CN202323893U - Hydroelectric power station capable of being built densely - Google Patents

Hydroelectric power station capable of being built densely Download PDF

Info

Publication number
CN202323893U
CN202323893U CN2011204253665U CN201120425366U CN202323893U CN 202323893 U CN202323893 U CN 202323893U CN 2011204253665 U CN2011204253665 U CN 2011204253665U CN 201120425366 U CN201120425366 U CN 201120425366U CN 202323893 U CN202323893 U CN 202323893U
Authority
CN
China
Prior art keywords
gate
built
gutter
hydraulic turbine
divider wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204253665U
Other languages
Chinese (zh)
Inventor
李建英
李盈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011204253665U priority Critical patent/CN202323893U/en
Application granted granted Critical
Publication of CN202323893U publication Critical patent/CN202323893U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

A hydroelectric power station capable of being built densely comprises water turbines, electric generating sets and transmission mechanisms used for connecting the water turbines and the electric generating sets; the hydroelectric power station further comprises a first shunting gate, a second shunting gate, a first flushing gate, a second flushing gate, a first isolating wall, a second isolating wall, as well as a first water guiding tank and a second water guiding tank which comprise the first isolating wall and the second isolating wall; the first shunting gate, the second shunting gate as well as the first flushing gate and the second flushing gate are sequentially built at an upstream end in the water coming direction of a river or a stream, and the first isolating wall and the second isolating wall are built at the lower stream ends of the first flushing gate and the second flushing gate; and the water turbines are arranged in the first water guiding tank and the second water guiding tank, and the transmission shafts of all transverse water turbines are mutually connected and then connected with the transmission mechanisms. The generated electrical energy of part of hydroelectric power stations built behind a built hydroelectric station is close to the generated electrical energy of the built hydroelectric station; limited water resource can be used fully in a manifold manner, and the problem that hydroelectric power stations can not be built in part of plain areas where rivers and water flow exist can be solved.

