CN102454218A CN2011103489637A CN201110348963A CN102454218A CN 102454218 A CN102454218 A CN 102454218A CN 2011103489637 A CN2011103489637 A CN 2011103489637A CN 201110348963 A CN201110348963 A CN 201110348963A CN 102454218 A CN102454218 A CN 102454218A
Authority
CN
China
Prior art keywords
chord
chord member
tube
steel
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103489637A
Other languages
Chinese (zh)
Other versions
CN102454218B (en
Inventor
马克俭
周观根
朱方正
肖建春
程志敏
张晓楠
张华刚
李国强
段渝忠
彭登
周家干
徐向东
覃士杰
覃亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUIYANG ARCHITECTURE DESIGN INSTITUTE Co Ltd
HUNAN JINHAI STEEL STRUCTURE CO Ltd
Guizhou University
Zhejiang Southeast Space Frame Co Ltd
Guizhou Huiton Shenfa Steel Structure Co Ltd
Original Assignee
GUIYANG ARCHITECTURE DESIGN INSTITUTE Co Ltd
Guizhou University
Zhejiang Southeast Space Frame Co Ltd
Guizhou Huiton Shenfa Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIYANG ARCHITECTURE DESIGN INSTITUTE Co Ltd, Guizhou University, Zhejiang Southeast Space Frame Co Ltd, Guizhou Huiton Shenfa Steel Structure Co Ltd filed Critical GUIYANG ARCHITECTURE DESIGN INSTITUTE Co Ltd
Priority to CN 201110348963 priority Critical patent/CN102454218B/en
Publication of CN102454218A publication Critical patent/CN102454218A/en
Application granted granted Critical
Publication of CN102454218B publication Critical patent/CN102454218B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a tube-in-tube structure, in particular to a tube-in-tube structure for high-rise and super high-rise reinforced concrete core tubes and integrally-assembled space steel grids. The tube-in-tube structure comprises four steel frame columns which are distributed at four corners, wherein steel frame girders are arranged in the centers of the four steel frame columns; the steel frame columns and the steel frame girders are assembled and fixedly connected together through wall shelf units; and wall frame floor plate units are assembled and fixed on the wall frame units in a matched mode. The tube-in-tube structure for the reinforced concrete core tubes and the integrally-assembled space steel grids is simple in structure and convenient to mount, can be safely used, is stressed uniformly, has high assembly accuracy, and improves the construction progress.

