CN108396871A - The assembled toilet and its installation method being easily installed - Google Patents

The assembled toilet and its installation method being easily installed Download PDF

Info

Publication number
CN108396871A
CN108396871A CN201810460719.1A CN201810460719A CN108396871A CN 108396871 A CN108396871 A CN 108396871A CN 201810460719 A CN201810460719 A CN 201810460719A CN 108396871 A CN108396871 A CN 108396871A
Authority
CN
China
Prior art keywords
keel
metope
waterproof
riser
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810460719.1A
Other languages
Chinese (zh)
Inventor
张勇
张兴证
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Hubang Assembly Building Engineering Co Ltd
Original Assignee
Chongqing Hubang Assembly Building Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Hubang Assembly Building Engineering Co Ltd filed Critical Chongqing Hubang Assembly Building Engineering Co Ltd
Priority to CN201810460719.1A priority Critical patent/CN108396871A/en
Publication of CN108396871A publication Critical patent/CN108396871A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • E04B1/34321Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts mainly constituted by panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • E04B1/34326Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts mainly constituted by longitudinal elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sanitary Device For Flush Toilet (AREA)

Abstract

The invention discloses a kind of assembled toilets and its installation method being easily installed, this assembled toilet includes the steelframe being arranged in toilet, flexible water disk, precast floor and co-layer draining pipe, the steelframe is arranged on the upside of toilet earth's surface, the precast floor includes the first precast floor and the second precast floor, first precast floor is fixed on the upside of the keel of steelframe, the flexible water disk is arranged on the upside of the first precast floor, and second precast floor is arranged on the upside of the waterproof bottom plate of flexible water disk;The main pipeline of co-layer draining pipe is fixed on the upside of toilet earth's surface and below keel, and the subtube of co-layer draining pipe sequentially passes through the first precast floor, flexible water disk and the second precast floor from the bottom up and water inlet is located above the second precast floor.This assembled toilet and its installation method improve the installation effectiveness of toilet, reduce the installation difficulty and installation cost of toilet.

Description

The assembled toilet and its installation method being easily installed
Technical field
The present invention relates to assembled architecture technical field, be specifically related to a kind of assembled toilet being easily installed and its Installation method.
Background technology
It being sharply increased with the continuous development of society with population, assembled builds the mainstream for slowly becoming and building, In it is most important be house construction, toilet is built an essential part as assembled-type house and is also increasingly received Concern.In recent years, assembled toilet had obtained significant progress, but the installation and decoration process of existing assembled toilet Construction technology that is complicated and needing profession, time installation period is long, and therefore, existing assembled toilet has the following problems: 1, installation effectiveness is low;2, installation difficulty is high;3, installation cost is high.
Invention content
For deficiencies of the prior art, it is an object of the invention to propose that a kind of assembled being easily installed is defended Between life and its installation method, this assembled toilet and its installation method reduce the installation cost and installation difficulty of toilet, Improve the installation effectiveness of toilet.
For this purpose, technical solution of the present invention is:A kind of flexible water disk, including steelframe, flexible water disk, precast floor and Co-layer draining pipe, the steelframe, flexible water disk, precast floor and co-layer draining pipe are arranged in toilet;The steel Frame is arranged on the upside of toilet earth's surface, and steelframe includes keel, vertical supporting frame and cross-brace frame;The keel, which constitute one jiao, to be had In netted, the vertical supporting frame is used to support keel and adjusts keel height for the rectangular platform of notch and the keel in rectangular platform Degree, the cross-brace frame are fixed on the keel on four side of rectangular platform to prevent keel from being moved relative to metope;The assembled Floor includes the first precast floor and the second precast floor, and first precast floor is fixed on the upside of keel;It is described Flexible water disk is arranged on the upside of the first precast floor, and flexible water disk includes bottom plate and riser, the floor level setting And it is jaggy rectangular-shaped in one jiao, discharge outlet is provided on bottom plate, the riser is located at around bottom plate, bottom plate and riser one It is molded and constitutes the case shape of upper opening;Second precast floor is arranged on the upside of the bottom plate of flexible water disk;Same layer The main pipeline of drainpipe is fixed on the upside of toilet earth's surface and below keel, the subtube of co-layer draining pipe from the bottom up according to It is secondary to pass through the first precast floor, flexible water disk and the second precast floor and water inlet is located on the second precast floor Side.
Steelframe, flexible water disk, the first precast floor of this assembled toilet (are used to support flexible water disk, prevent Only flexible water disk deforms) and the second precast floor be convenient for in-site installation, be not necessarily to cement mortar, it is clean environmentally friendly, not only realize Co-layer draining, it is easy for construction, it interferes few under upstairs house, improves residence comfort, and also reduce the material of toilet Cost, installation cost and installation difficulty improve the installation effectiveness of toilet.
Further, second precast floor includes that substrate, positioning net, positioning card and face brick, the positioning net are in It is rectangular-shaped and be fixed on upper surface of base plate, it is clamped between adjacent positioning net;The positioning card includes the first positioning card and second Positioning card, first positioning, which fixes, is scheduled on positioning net middle part, and second positioning, which fixes, is scheduled on positioning net four corners, the face Brick positions card and the locking position of the second positioning by adjacent first and is bonded in positioning on the net.
Further, the vertical supporting frame includes L-shaped spine support frame, main tee supporting rack and cross keel branch Support, the L-shaped spine support frame, main tee supporting rack and cross spine support frame include bending part, support column and height Regulating mechanism is spent, the bending part is fixed on the upper head of support column and is bolted with keel, the height adjustment mechanism The lower end head of support column is fixed on to adjust the vertical supporting height of support column and bending part;The bending part includes being located at L The L-shaped bending part on shape spine support frame top, positioned at main tee supporting rack top T shapes bending part and be located at cross keel The cross bending part on supporting rack top, the L-shaped bending part include L-shaped bottom plate and the riser perpendicular to L-shaped bottom plate, L-shaped bottom Plate and riser collectively form the L-shaped keel link slot of opening upwards, are all provided on the riser of two ends of L-shaped keel link slot It is equipped with the keel fixing bolt of connection keel;The T shapes bending part includes T shapes bottom plate and the riser perpendicular to T shape bottom plates, T shapes Bottom plate and riser collectively form the main tee link slot of opening upwards, on the riser of three ends of main tee link slot It is provided with the keel fixing bolt of connection keel;The cross bending part includes cross bottom plate and perpendicular to cross bottom plate Riser, cross bottom plate and riser collectively form the cross keel link slot of opening upwards, close to cross keel connection The keel fixing bolt of connection keel is both provided on the riser of four ends of slot.
