CN202331187U - Remote PLC (programmable logic controller) state monitoring and fault alarm system supporting WEB view - Google Patents

Remote PLC (programmable logic controller) state monitoring and fault alarm system supporting WEB view Download PDF

Info

Publication number
CN202331187U
CN202331187U CN2011205314755U CN201120531475U CN202331187U CN 202331187 U CN202331187 U CN 202331187U CN 2011205314755 U CN2011205314755 U CN 2011205314755U CN 201120531475 U CN201120531475 U CN 201120531475U CN 202331187 U CN202331187 U CN 202331187U
Authority
CN
China
Prior art keywords
server
processing module
data storage
storage processing
web
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205314755U
Other languages
Chinese (zh)
Inventor
郑宇�
郭旭
白建波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Campus of Hohai University
Original Assignee
Changzhou Campus of Hohai University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Campus of Hohai University filed Critical Changzhou Campus of Hohai University
Priority to CN2011205314755U priority Critical patent/CN202331187U/en
Application granted granted Critical
Publication of CN202331187U publication Critical patent/CN202331187U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Alarm Systems (AREA)

Abstract

The utility model discloses a remote PLC (programmable logic controller) state monitoring and fault alarm system supporting WEB view. The system comprises a data acquisition module, a data storage processing module, a WEB server and a mobile terminal connected with the WEB server, wherein the data storage processing module is used for receiving and transferring the equipment operation information acquired by the data acquisition module; and the data storage processing module transfers the received information to the mobile terminal through the WEB server. The system disclosed by the utility model masters the operation condition of the equipment in real time, realizes remote monitoring and remote analysis diagnosis, acquires the firsthand information about the equipment operation 'in real time and anytime anywhere', breaks through the informatization bottleneck' in equipment management of the enterprises and manufacturers, solves the problem of information island, and can conveniently, effectively and widely utilize the experiences and knowledge of experts to promote the management work of large equipment.