Description

The tube in tube structure of steel concrete core tube and assembled integral spatial steel grid
Technical field
Patent of the present invention relates to a kind of tube in tube structure, relates in particular to the tube in tube structure of a kind of high level and superelevation layer steel concrete core tube and assembled integral spatial steel grid.
Background technology
Along with development of economic construction, highrise building particularly height is more and more many greater than 100 layers super highrise building, and it is by the steel bar concrete frame Tong structure of routine; Develop into inner steel concrete core Tong; Form interior Tong frame structure through steel-frame beam and peripheral frame post, promptly conventional steel frame concrete core Tong combination construction, the combination construction of Tong outside framework in this steel concrete; From the thirties in century; Continue to use and today, also there is many-sided deficiency in the requirement analysis from structure design " safety, reasonable, advanced, economy ".
Summary of the invention
The present invention solves the deficiency that exists in the prior art; Provide the inside concrete thin-wall Tong of a kind of steel concrete core tube and assembled integral spatial steel grid superstructure and outer steel grid formation and " tube in the tube " of outer steel grid frame tube composition to mix tall and slender structure; Overcome the deficiency of above-mentioned conventional framed-tube structure, form a kind of high level and superelevation layer new hybrid structural system.
Above-mentioned technical problem of the present invention mainly is able to solve through following technical proposals:
The tube in tube structure of a kind of steel concrete core tube and assembled integral spatial steel grid; Comprise and be four jiaos of 4 Steel Frame Column that distribute; The centre bit of described 4 Steel Frame Column is provided with steel-frame beam; Between described Steel Frame Column and steel-frame beam through wall frame unit mutually assembly unit be fixedly connected; Described wall frame unit is provided with the fixing wall frame floor plates unit of assembly unit that is complementary with it; Described wall frame unit comprises horizontal chord member, down horizontal chord member, the perpendicular chord member in a left side and right perpendicular chord member, describedly horizontal chord member, horizontal chord member, the perpendicular chord member in a left side and right perpendicular chord member form " well " word shape assembly unit unit down, describedly the two ends of horizontal chord member, two ends, the two ends of the perpendicular chord member in a left side and the two ends of right perpendicular chord member of horizontal chord member are respectively equipped with high-strength bolt joints node down; Described wall frame floor plates unit comprises that upper chord, lower chord, tubing string, a left side connect chord member and the right chord member that is connected; Fix through tubing string between described upper chord and lower chord; The edge connecting of described upper chord and lower chord has a left side to be connected chord member and the right chord member that is connected; The surface of described upper chord is provided with floor plates, and the two ends that the two ends of described upper chord, the two ends of lower chord, a left side connect chord member are respectively equipped with high-strength bolt joints node with the right two ends that are connected chord member; A described left side connects chord member and equates that with left spacing of erecting between chord member and right perpendicular chord member the perpendicular chord member in a described left side connection chord member and a left side is fixedly connected with the right spacing that is connected between chord member, and described right connection chord member and right perpendicular chord member are fixedly connected; Head and the tail are assembled continuously successively for described wall frame unit and wall frame floor plates unit.
Wall frame unit (every layer of bottom) is installed again by wall frame floor plates unit (containing the floor part) earlier,, is all adopted high-strength bolt to connect at the scene because of all welding of wall frame node in the workshop; On-the-spot do not have a welding operation, avoids fire to take place, and every layer of wall frame and assembled integral steel lattice superstructure carry out simultaneously; Because assembly unit wall frame unit and wall frame floor plates unit weight are all less than 1 ton; Transporting and hoisting is convenient and simple, improves construction speed more than 30%, after the wall frame installs than conventional steel framework Tong structure; This layer on an empty stomach steel lattice wind up be equipped with pin cast-in-place 80 thick concrete after, conventional wallboard is installed again or materials for wall such as curtain wall is installed by design demand.
As preferably, the perpendicular chord member in a described left side and last horizontal chord member fix layer by force through waiting respectively with horizontal chord member down, perpendicular chord member in the described right side and last horizontal chord member and following horizontal chord member respectively through etc. by force layer is fixed; A described left side connect chord member and upper chord and lower chord respectively through etc. by force layer is fixed; Described right connect chord member and upper chord and lower chord respectively through etc. by force layer is fixed; A described left side connects chord member and is with ribs in the chord member respectively with right the connection; Described ribs fixes with upper chord and lower chord respectively, is respectively equipped with supporting plate in described upper chord and the lower chord, described supporting plate and tubing string crimping mutually; The top of described upper chord and the bottom of lower chord are respectively equipped with top board; Described top board and supporting plate fix, described top board and upper chord and lower chord crimping mutually, between described upper chord and lower chord with tubing string through etc. by force layer is fixed.
As preferably, described upper chord, lower chord and tubing string form double-layer cross shape assembly unit unit, and double-layer cross shape assembly unit unit is assembly unit continuously successively.Double-layer cross shape assembly unit unit is the part of tier, with wall frame floor plates unit be one.