Further, the height adjustment mechanism include height fixing nut, height adjusting pads piece, height locking nut and Height adjustment bolt, the height fixing nut are fixedly connected with support column lower end head, the height adjusting pads piece and height Locking nut is successively set on the downside of height fixing nut, and the height adjustment bolt includes head and threaded portion, and height is adjusted The threaded portion of bolt sequentially passes through height locking nut, height adjusting pads piece and height fixing nut, the height from the bottom up Locking nut and height fixing nut are adapted with the threaded portion of height adjustment bolt.
Further, the cross-brace frame includes wall face supporting beam and metope retaining mechanism, on the wall face supporting beam Portion is fixedly connected with keel, and the metope retaining mechanism is arranged in the lower part of wall face supporting beam to prevent keel from being moved with respect to metope It is dynamic;The metope retaining mechanism includes that metope fixing nut, metope adjusting gasket, metope locking nut and metope smooth bolt, Wall face supporting beam lower part is provided perpendicular to the metope smoothing bolt mounting holes of metope, and the metope fixing nut is fixed on Metope is smoothed on the wall face supporting beam of the remote metope side of bolt mounting holes, and the metope adjusting gasket and metope locking nut are set successively Set the nearly metope side that bolt mounting holes are smoothed in metope;The metope smoothing bolt includes head and threaded portion, and metope smooths spiral shell The threaded portion of bolt sequentially passes through metope locking nut, metope adjusting gasket, metope smoothing bolt mounting holes and metope from outside to inside The threaded portion that fixing nut, the metope locking nut and metope fixing nut smooth bolt with metope is adapted.
Further, the keel and support column are square tube, and wall face supporting beam is channel steel.
Further, between adjacent riser by inner corner trim electromagnetism joint angle and the thermofussion welding of external corner electromagnetism joint angle in succession Connect, the inner corner trim electromagnetism joint angle is located at the interior angle side that adjacent two waterproof risers are constituted, inner corner trim electromagnetism joint angle with it is adjacent Sweat soldering connection on the upside of two waterproof risers and waterproof bottom plate, it is vertical that the external corner electromagnetism joint angle is located at two adjacent waterproofs The exterior angle side that plate is constituted, external corner electromagnetism joint angle connect with two adjacent waterproof risers and the equal sweat soldering of waterproof baseplate underside It connects.
Further, the inner corner trim electromagnetism joint angle includes inner corner trim lower connecting plate, inner corner trim upper junction plate and inner corner trim electromagnetic screen Face, the inner corner trim lower connecting plate are in isosceles right triangle, are connected under the inner corner trim upper junction plate section is L-shaped and lower end and inner corner trim Two right-angle sides of fishplate bar are fixedly connected with, and the inner corner trim electromagnetism wire side is arranged in the close of inner corner trim lower connecting plate and inner corner trim upper junction plate Waterproof riser side;The external corner electromagnetism joint angle includes external corner lower connecting plate, external corner upper junction plate and external corner electromagnetism wire side, described External corner lower connecting plate is in isosceles right triangle, and the external corner upper junction plate section is L-shaped and lower end and external corner lower connecting plate Two right-angle sides are fixedly connected with, and the external corner electromagnetism wire side is arranged vertical in the nearly waterproof of external corner lower connecting plate and external corner upper junction plate Plate side.
Further, the waterproof bottom plate, waterproof riser, inner corner trim lower connecting plate, inner corner trim upper junction plate, external corner lower connecting plate It is all made of HDPE materials with external corner upper junction plate.
A kind of assembled Toilet Installation method is installed using above-described assembled toilet, including as follows Step:
Step 1, the size for measuring toilet, according to the size precasting steel frame of toilet;
Step 2, it is laid with same-floor drainage pipeline;
Step 3, steelframe is installed, wherein step 3 includes the following steps:Step 3.1, vertical supporting frame is tentatively adjusted to one A unified height;Step 3.2, keel are connect with vertical supporting frame;Step 3.3, the keel on adjustment rectangular platform four side with Spacing between metope;Step 3.4, accurate adjustment vertical supporting frame height makes to be located at same level on the upside of keel;Step 3.5, lead to Cross-brace frame is crossed to lock the spacing between the keel and metope on four side of rectangular platform;
Step 4, the first precast floor is installed;
Step 5, flexible water disk is installed, wherein step 5 includes the following steps:Step 5.1, it is cut out according to the size of toilet It cuts flexible web and constitutes the original-shape of flexible water disk, the original-shape of flexible water disk is by integrally formed waterproof bottom plate It is collectively formed with waterproof riser, the shape of waterproof bottom plate is identical as toilet flat shape, and waterproof riser is located at waterproof bottom plate week It encloses;Step 5.2, by waterproof riser hot bending, waterproof riser and waterproof bottom plate is made to constitute the case shape of upper opening;Step 5.3, exist External corner electromagnetism joint angle is placed in exterior angle side that is adjacent and needing the two waterproof risers connected to constitute, adjacent and need two connected Place inner corner trim electromagnetism joint angle in the interior angle side that waterproof riser is constituted;Step 5.4, with fixture by inner corner trim electromagnetism joint angle, it is adjacent simultaneously It needs the two waterproof risers connected and external corner electromagnetism joint angle while clamping, inner corner trim electromagnetism joint angle is kept to be connected with external corner electromagnetism There is lasting clamping force between angle;Step 5.5, to inner corner trim electromagnetism joint angle and external corner electromagnetism joint angle, electromagnetic induction adds simultaneously Heat waits between the inner corner trim electromagnetic screen surface side of inner corner trim electromagnetism joint angle and two adjacent waterproof risers and waterproof bottom plate upside, sun Equal sweat soldering between the external corner electromagnetic screen surface side of angle electromagnetism joint angle and two adjacent waterproof risers and waterproof baseplate underside Stop electromagnetic induction heating after connection;Step 5.6, process discharge outlet, make discharge outlet formed with bottom plate be integrally formed and be open to Under circular ring shape hot bending portion;Step 5.7, discharge outlet is connect with main drainpipe;Step 5.8, flexible water disk is shelved on school On cushion layer;
Step 6, the second precast floor is installed, wherein step 6 includes the following steps:Step 6.1, installation base plate;Step 6.2, positioning net fixed substrate upper surface will be clamped by installation positioning net between adjacent positioning net;Step 6.3, by glue for tile It pours into positioning net, strikes off;Step 6.4, the first positioning is connected to positioning net middle part, the second positioning is connected to positioning Net four corners;Step 6.5, according to the first positioning card and the second positioning locking position paving brick;
Step 7, safety inspection.
