CN202302307U - Pipeline suspension combination in combination with assembly type spread method - Google Patents

Pipeline suspension combination in combination with assembly type spread method Download PDF

Info

Publication number
CN202302307U
CN202302307U CN201120381119XU CN201120381119U CN202302307U CN 202302307 U CN202302307 U CN 202302307U CN 201120381119X U CN201120381119X U CN 201120381119XU CN 201120381119 U CN201120381119 U CN 201120381119U CN 202302307 U CN202302307 U CN 202302307U
Authority
CN
China
Prior art keywords
suspension
pipeline
combination
assembling type
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120381119XU
Other languages
Chinese (zh)
Inventor
杨建华
高俊星
霍亚超
刘彦林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Municipal Construction Co Ltd
Original Assignee
Beijing Municipal Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Municipal Construction Co Ltd filed Critical Beijing Municipal Construction Co Ltd
Priority to CN201120381119XU priority Critical patent/CN202302307U/en
Application granted granted Critical
Publication of CN202302307U publication Critical patent/CN202302307U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a pipeline suspension combination in combination with an assembly type spread method. The pipeline suspension combination comprises a cross beam orthogonally arranged on a pipeline and a suspension frame arranged on the cross beam, wherein the suspension frame comprises two suspension hooks symmetrically arranged on the cross beam with respect to the pipeline; a flower basket bolt is suspended under each suspension hook; the other end of the flower basket bolt is connected with a steel bar suspension rod; the tail end of the steel bar suspension rod is fixedly connected on a bottom support plate; and the pipeline is arranged on the bottom support plate. The pipeline suspension combination is combined with the assembly type spread method, so that the operation is simple, the less time is used, the working period is shortened, the cyclic utilization of a suspension structure is realized, the materials are saved, and the safety of the pipeline in a suspending process is guaranteed by using a bracket; and a structure of the combination is effective improvement of the traditional structure, has remarkable advantages in comparison with the traditional structure and is certainly for wide use in foundation pit projects in the future.