As preferably; Be respectively equipped with the supporting plate breach in described upper chord and the lower chord; Described supporting plate is located in the supporting plate breach and phase clamping with it; Top board on the described upper chord is provided with and expands the position reinforcing bar, and the top of the joint between described upper chord is provided with the inflection point plate, and the bottom of the joint between described lower chord is provided with down the inflection point plate.
As preferably, described upper chord and lower chord and tubing string etc. be " U " shape to layer by force.
The tube in tube structure of steel concrete core tube of the present invention and assembled integral spatial steel grid, simple in structure, easy for installation, safe in utilization, stress equalization, assembly precision is high, improves construction speed.
Description of drawings
Fig. 1 is a structural representation of the present invention;
Fig. 2 is the structural representation of the double-layer cross shape continuous assembly unit in assembly unit unit among the present invention;
Fig. 3 is the structural representation of node among Fig. 2;
Fig. 4 is the structural representation of wall frame unit among the present invention;
Fig. 5 is the structural representation of wall frame floor plates unit among the present invention;
Fig. 6 is the structural representation of high-strength bolt assembly unit unit among Fig. 2;
Fig. 7 is the structural representation of wall frame unit and the continuous assembly unit in floor plates unit of wall frame among the present invention.
The specific embodiment
Pass through embodiment below, and combine accompanying drawing, do further bright specifically technical scheme of the present invention.
Embodiment 1: like Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6 and shown in Figure 7; The tube in tube structure of a kind of steel concrete core tube and assembled integral spatial steel grid; Comprise and be four jiaos of 4 Steel Frame Column 1 that distribute; The centre bit of described 4 Steel Frame Column 1 is provided with steel-frame beam 2; Described Steel Frame Column 1 is passed through wall frame unit 3 assembly unit fixed connection mutually with 2 of steel-frame beams; Described wall frame unit 3 is provided with the fixing wall frame floor plates unit 4 of assembly unit that is complementary with it; Described wall frame unit 3 comprises horizontal chord member 5, down horizontal chord member 6, the perpendicular chord member 7 in a left side and right perpendicular chord member 8, and described horizontal chord member 5, down horizontal chord member 6, the perpendicular chord member 7 in a left side and the right perpendicular chord member 8 forms " well " word shape assembly unit unit, describedly the two ends of horizontal chord member 5, two ends, the two ends of the perpendicular chord member 7 in a left side and the two ends of right perpendicular chord member 8 of horizontal chord member 6 are respectively equipped with high-strength bolt joints node 9-1 down; Described wall frame floor plates unit 3 comprises that upper chord 10, lower chord 11, tubing string 12, a left side connect chord member 13 and the right chord member 14 that is connected; 11 of described upper chord 10 and lower chords fix through tubing string 12; The edge connecting of described upper chord 10 and lower chord 11 has a left side to be connected chord member 13 and the right chord member 14 that is connected; The surface of described upper chord 10 is provided with floor plates 16, and the two ends that the two ends of the two ends of described upper chord 10, lower chord 11, a left side connect chord member 13 are respectively equipped with high-strength bolt joints node 9-2 with the right two ends that are connected chord member 14; Described left side connection chord member 13 equates with left perpendicular chord member 7 and right spacing of erecting 8 of chord members that with the right spacing that is connected 14 of chord members described left side connection chord member 13 erects chord member 7 with a left side and is fixedly connected, and described right connection chord member 14 is fixedly connected with the right chord member 8 that erects; Head and the tail are assembled continuously successively with wall frame floor plates unit 4 in described wall frame unit 3; The perpendicular chord member 7 in a described left side fixes layer by force through waiting respectively with last horizontal chord member 5 and following horizontal chord member 6, and the perpendicular chord member 8 in the described right side fixes layer by force through waiting respectively with last horizontal chord member 5 and following horizontal chord member 6; A described left side connects chord member 13 and by force layer is fixed through waiting respectively with upper chord 10 and lower chord 11; The described right chord member 14 that connects fixes layer by force through waiting respectively with upper chord 10 and lower chord 11; A described left side connects chord member 13 and is with ribs 18 in the chord member 14 respectively with right the connection; Described ribs 18 fixes with upper chord 10 and lower chord 11 respectively, is respectively equipped with supporting plate 19, described supporting plate 19 and tubing string 12 crimping mutually in described upper chord 10 and the lower chord 11; The bottom of the top of described upper chord 10 and lower chord 11 is respectively equipped with top board 20; Described top board 20 fixes with supporting plate 19, described top board 20 and upper chord 10 and lower chord 11 crimping mutually, 11 of described upper chord 10 and lower chords and tubing string 12 through etc. by force layer is fixed; Described upper chord 10, lower chord 11 and tubing string 12 form double-layer cross shape assembly unit unit; Double-layer cross shape assembly unit unit is assembly unit continuously successively, is respectively equipped with supporting plate breach 21 in described upper chord 10 and the lower chord 11, and described supporting plate 19 is located in the supporting plate breach 21 and phase clamping with it; Top board 20 on the described upper chord 10 is provided with and expands position reinforcing bar 22; The top of the joint that described upper chord is 10 is provided with inflection point plate 23, and the bottom of the joint that described lower chord is 11 is provided with down inflection point plate 24, and the grade of described upper chord 10 and lower chord 11 and tubing string 12 is " U " shape to layer by force.
Black point among Fig. 7 is the high-strength bolt node.