Beneficial effects of the present invention:
1, the steelframe of this assembled toilet, flexible water disk and precast floor are convenient for in-site installation, working procedure letter It is single, material cost, installation cost and the installation difficulty of toilet are reduced, installation effectiveness (this assembled of toilet is improved Toilet can largely reduce difficulty of construction, largely shorten the construction period the time, and not have technical difficulty or even ordinary people finishing watching Oneself can have no the assembled toilet of difficulty after bright book, whole dresses of toilet can be completed in the people one day of actual test two It repaiies).
2, co-layer draining is realized, it is easy for construction, it is interfered less under upstairs house, improves residence comfort;
3, using flexible water disk, cost is reduced while being easily installed;
4, this assembled toilet is not necessarily to cement mortar, clean environmental protection.
Description of the drawings
Fig. 1 is assembled toilet of the present invention structural schematic diagram;
Fig. 2 is the dimensional structure diagram of flexible water disk of the present invention;
Fig. 3 is the schematic top plan view of flexible water disk of the present invention;
Fig. 4 is enlarged drawing at A in Fig. 3;
Fig. 5 is the schematic elevation view of inner corner trim electromagnetism joint angle of the present invention;
Fig. 6 is the vertical view of Fig. 5;
Fig. 7 is the right view of Fig. 5;
Fig. 8 is the schematic elevation view of external corner electromagnetism joint angle of the present invention;
Fig. 9 is the vertical view of Fig. 8;
Figure 10 is the right view of Fig. 8;
Figure 11 is flexible water disk discharge structure schematic diagram of the present invention;
Figure 12 is the original-shape figure of flexible water disk;
Figure 13 is the dimensional structure diagram of steelframe of the present invention;
Figure 14 is the structural schematic diagram of L-shaped spine support frame of the present invention;
Figure 15 is the structural schematic diagram of main tee supporting rack of the present invention;
Figure 16 is the structural schematic diagram of cross spine support frame of the present invention;
Figure 17 is height adjustment mechanism schematic diagram of the present invention;
Figure 18 is metope retaining mechanism schematic diagram of the present invention;
Figure 19 is the structural schematic diagram of precast floor of the present invention;
Figure 20 is the structural schematic diagram of present invention positioning net;
Figure 21 is the structural schematic diagram of the present invention the second positioning card.
In attached drawing:1- flexible water disks;2- steelframes;The second precast floors of 3-;The first precast floors of 4-;5- same layers are arranged Water pipe;6- main drainpipes;The toilets 7-;
11- waterproof bottom plates;12- waterproof risers;13- inner corner trim electromagnetism joint angles;14- external corner electromagnetism joint angles;15- hot bendings Line;16- support tubes;17- electrodes heat elbow;21- keel;22- vertical supporting framves;22a-L shape spine support framves;22b-T shapes Spine support frame;22c- cross spine support framves;23- cross-brace framves;31- substrates;32- positions net;33- face bricks;34- One positioning card;The positioning cards of 35- second;51- co-layer draining pipe main pipelines;52- co-layer draining pipe subtubes;53- water-proof plates drain Pipeline;
111- discharge outlet;131- inner corner trim lower connecting plates;132- inner corner trim upper junction plates;133- inner corner trim electromagnetism wire sides;141- sun Angle lower connecting plate;142- external corner upper junction plates;143- external corner electromagnetism wire sides;211- lateral keels;212- longitudinal keels;221-L Shape bending part;222-T shape bending parts;223- cross bending parts;224- support columns;225- height adjustment mechanisms;231- metopes Supporting beam;232- metope retaining mechanisms;The first card holes of 321-;351- support portions;352- limiting sections;
2211-L shape bottom plates;2221-T shape bottom plates;2231- cross bottom plates;2251- height fixing nuts;2252- height Adjusting gasket;2253- height locking nuts;2254- height adjustment bolts;2321- metope fixing nuts;2322- metopes are adjusted Gasket;2323- metope locking nuts;2324- metopes smooth bolt.
Specific implementation mode
The invention will be further described with reference to the accompanying drawings and examples:
As shown in Figure 1, a kind of assembled toilet of the present embodiment, has steelframe 2, flexible water disk 1, precast floor With co-layer draining pipe 5, above-mentioned steelframe 2, flexible water disk 1, precast floor and co-layer draining pipe 5 are arranged in toilet 7.