Description

A kind of natural flow station that can intensive construction
Technical field
The utility model relates to the water generating technical field, specifically refers to a kind ofly need not block to build a dam in the river and directly be installed in a kind of natural flow station that can intensive construction that just can generate electricity on the water surface to the hydraulic turbine.
Background technology
The energy water of existing natural flow station utilization all is disposable; Be after water flows out from the power station; This water is just along flow through again tens of or hundreds of kms to next power station or flow directly into the sea of rivers; Can not block the river again because of the restriction of many-sided conditioned disjunction reason therebetween and build a dam and set up natural flow station, make limited water resource cause unlimited waste.
And existing natural flow station basically all is on rivers, to select suitable place to block the river to build a dam, and is installed in the hydraulic turbine under the water power dam with certain height of water, utilizes high drop, the high flow rate of water level to promote hydraulic turbine running generating.Consequently to take the good farmland and plough, move the immigrant, the big and influence ecological environment of construction cost.
The utility model content
The utility model provides a kind of power station that is different from existing water generating mode, limited water resource is obtained fully or utilization at double, and more can solve the part plains region has river waterflow but can not build the problem of natural flow station.
For this reason, the technical scheme that is adopted is: a kind of natural flow station that can intensive construction comprises the hydraulic turbine, generating set and connects both transmission mechanism; It also comprises first, second diversion gate; First, second bath gate, first, second divider wall and first, second gutter that forms by this first, second divider wall; Said first, second diversion gate and first, second bath gate are built the upstream extremity of river or inflow direction, river successively in, and said first, second divider wall is built the downstream of said first, second bath gate in; The said hydraulic turbine is located among first, second gutter, is connected with said transmission mechanism after the power transmission shaft of each hydraulic turbine that this is horizontal interconnects again.
Said transmission mechanism comprises break-in power transmission shaft and speed change wheels; Be connected with break-in power transmission shaft on being located at haugh through change gear again after the power transmission shaft of said horizontal each hydraulic turbine interconnects, and this break-in power transmission shaft passes through the speed change wheels and is connected with said generating set.
The utility model is when in the existing waterway, building natural flow station; The drop space of several meters or ten several meters between river course normal water flowing water bit line that utilization does not obtain for a long time utilizing except that flood season and the flood season waterline; After with the gate form normal water flowing water bit line being increased to the flood season waterline and forming maximum drop height water stream, be installed to the hydraulic turbine and make its running generating on the water surface.And when building the power station,, downstream square when the two lines going cross each other point place of the flood season current waterline that extends to next section river course, can build a natural flow station again to build or the riverbed bottom line at place, last seat power station.By this principle; The suitable part rivers section of condition can be built one or several generated energy natural flow station thousands of kilowatts to tens thousand of kilowatts or bigger kilowatt according to the difference of coming the water yield within thousands of meters distances, utilize the utility model to build in to build the generated energy of power station part natural flow station afterwards will approach to have built the generated energy in power station; Can make that limited water resource obtains fully, utilization at double, more can solve the part plains region has river waterflow but can not build the problem of natural flow station.
The utility model utilizes the existing waterway to be directly installed on the hydraulic turbine on the water surface, and don't stops up the river course, and the polluted source environment more need not block the river and build a dam, do not take the arable land, good farmland, do not move the immigrant, and cost is low; Except that dry season, do not receive upland water amount size, water to rise and fall to influencing, and, can shunt by diversion gate when flood season comes the water yield bigger than normal basically according to the generated energy that how much increases and decreases that comes the water yield; Riverbank height gate can appropriate be increased in the part section when the surrounding enviroment conditions permit before within the certain distance, drop increases generated energy to flood.
The utility model is suitable for the large, medium and small rivers power station of building that utilizes water for producing electric power.
Description of drawings
Fig. 1 is the schematic side view of the utility model installation site in rivers;
Fig. 2 is that the utility model embodiment 1 is at fluviatic schematic layout pattern;
Fig. 3 is the structural representation of the utility model embodiment 1;
Fig. 4 is the rivers schematic cross-section under the normal condition;
Fig. 5 is the diversion gate of the utility model riverbank when not increasing and bath gate schematic cross-section;
Fig. 6 is the diversion gate of the utility model riverbank after increasing and bath gate schematic cross-section;
Fig. 7 is the rivers side cross-sectional schematic under the normal condition;