Claims (5)

1. the tube in tube structure of steel concrete core tube and assembled integral spatial steel grid; It is characterized in that: comprise being four jiaos of 4 Steel Frame Column (1) that distribute; The centre bit of described 4 Steel Frame Column (1) is provided with steel-frame beam (2); Between described Steel Frame Column (1) and steel-frame beam (2) through wall frame unit (3) mutually assembly unit be fixedly connected; Described wall frame unit (3) is provided with the fixing wall frame floor plates unit (4) of assembly unit that is complementary with it; Described wall frame unit (3) comprises horizontal chord member (5), chord member (8) is erected on horizontal chord member (6), the perpendicular chord member (7) in a left side and the right side down; Described horizontal chord member (5), following horizontal chord member (6), left chord member (7) and right perpendicular chord member (8) formation " well " word shape assembly unit unit of erecting, the two ends that chord member (8) is erected on the two ends of the two ends of described horizontal chord member (5), the two ends of following horizontal chord member (6), the perpendicular chord member (7) in a left side and the right side are respectively equipped with high-strength bolt joints node (9-1); Described wall frame floor plates unit (3) comprises that upper chord (10), lower chord (11), tubing string (12), a left side connect chord member (13) and the right chord member (14) that is connected; Fix through tubing string (12) between described upper chord (10) and lower chord (11); The edge connecting of described upper chord (10) and lower chord (11) has a left side to be connected chord member (13) and the right chord member (14) that is connected; The surface of described upper chord (10) is provided with floor plates (16), and the two ends that the two ends of the two ends of described upper chord (10), lower chord (11), a left side connect chord member (13) are respectively equipped with high-strength bolt joints node (9-2) with the right two ends that are connected chord member (14); A described left side connects chord member (13) and equates with the spacing that erect between chord member (7) and right perpendicular chord member (8) on a left side with the right spacing that is connected between chord member (14); A described left side connects chord member (13) and is fixedly connected with the perpendicular chord member (7) in a left side, and the described right chord member (14) that connects is fixedly connected with right perpendicular chord member (8); Head and the tail are assembled continuously successively for described wall frame unit (3) and wall frame floor plates unit (4).
2. according to the tube in tube structure of claim 1 described steel concrete core tube and assembled integral spatial steel grid; It is characterized in that: a described left side is erected chord member (7) and last horizontal chord member (5) and by force layer is fixed through waiting respectively with horizontal chord member (6) down, the described right side erect chord member (8) and last horizontal chord member (5) and time horizontal chord member (6) respectively through etc. by force layer is fixed; A described left side connect chord member (13) and upper chord (10) and lower chord (11) respectively through etc. by force layer is fixed; Described right connect chord member (14) and upper chord (10) and lower chord (11) respectively through etc. by force layer is fixed; A described left side connects chord member (13) and is with ribs (18) in the chord member (14) respectively with right the connection; Described ribs (18) fixes with upper chord (10) and lower chord (11) respectively; Be respectively equipped with supporting plate (19) in described upper chord (10) and the lower chord (11); Described supporting plate (19) is respectively equipped with top board (20) with tubing string (12) crimping mutually, the bottom of the top of described upper chord (10) and lower chord (11), and described top board (20) fixes with supporting plate (19); Described top board (20) and upper chord (10) and lower chord (11) crimping mutually, between described upper chord (10) and lower chord (11) with tubing string (12) through etc. by force layer is fixed.
3. the tube in tube structure of steel concrete core tube according to claim 1 and 2 and assembled integral spatial steel grid; It is characterized in that: described upper chord (10), lower chord (11) and tubing string (12) form double-layer cross shape assembly unit unit, and double-layer cross shape assembly unit unit is assembly unit continuously successively.
4. the tube in tube structure of steel concrete core tube according to claim 1 and 2 and assembled integral spatial steel grid; It is characterized in that: be respectively equipped with supporting plate breach (21) in described upper chord (10) and the lower chord (11); Described supporting plate (19) is located in the supporting plate breach (21) and phase clamping with it; Top board (20) on the described upper chord (10) is provided with and expands position reinforcing bar (22); The top of the joint between described upper chord (10) is provided with inflection point plate (23), and the bottom of the joint between described lower chord (11) is provided with down inflection point plate (24).
5. the tube in tube structure of steel concrete core tube according to claim 1 and 2 and assembled integral spatial steel grid is characterized in that: described upper chord (10) and lower chord (11) and tubing string (12) etc. be " U " shape to layer by force.
CN 201110348963 2011-11-08 2011-11-08 Tube-in-tube structure for reinforced concrete core tubes and integrally-assembled space steel grids Active CN102454218B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110348963 CN102454218B (en) 2011-11-08 2011-11-08 Tube-in-tube structure for reinforced concrete core tubes and integrally-assembled space steel grids

