CN202323757U - Connecting device used for bridge construction process - Google Patents
Connecting device used for bridge construction process Download PDFInfo
- Publication number
- CN202323757U CN202323757U CN2011204873013U CN201120487301U CN202323757U CN 202323757 U CN202323757 U CN 202323757U CN 2011204873013 U CN2011204873013 U CN 2011204873013U CN 201120487301 U CN201120487301 U CN 201120487301U CN 202323757 U CN202323757 U CN 202323757U
- Authority
- CN
- China
- Prior art keywords
- hole
- bridge
- construction process
- bridge construction
- connecting device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses a connecting device used for a bridge construction process, which comprises a casing pipe; the center of the casing pipe is provided with a threaded through hole; the casing pipe is provided with a mounting base; and the mounting base is provided with penetration holes. The connecting device has a simple structure and is convenient to disassemble. Steel pipes, especially steel pipes crossed in different directions, are connected by the through holes. The structure stability is improved. The connecting device can be utilized for multiple times, the mounting time is saved, and the working efficiency is improved.
Description
Technical field
The utility model relates to a kind of linkage, especially relates to a kind of linkage that is used for bridge construction process.
Background technology
Human at protohistory age, cross over water channel and valley, be the trees that utilize nature to fall down, the stone beam or the stone arch that form naturally, the stone that the mountain stream is outstanding, the Chinese wistaria of paddy bank growth etc.The mankind on purpose lumber to bridge or enrockment, frame stone are when bridge starts from, and have been difficult to textual criticism.According to the historical data record, beam bridge and pontoon bridge have been had in the Zhou Dynasty (B.C. 11st century~preceding 256 years) in China, and as B.C. about 1134, the Western Zhou Dynasty, the water frame had pontoon bridge in Weihe.Ancient babylonia is at the B.C. wooden bridge of building multispan in 1800, and bridge reaches 183 meters.Ancient Roman built the wooden bridge of crossing over the Tiber at B.C. 621 years, erected the pontoon bridge of crossing over these other straits of haler at B.C. 481 years.Mesopotamia area was built up when B.C. 4th century and was chosen stone arch bridge (soffit is a step) ancient times.Ancient times, bridge was before the 17th century, generally was to build with wood, stone material, and was divided into stone bridge and wooden bridge to bridge by the bridge construction material.
18th century iron production and casting, for bridge provides new construction material.But the cast iron shock resistance is poor, and tensile property is also low, and easy fracture is not good bridging material.After the fifties in 19th century, along with the development of acid converter steel-making and open hearth steel-smelting technology, steel become important bridging material.The tensile strength of steel is big, and shock resistance is good, the seventies in 19th century especially occurs steel plate and the rolling section steel of rectangle, in factory, assembles the condition of having created for the parts of bridge, and it is increasingly extensive that steel are used.18 beginnings of the century, invented the cement that forms with lime, clay, bloodstone mixed calcining.The fifties in 19th century, begin to be employed in and place reinforcing bar in the concrete to remedy the shortcoming of cement tensile property difference.After this, built up reinforced concrete bridge the seventies in 19th century.
Modern age, bridge construction promoted the rise and the development of bridge scientific theory.1857 by Sheng Wonan on the basis of theory, statics and mechanics of materials research of forefathers to arch, proposed more complete beam theory and reversed theory.This, theory of continuous beam and semi girder was also set up in period.Bridge truss is analyzed (like the analytical method of Warren girder and Howe truss) and also is resolved.The seventies in 19th century, structural mechanics obtained very big development, can analyze the stress that each member of bridge takes place under load action after people's such as German K. Coleman, British W.J.M. Rankine and J.C. Maxwell effort.The development that these are theoretical has promoted the development of truss, continuous beam and semi girder.In 19 end of the centurys, elastic arch theory is more perfect, has promoted the arch bridge development.The twenties in 20th century soil mechanics rise, promoted the theoretical research of bridge foundation.
Bridge needs to adopt different steel pipes to connect when building, because the One's name is legion of steel pipe can produce infall sometimes, needs to adopt device that cross one another steel pipe is connected, and increases stability.
The utility model content
The purpose of the utility model is to overcome the shortcoming and defect of above-mentioned prior art, and a kind of linkage that is used for bridge construction process is provided, this linkage simple in structure; Utilize through hole that steel pipe is connected, especially, increase stability of structure at the steel pipe of the intersection of different directions; Can repeatedly utilize; And convenient disassembly, save the set-up time, increase work efficiency.
The purpose of the utility model realizes through following technical proposals: be used for the linkage of bridge construction process, comprise that the center is provided with the sleeve pipe of tapped through hole, said sleeve pipe is provided with mount pad, and said mount pad is provided with through hole.
The center line of said through hole is vertical with the center line of tapped through hole.
Said sleeve pipe is provided with holder in the side away from mount pad, and said holder is provided with groove.
Said holder is provided with through hole, and said through hole penetrates the inside of groove, and the center line of said through hole is parallel with the center line of through hole.
Be provided with bolt in the said through hole, the two ends of said bolt are arranged on the outside of holder.
In sum, the beneficial effect of the utility model is: this linkage simple in structure, and utilize through hole that steel pipe is connected; Especially at the steel pipe of the intersection of different directions, increase stability of structure, can repeatedly utilize; And convenient disassembly, save the set-up time, increase work efficiency.
Description of drawings
The structural representation of Fig. 1 the utility model.
Mark and corresponding component title in the accompanying drawing: 1-through hole; 2-sleeve pipe; 3-groove; 4-holder; 5-tapped through hole; 6-through hole; 7-mount pad.