The schematic side view that Fig. 8 does not increase for the utility model riverbank;
Fig. 9 is the schematic side view of the utility model riverbank after increasing;
Figure 10 is the structural representation of the utility model embodiment 2;
Figure 11 is the schematic side view of the utility model embodiment 2 when normal operation;
Figure 12 is the schematic side view of the utility model embodiment 2 when flood season;
Figure 13 is the steel gutter bottom plate stanchions position view of the utility model embodiment 2.
The specific embodiment
Below in conjunction with accompanying drawing the utility model and beneficial effect thereof are done further detailed explanation.
Embodiment 1: with reference to Fig. 1, Fig. 2, Fig. 3, Fig. 5, Fig. 8, Fig. 9; A kind of natural flow station that can intensive construction; Comprise outside the hydraulic turbine 11, hydraulic turbine power transmission shaft 9, break-in power transmission shaft 8, speed change wheels 6, the generating set 7 that it also comprises first, second diversion gate 2,3, first, second gate 5,4 of washing by water; Riverbank cemented platform 45, first, second cement divider wall 13,12 and first, second gutter 55,54 that forms by this first, second cement divider wall 13,12; Said first, second diversion gate 2,3 and first, second bath gate 5,4 are built the upstream extremity of river or 1 inflow direction, river successively in; A left side or right bank that the concrete landform of position basis of this first, second diversion gate 2,3 or first, second bath gate 5,4 and needs can be located at river or river 1, and they are covered with whole river surface width; Said first, second cement divider wall 13,12 is built the downstream of said first, second bath gate 5,4 in; Said ice turbine 11 is located among first, second gutter 55,54; The break-in power transmission shafts of fixing through change gear 10 and the holder 28 on being located at riverbank cemented platform 45 again after the power transmission shaft 9 of each hydraulic turbine 11 that this is horizontal connects with the power transmission shaft terminal pad each other 8 are connected, and this break-in power transmission shaft 8 is connected with generating set 7 on being located at riverbank cemented platform 45 equally through the speed change wheels 6 that are located on the riverbank cemented platform 45.Thereby the low-speed machinery that each hydraulic turbine power transmission shaft 9 is produced can pass to speed change wheels 6 through break-in power transmission shaft 8, and speed change wheels 6 can speed change be that generating set 7 required high speeds can pass to generating set 7 back with low speed.
The effect of said first, second diversion gate 2,3 is: when flood season comes water yield excess, shunt; But when coming the water yield just often, open said first, second bath gate 5,4 bath generating synchronously, when coming the water yield less than normal, close second gate 4, make the first bath gate 5 continue the bath generating, to make full use of water resource.
Embodiment 2: with reference to Fig. 1, Fig. 8, Figure 10, Figure 11, Figure 12, a kind of natural flow station comprises the hydraulic turbine 11; Hydraulic turbine power transmission shaft 9, break-in power transmission shaft 8, speed change wheels 6; Generating set 7, the first diversion gates 2, first, second, third bath gates 5,4,57; Riverbank cemented platform 45, first, second, third cement divider walls 13,12,58 and first, second, third gutter 55,54,56 that forms by this first, second, third cement divider wall 13,12,58; Said first diversion gate 2 and first, second, third bath gate 5,4,57 are built the upstream extremity of river or 1 inflow direction, river in; A left side or right bank that the concrete landform of position basis of this first diversion gate 2 or first, second, third bath gate 5,4,57 and needs can be located at river or river 1, and they are covered with whole river surface width; Downstream and this first, second, third cement divider wall 13,12,58 that said first, second, third cement divider wall 13,12,58 is built said first, second, third bath gate 5,4,57 in form first, second, third gutter 55,54,56; The said hydraulic turbine 11 is distributed among said first, second, third gutter 55,54,56; The break-in power transmission shafts of fixing through change gear 10 and the holder 28 on being located at riverbank cemented platform 45 again after the power transmission shaft 9 of each hydraulic turbine 11 that this is horizontal connects with the power transmission shaft terminal pad each other 8 are connected, and this break-in power transmission shaft 8 is connected with said generating set 7 on being located at riverbank cemented platform 45 equally through the speed change wheels 6 that are located on the riverbank cemented platform 45.The low-speed machinery that each hydraulic turbine power transmission shaft 9 is produced can pass to speed change wheels 6 through break-in power transmission shaft 8, and speed change wheels 6 can speed change be that generating set 7 required high speeds can pass to generating set 7 back with low speed.
Embodiment 3, with reference to Figure 10, are the basis with embodiment 2, form splitter box 22 at first diversion gate 2 described in the embodiment 2, and the upper reaches of this splitter box 22, tract have upper and lower navigation gate 23,24 respectively.This embodiment is suitable for being built in the big-and-middle-sized section of ship's navigation; The upper and lower navigation gate 23,24 into the push-and-pull gate-type is built in first diversion gate, 2 changes of former ascending/decending; When flood season, do the to drain off floodwaters usefulness of shunting at river waterflow just often, also can be used as the current road of boats and ships.
