CN202300428U - Trolley for installing tunnel waterproof plate - Google Patents

Trolley for installing tunnel waterproof plate Download PDF

Info

Publication number
CN202300428U
CN202300428U CN2011204183179U CN201120418317U CN202300428U CN 202300428 U CN202300428 U CN 202300428U CN 2011204183179 U CN2011204183179 U CN 2011204183179U CN 201120418317 U CN201120418317 U CN 201120418317U CN 202300428 U CN202300428 U CN 202300428U
Authority
CN
China
Prior art keywords
trolley
waterproof plate
dolly
chassis
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204183179U
Other languages
Chinese (zh)
Inventor
黄永强
董红波
周和勇
徐定平
骆顺东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Xinzhu Road and Bridge Machinery Co Ltd
Original Assignee
Chengdu Xinzhu Road and Bridge Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Xinzhu Road and Bridge Machinery Co Ltd filed Critical Chengdu Xinzhu Road and Bridge Machinery Co Ltd
Priority to CN2011204183179U priority Critical patent/CN202300428U/en
Application granted granted Critical
Publication of CN202300428U publication Critical patent/CN202300428U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a trolley for installing a tunnel waterproof plate. The trolley comprises a gantry, a dolly track, a crawling dolly, a working cradle and a walking mechanism, wherein the walking mechanism is arranged at the bottom of the gantry, and the dolly track is arranged at the upper part of the periphery of the dolly track; and the crawling dolly is buckled on the dolly track, and the working cradle is arranged on the crawling dolly. According to the trolley for installing the tunnel waterproof plate, if a waterproof plate installing vehicle is adopted, the waterproof plate does not need to be cut out in advance, and the whole coil of waterproof plate is installed on the crawling dolly of the trolley for installing the waterproof plate directly, accordingly, the trouble that a steel arch is manufactured to be specially used for installing the waterproof plate, the installation of the waterproof plate can be completed by operators only needing to stand in the cradle, and thus the working safety is enhanced, the working procedures of leveling and calibrating of the waterproof plate can be simultaneously eliminated, the labor intensity is greatly reduced, and the labor efficiency is improved.

