CN202324587U - Reinforcement bolt pull ring applied to building construction overhanging scaffold - Google Patents

Reinforcement bolt pull ring applied to building construction overhanging scaffold Download PDF

Info

Publication number
CN202324587U
CN202324587U CN2011204582431U CN201120458243U CN202324587U CN 202324587 U CN202324587 U CN 202324587U CN 2011204582431 U CN2011204582431 U CN 2011204582431U CN 201120458243 U CN201120458243 U CN 201120458243U CN 202324587 U CN202324587 U CN 202324587U
Authority
CN
China
Prior art keywords
reinforcing bar
draw ring
pull ring
bar bolt
bolt draw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011204582431U
Other languages
Chinese (zh)
Inventor
王跃军
张渭军
刘许春
李志斌
戚芳芳
金钰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GANSU THIRD CONSTRUCTION GROUP Corp
Original Assignee
GANSU THIRD CONSTRUCTION GROUP Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GANSU THIRD CONSTRUCTION GROUP Corp filed Critical GANSU THIRD CONSTRUCTION GROUP Corp
Priority to CN2011204582431U priority Critical patent/CN202324587U/en
Application granted granted Critical
Publication of CN202324587U publication Critical patent/CN202324587U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a tool applied to a building construction overhanging scaffold, in particular to a reinforcement bolt pull ring applied to a building construction overhanging scaffold. The reinforcement bolt pull ring applied to the building construction overhanging scaffold comprises a reinforcement bolt pull ring (1), a wood wedge (2), channel beam (3), a bushing (8), a floor (4) and a steel plate (5), and is characterized in that: the bushing (8) is embedded during casting of the floor (4); the steel plate (5) is arranged below the bushing (8); the reinforcement bolt pull ring (1) sequentially penetrates through the bushing (8) and the steel plate (5); a washer (7) is arranged on a threaded part of the reinforcement bolt pull ring (1) and is fixed by a nut (6); the channel beam (3) is arranged in the reinforcement bolt pull ring (1); and the top of the channel beam (3) is tightened by the wood wedge (2). The reinforcement bolt pull ring has the advantages of safety, reliability, reusability, low cost and capability of increasing working efficiency.

Description

A kind of reinforcing bar bolt draw ring that is applied to the building operations builder's jack
Technical field
The utility model relates to a kind of instrument that is applied to the building operations builder's jack, more specifically to a kind of reinforcing bar bolt draw ring that is applied to the building operations builder's jack.
Background technology
At present, at the draw ring that the construction site builder's jack uses, traditional way is an embedded bar, and this way cost height is uneconomical, can only use once, can not reuse, and each use all needs processing and fabricating, causes unnecessary manpower, financial resources waste.
The utility model content
The technical problem that the utility model will solve is: a kind of reinforcing bar bolt draw ring that is applied to the building operations builder's jack is provided, replaces embedded bar with reinforcing bar bolt draw ring, and safe and reliable; Can repeatedly have enough to meet the need use; Cost is low, does not influence follow-up work, increases work efficiency.
The utility model comprises reinforcing bar bolt draw ring, wooden contract, channel-section steel, sleeve pipe, floor, steel plate; Its characteristics are: service sleeve during the cast floor, steel plate is housed below sleeve pipe, and reinforcing bar bolt draw ring passes sleeve pipe, steel plate successively; Packing ring is equipped with at the screw thread place of reinforcing bar bolt draw ring, is fixed by nut.Channel-section steel is packed in the reinforcing bar bolt draw ring, and the channel-section steel top is by wooden contract jam-pack.
The utility model has the advantages that: safe and reliable, reusable, cost is low, thereby has improved operating efficiency.
Description of drawings
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is done further explain.
Fig. 1 is a kind of structural representation of reinforcing bar bolt draw ring in construction that is applied to the building operations builder's jack of the utility model;
Fig. 2 be among Fig. 1 A to right view;
Fig. 3 is the structural representation of reinforcing bar bolt draw ring 1 among Fig. 1;
Fig. 4 is the structural representation of Fig. 1 light plate 5.
The specific embodiment
In Fig. 1,2,3,4: service sleeve 8 when cast floor 4, sleeve pipe 8 is a plastic pipe, and steel plate 5 is housed below sleeve pipe 8, reinforcing bar bolt draw ring 1 passes sleeve pipe 8, steel plate 5 successively.Reinforcing bar bolt draw ring 1 is a ∩ shape, and its two ends are screw thread, and packing ring 7 is equipped with at the screw thread place of reinforcing bar bolt draw ring 1 respectively, and is fixing by nut 6.Reinforcing bar bolt draw ring 1 length is 100cm; Diameter
Figure BSA00000615144600021
is for the I level steel clod wash of 16mm becomes ∩ shape, and its two ends reach is 300mm.Steel plate 5 is provided with two identical holes 9, and hole 9 is oval, and its effect is: in case when deviation took place in pre-buried sleeve pipe 8 positions, reinforcing bar bolt draw ring 1 can be through slotted eye 9 adjustment.The specification of steel plate 5 is 220 * 80 * 10mm, and two holes 9 on the steel plate 5 are 18 * 40mm, and pitch-row is 100mm.Channel-section steel 3 is packed in the reinforcing bar bolt draw ring 1, channel-section steel 3 tops are by wooden contract 2 jam-packs again.
In sum: reinforcing bar bolt draw ring 1 is fixing shaped steel outrigger when setting up builder's jack at the construction field (site), after scaffold is removed, and promptly dismountable reinforcing bar bolt draw ring 1, reinforcing bar bolt draw ring 1 can continue use when setting up scaffold once more.Reinforcing bar bolt draw ring 1 can use in Projects with Different or in the different floor turnovers of identical items, and is easy for installation, with low cost, safe and reliable, reusable, thereby improved operating efficiency.

