CN202323757U - Connecting device used for bridge construction process - Google Patents

Connecting device used for bridge construction process Download PDF

Info

Publication number
CN202323757U
CN202323757U CN2011204873013U CN201120487301U CN202323757U CN 202323757 U CN202323757 U CN 202323757U CN 2011204873013 U CN2011204873013 U CN 2011204873013U CN 201120487301 U CN201120487301 U CN 201120487301U CN 202323757 U CN202323757 U CN 202323757U
Authority
CN
China
Prior art keywords
hole
bridge
construction process
bridge construction
connecting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204873013U
Other languages
Chinese (zh)
Inventor
谭强
曾维亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU MUNICIPAL ENGINEERING (GROUP) Co Ltd
Original Assignee
CHENGDU MUNICIPAL ENGINEERING (GROUP) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU MUNICIPAL ENGINEERING (GROUP) Co Ltd filed Critical CHENGDU MUNICIPAL ENGINEERING (GROUP) Co Ltd
Priority to CN2011204873013U priority Critical patent/CN202323757U/en
Application granted granted Critical
Publication of CN202323757U publication Critical patent/CN202323757U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a connecting device used for a bridge construction process, which comprises a casing pipe; the center of the casing pipe is provided with a threaded through hole; the casing pipe is provided with a mounting base; and the mounting base is provided with penetration holes. The connecting device has a simple structure and is convenient to disassemble. Steel pipes, especially steel pipes crossed in different directions, are connected by the through holes. The structure stability is improved. The connecting device can be utilized for multiple times, the mounting time is saved, and the working efficiency is improved.