Description

A kind of chassis that is used for the installation of tunnel water proofing plate
Technical field
The utility model relates to a kind of chassis that is used for the tunnel, relates in particular to a kind of chassis that the tunnel water proofing plate is installed that is used for, and belongs to tunnel water proofing plate installation auxiliary device technical field.
Background technology
At present, splash guard is installed in the constructing tunnel and is mainly still adopted artificial the laying.During artificial the laying: at first, need the cutting coiled material, cut corresponding waterproof plate according to the cross-sectional outling in tunnel; Then; The PE foamed plastics pad subscript of dome portions goes out the tunnel longitudinal centre line in the tunnel; Cross central line and this center line of splash guard are coincided, begin to lay to both sides are down vertical from vault, in the limit, shop with the sweat soldering of plastics ring washer.So not only need prior cutting splash guard; But also need to make the steel bow member that is used for installing splash guard specially, in addition, when mounted; Operating personnel operate on the steel bow member; Not only need flatten splash guard and also need proofread the center line of splash guard and liner, very waste man-hour, also safety inadequately during operation.
The utility model content
The purpose of the utility model is: a kind of simple to operate, safety is provided; The practical chassis that is used for the installation of tunnel water proofing plate; Solve the technical problem that exists in the existing tunnel splash guard installation process, thereby can effectively solve the problem that exists in the above-mentioned prior art.
The purpose of the utility model is to realize through following technical proposals: a kind of chassis that is used for the installation of tunnel water proofing plate; Comprise door frame, trolley track, crawl trolley, work hanging basket and walking mechanism; Said walking mechanism is located at the bottom of door frame; Trolley track is located at the peripheral top of door frame, and crawl trolley is fastened on the trolley track, and said work hanging basket is located on the crawl trolley.
As a kind of optimal way, wherein: the end of said work hanging basket and crawl trolley is hinged, and establishes brake in the hinged place;
As a kind of optimal way, wherein: the arch that said trolley track forms for the bending of " H " structural section;
As a kind of optimal way, wherein: said walking mechanism is connected with the door frame bolt;
As a kind of optimal way, wherein: trolley track is connected with the door frame bolt;
As a kind of optimal way, wherein: said walking mechanism is a pulley;
Preferred as further, also comprise splash guard, said splash guard is located at the front end of crawl trolley.
Compared with prior art; The beneficial effect of the utility model: the utility model is used for the chassis of tunnel water proofing plate installation, does not then need to cut out in advance splash guard if adopt splash guard that car is installed, and directly will put in order to roll up on the crawl trolley that is installed in splash guard installation chassis getting final product; Reduced and made the trouble that the steel bow member is specifically designed to the installation splash guard; Operating personnel only need stand in the installation that just can accomplish in the work hanging basket splash guard, strengthen job security, can reduce the operation of leveling and calibration splash guard simultaneously; Alleviate labour intensity greatly, improved efficiency.
Description of drawings
Fig. 1 is the structural representation that the utility model is used for the chassis of tunnel water proofing plate installation;
Fig. 2 is the three-dimensional structural scheme of mechanism that the utility model is used for the chassis of tunnel water proofing plate installation.
Among the figure, door frame-1, trolley track-2, splash guard-3, crawl trolley-4, work hanging basket-5, walking mechanism-6.
The specific embodiment
Below in conjunction with specific embodiment and accompanying drawing the utility model is further described.
Disclosed all characteristics in this manual, or the step in disclosed all methods or the process are except the speciality of mutual repulsion and/or the step; All can make up by any way; Only if special narration all can be replaced by other equivalences or the alternative features with similar purpose, promptly; Only if special narration, an embodiment in a series of equivalences of each characteristic or the similar characteristics.
Like Fig. 1, shown in Figure 2; The chassis that the utility model is used for the installation of tunnel water proofing plate comprises door frame 1, trolley track 2, crawl trolley 4, work hanging basket 5 and walking mechanism 6; Said walking mechanism 6 is located at the bottom of door frame 1; Trolley track 2 is located at the peripheral top of door frame 1, and crawl trolley 4 is fastened on the trolley track 2, and said work hanging basket 5 is located on the crawl trolley 4.
Specifically in the present embodiment, said work hanging basket 5 is hinged with the end of crawl trolley 4, and establishes brake in the hinged place, and this brake is not shown in the drawings; The arch that said trolley track 2 forms for the bending of " H " structural section; Said walking mechanism 6 is connected with door frame 1 bolt; Trolley track 2 is connected with door frame 1 bolt; Said walking mechanism 6 is a pulley; Also comprise splash guard 3, said splash guard 3 is located at the front end of crawl trolley 4.
The operating principle of the utility model is: door frame is the braced structures of whole chassis, for steel truss constitutes, door frame is put in the tunnel, and the size of door frame is according to the practice of construction decision in tunnel.Walking mechanism is connected with the lower end of door frame with bolt, realizes whole chassis moving in the inside, tunnel.Walking mechanism is by the motor-driven of band reductor, and the motor band is automatic, can guarantee that chassis can adapt to the tunnel that longitudinal gradient is arranged, and chassis is also convenient with regard to bit manipulation.Trolley track is connected with the upper end of door frame with bolt, for dolly moves track is provided.The wheel of crawl trolley is fastened on the trolley track; Trolley track is formed by the bending of H shaped steel, on the H shaped steel edge of a wing, is equipped with chain, and crawl trolley is provided with four driving wheels; Drive by four motor band reductors; Through the gear motion of sprocket wheel on the driving wheel and chain, the motor of band brake plays the effect of braking, thereby guarantees that crawl trolley can rest on the track optional position reliably.
The splash guard of web-like is contained in the crawl trolley front end; End with splash guard is fixed on the position that needs earlier; Along with crawl trolley moves along trolley track, splash guard just is laid on the tunnel wall automatically, and splash guard is at the back immediately following a rubber cylinder is arranged; Rubber cylinder supports afterbody and is provided with oil cylinder and spring assembly; Rubber cylinder can adapt to the out-of-flatness of tunnel wall through the damping of flexible deviation and the coil tension spring with the variation that adapts to the cross section, tunnel and walking track laying of oil cylinder, guarantees that splash guard can smooth being fitted on the tunnel wall, can satisfy operating personnel and fix, weld work such as splash guard easily.
The work hanging basket is through the afterbody of bearing hinge connection at crawl trolley; Move along with the motion of crawl trolley, operating personnel weld inside standing in the work hanging basket, fixedly operation such as splash guard, the whole chassis of operation, and the work hanging basket leans on the gravity self-balancing; The hinged axle of the afterbody of work hanging basket and crawl trolley is provided with electromagnetic brake; Brake was held the hanging basket bearing pin tightly when dolly stopped, and the guarantor does not rock in the work hanging basket, has improved the traffic safety and riding comfort of equipment.
About on the door frame, a cover chassis is set respectively, a chassis is provided with two cover crawl trolleys and work hanging basket.EVA (acetate ethylene copolymer), LDPE (english abbreviation of low density polyethylene (LDPE) Low-Density Polyethylene), ECB splash guard fabric widths such as (blends of ethylene copolymer and pitch) commonly used are generally 2.1 meters; Laying width is 2 meters; Overlap joint is 0.1 meter between two splash guards; Therefore, the longitudinal pitch of setting two cover crawl trolleys and work hanging basket is 4 meters, and splash guard interlocks moving of tunnel with chassis and lays.
The above is merely the preferred embodiment of the utility model; Not in order to restriction the utility model; Any modification of being done within all spirit and principles at the utility model, be equal to replacement and improvement etc., all should be included within the protection domain of the utility model.

