CN202323758U - Movable supporting frame in construction process of bridge - Google Patents

Movable supporting frame in construction process of bridge Download PDF

Info

Publication number
CN202323758U
CN202323758U CN2011204873028U CN201120487302U CN202323758U CN 202323758 U CN202323758 U CN 202323758U CN 2011204873028 U CN2011204873028 U CN 2011204873028U CN 201120487302 U CN201120487302 U CN 201120487302U CN 202323758 U CN202323758 U CN 202323758U
Authority
CN
China
Prior art keywords
steel pipe
pipe
stay
bridge
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204873028U
Other languages
Chinese (zh)
Inventor
谭强
曾维亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU MUNICIPAL ENGINEERING (GROUP) Co Ltd
Original Assignee
CHENGDU MUNICIPAL ENGINEERING (GROUP) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU MUNICIPAL ENGINEERING (GROUP) Co Ltd filed Critical CHENGDU MUNICIPAL ENGINEERING (GROUP) Co Ltd
Priority to CN2011204873028U priority Critical patent/CN202323758U/en
Application granted granted Critical
Publication of CN202323758U publication Critical patent/CN202323758U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a movable supporting frame in the construction process of a bridge. The movable supporting frame comprises a first steel pipe, a second steel pipe, a third steel pipe and a fourth steel pipe, which are hollow and sequentially connected, wherein the first steel pipe is connected with the fourth steel pipe; and a roller is arranged at the bottom of each steel pipe. The movable supporting frame is simple in structure; with the rollers, the supporting frame quickly moves, construction of the bottom and sidewall of the bridge is facilitated, and the labor intensity of an operator is reduced; meanwhile, the movable supporting frame is low in manufacturing cost and can be manufactured by using rejected materials of a construction site, and production resources are saved.