The specific embodiment
Below in conjunction with embodiment and accompanying drawing, the utility model is done further to specify, but the embodiment of the utility model is not limited only to this.
Embodiment:
As shown in Figure 1, be used for the linkage of bridge construction process, comprise that the center is provided with the sleeve pipe 2 of tapped through hole 6, said sleeve pipe 2 is provided with mount pad 7, and said mount pad 7 is provided with through hole 1.Sleeve pipe 2 utilizes tapped through hole 5 that steel pipe is fixed to clamp, and through hole 1 is fixed the pipeline vertical with steel pipe simultaneously, makes steel pipe and pipeline link together, and increases the stable degree between them.
The center line of said through hole 1 is vertical with the center line of tapped through hole 5.Design has the function of cross buckle like this, and concrete angle can design various ways, selects the linkage of different angles according to the needs of job site.
Said sleeve pipe 2 is provided with holder 4 in the side away from mount pad 7, and said holder 4 is provided with groove 3.Groove 3 makes things convenient for bolt when unscrewing, to be rotated, and can change installation direction, makes that workman's operation is lighter.
4 are provided with through hole 6 on the said holder, and said through hole 6 penetrates the inside of groove 3, and the center line of said through hole 6 is parallel with the center line of through hole 1.
Be provided with bolt in the said through hole 6, the two ends of said bolt are arranged on the outside of holder 4.Bolt is as link, and sleeve pipe 2 and other parts and integral bridge are fixed, and makes all parts form an integral body, practices thrift installing space, and is more attractive in appearance in appearance.
Take aforesaid way, just can realize the utility model preferably.
Claims (5)
1. be used for the linkage of bridge construction process, it is characterized in that: comprise that the center is provided with the sleeve pipe of tapped through hole (6) (2), said sleeve pipe (2) is provided with mount pad (7), and said mount pad (7) is provided with through hole (1).
2. the linkage that is used for bridge construction process as claimed in claim 1 is characterized in that: the center line of said through hole (1) is vertical with the center line of tapped through hole (6).
3. the linkage that is used for bridge construction process as claimed in claim 1 is characterized in that: said sleeve pipe (2) is provided with holder (4) in the side away from mount pad (7), and said holder (4) is provided with groove (3).
4. the linkage that is used for bridge construction process as claimed in claim 3; It is characterized in that: said holder (4) is provided with through hole (5); Said through hole (5) penetrates the inside of groove (3), and the center line of said through hole (5) is parallel with the center line of through hole (1).
5. the linkage that is used for bridge construction process as claimed in claim 4 is characterized in that: said through hole is provided with bolt in (5), and the two ends of said bolt are arranged on the outside of holder (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204873013U CN202323757U (en) | 2011-11-30 | 2011-11-30 | Connecting device used for bridge construction process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204873013U CN202323757U (en) | 2011-11-30 | 2011-11-30 | Connecting device used for bridge construction process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202323757U true CN202323757U (en) | 2012-07-11 |
Family
ID=46435741
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011204873013U Expired - Fee Related CN202323757U (en) | 2011-11-30 | 2011-11-30 | Connecting device used for bridge construction process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202323757U (en) |
-
2011
- 2011-11-30 CN CN2011204873013U patent/CN202323757U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104032840B (en) | The prestressing force assembling frame node connecting structure of additional angle steel | |
CN204983171U (en) | Prefabricated post connecting device | |
CN202323654U (en) | Stone grinding machine for bridge construction process | |
CN102061742B (en) | Shockproof reinforced concrete pseudo-classic building structural system | |
CN203096945U (en) | Novel panel point of concrete-filled steel tubular column, reinforced concrete beam having bonding pre-stressing force and ring beam | |
CN103938730A (en) | Combination node for connecting concrete beam with round steel tube concrete column through unbonded prestressed ribs and ordinary steel bars | |
CN202316866U (en) | Cutting machine for steel bars in bridge construction process | |
CN107605064A (en) | A kind of anti-buckling support coupling beam of assembled X-shaped | |
CN206091355U (en) | Post structure is taken out to concrete plant's pillars of a house | |
CN202323757U (en) | Connecting device used for bridge construction process | |
CN103924676A (en) | Prestressed connecting joint for concrete beam and circular steel pipe concrete column | |
CN202323760U (en) | Support frame for mounting steel column during bridge construction | |
CN202610830U (en) | Bracket type material-blocking wall and umbrella-shaped roof | |
CN202323755U (en) | Multi-functional supporting device used in construction process of bridge | |
CN202323756U (en) | Hollow grouting anchor rod used in bridge construction process | |
CN202401384U (en) | Ballasting structure of steel-truss cable-stayed bridge | |
CN205003027U (en) | Experiment loading device of web member node stress amplitude is considered to purlin formula arched bridge | |
CN103924682A (en) | Circular concrete-filled steel tubular column node of unbonded pre-stressing connecting concrete beam | |
CN103938732A (en) | Combination joint of prefabricated concrete beam and rectangular concrete filled steel tubular column connected through pre-stressed steel bars and common steel bars | |
CN202323758U (en) | Movable supporting frame in construction process of bridge | |
CN204185854U (en) | Based on the recyclable steel strand abnormity soldier pile of prestressing technique | |
CN203669204U (en) | Trussed steel reinforced concrete coupling beam | |
CN202323680U (en) | Device used for fixedly connecting steel column | |
CN103924685B (en) | Prestress connected concrete beam round steel tube concrete column node | |
CN202323947U (en) | Anchor rod piling structure used for bridge construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120711 Termination date: 20121130 |