Description

But the remote PLC status monitoring and the failure warning system of WEB visit
Technical field
The utility model relates to a kind of warning system, but relates in particular to a kind of remote PLC status monitoring and failure warning system of WEB visit.
Background technology
The large scale computer group equipment is factory's " heart ", is concerning the safe and stable operation of full factory process units.Present most of enterprise takes basically is to patrol and examine in daily spot check+cycle+the equipment operation maintenance pattern of planned prophylactic repair; The problem that this management mode exists blindly maintenance and the maintenance of accident property inevitably and deposits; Be planned maintenance for state preferably equipment be unnecessary waste, even also can cause the maintainability fault; And when unit equipment begins to break down or be unusual; Possibly do not found; Also possibly receive the restriction of turnaround plan and operation in spite of illness, cause fault to worsen at last and cause industrial accident or even human casualty accident; Had a strong impact on the serialization production of enterprise, brought heavy economic losses to enterprise.Can't conveniently obtain the real time data of armamentarium in the system when detecting on the spot in addition, to safeguarding or overhauling and all caused certain difficulty.
This shows that above-mentioned existing planned maintenance mode obviously still has inconvenience and defective, and demands urgently further improving.In order to solve the problem that planned maintenance mode exists; Relevant manufacturer there's no one who doesn't or isn't seeks solution painstakingly; But do not see always that for a long time suitable design is developed completion; And general examination and repair system does not have appropriate structure to address the above problem, and this obviously is the problem that the anxious desire of relevant dealer solves.
Because the defective that above-mentioned existing planned maintenance mode exists; The utility model people is based on practical experience and professional knowledge; And cooperate the utilization of scientific principle, actively study innovation, but the remote PLC status monitoring and the failure warning system of going sight-seeing in the hope of the WEB that founds a kind of new structure; Can improve the deficiency that general existing planned maintenance exists, make it have more practicality.Through constantly research, design, and after studying sample and improvement repeatedly, found out the utility model of true tool practical value finally.
The utility model content
The fundamental purpose of the utility model is; Overcome the defective that existing planned maintenance exists; And but a kind of remote PLC status monitoring and failure warning system of WEB visit of new structure be provided; Technical matters to be solved is to make the fault that it is more convenient for monitoring timely and discovering device occurs, thereby is convenient to monitoring more, and has the value on the industry.
The purpose of the utility model and solve its technical matters and adopt following technical scheme to realize.But the remote PLC status monitoring and the failure warning system of a kind of WEB visit that proposes according to the utility model comprise data acquisition module and data storage processing module, also comprise the WEB server and and its joining portable terminal,
The data storage processing module is used to receive the also information of the equipment operation of Data transmission acquisition module collection;
The data storage processing module is passed to portable terminal through the WEB server with the information that is received.
But the remote PLC status monitoring and the failure warning system of aforesaid WEB visit, wherein, data acquisition module comprises equipment unit, PLC and I/O from server, said equipment unit links to each other from server with I/O through PLC.
But the remote PLC status monitoring and the failure warning system of aforesaid WEB visit; Wherein, The data storage processing module comprises industrial server, I/O master server and relational database; Said I/O master server links from server through internet and I/O, and the data storage processing module is through WEB server and communication of mobile terminal, and the WEB server connects through wireless network with portable terminal.
But the remote PLC status monitoring and the failure warning system of aforesaid WEB visit; Wherein, Comprise that also statistics generates server and Report Server Management server; Statistics generates server and the Report Server Management server all communicates with the WEB server, and statistics generates server and the Report Server Management server all communicates with the data storage processing module.
But the remote PLC status monitoring and the failure warning system of aforesaid WEB visit wherein, also comprise Alarm Server, and said Alarm Server and WEB server communicate, and said Alarm Server and said data storage processing module link.
By technique scheme, but the remote PLC status monitoring and the failure warning system of the utility model WEB visit have advantage at least:
Through portable terminal visit device, " in real time, at any time, everywhere ", the first-hand information of grasp equipment operation is broken " information-based bottleneck " in enterprise and the manufacturer's equipment control, promotes the management of main equipment and the work of remote expert fault diagnosis.
In sum, but the remote PLC status monitoring and the failure warning system of the WEB of the utility model special construction visit are more convenient for monitoring timely and fault that discovering device occurs.It has above-mentioned many advantages and practical value; Have large improvement technically; And produced handy and practical effect, and more existing planned maintenance has the multinomial effect of enhancement, thus be suitable for practicality more; And have the extensive value of industry, really be a novelty, progress, practical new design.
Above-mentioned explanation only is the general introduction of the utility model technical scheme, in order more to know the technological means of understanding the utility model, and can implement according to the content of instructions, below with the preferred embodiment of the utility model and conjunction with figs. specify as after.
The embodiment of the utility model is provided by following examples and accompanying drawing thereof in detail.
Description of drawings
But Fig. 1 is the remote PLC status monitoring of the utility model WEB visit and the structural representation of failure warning system.
Embodiment
For further setting forth the utility model is to reach technological means and the effect that predetermined utility model purpose is taked; Below in conjunction with accompanying drawing and preferred embodiment; But to remote PLC status monitoring and its embodiment of failure warning system, structure, characteristic and the effect thereof of the WEB visit that proposes according to the utility model, specify as after.
See also shown in Figure 1, but the remote PLC status monitoring and the failure warning system of a kind of WEB of the utility model preferred embodiment visit, comprise data acquisition module, data storage processing module, WEB server and and its joining portable terminal, wherein,
Data acquisition module comprises equipment unit, PLC and I/O from server, and the equipment unit links to each other from server with I/O through PLC;
The data storage processing module is used to receive and transmit the information of the equipment operation of said data collecting module collected; The data storage processing module comprises industrial server, I/O master server and relational database; Wherein, industrial server has the function of high speed storing and retrieval, is responsible for receiving the on-site real-time data; Preserve historical device data continuously, compression, reduction, management and the visit of historical data are provided.Relational database is preserved significant data archives such as complete equipment state, overhaul of the equipments, fault handling; For the equipment state maintenance decision provides basic data; The I/O master server links to each other from server with I/O through the internet, and the data storage processing module is passed to portable terminal through the WEB server with the information that is received.
For adapting to distribute wider large-scale unit or device cluster; Data acquisition module and data storage processing module combine; Adopted " I/O is from server+I/O master server "; Express network connects the data compression technique that combines high-fidelity, and just can transmit one group of data (comprising the whole raw data of all measuring points of equipment etc.) to the WEB server p.s., guarantees the rapidity and the promptness of a large amount of key equipment service data transmission.
It can also comprise that statistics generates server and Report Server Management server the utility model; Statistics generates server and Report Server Management server; Statistics generates server and the Report Server Management server all communicates with the data storage processing module; Statistics generates server and the Report Server Management server carries out further statistical study generation relational graph and list according to the equipment operating data that is delivered to from the data storage processing module, is transferred to portable terminal through Web server at last.
For the ease of timely monitoring; Another innovative point of the utility model is; It also comprises Alarm Server; Condition according to user preset is monitored the data that collect from the data storage processing module, when data during at preset certain scope or particular value, sends warning message through Web server to portable terminal.
The above; It only is the preferred embodiment of the utility model; Not being that the utility model is done any pro forma restriction, though the utility model with the preferred embodiment exposure as above, yet is not in order to limit the utility model; Anyly be familiar with the professional and technical personnel; In not breaking away from the utility model technical scheme scope, make a little change or be modified to the equivalent embodiment of equivalent variations when the technology contents of above-mentioned announcement capable of using, be the content that does not break away from the utility model technical scheme in every case;, all still belong in the scope of the utility model technical scheme any simple modification, equivalent variations and modification that above embodiment did according to the technical spirit of the utility model.