As shown in Fig. 1 and Figure 13, in the present embodiment, steelframe 2 is arranged on the upside of 7 earth's surface of toilet, and steelframe 2 has keel 21, vertical supporting frame 22 and cross-brace frame 23, wherein keel 21 are constituted in one jiao of rectangular platform jaggy and rectangular platform Keel 21 be in square grid shape;22 frame of vertical supporting is used to support keel 21 and adjusts 21 height of keel, and cross-brace frame 23 is solid It is scheduled on the keel 21 on four side of rectangular platform to prevent keel 21 from being moved relative to 7 metope of toilet.In the present embodiment, rectangular platform One jiao jaggy is to avoid pipeline or structural column, and in practical application, the keel 21 in rectangular platform can also constitute it The reticular structure of its shape, such as diamond shape or decorative pattern shape.Precast floor is located on rectangular platform, due to rectangular platform supporting surface Product is big, precast floor is also just unlikely to deform, and leveling rectangular platform is that is, leveling precast floor, 2 leveling of this steelframe From the artificial leveling in the gap of keel 21 when rectangular platform, leveling difficulty is low.In use, due to precast floor and keel 21 contacts area are big, are not easy to move horizontally after precast floor stress, and 5 leak of drainpipe and accomodation ground will not be caused to shake It is dynamic.
As shown in Fig. 1 and Figure 13, in the present embodiment, precast floor includes the first precast floor 4 and the second assembled Floor 3, the first precast floor 4 are fixed on 21 upside of keel;The setting of flexible water disk 1 is in 4 upside of the first precast floor.This In embodiment, the first precast floor 4 is used to support flexible water disk 1, prevents flexible water disk 1 from deforming, in practical application, the Fiber cement board may be used in one precast floor 4.
As depicted in figs. 1 and 2, in the present embodiment, flexible water disk 1 includes waterproof bottom plate 11 and waterproof riser 12, waterproof Bottom plate 11 is horizontally disposed and jaggy rectangular-shaped in one jiao, and discharge outlet 111, waterproof riser 12 are provided on waterproof bottom plate 11 Around waterproof bottom plate 11, waterproof bottom plate 11 and waterproof riser 12 are integrally formed and constitute the case shape of upper opening;Second dress It is arranged in 11 upside of waterproof bottom plate of flexible water disk 1 with formula floor 3.Specifically, in the present embodiment, 1 notch of flexible water disk One jiao be to avoid main drainpipe 6 or structural column and be adapted with steelframe 2.
As shown in Fig. 1 and Figure 13, in the present embodiment, co-layer draining pipe main pipeline 51 is fixed on the upside of 7 earth's surface of toilet simultaneously Positioned at 21 lower section of keel, co-layer draining pipe subtube 52 sequentially passes through the first precast floor 4, flexible water disk 1 from the bottom up It is located at 3 top of the second precast floor with the second precast floor 3 and water inlet.
As shown in Fig. 1 and Figure 13, in the present embodiment, vertical supporting frame 22 includes L-shaped spine support frame 22a, main tee branch Support 22b and cross spine support frame 22c, L-shaped spine support frame 22a, main tee supporting rack 22b and cross keel branch Support 22c includes bending part, support column 224 and height adjustment mechanism 225, and bending part is fixed on the upper end of support column 224 Portion is simultaneously bolted with keel 21, and height adjustment mechanism 225 is fixed on the lower end head of support column 224 to adjust support column 224 With the vertical supporting height of bending part;Cross-brace frame 23 is fixed on the keel 21 on four side of rectangular platform, cross-brace frame 23 Including wall face supporting beam 231 and metope retaining mechanism 232,231 top of wall face supporting beam is fixedly connected with keel 21, metope locking Mechanism 232 is arranged in the lower part of wall face supporting beam 231 to prevent keel 21 from being moved relative to metope.In the present embodiment, steelframe 2 passes through Vertical supporting frame 22 adjusts 21 height of keel, and wherein L-shaped spine support frame 22a is mainly used for supporting the keel at rectangular platform angle 21, main tee supporting rack 22b are mainly used for that the keel 21 at rectangular platform side, cross spine support frame 22c is supported mainly to use Keel 21 inside support rectangular platform.In the present embodiment, two groups of cross are respectively provided on the keel 21 on four side of nearly metope of steelframe 2 To supporting rack 23, keel 21 and metope horizontal distance are adjusted by cross-brace frame 23 and limit keel 21 and is moved, therefore, steelframe Structure (overhead system) stability is preferable;Specifically, cross-brace frame 23 is arranged quantity and position will according to toilet and The shape of keel 21 specifically considers, as long as can the effectively horizontal distance between adjustment keel 21 and metope and after adjustment Prevent keel 21 from moving.In the present embodiment, which up to 40 years or more, and is dismantled by plastic-spraying antirust treatment, long lifespan It is convenient.
As shown in Figure 13 to Figure 17, in the present embodiment, bending part includes that the L-shaped positioned at the tops L-shaped spine support frame 22a is rolled over Comer pieces 221, positioned at the T shapes bending part 222 on the tops main tee supporting rack 22b and positioned at the tops cross spine support frame 22c Cross bending part 223, L-shaped bending part 221 include L-shaped bottom plate 2211 and the riser perpendicular to L-shaped bottom plate 2211, L-shaped bottom plate 2211 and riser collectively form the L-shaped keel link slots of opening upwards, on the riser of two ends of L-shaped keel link slot It is provided with the keel fixing bolt of connection keel;T shapes bending part 222 is including T shapes bottom plate 2221 and perpendicular to T shapes bottom plate 2221 Riser, T shapes bottom plate 2221 and riser collectively form the main tee link slot of opening upwards, close to three ends of main tee link slot The keel fixing bolt of connection keel is both provided on the riser in portion;Cross bending part 223 includes 2231 He of cross bottom plate Perpendicular to the riser of cross bottom plate 2231, the cross keel that cross bottom plate 2231 and riser collectively form opening upwards connect Access slot is both provided with the keel fixing bolt of connection keel on the riser of four ends of cross keel link slot.Specifically Ground, in the present embodiment, in order to keep bending part easy to process, stable structure, L-shaped bending part 221, T shapes bending part 222 and cross Bending part 223 is integrally formed;In order to alleviate the weight of bending part and be convenient for punch forming, the two of L-shaped bending part 221 are short vertical Between plate, between 222 circumferentially adjacent and mutually perpendicular riser of T shapes bending part, cross bending part 223 it is circumferentially adjacent And be both provided with notch between mutually perpendicular riser.In practical application, as needed, bending part can also be by multiple zero Part welding is composed, and bending part according to actual needs, can also use other shapes, as long as not influencing installation and use i.e. It can.