Embodiment; 4, with reference to Fig. 1, Fig. 2, Fig. 3, Fig. 5, Fig. 8, Fig. 9, Figure 10, Figure 11, Figure 12, Figure 13, be the basis with embodiment 1; Install the boom hoisting of a hydraulic turbine 11 additional; The both sides, gutter base plate 33 lower surface of this boom hoisting are connected with matrix steel card 35, and this matrix steel card 35 is stuck on the bottom plate stanchions 34, and this bottom plate stanchions 34 is built on the bottom surface of said first, second gutter 55,54 and is in the both sides of said first, second divider wall 13,12; The said hydraulic turbine 11 is installed in top, said gutter base plate 33 upper surfaces; And the bridge-type steelframe 36 of this boom hoisting is installed on the upper surface of said first, second divider wall 13,12 and riverbank cemented platform 45, and running block 37 is installed on the bridge-type steelframe 36 and when lifting and is connected with the said hydraulic turbine 11 and gutter base plate 33.And construction has flood discharge tail gates 27 below said first, second bath gate 5,4.Open required bath gate bath generating when coming the water yield just often to close flood discharge tail gates 27; When coming the bigger than normal or flood season of the water yield, open first, second bath gate 5,4 bath generatings and 2,3 shuntings of first, second diversion gate simultaneously and drain off floodwaters, get rid of the sandstone foreign material.When running into especially big flood season, with running block 37 hang simultaneously premium on currency turbine 11 with gutter base plate 33 in case the hydraulic turbine 11 is flooded, open the 27 safety flood discharges smoothly of flood discharge tail gates simultaneously.
Embodiment 5; With reference to Fig. 1, Fig. 8, Figure 10, Figure 11, Figure 12, Figure 13; Be the basis with embodiment 2, install the boom hoisting of a cover hydraulic turbine 11 additional, but the both sides, gutter base plate 33 lower surface of this boom hoisting be connected with matrix steel card 35; This matrix steel card 35 is stuck on the bottom plate stanchions 34, and this bottom plate stanchions 34 is built on the bottom surface of said first, second, third gutter 55,54,56 and is in the both sides of said first, second, third divider wall 13,12,58; The said hydraulic turbine 11 is installed in top, said gutter base plate 33 upper surfaces; And the bridge-type steelframe 36 of this device of slinging is installed on the upper surface of said first, second, third divider wall 13,12,58 and riverbank cemented platform 45, and running block 37 is installed on the bridge-type steelframe 36 and when lifting and is connected with the said hydraulic turbine 11 and gutter base plate 33.And construction has flood discharge tail gates 27 below said first, second, third bath gate 5,4,57.Open required bath gate bath generating when coming the water yield just often to close flood discharge tail gates 27; When coming the bigger than normal or flood season of the water yield, open 5,4, the 57 bath generatings of first, second, third bath gate simultaneously and 2 shuntings of first diversion gate are drained off floodwaters, get rid of the sandstone foreign material.When running into especially big flood season, with running block 37 hang simultaneously premium on currency turbine 11 with gutter base plate 33 in case the hydraulic turbine 11 is flooded, open the 27 safety flood discharges smoothly of flood discharge tail gates simultaneously.
Embodiment 2,3,5 is suitable for building among the river course within existing river hydraulic power plant 20 certain distance afterwards; Come the water yield to be directed to the upper reaches, inflow direction natural flow station; Come the water yield stable; River comes the basic excessive sandstone foreign material that this power station do not worked the mischief in the water, and is therefore, an amount of as long as diversion gate, splitter box, bath gate and gutter are built.
Embodiment 6, referring to figs. 1 through Figure 13, when the section that the foregoing description 1 or 2 or 3 or 4 or 5 is built does not influence under the condition of peripheral farmland and farm house environment, can appropriateness increase the riverbank height within the preceding certain distance of gate, and drop increases generated energy to flood.In the accompanying drawing, 14 are the riverbank altitude line after increasing, the 15th, the normal water bit line before not damming; 16 do not increase preceding riverbank altitude line; 17 are the flood season flood level line before not increasing, and 18 are the normal water bit line of river after damming, and 19 are the normal water bit line of riverbank after increasing.
The method of the intensive construction of the foregoing description: to build or the delivery port bottom line at last seat 20 places, power station or the riverbed bottom line 21 at place, site are starting line; And with this line downstream square to the joining place of the flood season current waterline 17 that extends to next section river course, can build a said natural flow station again; When if two lines going cross each other point place should not build for some reason; Can be downstream square to continuing to extend to suitable construction place; When the riverbank height of suitable construction place is on the low side; Can riverbank altitude line 16 appropriateness of the former riverbank within the required separation distance before the gate before promptly not increasing be increased the riverbank altitude line 14 after increase; After damming, normal water bit line 19 places after the normal water bit line 15 before not damming also increases and increases to the riverbank, the horizontal water bit line of the normal water bit line 19 after increase on the riverbank must not be higher than have been built or the delivery port bottom line in last seat power station 20 or the riverbed bottom line 21 under the site.Otherwise, will produce resistance to the current of last seat power station delivery port; By this principle, the part rivers section that condition is suitable can be built one or several generated energy at thousands of kilowatts to tens thousand of kilowatts perhaps bigger kilowatt natural flow stations within thousands of meters distances, limited water resource is obtained fully or utilization at double.