Description

The mobile bracing frame that is used for bridge construction process
Technical field
The utility model relates to a kind of mobile bracing frame, especially relates to a kind of mobile bracing frame that is used for bridge construction process.
Background technology
Human at protohistory age, cross over water channel and valley, be the trees that utilize nature to fall down, the stone beam or the stone arch that form naturally, the stone that the mountain stream is outstanding, the Chinese wistaria of paddy bank growth etc.The mankind on purpose lumber to bridge or enrockment, frame stone are when bridge starts from, and have been difficult to textual criticism.According to the historical data record, beam bridge and pontoon bridge have been had in the Zhou Dynasty (B.C. 11st century~preceding 256 years) in China, and as B.C. about 1134, the Western Zhou Dynasty, the water frame had pontoon bridge in Weihe.Ancient babylonia is at the B.C. wooden bridge of building multispan in 1800, and bridge reaches 183 meters.Ancient Roman built the wooden bridge of crossing over the Tiber at B.C. 621 years, erected the pontoon bridge of crossing over these other straits of haler at B.C. 481 years.Mesopotamia area was built up when B.C. 4th century and was chosen stone arch bridge (soffit is a step) ancient times.Ancient times, bridge was before the 17th century, generally was to build with wood, stone material, and was divided into stone bridge and wooden bridge to bridge by the bridge construction material.
18th century iron production and casting, for bridge provides new construction material.But the cast iron shock resistance is poor, and tensile property is also low, and easy fracture is not good bridging material.After the fifties in 19th century, along with the development of acid converter steel-making and open hearth steel-smelting technology, steel become important bridging material.The tensile strength of steel is big, and shock resistance is good, the seventies in 19th century especially occurs steel plate and the rolling section steel of rectangle, in factory, assembles the condition of having created for the parts of bridge, and it is increasingly extensive that steel are used.18 beginnings of the century, invented the cement that forms with lime, clay, bloodstone mixed calcining.The fifties in 19th century, begin to be employed in and place reinforcing bar in the concrete to remedy the shortcoming of cement tensile property difference.After this, built up reinforced concrete bridge the seventies in 19th century.
Modern age, bridge construction promoted the rise and the development of bridge scientific theory.1857 by Sheng Wonan on the basis of theory, statics and mechanics of materials research of forefathers to arch, proposed more complete beam theory and reversed theory.This, theory of continuous beam and semi girder was also set up in period.Bridge truss is analyzed (like the analytical method of Warren girder and Howe truss) and also is resolved.The seventies in 19th century, structural mechanics obtained very big development, can analyze the stress that each member of bridge takes place under load action after people's such as German K. Coleman, British W.J.M. Rankine and J.C. Maxwell effort.The development that these are theoretical has promoted the development of truss, continuous beam and semi girder.In 19 end of the centurys, elastic arch theory is more perfect, has promoted the arch bridge development.The twenties in 20th century soil mechanics rise, promoted the theoretical research of bridge foundation.
In the work progress of bridge, there is certain height the bottom of bridge apart from ground usually, and workman's height can't reach, and not only cost is high to use large-scale equipment, and volume is big, moves inconvenience, incurs loss through delay the duration.
The utility model content
The purpose of the utility model is to overcome the shortcoming and defect of above-mentioned prior art, and a kind of mobile bracing frame that is used for bridge construction process is provided, and this moves the simple in structure of bracing frame; Utilize the pair of rollers bracing frame to carry out fast moving; Conveniently the bottom and the sidewall of bridge are constructed, reduced labor intensity of operating personnel, cost of manufacture is low simultaneously; Utilizing the building site is that obsolete material just can be made, and has practiced thrift the resources of production.
The purpose of the utility model realizes through following technical proposals: the mobile bracing frame that is used for bridge construction process; The steel pipe one, steel pipe two, steel pipe three, the steel pipe four that comprise inner hollow; Said steel pipe one, steel pipe two, steel pipe three, steel pipe four connect successively; Steel pipe one is connected with steel pipe four, and the bottom of said steel pipe one, steel pipe two, steel pipe three, steel pipe four is provided with roller.
Be provided with stay pipe one between said steel pipe one and the steel pipe two, the two ends of said stay pipe one are connected with steel pipe two with steel pipe one respectively.
Be provided with stay pipe two between said steel pipe three and the steel pipe four, the two ends of said stay pipe two are connected with steel pipe four with steel pipe three respectively.