As shown in Figure 13 to Figure 17, in the present embodiment, height adjustment mechanism 225 includes height fixing nut 2251, height Under adjusting gasket 2252, height locking nut 2253 and height adjustment bolt 2254, height fixing nut 2251 and support column 224 End head is fixedly connected, and height adjusting pads piece 2252 and height locking nut 2253 are successively set under height fixing nut 2251 Side, height adjustment bolt 2254 include head and threaded portion, and the threaded portion of height adjustment bolt 2254 sequentially passes through from the bottom up Height locking nut 2253, height adjusting pads piece 2252 and height fixing nut 2251, height locking nut 2253 and height are solid Determine nut 2251 to be adapted with the threaded portion of height adjustment bolt 2254.Before adjusting 21 height of keel, height is first unscrewed downwards Locking nut 2253 is spent, then rotation height adjusting bolt 2254 adjusts 21 height of keel, after keel 21 highly adjust, to On screw 2253 mother of height locking screw.
As shown in Figure 13 and Figure 18, in the present embodiment, metope retaining mechanism 232 includes metope fixing nut 2321, metope Adjusting gasket 2322, metope locking nut 2323 and metope smooth bolt 2324, and 231 lower part of wall face supporting beam is provided perpendicular to The metope of metope smooths bolt mounting holes, and metope fixing nut 2321 is fixed on the wall of the remote metope side of metope smoothing bolt mounting holes In face supporting beam 231, metope adjusting gasket 2322 and metope locking nut 2323 are successively set on metope smoothing bolt mounting holes Nearly metope side;It includes head and threaded portion that metope, which smooths bolt 2324, and metope smooths the threaded portion of bolt 2324 from outside to inside Sequentially pass through metope locking nut 2323, metope adjusting gasket 2322, metope smoothing bolt mounting holes and metope fixing nut 2321, metope locking nut 2323 and metope fixing nut 2321 are adapted with the threaded portion of metope smoothing bolt 2324.This In embodiment, the metope smoothing bolt 2324 of metope retaining mechanism 232 is abutted with 7 metope of toilet, adjusts keel 21 and metope Before distance, metope locking nut 2323 is first unscrewed, then rotates metope smoothing bolt 2324 and adjusts keel 21 and metope distance, when After keel 21 and metope distance adjustment, screwing metope locking nut 2321 prevents keel 21 from moving horizontally.
As shown in Figure 13 to Figure 18, in the present embodiment, height adjustment bolt 2254 and metope smoothing bolt 2324 are all made of Nylon material.For the ease of attaching nut and bolt, keel 21 and support column 224 are all made of square tube making, wall face supporting beam 231 are made of channel steel.In the present embodiment, height fixing nut 2251 is welded in the square hole on 224 lower end head of support column, high The lower end of degree fixing nut 2251 is flushed with 224 lower end of support column.
As shown in Figure 13 to Figure 18, in the present embodiment, keel 21 include lateral keel 211 and longitudinal keel 212, wherein horizontal It is arranged in parallel to keel 211 along rectangular platform length direction, longitudinal keel 212 is vertical with lateral keel 211.The present embodiment In, the vertical height all same in 212 section of lateral keel 211 and longitudinal keel, the specification of longitudinal keel 212 and be located at grid The 211 specification all same of lateral keel at shape edge, 211 cross-sectional width of lateral keel being located in square grid shape are more than positioned at grid 211 cross-sectional width of lateral keel of web-like edge;In order to reduce installation error, lateral keel 211 is fixed on transversely keel 211 On all vertical supporting framves 22 of axis direction setting, therefore 211 length of most of lateral keels is grown more than longitudinal keel 212 Degree, longitudinal keel 212 are fixed on two adjacent vertical supporting framves 22.In the present embodiment, in order to which the support for increasing bending part is strong It spends, in T shapes bending part 222, T shapes bottom plate 2221, which supports the downside at longitudinal keel 212 and is both provided between support column 224, to be added The stiffener plate of strong structure;In cross bending part 223, cross bottom plate 2231 supports downside and branch at longitudinal keel 212 The stiffener plate of reinforcement structure is both provided between dagger 224.
As shown in Fig. 2 to Figure 10, in the present embodiment, pass through inner corner trim electricity between the adjacent waterproof riser 12 of flexible water disk 1 Magnetic connects angle 13 is connected with 14 sweat soldering of external corner electromagnetism joint angle, and inner corner trim electromagnetism joint angle 13 is located at two adjacent waterproof risers The 12 interior angle sides constituted, inner corner trim electromagnetism joint angle 13 and the 11 equal thermofussion welding in upside of two adjacent waterproof risers 12 and waterproof bottom plate Connect in succession, external corner electromagnetism joint angle 14 is located at the exterior angle side that adjacent two waterproof risers 12 are constituted, external corner electromagnetism joint angle 14 with Adjacent two waterproof risers 12 and the sweat soldering connection of 11 downside of waterproof bottom plate.The adjacent waterproof of this flexible water disk 1 is vertical Pass through the inner corner trim electromagnetism joint angle 13 positioned at 11 inside of riser and the external corner electromagnetism joint angle 14 on the outside of riser between plate 12 Sweat soldering connects, easy to operate, when operation inner corner trim electromagnetism joint angle 13 and external corner electromagnetism joint angle 14 are placed after use Electromagnetic welding equipment electromagnetic induction heating, installation difficulty is low, and not only water resistance is good for this flexible water disk 1, but also can Differ to avoid thickness everywhere, shape is overall beautiful.In practical application, inner corner trim and external corner and flexible water disk can also be used The mode of 1 bonding.