Claims (3)

1. reinforcing bar bolt draw ring that is applied to the building operations builder's jack; Comprise reinforcing bar bolt draw ring (1), wooden contract (2), channel-section steel (3), sleeve pipe (8), floor (4), steel plate (5) is characterized in that: service sleeve (8) during cast floor (4); Steel plate (5) is housed below sleeve pipe (8); Reinforcing bar bolt draw ring (1) passes sleeve pipe (8), steel plate (5) successively, and packing ring (7) is equipped with at the screw thread place of reinforcing bar bolt draw ring (1), and is fixing by nut (6); Channel-section steel (3) is packed in the reinforcing bar bolt draw ring (1), and channel-section steel (3) top is by wooden contract (2) jam-pack.
2. a kind of reinforcing bar bolt draw ring that is applied to the building operations builder's jack according to claim 1 is characterized in that: reinforcing bar bolt draw ring (1) is a ∩ shape, and its two ends are screw thread.
3. a kind of reinforcing bar bolt draw ring that is applied to the building operations builder's jack according to claim 1, it is characterized in that: steel plate (5) is provided with two identical holes (9), and its hole (9) are oval.
CN2011204582431U 2011-11-18 2011-11-18 Reinforcement bolt pull ring applied to building construction overhanging scaffold Expired - Lifetime CN202324587U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204582431U CN202324587U (en) 2011-11-18 2011-11-18 Reinforcement bolt pull ring applied to building construction overhanging scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204582431U CN202324587U (en) 2011-11-18 2011-11-18 Reinforcement bolt pull ring applied to building construction overhanging scaffold

Publications (1)

Publication Number Publication Date
CN202324587U true CN202324587U (en) 2012-07-11

Family

ID=46436568

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204582431U Expired - Lifetime CN202324587U (en) 2011-11-18 2011-11-18 Reinforcement bolt pull ring applied to building construction overhanging scaffold

Country Status (1)

Country Link
CN (1) CN202324587U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102777022A (en) * 2012-08-03 2012-11-14 汕头市建筑工程总公司 Postpositional double-steel-channel overhanging scaffold and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102777022A (en) * 2012-08-03 2012-11-14 汕头市建筑工程总公司 Postpositional double-steel-channel overhanging scaffold and construction method thereof

Similar Documents

Publication Publication Date Title
CN103711298A (en) Method for constructing anchoring system of structural steel overhanging scaffold
CN101781930A (en) Template system
CN204081445U (en) To encorbelment i iron anchor device
CN103072906A (en) Connecting device of inner climbing type tower crane and building structure and construction method utilizing same
CN202324587U (en) Reinforcement bolt pull ring applied to building construction overhanging scaffold
CN204199667U (en) Detachable builder's jack corner tripod
CN203939240U (en) A kind of for post or the fixing single-ended mantle fiber split bolt of shear wall formwork
CN203145430U (en) Detachable anchor ring structure for fixing cantilever beam
CN206942120U (en) A kind of pre-embedded device of builder's jack
CN206903226U (en) One kind sled shoulders formula wall column Side Template fastening lockset
CN204343647U (en) A kind of the shaped steel suspension scaffolding bracing frame
CN204645589U (en) A kind of tool-type builder's jack bracing device
CN203531350U (en) U-shaped pull ring for steel beam fixing of cantilever outer frame
CN211776192U (en) Steel structure factory building
CN204252543U (en) For culvert, foot bridge abutment body construction the U-shaped card of positive and negative silk to drawing push rod
CN205591545U (en) Instrument is consolidated to log template
CN103195235A (en) Design and calculation for detachable steel plate type steel fixture
CN102720353A (en) Post-construction one-side shear wall formwork for settlement joint of tower and construction method
CN203065063U (en) Connecting device of internal-climbing type tower crane and architectural structure
CN203097291U (en) Reinforcing and counter-pulling device of building construction formwork
CN204265232U (en) A kind of I-beam section uses stressed suspension rod
CN205350013U (en) Integral nut washer fastener
CN203769313U (en) Concrete pouring formwork reinforcing component
CN104499644A (en) Crossbeam with lapping bars and triangular rib plates
CN104164934A (en) Simple NZ built-in pipe die anti-floating draw hook device and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120711