Claims (6)

  1. One kind can intensive construction natural flow station, comprise the hydraulic turbine (11), generating set (7) and connect both transmission mechanism; It is characterized in that: it also comprises first, second diversion gate (2,3), first, second bath gate (5,4), first, second divider wall (13,12) Reach first, second gutter (55,54) that forms by this first, second divider wall (13,12);Said first, second diversion gate (2,3) and first, second bath gate (5,4) are built the upstream extremity of rivers (1) inflow direction successively in, and said first, second divider wall (13,12) is built the downstream of said first, second bath gate (5,4) in; The said hydraulic turbine (11) is distributed among first, second gutter (55,54), is connected with said transmission mechanism after the power transmission shaft (9) of each hydraulic turbine (11) that this is horizontal interconnects again.
  2. 2. a kind of natural flow station that can intensive construction according to claim 1 is characterized in that: it also has the 3rd gutter (56) of the 3rd bath gate (57) and the 3rd divider wall (58) and formation thereof; Said first diversion gate (2) and first, second, third bath gate (5,4,57) are built the upstream extremity of rivers (1) inflow direction in; Downstream and this first, second, third divider wall (13,12,58) that said first, second, third divider wall (13,12,58) is built said first, second, third bath gate (5,4,57) in form first, second, third gutter (55,54,56); The said hydraulic turbine (11) is distributed among said first, second, third gutter (55,54,56), is connected with said transmission mechanism after the power transmission shaft (9) of each hydraulic turbine (11) that this is horizontal interconnects again.
  3. 3. a kind of natural flow station that can intensive construction according to claim 2, it is characterized in that: said first diversion gate (2) forms splitter box (22), and the upper reaches of this splitter box (22), tract have upper and lower navigation gate (23,24) respectively.
  4. 4. a kind of natural flow station that can intensive construction according to claim 1 and 2; It is characterized in that: said transmission mechanism comprises break-in power transmission shaft (8) and speed change wheels (6); Be connected with break-in power transmission shaft (8) on being located at haugh (45) through change gear (10) again after the power transmission shaft (9) of said horizontal each hydraulic turbine (11) interconnects, and this break-in power transmission shaft (8) passes through speed change wheels (6) and is connected with said generating set (7).
  5. 5. according to claim 1 or 2 or 3 described a kind of natural flow stations that can intensive construction; It is characterized in that: it also comprises the boom hoisting of the hydraulic turbine (11); The gutter base plate (33) of this boom hoisting is fixed on the bottom plate stanchions (34) through matrix steel card (35), and this bottom plate stanchions (34) is built on the bottom surface of said first, second gutter (55,54) or first, second, third gutter (55,54,56) and is in the both sides of said first, second divider wall (13,12) or first, second, third divider wall (13,12,58); The said hydraulic turbine (11) is installed in top, said gutter base plate (33) upper surface; And the bridge-type steelframe (36) of this boom hoisting is installed on the upper surface of said first, second divider wall (13,12) and riverbank cemented platform (45) or first, second, third divider wall (13,12,58) and riverbank cemented platform (45), and running block (37) is installed in bridge-type steelframe (36) and upward and when lifting is connected with the said hydraulic turbine (11) and gutter base plate (33).
  6. 6. a kind of natural flow station that can intensive construction according to claim 5; It is characterized in that: it also comprises flood discharge tail gates (27), and these flood discharge tail gates (27) are installed in the below of said first, second bath gate (5,4) or first, second, third bath gate (5,4,57).
CN2011204253665U 2011-09-16 2011-11-01 Hydroelectric power station capable of being built densely Expired - Fee Related CN202323893U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204253665U CN202323893U (en) 2011-09-16 2011-11-01 Hydroelectric power station capable of being built densely

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201120347383.1 2011-09-16
CN201120347383 2011-09-16
CN2011204253665U CN202323893U (en) 2011-09-16 2011-11-01 Hydroelectric power station capable of being built densely