As shown in Fig. 5 to Figure 10, in the present embodiment, inner corner trim electromagnetism joint angle 13 is including on inner corner trim lower connecting plate 131, inner corner trim Connecting plate 132 and inner corner trim electromagnetism wire side 133, inner corner trim lower connecting plate 131 are in isosceles right triangle, and inner corner trim upper junction plate 132 is disconnected Face is L-shaped and lower end and two right-angle sides of inner corner trim lower connecting plate 131 are fixedly connected with, and inner corner trim electromagnetism wire side 133 is arranged in inner corner trim The nearly riser side of lower connecting plate 131 and inner corner trim upper junction plate 132;External corner electromagnetism joint angle 14 includes external corner lower connecting plate 141, sun Angle upper junction plate 142 and external corner electromagnetism wire side 143, external corner lower connecting plate 141 are in isosceles right triangle, external corner upper junction plate 142 sections are L-shaped and lower end and two right-angle sides of external corner lower connecting plate 141 are fixedly connected with, and the setting of external corner electromagnetism wire side 143 exists The nearly riser side of external corner lower connecting plate 141 and external corner upper junction plate 142.In the present embodiment, inner corner trim electromagnetism wire side 133 and external corner electricity Magnetic wire side 143 is made of wire electrode, and after electromagnetic induction heating, wire electrode fever makes inner corner trim electromagnetism joint angle 13, external corner electromagnetism Joint angle 14 is connect with 1 sweat soldering of flexible water disk respectively.For the ease of installation, waterproof bottom plate 11, waterproof riser 12, inner corner trim Lower connecting plate 131, inner corner trim upper junction plate 132, external corner lower connecting plate 141 and external corner upper junction plate 142 are all made of HDPE materials.For The upper end of good appearance, inner corner trim upper junction plate 132 and external corner upper junction plate 142 is flushed with 12 upper end of waterproof riser.
As shown in figure 11, in the present embodiment, for the ease of the discharge outlet 111 and water-proof plate drainage pipeline of flexible water disk 1 53 connect and prevent leak, discharge outlet 111 to be equipped with circular ring shape hot bending portion integrally formed with waterproof bottom plate 11 and that Open Side Down.
As shown in figure 11, a kind of flexible water disk discharge structure of the present embodiment has discharge outlet 111, support tube 16, electricity The waterproof bottom plate 11 of very hot molten elbow 17 and water-proof plate drainage pipeline 53, discharge outlet 111 and flexible water disk 1 is integrally formed and is in The annular shape extended downwardly, 16 lower part of support tube are located in discharge outlet 111, and 16 lower end of support tube is flushed with 111 lower end of discharge outlet And upper end exceeds 111 upper end of discharge outlet, 16 upper end edge of support tube is circumferentially provided with rhone;Electrode heats 17 upper head of elbow Inside is provided with electromagnetism wire side, and 111 lower part of discharge outlet is inserted into after electrode hot melt 17 upper head of elbow and heats elbow 17 with electrode Sweat soldering connects, and water-proof plate drainage pipeline 53 is connected to the lower end head of electrode hot melt elbow 17.This flexible water disk drains In structure, the waterproof bottom plate 11 of discharge outlet 111 and flexible water disk 1 is integrally formed and in the annular shape extended downwardly, electrode heat Electromagnetism wire side on the inside of 17 upper head of molten elbow is made of wire electrode, after electromagnetic induction heating electromagnetism wire side, wire electrode fever Sweat soldering between electrode hot melt elbow 17 and discharge outlet 111 is set to connect, connection difficulty is low, and water resistance is good;Support tube upper end Surrounding opens up rhone, is convenient to clean sundries and draining.Specifically, discharge outlet 111 and electrode heat elbow 17 in the present embodiment HDPE materials are all made of, support tube 16 and water-proof plate drainage pipeline 53 are pvc pipe;The discharge outlet 111 of flexible water disk 1 passes through Water is drained into 5 (not shown) of same layer main drainpipe by water-proof plate drainage pipeline 53.
As shown in figure 19, precast floor 3 includes substrate 31, positioning net 32, positioning card and face brick 33, and positioning net 32 is in square Shape is simultaneously fixed on 31 upper surface of substrate, is clamped between adjacent positioning net 32;Positioning card includes the first positioning card 34 and second Positioning card 35, the first positioning card 34 are fixed on 32 middle part of positioning net, and the second positioning card 35 is fixed on positioning 32 four corners of net, face brick 33 are positioned by adjacent the first positioning card 34 and the second positioning card 35 and are bonded on positioning net 32.In the present embodiment, substrate 31 For fiber cement board, positioning net 32 is made of ABS engineering plastics, and in practical application, substrate 31 can also use alloy sheets.
As shown in Fig. 1 and Figure 19, substrate 31 is first fixed on steelframe 32 by this precast floor 3, then will position net 32 Between be clamped and it is fixed on the substrate 31, position after spreading glue for tile on net 32 by the first positioning block 34 and second positioning card 35 with It positions net 32 to connect, face brick 33 can easily be installed by the first adjacent positioning card 34 and 35 positioning of the second positioning card at this time, The installation difficulty for reducing face brick 33 improves the installation effectiveness of face brick 33, and the personnel for not needing profession can be by face brick 33 It installs smooth.Specifically, the gap between adjacent tile 33 is filled with jointing agent;In the present embodiment, positioning net 32 and substrate 31 Between using rifle nail be fixedly connected, can also be connected with common nails in practical application, as long as do not influence installation and use.