Claims (7)

1. one kind is used for the chassis that the tunnel water proofing plate is installed; It is characterized in that: comprise door frame (1), trolley track (2), crawl trolley (4), work hanging basket (5) and walking mechanism (6); Said walking mechanism (6) is located at the bottom of door frame (1); Trolley track (2) is located at the peripheral top of door frame (1), and crawl trolley (4) is fastened on the trolley track (2), and said work hanging basket (5) is located on the crawl trolley (4).
2. the chassis that is used for the installation of tunnel water proofing plate as claimed in claim 1 is characterized in that: said work hanging basket (5) is hinged with the end of crawl trolley (4), and establishes brake in the hinged place.
3. the chassis that is used for the installation of tunnel water proofing plate as claimed in claim 1 is characterized in that: the arch that said trolley track (2) forms for the bending of " H " structural section.
4. the chassis that is used for the installation of tunnel water proofing plate as claimed in claim 1, it is characterized in that: said walking mechanism (6) is connected with door frame (1) bolt.
5. the chassis that is used for the installation of tunnel water proofing plate as claimed in claim 1, it is characterized in that: trolley track (2) is connected with door frame (1) bolt.
6. the chassis that is used for the installation of tunnel water proofing plate as claimed in claim 1 is characterized in that: said walking mechanism (6) is pulley.
7. like the described chassis that is used for the installation of tunnel water proofing plate of arbitrary claim among the claim 1-6, it is characterized in that: also comprise splash guard (3), said splash guard (3) is located at the front end of crawl trolley (4).
CN2011204183179U 2011-10-28 2011-10-28 Trolley for installing tunnel waterproof plate Expired - Fee Related CN202300428U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204183179U CN202300428U (en) 2011-10-28 2011-10-28 Trolley for installing tunnel waterproof plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204183179U CN202300428U (en) 2011-10-28 2011-10-28 Trolley for installing tunnel waterproof plate

Publications (1)

Publication Number Publication Date
CN202300428U true CN202300428U (en) 2012-07-04

Family

ID=46369350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204183179U Expired - Fee Related CN202300428U (en) 2011-10-28 2011-10-28 Trolley for installing tunnel waterproof plate

Country Status (1)

Country Link
CN (1) CN202300428U (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924989A (en) * 2014-04-30 2014-07-16 重庆工商职业学院 Tunnel primary support steel arch installing rack and method
WO2015154698A1 (en) * 2014-04-09 2015-10-15 邓卫东 Installation platform and installation method for tunnel waterproof sheet having wide width
WO2015154514A1 (en) * 2013-07-24 2015-10-15 常熟佳发化学有限责任公司 Inflation-type device used for installation of tunnel waterproof sheet having wide width, and construction and installation methods
CN105178987A (en) * 2015-09-30 2015-12-23 中铁工程装备集团有限公司 Novel tunnel waterproof plate paving and hanging trolley
CN106869947A (en) * 2017-04-10 2017-06-20 贵州桥梁建设集团有限责任公司 Preliminary bracing stand operates chassis after a kind of tunnel tunnel face is excavated
CN107559025A (en) * 2017-10-13 2018-01-09 湖南五新隧道智能装备股份有限公司 A kind of waterproof construction chassis
CN107654242A (en) * 2017-10-13 2018-02-02 湖南五新隧道智能装备股份有限公司 A kind of waterproof construction arm group
CN107882581A (en) * 2017-12-29 2018-04-06 中铁工程装备集团有限公司 A kind of automatic platform formula splash guard lays chassis
CN107881907A (en) * 2017-10-19 2018-04-06 重庆红岩建设机械制造有限责任公司 A kind of inspection car for bridge main arch
CN108104847A (en) * 2017-12-08 2018-06-01 四川省创力隧道机械设备有限公司 Waterproof cloth trolley steel cable swelling device
CN108396871A (en) * 2018-05-15 2018-08-14 重庆互邦莱装配式建筑工程有限公司 The assembled toilet and its installation method being easily installed
CN108533297A (en) * 2018-06-13 2018-09-14 福建正海机械设备有限公司 Tunnel wall waterproof film sticking apparatus
CN109162740A (en) * 2018-09-11 2019-01-08 中国铁建重工集团有限公司 For being laid with the device and trolley of waterproof layer
CN109505632A (en) * 2018-12-24 2019-03-22 长安大学 A kind of novel tunnel waterproof layer is laid with trolley and its application method
CN113123804A (en) * 2020-01-13 2021-07-16 中国建筑第四工程局有限公司 Tunnel inner wall repairing method and device