Claims (5)

1. but the remote PLC status monitoring and the failure warning system of WEB visit comprise data acquisition module and data storage processing module, it is characterized in that: also comprise the WEB server and and its joining portable terminal,
The data storage processing module is used to receive and transmit the information of the equipment operation of said data collecting module collected;
Said data storage processing module is passed to portable terminal through the WEB server with the information that is received.
2. but the remote PLC status monitoring and the failure warning system of WEB visit according to claim 1 is characterized in that said data acquisition module comprises equipment unit, PLC and I/O from server, and said equipment unit links to each other from server with I/O through PLC.
3. but the remote PLC status monitoring and the failure warning system of WEB visit according to claim 1; It is characterized in that; Said data storage processing module comprises industrial server, I/O master server and relational database; Said I/O master server links from server through internet and I/O, and said data storage processing module is through WEB server and communication of mobile terminal.
4. but the remote PLC status monitoring and the failure warning system of WEB visit according to claim 1; It is characterized in that: comprise that also statistics generates server and Report Server Management server; Said statistics generates server and said Report Server Management server all communicates with said WEB server, and said statistics generates server and said Report Server Management server all communicates with said data storage processing module.
5. but the remote PLC status monitoring and the failure warning system of WEB visit according to claim 1; It is characterized in that: also comprise Alarm Server; Said Alarm Server and WEB server communicate, and said Alarm Server all links with said data storage processing module.
CN2011205314755U 2011-12-16 2011-12-16 Remote PLC (programmable logic controller) state monitoring and fault alarm system supporting WEB view Expired - Fee Related CN202331187U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205314755U CN202331187U (en) 2011-12-16 2011-12-16 Remote PLC (programmable logic controller) state monitoring and fault alarm system supporting WEB view

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205314755U CN202331187U (en) 2011-12-16 2011-12-16 Remote PLC (programmable logic controller) state monitoring and fault alarm system supporting WEB view

Publications (1)

Publication Number Publication Date
CN202331187U true CN202331187U (en) 2012-07-11

Family

ID=46443161

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205314755U Expired - Fee Related CN202331187U (en) 2011-12-16 2011-12-16 Remote PLC (programmable logic controller) state monitoring and fault alarm system supporting WEB view

Country Status (1)

Country Link
CN (1) CN202331187U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106325200A (en) * 2016-08-30 2017-01-11 江苏永冠给排水设备有限公司 Realization method of sodium hypochlorite generator equipment group control system based on online self-service
CN106365249A (en) * 2016-08-30 2017-02-01 江苏永冠给排水设备有限公司 Implementation method based on nitrate removal water treatment equipment control system
CN106444601A (en) * 2016-08-30 2017-02-22 江苏永冠给排水设备有限公司 Implementation method of self-service nitrate removal water treatment device group control system based on networking

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106325200A (en) * 2016-08-30 2017-01-11 江苏永冠给排水设备有限公司 Realization method of sodium hypochlorite generator equipment group control system based on online self-service
CN106365249A (en) * 2016-08-30 2017-02-01 江苏永冠给排水设备有限公司 Implementation method based on nitrate removal water treatment equipment control system
CN106444601A (en) * 2016-08-30 2017-02-22 江苏永冠给排水设备有限公司 Implementation method of self-service nitrate removal water treatment device group control system based on networking
CN106365249B (en) * 2016-08-30 2019-04-23 江苏永冠给排水设备有限公司 A kind of implementation method based on removal nitrate water treatment facilities control system

Similar Documents

Publication Publication Date Title
CN202837985U (en) GPRS-communication based remote online monitoring system for sewage treatment equipment
CN102830673A (en) GPRS (General Packet Radio Service) communication-based remote online monitoring system and method for sewage treatment equipment
CN201716576U (en) Energy saving and emission reduction monitoring system of key energy-consuming enterprise
CN105430091A (en) Cloud storage based remote equipment health management method and system using same
CN203325039U (en) Routing-inspection supporting system for power transformation operation and maintenance
CN101817352B (en) Intelligent wheel stopper system based on wireless communication
CN108470386A (en) A kind of cable run intelligent inspection system based on GPS and cloud platform
CN202331187U (en) Remote PLC (programmable logic controller) state monitoring and fault alarm system supporting WEB view
CN106845568A (en) A kind of production management system and production monitoring and managing method
CN103034207A (en) Infrastructure health monitoring system and implementation process thereof
CN114446037A (en) Carbon emission monitoring system and method based on Internet of things technology
CN201657028U (en) Large scale wind power generation monitoring system
CN105928556A (en) Sanitation facility and equipment on-line monitoring and intelligent diagnosis system
CN114047730A (en) Power generation production optimizing control device of efficient energy-saving thermal power plant
CN110417837A (en) Transformer substation monitoring system
CN106649034B (en) Visual intelligent operation and maintenance method and platform
CN112068524A (en) Energy management and control platform for enterprise operation and maintenance
CN208257863U (en) Weft-knitting machine real-time monitoring system
CN202870922U (en) Intelligent power inspection system
CN203191761U (en) A device fault monitoring system of a rail transit automatic fare collection system station control center
CN112947281A (en) Automobile production line safety monitoring system and method based on PLC control
CN207472322U (en) A kind of biogas engineering big data platform system
CN202478751U (en) Remote running maintenance system for bag filter
CN207354335U (en) A kind of intelligence ground washing vehicle management system for internet of things
CN203909577U (en) Cleaning device management system based on Internet of Things

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120711

Termination date: 20141216

EXPY Termination of patent right or utility model