Be provided with gripper shoe between said stay pipe one and the stay pipe two, the two ends of said gripper shoe are connected with stay pipe two with stay pipe one respectively.
Between said steel pipe one and the steel pipe four mounting pipe one is set, the two ends of said mounting pipe one are connected with steel pipe four with steel pipe one respectively; Between said steel pipe two and the steel pipe three mounting pipe two is set, the two ends of said mounting pipe two are connected with steel pipe three with steel pipe two respectively.
Be provided with stay pipe three between said steel pipe one and the steel pipe two, be provided with cat ladder one between said stay pipe one and the stay pipe three, the two ends of said cat ladder one are connected with stay pipe three with stay pipe one respectively.
Be provided with stay pipe four between said steel pipe three and the steel pipe four, be provided with cat ladder two between said stay pipe two and the stay pipe four, the two ends of said cat ladder two are connected with stay pipe four with stay pipe two respectively.
The bottom of said roller is arranged on the same horizontal plane.
In sum; The beneficial effect of the utility model is: this moves the simple in structure of bracing frame, utilizes the pair of rollers bracing frame to carry out fast moving, conveniently the bottom and the sidewall of bridge is constructed; Reduced labor intensity of operating personnel; Cost of manufacture is low simultaneously, and utilizing the building site is that obsolete material just can be made, and has practiced thrift the resources of production.
Description of drawings
The structural representation of Fig. 1 the utility model.
Mark and corresponding component title in the accompanying drawing: 1-stay pipe one; 2-cat ladder one; 3-steel pipe one; 4-stay pipe three; 5-mounting pipe one; 6-mounting pipe two; 7-roller; 8-stay pipe four; 9-cat ladder two; 10-steel pipe three; 11-stay pipe two; 12-steel pipe four; 13-gripper shoe; 14-steel pipe two.
The specific embodiment
Below in conjunction with embodiment and accompanying drawing, the utility model is done further to specify, but the embodiment of the utility model is not limited only to this.
Embodiment:
As shown in Figure 1; The mobile bracing frame that is used for bridge construction process; The steel pipe 1, steel pipe 2 14, steel pipe 3 10, the steel pipe 4 12 that comprise inner hollow; Said steel pipe 1, steel pipe 2 14, steel pipe 3 10, steel pipe 4 12 connect successively, and steel pipe 1 is connected with steel pipe 4 12, and the bottom of said steel pipe 1, steel pipe 2 14, steel pipe 3 10, steel pipe 4 12 is provided with roller 7.Adopt steel pipe manufacturing, not only simple in structure, and quick-detach soon.
Be provided with stay pipe 1 between said steel pipe 1 and the steel pipe 2 14, the two ends of said stay pipe 1 are connected with steel pipe 2 14 with steel pipe 1 respectively.Through the connection of many stay pipes, make that the steadiness between the steel pipe is better, constitute a stereochemical structure, the workman stands in the top and can not produce and rock.
Be provided with stay pipe 2 11 between said steel pipe 3 10 and the steel pipe 4 12, the two ends of said stay pipe 2 11 are connected with steel pipe 4 12 with steel pipe 3 10 respectively.
Be provided with gripper shoe 13 between said stay pipe 1 and the stay pipe 2 11, the two ends of said gripper shoe 13 are connected with stay pipe 2 11 with stay pipe 1 respectively.The device that gripper shoe 13 is trampled in work progress as the workman, gripper shoe 13 need have suitable width and thickness, can support the weight of workman and instrument, guarantees workman's safety.
Between said steel pipe 1 and the steel pipe 4 12 mounting pipe 1 is set, the two ends of said mounting pipe 1 are connected with steel pipe 4 12 with steel pipe 1 respectively; Between said steel pipe 2 14 and the steel pipe 3 10 mounting pipe 26 is set, the two ends of said mounting pipe 26 are connected with steel pipe 3 10 with steel pipe 2 14 respectively.Mounting pipe guarantees the steadiness that bracing frame is whole on the side, play a part floor.
Be provided with stay pipe 34 between said steel pipe 1 and the steel pipe 2 14, be provided with cat ladder 1 between said stay pipe 1 and the stay pipe 34, the two ends of said cat ladder 1 are connected with stay pipe 34 with stay pipe 1 respectively.Both sides at bracing frame are provided with cat ladder, make things convenient for the workman about.Stay pipe 34 is arranged on the below of stay pipe 1.
Be provided with stay pipe 48 between said steel pipe 3 10 and the steel pipe 4 12, be provided with cat ladder 29 between said stay pipe 2 11 and the stay pipe 4 12, the two ends of said cat ladder 29 are connected with stay pipe 4 12 with stay pipe 2 11 respectively.Stay pipe 4 12 is arranged on the below of stay pipe 2 11
The bottom of said roller 7 is arranged on the same horizontal plane.Roller 7 is arranged on the same horizontal plane, has guaranteed the balance of bracing frame, makes things convenient for workman stablizing in work progress, guarantees workman's safety.
Take aforesaid way, just can realize the utility model preferably.