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110348963 CN102454218B (en) 2011-11-08 2011-11-08 Tube-in-tube structure for reinforced concrete core tubes and integrally-assembled space steel grids

Publications (2)

Publication Number Publication Date
CN102454218A true CN102454218A (en) 2012-05-16
CN102454218B CN102454218B (en) 2013-09-11

Family

ID=46037859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110348963 Active CN102454218B (en) 2011-11-08 2011-11-08 Tube-in-tube structure for reinforced concrete core tubes and integrally-assembled space steel grids

Country Status (1)

Country Link
CN (1) CN102454218B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102888894A (en) * 2012-06-06 2013-01-23 中国建筑第四工程局有限公司 Structure and construction method for steel frame building with inner cylinder, outer frame and shape like Chinese character 'hui'
CN106013451A (en) * 2016-07-15 2016-10-12 广州容柏生建筑结构设计事务所 Multi-layer sealing frame structure for connecting inner and outer cylinders
CN107060096A (en) * 2017-04-07 2017-08-18 东南大学 Cellular boundling arranges the Super High turret structure system of hexagon cylinder
CN107905378A (en) * 2017-12-10 2018-04-13 湖南金海集团有限公司 Super High mixed type space steel lattice boxlike tube-in-tube structure and production method
CN107956254A (en) * 2017-12-04 2018-04-24 湖南金海集团有限公司 Assembled mixed type space steel lattice boxlike tube-in-tube structure and production method
CN107989193A (en) * 2017-12-10 2018-05-04 湖南金海钢结构股份有限公司 Compound orthogonal spatial space lattice boxlike tube-in-tube structure and production method
CN109972781A (en) * 2019-01-23 2019-07-05 贵州建工集团第一建筑工程有限责任公司 A kind of combination layer beam and its manufacturing method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000087447A (en) * 1998-09-11 2000-03-28 Hanya Sadahiko Method for selecting placement position of stiffening member for single-latticed shell structure and rectangular planar hybrid single-latticed ep shell structure
CN101302775A (en) * 2008-07-02 2008-11-12 天津大学 Bolt connection prefabricated assembly quadrangular pyramid space grid structure and manufacturing method thereof
CN101457550A (en) * 2008-11-12 2009-06-17 芜湖天航科技(集团)股份有限公司 Installation method for special-shaped arch shell type construction network frame
US20090178356A1 (en) * 2008-01-15 2009-07-16 Baumann Hanns U Pre-cast concrete column and method of fabrication
CN202338029U (en) * 2011-11-08 2012-07-18 浙江东南网架股份有限公司 Tube-in-tube structure of reinforced concrete core tube and assembled integral space steel grid