Description

The combination of assembling type bedding method conduit wiring suspension
Technical field
The utility model relates to the base pit engineering field, and specifically, the utility model relates to a kind of structure of assembling type bedding method conduit wiring suspension combination.
Background technique
At present, the domestic assembling type bedding worker method of in metro construction, introducing first.Assembling type bedding worker method combine simple, economic, the quick and bedding method foundation ditch of cut and cover tunneling exposure time short, fast advantage resumes traffic.Because subway all is in the city of prosperity, to construct; The construction area gut line is intensive, of a great variety; All can run into the problem that underground utility are handled in the construction; Great majority all are to adopt to change the method for moving to the processing of underground utility, and it is to adopt the suspention method that the part engineering is also arranged, yet change to move with existing overhung construction drawback is arranged all.Pipeline changes to move has not only wasted manpower and materials, and has wasted the time, has prolonged the duration.There is following drawback in existing overhung construction: one, they can not combine with assembling type bedding method; The construction of bedding method still belongs to the first time at home; Many problems are difficult to expect, in order to realize safe construction, must effectively study the processing and the protective measure of various pipelines; Two, existing overhung construction major part not removable, can not reuse, cause the waste of material, and mostly work progress is loaded down with trivial details, the time is long, has prolonged the construction period; Three, these structures all can not effectively stop phenomenon beyond the slippage that occurs in the conduit wiring suspension process.
Summary of the invention
In view of the problem that exists in the existing technology; The purpose of the utility model is to provide in a kind of assembling type bedding method, the suspention composite structure that in whole construction course, is not destroyed of protection pipeline, this structure as dismountable, can reuse, simple to operate; Not only practiced thrift material; And shortened the duration, and can prevent also that in the conduit wiring suspension process phenomenon beyond the slippage from appearring in pipeline, compare with structure in the past and have tangible advantage.
For realizing above-mentioned model utility purpose; The technological scheme of the assembling type bedding method conduit wiring suspension combination that the utility model provides is: a kind of assembling type bedding method conduit wiring suspension combination; Comprise that a quadrature is arranged on the crossbeam of pipeline top; Described suspention combination comprises that also one is arranged on the suspension bracket on the crossbeam, and suspension bracket comprises two suspension hooks that are symmetricly set on crossbeam with respect to pipeline, all is hung with a flower basket bolt below each suspension hook; The other end of flower basket bolt links to each other with the reinforcing bar suspension rod, and the end of reinforcing bar suspension rod is fixedly connected on the backing board; Described pipeline is shelved on the backing board.
Described suspension bracket is uniformly distributed with the both sides that are arranged on the unit pipe line segment.
Described backing board is a channel-section steel, and two of being inlaid with two arc section adaptations bottom pipeline on the channel-section steel are wooden in an opposite direction.
Described backing board both sides are provided with bolt hole, and aforesaid bolt hole is passed in the end of said reinforcing bar suspension rod, and adopt the screw end of reinforcing bar suspension rod of nut.
Described suspention combination also comprises a support; Described support is arranged on the medium position of unit pipe line segment, comprises a basic central pile, is fixed on the horizontal supporting plate of the support pipeline on the basic central pile; Horizontal supporting plate is arranged with fixedly bearing diagonal, and the pipeline both sides on the horizontal supporting plate are fixed with position-limited lever.
The beneficial effect of the utility model is: combines with assembling type bedding method, and simple to operate, the time spent is few, has shortened the duration; And realized the recycle of overhung construction; Practiced thrift material, the utilization of support has guaranteed pipeline in the suspention process safe, and this composite structure is the effective transformation to existing structure; Compare with structure in the past and to have obvious advantage, will be widely used in the base pit engineering afterwards.
Description of drawings
When combining accompanying drawing to consider; Through with reference to following detailed, can more completely understand the utility model better and learn wherein many attendant advantages easily, but accompanying drawing described herein is used to provide the further understanding to the utility model; Constitute the part of the utility model; Illustrative examples of the utility model and explanation thereof are used to explain the utility model, do not constitute the improper qualification to the utility model, wherein:
Fig. 1 is the structural representation of the suspension bracket of the utility model;
Fig. 2 is the structural representation of the support of the utility model;
Among the figure, 1-reinforcing bar suspension rod, the 2-flower basket bolt, the 3-backing board, 4-is wood in an opposite direction, 5-channel-section steel, 6-crossbeam, 7-bed board beam, 8-position-limited lever, the horizontal supporting plate of 9-, 10-bearing diagonal.
Embodiment
Followingly the embodiment of the utility model is described with reference to Fig. 1, Fig. 2; Fig. 1 is the structural representation of the suspension bracket of the utility model; Fig. 2 is the structural representation of the support of the utility model; Like Fig. 1,2 shown, the utility model makes up according to the construction assembled bedding method of following steps conduit wiring suspension:
(1) mouth of pipe is dug out;
(2) set up crossbeam 6 uniformly at intervals with the pipeline orthogonal direction, span is corresponding with the flat segments of the adjacent mouth of pipe; Crossbeam 6 is an I-steel, and the two ends bolt of I-steel is in the bottom of bed board beam shaped steel 7.
(3) earthing is dug to the pipe radius;
(4) along the 6 position groovings of the corresponding pipeline suspended cross-beam of pipe shaft flat segments, to managing at the end;
(5) backing board is passed under pipe from institute's shoveling groove; Backing board 3 by channel-section steel 5 and two in an opposite direction wood 4 forms, wooden 4 be embedded in the channel-section steel 5 in an opposite direction, there is bolt hole the both sides of channel-section steel 5.
(6) on crossbeam 6 with respect to two suspension hooks 21 of pipeline symmetry bolt, an end of flower basket bolt 2 is hung on suspension hook 21, the other end links to each other with reinforcing bar suspension rod 1, the end of reinforcing bar suspension rod 1 passes the bolt hole of backing board 3 both sides, screws with nut 22;
(7) fastening flower basket bolt makes it hold power;
(8) occur phenomenon beyond the slippage in the pipeline line suspention process for preventing, also need carry out rack making, adopt interim central pile 11 as the basis; Weld a horizontal supporting plate 9; Horizontal supporting plate is welded with bearing diagonal 10 9 times, and pipeline is placed on the horizontal supporting plate 9, and the pipeline both sides are welded with position-limited lever 8.

Claims (5)

1. assembling type bedding method conduit wiring suspension combination; Comprise that a quadrature is arranged on the crossbeam of pipeline top, it is characterized in that described suspention combination comprises that also one is arranged on the suspension bracket on the crossbeam; Suspension bracket comprises two suspension hooks that are symmetricly set on crossbeam with respect to pipeline; All be hung with a flower basket bolt below each suspension hook, the other end of flower basket bolt links to each other with the reinforcing bar suspension rod, and the end of reinforcing bar suspension rod is fixedly connected on the backing board; Described pipeline is shelved on the backing board.
2. a kind of assembling type bedding method conduit wiring suspension combination according to claim 1 is characterized in that described suspension bracket is uniformly distributed with the both sides that are arranged on the unit pipe line segment.
3. a kind of assembling type bedding method conduit wiring suspension combination according to claim 1 is characterized in that described backing board is a channel-section steel, and two of being inlaid with two arc section adaptations bottom pipeline on the channel-section steel are wooden in an opposite direction.
4. a kind of assembling type bedding method conduit wiring suspension combination according to claim 1 is characterized in that described backing board both sides are provided with bolt hole, and aforesaid bolt hole is passed in the end of said reinforcing bar suspension rod, and adopts the screw end of reinforcing bar suspension rod of nut.
5. a kind of assembling type bedding method conduit wiring suspension combination according to claim 1; It is characterized in that described suspention combination also comprises a support, described support is arranged on the medium position of unit pipe line segment; Comprise a basic central pile; Be fixed on the horizontal supporting plate of the support pipeline on the basic central pile, horizontal supporting plate is arranged with fixedly bearing diagonal, and the pipeline both sides on the horizontal supporting plate are fixed with position-limited lever.
CN201120381119XU 2011-09-30 2011-09-30 Pipeline suspension combination in combination with assembly type spread method Expired - Fee Related CN202302307U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120381119XU CN202302307U (en) 2011-09-30 2011-09-30 Pipeline suspension combination in combination with assembly type spread method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120381119XU CN202302307U (en) 2011-09-30 2011-09-30 Pipeline suspension combination in combination with assembly type spread method