Claims (8)

1. the mobile bracing frame that is used for bridge construction process; The steel pipe one (3), steel pipe two (14), steel pipe three (10), the steel pipe four (12) that comprise inner hollow; It is characterized in that: said steel pipe one (3), steel pipe two (14), steel pipe three (10), steel pipe four (12) connect successively; Steel pipe one (3) is connected with steel pipe four (12), and the bottom of said steel pipe one (3), steel pipe two (14), steel pipe three (10), steel pipe four (12) is provided with roller (7).
2. the mobile bracing frame that is used for bridge construction process as claimed in claim 1; It is characterized in that: be provided with stay pipe one (1) between said steel pipe one (3) and the steel pipe two (14), the two ends of said stay pipe one (1) are connected with steel pipe two (14) with steel pipe one (3) respectively.
3. the mobile bracing frame that is used for bridge construction process as claimed in claim 2; It is characterized in that: be provided with stay pipe two (11) between said steel pipe three (10) and the steel pipe four (12), the two ends of said stay pipe two (11) are connected with steel pipe four (12) with steel pipe three (10) respectively.
4. the mobile bracing frame that is used for bridge construction process as claimed in claim 3; It is characterized in that: be provided with gripper shoe (13) between said stay pipe one (1) and the stay pipe two (11), the two ends of said gripper shoe (13) are connected with stay pipe two (11) with stay pipe one (1) respectively.
5. the mobile bracing frame that is used for bridge construction process as claimed in claim 4; It is characterized in that: between said steel pipe one (3) and the steel pipe four (12) mounting pipe one (5) is set, the two ends of said mounting pipe one (5) are connected with steel pipe four (12) with steel pipe one (3) respectively; Between said steel pipe two (14) and the steel pipe three (10) mounting pipe two (6) is set, the two ends of said mounting pipe two (6) are connected with steel pipe three (10) with steel pipe two (14) respectively.
6. the mobile bracing frame that is used for bridge construction process as claimed in claim 5; It is characterized in that: be provided with stay pipe three (4) between said steel pipe one (3) and the steel pipe two (14); Be provided with cat ladder one (2) between said stay pipe one (1) and the stay pipe three (4), the two ends of said cat ladder one (2) are connected with stay pipe three (4) with stay pipe one (1) respectively.
7. the mobile bracing frame that is used for bridge construction process as claimed in claim 6; It is characterized in that: be provided with stay pipe four (8) between said steel pipe three (10) and the steel pipe four (12); Be provided with cat ladder two (9) between said stay pipe two (11) and the stay pipe four (8), the two ends of said cat ladder two (9) are connected with stay pipe four (8) with stay pipe two (11) respectively.
8. like any described mobile bracing frame that is used for bridge construction process in the claim 1 to 7, it is characterized in that: the bottom of said roller (7) is arranged on the same horizontal plane.
CN2011204873028U 2011-11-30 2011-11-30 Movable supporting frame in construction process of bridge Expired - Fee Related CN202323758U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204873028U CN202323758U (en) 2011-11-30 2011-11-30 Movable supporting frame in construction process of bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204873028U CN202323758U (en) 2011-11-30 2011-11-30 Movable supporting frame in construction process of bridge

Publications (1)

Publication Number Publication Date
CN202323758U true CN202323758U (en) 2012-07-11

Family

ID=46435742

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204873028U Expired - Fee Related CN202323758U (en) 2011-11-30 2011-11-30 Movable supporting frame in construction process of bridge

Country Status (1)

Country Link
CN (1) CN202323758U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106320175A (en) * 2016-03-17 2017-01-11 中天建设集团有限公司 Simple device for connecting steel pipe support piers

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106320175A (en) * 2016-03-17 2017-01-11 中天建设集团有限公司 Simple device for connecting steel pipe support piers

Similar Documents

Publication Publication Date Title
RU79908U1 (en) STEEL AND CONCRETE BEAM (OPTIONS)
CN102061742B (en) Shockproof reinforced concrete pseudo-classic building structural system
CN203559333U (en) Steel truss-channel girder combined bridge structure of railway
CN204356996U (en) The U-shaped beam of prefabricated reinforced concrete with horizontal steel diaphragm
CN217631485U (en) Rail sliding type temporary support for large-span steel structure roof
CN208293400U (en) A kind of ultra-high performance concrete-part girder steel combination bent cap
CN202323758U (en) Movable supporting frame in construction process of bridge
CN202316866U (en) Cutting machine for steel bars in bridge construction process
CN103541300A (en) Railway concrete continuous beam implemented based on flat-pushing method and construction method thereof
CN204059756U (en) The truss of a kind of pre-stressed steel pipe concrete purlin sheet and structure thereof
CN202323760U (en) Support frame for mounting steel column during bridge construction
CN202323947U (en) Anchor rod piling structure used for bridge construction
CN202323755U (en) Multi-functional supporting device used in construction process of bridge
CN203066357U (en) Large-span arch-shaped steel truss structure
CN202323680U (en) Device used for fixedly connecting steel column
CN205116776U (en) Support access structure
CN202323705U (en) Steel structure for supporting bridge guardrail
CN204645350U (en) Be inverted two-way abdomen gusset Prestressed Concrete Superimposed Sheet Of Steel Bar Truss
CN210031482U (en) Prestressed assembled UHPC trestle column structure
CN202323681U (en) Shear force piece used during bridge construction
CN202323757U (en) Connecting device used for bridge construction process
CN205935403U (en) Cellular material herringbone roof beam sequential structure and no purlin girder roof truss structure that forms thereof
CN202323761U (en) Device for transmitting steel cable in bridge construction process
CN202323764U (en) Bridge construction shear element provided with shear nails
CN201443161U (en) High-span roofing space pipe truss structure for heavy industry

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120711

Termination date: 20121130