As shown in Figure 19 to Figure 21, in the present embodiment, 32 middle part of positioning net is provided with the first card hole 321, the first positioning card 34 lower parts are connected in the first card hole 321 and top is beyond 32 upper surface of positioning net, the first positioning 34 lower parts of card and the first card hole 321 are adapted.Second positioning card 35 includes support portion 351 and limiting section 352, and the four corners of positioning net 32 are both provided with bayonet, Support portion 351 is adapted with bayonet and is connected to the four corners of positioning net 32,351 thickness of support portion and positioning 32 thickness phase of net Together.Specifically, in the present embodiment, first positioning the 34, first card hole 321 of card and limiting section 352 are cross;Bayonet and support Portion 352 is rectangular.In practical application, first positioning the 34, first card hole 321 of card and limiting section 352 can also use other shapes Shape, as long as not influencing installation and use.
As shown in Fig. 1 to Figure 21, a kind of assembled Toilet Installation method includes the following steps:
Step S1 measures the size of toilet, according to the size precasting steel frame 2 of toilet;
Step S2 is laid with same-floor drainage pipeline 5;
Step S3, installs steelframe 2, and wherein step S5 includes the following steps:Step S3.1, the first step of vertical supporting frame 22 Whole to one unified height;Step S3.2, keel 21 are connect with vertical supporting frame 22 (lateral keel 211 can be first connected, After all lateral keels 211 are connected with corresponding vertical supporting frame 22, longitudinal keel 212 is reconnected);Step S3.3, adjustment Rectangular platform four while keel 21 and metope between spacing (when preventing rectangular platform four with metope hypotelorism or too far);Step Rapid S3.4,22 height of accurate adjustment vertical supporting frame make 21 upside of keel be located at same level and (measure keel 21 by horizon rule side Levelness side adjusts 22 height of vertical supporting frame there are deviation);Step S3.5, by cross-brace frame 23 by rectangular platform four Spacing locking between the keel 21 and metope on side;
Step S4 installs the first precast floor 4;
Step S5, installation flexible water disk 1, wherein step S5 includes the following steps:Step S5.1, according to the ruler of toilet It is very little to cut flexible web and constitute the original-shape of flexible water disk 1, the original-shape (Figure 12) of flexible water disk by one at The waterproof bottom plate 11 and waterproof riser 12 of type collectively form, and the shape of waterproof bottom plate 11 is identical as toilet flat shape, waterproof Riser 12 is located at around waterproof bottom plate 11;Step S5.2 makes waterproof riser 12 and prevents by waterproof riser 12 along 15 hot bending of hot bending line Water-bed plate 11 constitutes the case shape of upper opening;Step S5.3, adjacent and to need the two waterproof risers 12 connected to constitute outer External corner electromagnetism joint angle 14 is placed in angle side, and inner corner trim electricity is placed in interior angle side that is adjacent and needing the two waterproof risers 12 connected to constitute Magnetic connects angle 13;Step S5.4, with fixture by inner corner trim electromagnetism joint angle 13, adjacent and need the two waterproof risers 12 connected and sun Angle electromagnetism joint angle 14 is clamped simultaneously, keeps having lasting clamping between inner corner trim electromagnetism joint angle 13 and external corner electromagnetism joint angle 14 Power;Step S5.5 waits for that inner corner trim electromagnetism connects to inner corner trim electromagnetism joint angle 13 and external corner electromagnetism joint angle 14 while electromagnetic induction heating It connects between 133 side of inner corner trim electromagnetism wire side at angle 13 and two adjacent waterproof risers 12 and the upside of waterproof bottom plate 11, external corner electromagnetism Equal thermofussion welding between 11 downside of 143 side of external corner electromagnetism wire side of joint angle 14 and two adjacent waterproof risers 12 and waterproof bottom plate Stop electromagnetic induction heating after connecing in succession;Step S5.6 processes discharge outlet 111, and discharge outlet 111 is made to be formed and waterproof bottom plate 11 1 Circular ring shape body formed and that Open Side Down;Discharge outlet 111 is connect by step S5.7 with main drainpipe 6;Step S5.8, will be flexible Water-proof plate 1 is shelved on smoothing bed course 4;
Step S6, installs precast floor 3, and wherein step S6 includes the following steps:Step S6.1, installation base plate 31;Step 31 upper surface of positioning 32 fixed substrate of net will be clamped by rapid S6.2, installation positioning net 32 between adjacent positioning net 32;Step Glue for tile is poured into positioning net 32, is struck off by S6.3;First positioning is blocked 34 and is connected to 32 middle part of positioning net by step S6.4, will Second positioning card 35 is connected to positioning 32 four corners of net;Step S6.5 blocks 34 and 35 positioning of the second positioning card according to the first positioning Paving brick 33;
Step S7, safety inspection.
In step S6, substrate 31 and 33 shape of face brick that co-layer draining pipe 5 is in charge of across place are in charge of phase with co-layer draining pipe 5 Adaptation, positioning net 32 herein will manually be cut when installing.
The preferred embodiment of the present invention has been described in detail above.It should be appreciated that those skilled in the art without It needs creative work according to the present invention can conceive and makes many modifications and variations.Therefore, all technologies in the art Personnel are available by logical analysis, reasoning, or a limited experiment on the basis of existing technology under this invention's idea Technical solution, all should be in the protection domain being defined in the patent claims.

Claims (10)

1. a kind of assembled toilet being easily installed, it is characterised in that:Including steelframe, flexible water disk, precast floor and Co-layer draining pipe, the steelframe, flexible water disk, precast floor and co-layer draining pipe are arranged in toilet;
The steelframe is arranged on the upside of toilet earth's surface, and steelframe includes keel, vertical supporting frame and cross-brace frame;The keel The keel constituted in one jiao of rectangular platform jaggy and rectangular platform are in netted, and the vertical supporting frame is used to support keel simultaneously Keel level is adjusted, the cross-brace frame is fixed on the keel on four side of rectangular platform to prevent keel from being moved relative to metope;
The precast floor includes the first precast floor and the second precast floor, and first precast floor is fixed on On the upside of keel;
The flexible water disk is arranged on the upside of the first precast floor, and flexible water disk includes waterproof bottom plate and waterproof riser, The waterproof floor level is arranged and is in one jiao jaggy rectangular-shaped, and discharge outlet is provided on waterproof bottom plate, and the waterproof is vertical Plate is located at around waterproof bottom plate, and waterproof bottom plate and waterproof riser are integrally formed and constitute the case shape of upper opening;
Second precast floor is arranged on the upside of the waterproof bottom plate of flexible water disk;
The main pipeline of co-layer draining pipe is fixed on the upside of toilet earth's surface and below keel, the subtube of co-layer draining pipe from Under up sequentially pass through the first precast floor, flexible water disk and the second precast floor and water inlet is located at the second assembled Above floor.