Publications (1)

Publication Number Publication Date
CN202302307U true CN202302307U (en) 2012-07-04

Family

ID=46371202

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120381119XU Expired - Fee Related CN202302307U (en) 2011-09-30 2011-09-30 Pipeline suspension combination in combination with assembly type spread method

Country Status (1)

Country Link
CN (1) CN202302307U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104518473A (en) * 2014-12-31 2015-04-15 上海市机械施工集团有限公司 Suspension protection structure and method of cable box culvert pipeline
CN107101048A (en) * 2017-06-19 2017-08-29 合肥元康环境科技有限公司 A kind of airduct Flexible Equipment para-seismic support system
CN107152566A (en) * 2017-06-02 2017-09-12 安徽奥睿德科技发展有限公司 A kind of denoising pipe installing mechanism for I-steel
CN109506047A (en) * 2018-12-21 2019-03-22 中国三冶集团有限公司 A kind of fixed hanger of hanging spool and construction method
CN109972623A (en) * 2019-03-22 2019-07-05 陕西铁路工程职业技术学院 A kind of construction method and device carrying out pipeline suspension using Bailey beam
CN110005902A (en) * 2019-05-17 2019-07-12 中建一局集团安装工程有限公司 A kind of clean area assembled damping suspension and support and installation method
CN111503373A (en) * 2020-04-17 2020-08-07 中国十七冶集团有限公司 Underground pipeline protection structure and construction method thereof
CN111878635A (en) * 2020-08-28 2020-11-03 广州市盾建地下工程有限公司 Pipeline suspension structure and method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104518473A (en) * 2014-12-31 2015-04-15 上海市机械施工集团有限公司 Suspension protection structure and method of cable box culvert pipeline
CN107152566A (en) * 2017-06-02 2017-09-12 安徽奥睿德科技发展有限公司 A kind of denoising pipe installing mechanism for I-steel
CN107101048A (en) * 2017-06-19 2017-08-29 合肥元康环境科技有限公司 A kind of airduct Flexible Equipment para-seismic support system
CN109506047A (en) * 2018-12-21 2019-03-22 中国三冶集团有限公司 A kind of fixed hanger of hanging spool and construction method
CN109972623A (en) * 2019-03-22 2019-07-05 陕西铁路工程职业技术学院 A kind of construction method and device carrying out pipeline suspension using Bailey beam
CN110005902A (en) * 2019-05-17 2019-07-12 中建一局集团安装工程有限公司 A kind of clean area assembled damping suspension and support and installation method
CN111503373A (en) * 2020-04-17 2020-08-07 中国十七冶集团有限公司 Underground pipeline protection structure and construction method thereof
CN111878635A (en) * 2020-08-28 2020-11-03 广州市盾建地下工程有限公司 Pipeline suspension structure and method

Similar Documents

Publication Publication Date Title
CN202302307U (en) Pipeline suspension combination in combination with assembly type spread method
CN202755634U (en) Suspension type operational platform
CN204080649U (en) The supporting shelf bracket of a kind of cantilever bridge No. 0 block
CN102518300A (en) Embedded conical bearing joint type steel structural support and construction method thereof
CN204717144U (en) A kind of concrete pump pipe setting tool cribbing
CN206971689U (en) Support operating platform that is detachable and recycling
CN103046743B (en) A kind of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system and construction method
CN206308702U (en) A kind of portable basis of derrick crane
CN104233961A (en) Triangular supporting bracket of suspended cast bridge block 0
CN203907010U (en) Flexible connection device for pipe jacking construction in soft soil layer
CN103628675A (en) Bailey beam type formwork supporting system and construction method thereof for super high-rise transfer story crossbeam
CN204753600U (en) System is strutted in quick installation of steel shotcrete
CN202530734U (en) Outside-overhanging scaffold
CN204728149U (en) Be applicable to the quick lap joint track of geological hazard control engineering rolling topography
CN202209055U (en) Protection rail for construction site
CN201924941U (en) Hoisting device for reinforced concrete pipe segment
CN203393721U (en) Inner support main purlin component
CN203755153U (en) Simply supported plate bridge bottom plate maintenance construction moving operation platform
CN203247591U (en) Deep foundation pit steel support
CN203654789U (en) Combined type shaping safety net on periphery of building
CN207295478U (en) Steel pipe column bracket seat connection apparatus
CN202575686U (en) Self-tightening type lifting appliance
CN206476686U (en) A kind of gate-type hoisting bracket
CN204754242U (en) Horizontal ladder muscle three -dimensional positioner of shear force wall
CN211368613U (en) Gate pier bracket formwork braced system that encorbelments

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20150930

EXPY Termination of patent right or utility model