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000087447A (en) * 1998-09-11 2000-03-28 Hanya Sadahiko Method for selecting placement position of stiffening member for single-latticed shell structure and rectangular planar hybrid single-latticed ep shell structure
US20090178356A1 (en) * 2008-01-15 2009-07-16 Baumann Hanns U Pre-cast concrete column and method of fabrication
CN101302775A (en) * 2008-07-02 2008-11-12 天津大学 Bolt connection prefabricated assembly quadrangular pyramid space grid structure and manufacturing method thereof
CN101457550A (en) * 2008-11-12 2009-06-17 芜湖天航科技(集团)股份有限公司 Installation method for special-shaped arch shell type construction network frame
CN202338029U (en) * 2011-11-08 2012-07-18 浙江东南网架股份有限公司 Tube-in-tube structure of reinforced concrete core tube and assembled integral space steel grid

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102888894A (en) * 2012-06-06 2013-01-23 中国建筑第四工程局有限公司 Structure and construction method for steel frame building with inner cylinder, outer frame and shape like Chinese character 'hui'
CN102888894B (en) * 2012-06-06 2014-08-20 中国建筑第四工程局有限公司 Structure and construction method for steel frame building with inner cylinder, outer frame and shape like Chinese character 'hui'
CN106013451A (en) * 2016-07-15 2016-10-12 广州容柏生建筑结构设计事务所 Multi-layer sealing frame structure for connecting inner and outer cylinders
CN106013451B (en) * 2016-07-15 2019-07-02 广州容柏生建筑结构设计事务所 A kind of close mount structure of multilayer connecting inner/outer tube
CN107060096A (en) * 2017-04-07 2017-08-18 东南大学 Cellular boundling arranges the Super High turret structure system of hexagon cylinder
CN107060096B (en) * 2017-04-07 2019-07-12 东南大学 The Super High turret structure system of honeycomb boundling arrangement hexagon cylinder
CN107956254A (en) * 2017-12-04 2018-04-24 湖南金海集团有限公司 Assembled mixed type space steel lattice boxlike tube-in-tube structure and production method
CN107905378A (en) * 2017-12-10 2018-04-13 湖南金海集团有限公司 Super High mixed type space steel lattice boxlike tube-in-tube structure and production method
CN107989193A (en) * 2017-12-10 2018-05-04 湖南金海钢结构股份有限公司 Compound orthogonal spatial space lattice boxlike tube-in-tube structure and production method
CN109972781A (en) * 2019-01-23 2019-07-05 贵州建工集团第一建筑工程有限责任公司 A kind of combination layer beam and its manufacturing method

Also Published As

Publication number Publication date
CN102454218B (en) 2013-09-11

Similar Documents

Publication Publication Date Title
CN102454218B (en) Tube-in-tube structure for reinforced concrete core tubes and integrally-assembled space steel grids
CN101538896B (en) Construction method for jettied structure at high attitude of high-rise building
CN203462764U (en) Large cantilever promotion counter-force frame
CN102454217A (en) Bunchy tube structure for concrete core tubes and integrally-assembled space steel grids
CN102418381B (en) Building structure system combined with steel beam and pre-tensioned prestressing superposed beam and construction method for building structure system
CN103422679A (en) Large cantilever promotion counter-force frame
CN103835435A (en) U-shaped steel-concrete composite beam
CN109184030B (en) Assembly type concrete shear wall superposed structure system and installation method
CN103883054A (en) Cable-strut rib beam combined floor and construction method thereof
CN107905385A (en) The assembled arthitecutral structure and method of construction that steel construction is combined with concrete structure
CN103615111A (en) Silo top construction method
CN201762974U (en) System for simultaneous construction of upper horizontal structure and lower horizontal structure in core tube
CN203716407U (en) U-shaped steel-concrete combination beam
CN202577580U (en) Multilayer longspan assembled integral space steel grid building structure
CN202338029U (en) Tube-in-tube structure of reinforced concrete core tube and assembled integral space steel grid
CN103669817B (en) Building structure overhanging scaffold external corner assembling type frame body device
CN110984383A (en) Large-section steel reinforced concrete column and beam joint construction structure and method
CN216920677U (en) First-layer supporting structure of large rockery outer package
WO2023123321A1 (en) Large-span prefabricated structure
CN202023257U (en) Joint between frame column and composite grid frame floor slab
CN103938908A (en) Silo top slip-form lifting construction method adopting spatial horizontal supporting system
CN201687083U (en) Suspension type template supporting structure with high-position integrated structure
CN104234189B (en) A kind of four tubular truss structures of prefabricated house
CN106088398A (en) A kind of combined wall board
CN211473320U (en) Tool type external hanging rack for corridor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: GUIZHOU UNIVERSITY HU NAN JINHAI STEEL STRUCTURE C

