) and building at a distance from the two ends of horizontal chord member (11) down, and described floor erect chord member (7) and is evenly equipped with formula node (21) outside the beam respectively with the separated sidewall that erects chord member (12) in building; Be provided with ribs (22) on the described grid under horizontal chord member (13) and the grid between horizontal chord member (14), described ribs (22) socket-connects with grid montant (15).
3. the bunchy tubular construction of concrete core tube according to claim 1 and 2 and assembled integral spatial steel grid is characterized in that: described grid floor part and grid building at a distance from part by A unit (23), B unit (24), C unit (25), D unit (26), E unit (27), A1 unit (28) and B1 unit (29) through high-strength bolt (30) etc. strong be connected mutually assembled.
4. the bunchy tubular construction of concrete core tube according to claim 1 and 2 and assembled integral spatial steel grid; It is characterized in that: horizontal chord member (6) under horizontal chord member (5), the floor, building are respectively H shaped steel cross section at a distance from last horizontal chord member (10) and building at a distance from the cross section of time horizontal chord member (11) on the described floor, on the described grid under horizontal chord member (13) and the grid horizontal chord member (14) cross section be respectively H shaped steel cross section or square shape steel tube cross section.
CN 201120437156 2011-11-08 2011-11-08 Bundled drum body structure of concrete core drum and assembling integral space steel grids Expired - Lifetime CN202338025U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120437156 CN202338025U (en) 2011-11-08 2011-11-08 Bundled drum body structure of concrete core drum and assembling integral space steel grids

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120437156 CN202338025U (en) 2011-11-08 2011-11-08 Bundled drum body structure of concrete core drum and assembling integral space steel grids

Publications (1)

Publication Number Publication Date
CN202338025U true CN202338025U (en) 2012-07-18

Family

ID=46486720

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120437156 Expired - Lifetime CN202338025U (en) 2011-11-08 2011-11-08 Bundled drum body structure of concrete core drum and assembling integral space steel grids

Country Status (1)

Country Link
CN (1) CN202338025U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102454217A (en) * 2011-11-08 2012-05-16 浙江东南网架股份有限公司 Bunchy tube structure for concrete core tubes and integrally-assembled space steel grids
CN105544982A (en) * 2015-12-08 2016-05-04 上海市机械施工集团有限公司 Construction method for hyperboloid torsional steel column
CN107905378A (en) * 2017-12-10 2018-04-13 湖南金海集团有限公司 Super High mixed type space steel lattice boxlike tube-in-tube structure and production method
CN107956254A (en) * 2017-12-04 2018-04-24 湖南金海集团有限公司 Assembled mixed type space steel lattice boxlike tube-in-tube structure and production method
CN107989193A (en) * 2017-12-10 2018-05-04 湖南金海钢结构股份有限公司 Compound orthogonal spatial space lattice boxlike tube-in-tube structure and production method
CN109537895A (en) * 2018-11-14 2019-03-29 中建局集团第建筑有限公司 Method for mounting beam-slab column of cast-in-place core tube structure of assembled integral frame

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102454217A (en) * 2011-11-08 2012-05-16 浙江东南网架股份有限公司 Bunchy tube structure for concrete core tubes and integrally-assembled space steel grids
CN102454217B (en) * 2011-11-08 2014-06-04 浙江东南网架股份有限公司 Bunchy tube structure for concrete core tubes and integrally-assembled space steel grids
CN105544982A (en) * 2015-12-08 2016-05-04 上海市机械施工集团有限公司 Construction method for hyperboloid torsional steel column
CN105544982B (en) * 2015-12-08 2017-08-25 上海市机械施工集团有限公司 A kind of hyperboloid reverses steel column construction method
CN107956254A (en) * 2017-12-04 2018-04-24 湖南金海集团有限公司 Assembled mixed type space steel lattice boxlike tube-in-tube structure and production method
CN107905378A (en) * 2017-12-10 2018-04-13 湖南金海集团有限公司 Super High mixed type space steel lattice boxlike tube-in-tube structure and production method
CN107989193A (en) * 2017-12-10 2018-05-04 湖南金海钢结构股份有限公司 Compound orthogonal spatial space lattice boxlike tube-in-tube structure and production method
CN109537895A (en) * 2018-11-14 2019-03-29 中建局集团第建筑有限公司 Method for mounting beam-slab column of cast-in-place core tube structure of assembled integral frame

Similar Documents

Publication Publication Date Title
CN102454217B (en) Bunchy tube structure for concrete core tubes and integrally-assembled space steel grids
CN202338025U (en) Bundled drum body structure of concrete core drum and assembling integral space steel grids
CN101446065B (en) Combined cable support tower
CN101942884B (en) Roof with approximately quadrate plane and super large space pre-stressed steel grid structure and manufacturing method thereof
CN103806639A (en) Steel tube truss support system for silo top and construction method of steel tube truss support system
CN108086556A (en) Integrated light girder truss composite floor and its flange plate type connection structure
CN103615111A (en) Silo top construction method
CN102454218A (en) Tube-in-tube structure for reinforced concrete core tubes and integrally-assembled space steel grids
CN201433490Y (en) Rectangular planar super large-span pre-stressed spacial pipe truss roof
CN210421574U (en) Spoke type tension structure system
CN201428193Y (en) Approximate square plane superlarge space prestressed steel lattice structure roof
CN114134995A (en) Frame core tube rigid-connection floor beam structure system and construction method
CN112459316B (en) Vertical long cantilever truss structure for spiral ascending type curtain wall support and application
CN212026601U (en) Rigid frame type supporting structure for bottom inclined leg of giant frame of super high-rise building
CN219343656U (en) Space structure for high-rise sail curtain wall
CN219711018U (en) Atrium tree-shaped supporting system
CN101942883B (en) Roof with rectangular plane, super-long span and prestressed space tube truss structure and manufacturing method
CN202672353U (en) Panel constraint type concrete filled steel tube composite column-steel beam joint
CN212453080U (en) Frame structure building
CN215167195U (en) Joint construction type subway station bearing platform solid web type steel reinforced concrete conversion beam column node
CN103938908A (en) Silo top slip-form lifting construction method adopting spatial horizontal supporting system
CN103306378A (en) Construction method of multidirectional through concrete filled steel tubular column beam joint provided with steel corbels and ring beam
CN204212261U (en) Post and curved beam horizontal flexibility connection space structural system
CN111485630A (en) Frame structure building and construction method
CN203320701U (en) Column-beam node of concrete filled steel tube with multi-directional piercing steel corbels and ring beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20120718

Effective date of abandoning: 20140604

RGAV Abandon patent right to avoid regrant