Publications (1)

Publication Number Publication Date
CN202323893U true CN202323893U (en) 2012-07-11

Family

ID=46217797

Family Applications (2)

Application Number Title Priority Date Filing Date
CN2011204253665U Expired - Fee Related CN202323893U (en) 2011-09-16 2011-11-01 Hydroelectric power station capable of being built densely
CN201110339190.6A Active CN102505670B (en) 2011-09-16 2011-11-01 Method for densely building hydroelectric power station and hydroelectric power station capable of being densely built

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201110339190.6A Active CN102505670B (en) 2011-09-16 2011-11-01 Method for densely building hydroelectric power station and hydroelectric power station capable of being densely built

Country Status (1)

Country Link
CN (2) CN202323893U (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625350A (en) * 2018-07-09 2018-10-09 中国电建集团北京勘测设计研究院有限公司 It is a kind of to be arranged in without the combined system according to flow control suspended load separate mode that pressure is dark to be contained
CN112359789B (en) * 2020-09-17 2022-06-10 吉林松江河水力发电有限责任公司 Construction method of simple hydroelectric power station and simple hydroelectric power station

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT1315627B1 (en) * 2000-03-30 2003-03-14 Paolo Mario Tosi HYDROELECTRIC SYSTEM WITH FORCED DUCTS PLACED ON THE UNFIUME BED.
CN101054948A (en) * 2007-05-21 2007-10-17 胡碎芬 Power station of running water
CN101725134A (en) * 2008-10-28 2010-06-09 路广耀 River waterflow power station
CN201574871U (en) * 2009-10-30 2010-09-08 王文君 Non-dam hydroelectric power station

Also Published As

Publication number Publication date
CN102505670B (en) 2014-08-27
CN102505670A (en) 2012-06-20

Similar Documents

Publication Publication Date Title
KR100883756B1 (en) Complex ocean power system combining sluice power and ocean current power
CN109580168B (en) Wave flow strong coupling simulation test pool and test method thereof
CN203188185U (en) United energy dissipation structure under ultralow Froude number
CN101806050A (en) Tube bundle-type natural water diversion device and water diversion method for generating electricity
CN103195015B (en) The method that river technological synthesis develops lake and marshland is made based on enclosing lake
CN202323893U (en) Hydroelectric power station capable of being built densely
CN102304911A (en) Horizontal dam-free running water impacted power station
CN201598620U (en) Inverted-L sediment retaining weir structure
CN106958235B (en) A kind of Hydraulic Design Method of water conservancy diversion bank-baffle pier-beam column construction baffle wall style combined energy dissipater
KR200418822Y1 (en) Water-power generating apparatus
CN202522430U (en) Experimental model for tunnel rainwater collection
CN201614576U (en) Natural water drawing device for pipe bundle electricity generation
CN206752427U (en) A kind of power station ground power house tailrace outlet structure and its power station
CN201986589U (en) Middle-layer water taking oncomelania prevention blocking net
KR20070093225A (en) Water-power generating method and apparatus
CN208456765U (en) A kind of artesian water power generator
CN102234993A (en) Unidirectional flow project for seawater in high-level downflow weirs
CN101089386A (en) Structure method of hydroenergy generation
CN206439142U (en) Draw the tridimensional drainage formula hydroelectric power system for connecing bridge
CN201420638Y (en) Gantry-type damless bucket blade runner hydroelectric generator
CN103485964B (en) Buoyancy series connection is utilized to promote the circulation hydraulic generating method and system of water
JP2012145090A (en) Power generation method by artificial water channel type water-wheel generator, power generation method by sea-water tide type water-wheel generator, artificial water channel type water-wheel generator, sea-water tide type water-wheel generator, artificial water channel for undershot water-wheel generator, and artificial water channel type irrigation water-wheel
CN103397977A (en) Pipeline-laying type hydroelectric generation method and electric generation facility thereof
CN202209247U (en) Suspended hydraulic power generation device
CN217923437U (en) Submersible power station

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120711

Termination date: 20141101

EXPY Termination of patent right or utility model