Free format text: FORMER OWNER: GUIZHOU UNIVERSITY GUIZHOU HUITONG SHENFA STEEL STRUCTURE CO., LTD. GUIYANG ARCHITECTURAL DESIGN INSTITUTE CO., LTD.

Effective date: 20120710

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Ma Kejian

Inventor after: Duan Yuzhong

Inventor after: Peng Deng

Inventor after: Zhou Jiagan

Inventor after: Xu Xiangdong

Inventor after: Qin Shijie

Inventor after: Qin Liang

Inventor after: Zhou Guangen

Inventor after: Hu Lan

Inventor after: Zhu Fangzheng

Inventor after: Xiao Jianchun

Inventor after: Cheng Zhimin

Inventor after: Zhang Xiaonan

Inventor after: Zhang Huagang

Inventor after: Li Guoqiang

Inventor before: Ma Kejian

Inventor before: Peng Deng

Inventor before: Zhou Jiagan

Inventor before: Xu Xiangdong

Inventor before: Qin Shijie

Inventor before: Qin Liang

Inventor before: Zhou Guangen

Inventor before: Zhu Fangzheng

Inventor before: Xiao Jianchun

Inventor before: Cheng Zhimin

Inventor before: Zhang Xiaonan

Inventor before: Zhang Huagang

Inventor before: Li Guoqiang

Inventor before: Duan Yuzhong

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: MA KEJIAN ZHOU GUANGEN ZHU FANGZHENG XIAO JIANCHUN CHENG ZHIMIN ZHANG XIAONAN ZHANG HUAGANG LI GUOQIANG DUAN YUZHONG PENG DENG ZHOU JIAGAN XU XIANGDONG QIN SHIJIE QIN LIANG TO: MA KEJIAN ZHOU GUANGEN HU LAN ZHU FANGZHENG XIAO JIANCHUN CHENG ZHIMIN ZHANG XIAONAN ZHANG HUAGANG LI GUOQIANG DUAN YUZHONG PENG DENG ZHOU JIAGAN XU XIANGDONG QIN SHIJIE QIN LIANG

TA01 Transfer of patent application right

Effective date of registration: 20120710

Address after: Hangzhou City, Zhejiang province 311209 Yaqian town Xiaoshan District

Applicant after: Zhejiang Southeast Space Frame Stock Limted

Co-applicant after: Guizhou University

Co-applicant after: Hunan Jinhai Steel Structure Co., Ltd.

Co-applicant after: Guizhou Huitong Shenfa Steel Structure Co., Ltd.

Co-applicant after: Guiyang Architecture Design Institute Co., Ltd.

Address before: Hangzhou City, Zhejiang province 311209 Yaqian town Xiaoshan District

Applicant before: Zhejiang Southeast Space Frame Stock Limted

Co-applicant before: Guizhou University

Co-applicant before: Guizhou Huitong Shenfa Steel Structure Co., Ltd.

Co-applicant before: Guiyang Architecture Design Institute Co., Ltd.

C14 Grant of patent or utility model