Description

The linkage that is used for bridge construction process
Technical field
The utility model relates to a kind of linkage, especially relates to a kind of linkage that is used for bridge construction process.
Background technology
Human at protohistory age, cross over water channel and valley, be the trees that utilize nature to fall down, the stone beam or the stone arch that form naturally, the stone that the mountain stream is outstanding, the Chinese wistaria of paddy bank growth etc.The mankind on purpose lumber to bridge or enrockment, frame stone are when bridge starts from, and have been difficult to textual criticism.According to the historical data record, beam bridge and pontoon bridge have been had in the Zhou Dynasty (B.C. 11st century~preceding 256 years) in China, and as B.C. about 1134, the Western Zhou Dynasty, the water frame had pontoon bridge in Weihe.Ancient babylonia is at the B.C. wooden bridge of building multispan in 1800, and bridge reaches 183 meters.Ancient Roman built the wooden bridge of crossing over the Tiber at B.C. 621 years, erected the pontoon bridge of crossing over these other straits of haler at B.C. 481 years.Mesopotamia area was built up when B.C. 4th century and was chosen stone arch bridge (soffit is a step) ancient times.Ancient times, bridge was before the 17th century, generally was to build with wood, stone material, and was divided into stone bridge and wooden bridge to bridge by the bridge construction material.
18th century iron production and casting, for bridge provides new construction material.But the cast iron shock resistance is poor, and tensile property is also low, and easy fracture is not good bridging material.After the fifties in 19th century, along with the development of acid converter steel-making and open hearth steel-smelting technology, steel become important bridging material.The tensile strength of steel is big, and shock resistance is good, the seventies in 19th century especially occurs steel plate and the rolling section steel of rectangle, in factory, assembles the condition of having created for the parts of bridge, and it is increasingly extensive that steel are used.18 beginnings of the century, invented the cement that forms with lime, clay, bloodstone mixed calcining.The fifties in 19th century, begin to be employed in and place reinforcing bar in the concrete to remedy the shortcoming of cement tensile property difference.After this, built up reinforced concrete bridge the seventies in 19th century.
Modern age, bridge construction promoted the rise and the development of bridge scientific theory.1857 by Sheng Wonan on the basis of theory, statics and mechanics of materials research of forefathers to arch, proposed more complete beam theory and reversed theory.This, theory of continuous beam and semi girder was also set up in period.Bridge truss is analyzed (like the analytical method of Warren girder and Howe truss) and also is resolved.The seventies in 19th century, structural mechanics obtained very big development, can analyze the stress that each member of bridge takes place under load action after people's such as German K. Coleman, British W.J.M. Rankine and J.C. Maxwell effort.The development that these are theoretical has promoted the development of truss, continuous beam and semi girder.In 19 end of the centurys, elastic arch theory is more perfect, has promoted the arch bridge development.The twenties in 20th century soil mechanics rise, promoted the theoretical research of bridge foundation.
Bridge needs to adopt different steel pipes to connect when building, because the One's name is legion of steel pipe can produce infall sometimes, needs to adopt device that cross one another steel pipe is connected, and increases stability.
The utility model content
The purpose of the utility model is to overcome the shortcoming and defect of above-mentioned prior art, and a kind of linkage that is used for bridge construction process is provided, this linkage simple in structure; Utilize through hole that steel pipe is connected, especially, increase stability of structure at the steel pipe of the intersection of different directions; Can repeatedly utilize; And convenient disassembly, save the set-up time, increase work efficiency.
The purpose of the utility model realizes through following technical proposals: be used for the linkage of bridge construction process, comprise that the center is provided with the sleeve pipe of tapped through hole, said sleeve pipe is provided with mount pad, and said mount pad is provided with through hole.
The center line of said through hole is vertical with the center line of tapped through hole.
Said sleeve pipe is provided with holder in the side away from mount pad, and said holder is provided with groove.
Said holder is provided with through hole, and said through hole penetrates the inside of groove, and the center line of said through hole is parallel with the center line of through hole.
Be provided with bolt in the said through hole, the two ends of said bolt are arranged on the outside of holder.
In sum, the beneficial effect of the utility model is: this linkage simple in structure, and utilize through hole that steel pipe is connected; Especially at the steel pipe of the intersection of different directions, increase stability of structure, can repeatedly utilize; And convenient disassembly, save the set-up time, increase work efficiency.
Description of drawings
The structural representation of Fig. 1 the utility model.
Mark and corresponding component title in the accompanying drawing: 1-through hole; 2-sleeve pipe; 3-groove; 4-holder; 5-tapped through hole; 6-through hole; 7-mount pad.
The specific embodiment
Below in conjunction with embodiment and accompanying drawing, the utility model is done further to specify, but the embodiment of the utility model is not limited only to this.
Embodiment:
As shown in Figure 1, be used for the linkage of bridge construction process, comprise that the center is provided with the sleeve pipe 2 of tapped through hole 6, said sleeve pipe 2 is provided with mount pad 7, and said mount pad 7 is provided with through hole 1.Sleeve pipe 2 utilizes tapped through hole 5 that steel pipe is fixed to clamp, and through hole 1 is fixed the pipeline vertical with steel pipe simultaneously, makes steel pipe and pipeline link together, and increases the stable degree between them.
The center line of said through hole 1 is vertical with the center line of tapped through hole 5.Design has the function of cross buckle like this, and concrete angle can design various ways, selects the linkage of different angles according to the needs of job site.
Said sleeve pipe 2 is provided with holder 4 in the side away from mount pad 7, and said holder 4 is provided with groove 3.Groove 3 makes things convenient for bolt when unscrewing, to be rotated, and can change installation direction, makes that workman's operation is lighter.
4 are provided with through hole 6 on the said holder, and said through hole 6 penetrates the inside of groove 3, and the center line of said through hole 6 is parallel with the center line of through hole 1.
Be provided with bolt in the said through hole 6, the two ends of said bolt are arranged on the outside of holder 4.Bolt is as link, and sleeve pipe 2 and other parts and integral bridge are fixed, and makes all parts form an integral body, practices thrift installing space, and is more attractive in appearance in appearance.
Take aforesaid way, just can realize the utility model preferably.