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015154514A1 (en) * 2013-07-24 2015-10-15 常熟佳发化学有限责任公司 Inflation-type device used for installation of tunnel waterproof sheet having wide width, and construction and installation methods
WO2015154698A1 (en) * 2014-04-09 2015-10-15 邓卫东 Installation platform and installation method for tunnel waterproof sheet having wide width
CN103924989B (en) * 2014-04-30 2016-08-10 重庆工商职业学院 Tunnel steel arch-shelf installs stand and steel arch-shelf installation method
CN103924989A (en) * 2014-04-30 2014-07-16 重庆工商职业学院 Tunnel primary support steel arch installing rack and method
CN105178987A (en) * 2015-09-30 2015-12-23 中铁工程装备集团有限公司 Novel tunnel waterproof plate paving and hanging trolley
CN106869947B (en) * 2017-04-10 2019-09-13 贵州大通路桥工程建设有限公司 Preliminary bracing stand operates trolley after a kind of tunnel tunnel face excavates
CN106869947A (en) * 2017-04-10 2017-06-20 贵州桥梁建设集团有限责任公司 Preliminary bracing stand operates chassis after a kind of tunnel tunnel face is excavated
CN107559025A (en) * 2017-10-13 2018-01-09 湖南五新隧道智能装备股份有限公司 A kind of waterproof construction chassis
CN107654242A (en) * 2017-10-13 2018-02-02 湖南五新隧道智能装备股份有限公司 A kind of waterproof construction arm group
CN107881907A (en) * 2017-10-19 2018-04-06 重庆红岩建设机械制造有限责任公司 A kind of inspection car for bridge main arch
CN107881907B (en) * 2017-10-19 2024-06-18 重庆红岩建设机械制造有限责任公司 Inspection vehicle for bridge main arch
CN108104847A (en) * 2017-12-08 2018-06-01 四川省创力隧道机械设备有限公司 Waterproof cloth trolley steel cable swelling device
CN107882581A (en) * 2017-12-29 2018-04-06 中铁工程装备集团有限公司 A kind of automatic platform formula splash guard lays chassis
CN108396871A (en) * 2018-05-15 2018-08-14 重庆互邦莱装配式建筑工程有限公司 The assembled toilet and its installation method being easily installed
CN108533297A (en) * 2018-06-13 2018-09-14 福建正海机械设备有限公司 Tunnel wall waterproof film sticking apparatus
CN109162740A (en) * 2018-09-11 2019-01-08 中国铁建重工集团有限公司 For being laid with the device and trolley of waterproof layer
CN109505632A (en) * 2018-12-24 2019-03-22 长安大学 A kind of novel tunnel waterproof layer is laid with trolley and its application method
CN113123804A (en) * 2020-01-13 2021-07-16 中国建筑第四工程局有限公司 Tunnel inner wall repairing method and device

Similar Documents

Publication Publication Date Title
CN202300428U (en) Trolley for installing tunnel waterproof plate
CN204436416U (en) Lay chassis
CN206071615U (en) A kind of splash guard lays chassis
CN207184017U (en) A kind of waterproof rolls up actinobacillus device automatically
CN108462139A (en) A kind of waterproof rolls up actinobacillus device automatically
CN206448820U (en) A kind of tunnel construction trolley
CN202431460U (en) Protective saddle of tower drum of wind driven generator
CN209621341U (en) Splash guard installs trolley
CN203593063U (en) Heavy type caterpillar tractor
CN207032837U (en) A kind of high-performance building construction platform
CN207761679U (en) A kind of automatic platform formula splash guard laying trolley
CN211258536U (en) Automatic bit feeding device of direct current main motor
CN203094139U (en) Crawler-type stair climbing cart for conveying bottled water
CN207418062U (en) Easy moving electric power cable field draw off gear
CN205778999U (en) A kind of crawler belt mobile system being applicable to constructing tunnel survival capsule
CN207161105U (en) A kind of rail side and roof arch telescoping steel form lining cutting locking device
CN211228372U (en) Supporting leg moving structure of automatic sanding device of hydraulic engineering and portal device with same
CN214823393U (en) Material conveying device for highway engineering construction
CN211226121U (en) Winding mechanism in automatic sanding device of hydraulic engineering and portal device with winding mechanism
CN211338139U (en) Safe laminating machine draw gear
CN210191502U (en) Trolley for highway bridge construction
CN2933842Y (en) Wiring device of automatic mold-change trolley
CN204714396U (en) The wheeled workover rig loop wheel machine structure of convenient walking
CN109850024A (en) A kind of walking mechanism and its application method for wetland caterpillar
CN211448297U (en) Movable threshold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20181028

CF01 Termination of patent right due to non-payment of annual fee