Claims (5)

1. be used for the linkage of bridge construction process, it is characterized in that: comprise that the center is provided with the sleeve pipe of tapped through hole (6) (2), said sleeve pipe (2) is provided with mount pad (7), and said mount pad (7) is provided with through hole (1).
2. the linkage that is used for bridge construction process as claimed in claim 1 is characterized in that: the center line of said through hole (1) is vertical with the center line of tapped through hole (6).
3. the linkage that is used for bridge construction process as claimed in claim 1 is characterized in that: said sleeve pipe (2) is provided with holder (4) in the side away from mount pad (7), and said holder (4) is provided with groove (3).
4. the linkage that is used for bridge construction process as claimed in claim 3; It is characterized in that: said holder (4) is provided with through hole (5); Said through hole (5) penetrates the inside of groove (3), and the center line of said through hole (5) is parallel with the center line of through hole (1).
5. the linkage that is used for bridge construction process as claimed in claim 4 is characterized in that: said through hole is provided with bolt in (5), and the two ends of said bolt are arranged on the outside of holder (4).
CN2011204873013U 2011-11-30 2011-11-30 Connecting device used for bridge construction process Expired - Fee Related CN202323757U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204873013U CN202323757U (en) 2011-11-30 2011-11-30 Connecting device used for bridge construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204873013U CN202323757U (en) 2011-11-30 2011-11-30 Connecting device used for bridge construction process

Publications (1)

Publication Number Publication Date
CN202323757U true CN202323757U (en) 2012-07-11

Family

ID=46435741

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204873013U Expired - Fee Related CN202323757U (en) 2011-11-30 2011-11-30 Connecting device used for bridge construction process

Country Status (1)

Country Link
CN (1) CN202323757U (en)

Similar Documents

Publication Publication Date Title
CN104032840B (en) The prestressing force assembling frame node connecting structure of additional angle steel
CN204983171U (en) Prefabricated post connecting device
CN202323654U (en) Stone grinding machine for bridge construction process
CN102061742B (en) Shockproof reinforced concrete pseudo-classic building structural system
CN203096945U (en) Novel panel point of concrete-filled steel tubular column, reinforced concrete beam having bonding pre-stressing force and ring beam
CN103938730A (en) Combination node for connecting concrete beam with round steel tube concrete column through unbonded prestressed ribs and ordinary steel bars
CN202316866U (en) Cutting machine for steel bars in bridge construction process
CN107605064A (en) A kind of anti-buckling support coupling beam of assembled X-shaped
CN206091355U (en) Post structure is taken out to concrete plant's pillars of a house
CN202323757U (en) Connecting device used for bridge construction process
CN103924676A (en) Prestressed connecting joint for concrete beam and circular steel pipe concrete column
CN202323760U (en) Support frame for mounting steel column during bridge construction
CN202610830U (en) Bracket type material-blocking wall and umbrella-shaped roof
CN202323755U (en) Multi-functional supporting device used in construction process of bridge
CN202323756U (en) Hollow grouting anchor rod used in bridge construction process
CN202401384U (en) Ballasting structure of steel-truss cable-stayed bridge
CN205003027U (en) Experiment loading device of web member node stress amplitude is considered to purlin formula arched bridge
CN103924682A (en) Circular concrete-filled steel tubular column node of unbonded pre-stressing connecting concrete beam
CN103938732A (en) Combination joint of prefabricated concrete beam and rectangular concrete filled steel tubular column connected through pre-stressed steel bars and common steel bars
CN202323758U (en) Movable supporting frame in construction process of bridge
CN204185854U (en) Based on the recyclable steel strand abnormity soldier pile of prestressing technique
CN203669204U (en) Trussed steel reinforced concrete coupling beam
CN202323680U (en) Device used for fixedly connecting steel column
CN103924685B (en) Prestress connected concrete beam round steel tube concrete column node
CN202323947U (en) Anchor rod piling structure used for bridge construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120711

Termination date: 20121130