2. assembled toilet according to claim 1, it is characterised in that:Second precast floor include substrate, Net, positioning card and face brick are positioned, the positioning net is rectangular and is fixed on upper surface of base plate, blocks between adjacent positioning net It connects;Positioning card includes that the first positioning card and the second positioning block, and first positioning, which fixes, to be scheduled in the middle part of positioning net, and described the Two positioning, which fix, is scheduled on positioning net four corners, and the face brick is by the first adjacent positioning card and the locking position of the second positioning and is bonded in Positioning is online.
3. the assembled toilet according to claim 2 being easily installed, it is characterised in that:The vertical supporting frame includes L-shaped spine support frame, main tee supporting rack and cross spine support frame, the L-shaped spine support frame, main tee supporting rack Include bending part, support column and height adjustment mechanism with cross spine support frame, the bending part is fixed on support column Upper head is simultaneously bolted with keel, the height adjustment mechanism be fixed on the lower end head of support column with adjust support column and The vertical supporting height of bending part;The bending part includes positioned at the L-shaped bending part on L-shaped spine support frame top, positioned at T shape dragons The T shapes bending part on bone supporting rack top and cross bending part positioned at cross spine support frame top, the L-shaped bending part The L-shaped keel that riser including L-shaped bottom plate and perpendicular to L-shaped bottom plate, L-shaped bottom plate and riser collectively form opening upwards connect Slot is both provided with the keel fixing bolt of connection keel on the riser of two ends of L-shaped keel link slot;The T shapes folding Comer pieces includes T shapes bottom plate and the riser perpendicular to T shape bottom plates, and the main tee that T shapes bottom plate and riser collectively form opening upwards connects Access slot is both provided with the keel fixing bolt of connection keel on the riser of three ends of main tee link slot;The cross Shape bending part includes cross bottom plate and the riser perpendicular to cross bottom plate, cross bottom plate and riser collectively form opening to On cross keel link slot, close to four ends of cross keel link slot riser on be both provided with connection keel dragon Bone fixation bolt.
4. the assembled toilet according to claim 3 being easily installed, it is characterised in that:The height adjustment mechanism packet Include height fixing nut, height adjusting pads piece, height locking nut and height adjustment bolt, the height fixing nut and support Column lower end head is fixedly connected, and the height adjusting pads piece and height locking nut are successively set on the downside of height fixing nut, The height adjustment bolt includes head and threaded portion, and the threaded portion of height adjustment bolt sequentially passes through height and locks from the bottom up Nut, height adjusting pads piece and height fixing nut, the height locking nut and height fixing nut adjust spiral shell with height The threaded portion of bolt is adapted.
5. the assembled toilet according to claim 4 being easily installed, it is characterised in that:The cross-brace frame includes Wall face supporting beam and metope retaining mechanism, wall face supporting beam top are fixedly connected with keel, and the metope retaining mechanism is set It sets in the lower part of wall face supporting beam to prevent keel from being moved relative to metope;The metope retaining mechanism include metope fixing nut, Metope adjusting gasket, metope locking nut and metope smooth bolt, and wall face supporting beam lower part is provided perpendicular to metope Metope smooths bolt mounting holes, and the metope fixing nut is fixed on the wall face supporting of the remote metope side of metope smoothing bolt mounting holes Liang Shang, the metope adjusting gasket and metope locking nut are successively set on the nearly metope side of metope smoothing bolt mounting holes;Institute It includes head and threaded portion to state metope smoothing bolt, and the threaded portion of metope smoothing bolt sequentially passes through metope locking screw from outside to inside Mother, metope adjusting gasket, metope smoothing bolt mounting holes and metope fixing nut, the metope locking nut and metope fix spiral shell Female threaded portion that bolt is smoothed with metope is adapted.
6. the assembled toilet according to claim 5 being easily installed, it is characterised in that:The keel and support column are equal For square tube, wall face supporting beam is channel steel.
7. the assembled toilet according to claim 2 being easily installed, it is characterised in that:Between adjacent waterproof riser It is connected with external corner electromagnetism joint angle sweat soldering by inner corner trim electromagnetism joint angle, the inner corner trim electromagnetism joint angle is located at adjacent two The interior angle side that waterproof riser is constituted, inner corner trim electromagnetism joint angle and equal thermofussion welding on the upside of two adjacent waterproof risers and waterproof bottom plate It connects in succession, the external corner electromagnetism joint angle is located at the exterior angle side that two adjacent waterproof risers are constituted, external corner electromagnetism joint angle and phase The equal sweat soldering connection of adjacent two waterproof risers and waterproof baseplate underside.
8. the assembled toilet according to claim 7 being easily installed, it is characterised in that:The inner corner trim electromagnetism joint angle Including inner corner trim lower connecting plate, inner corner trim upper junction plate and inner corner trim electromagnetism wire side, the inner corner trim lower connecting plate is in isosceles right triangle, The inner corner trim upper junction plate section is L-shaped and lower end and two right-angle sides of inner corner trim lower connecting plate are fixedly connected with, the inner corner trim electricity The nearly waterproof riser side in inner corner trim lower connecting plate and inner corner trim upper junction plate is arranged in magnetic wire side;The external corner electromagnetism joint angle includes sun Angle lower connecting plate, external corner upper junction plate and external corner electromagnetism wire side, the external corner lower connecting plate are in isosceles right triangle, the sun Angle upper junction plate section is L-shaped and lower end and two right-angle sides of external corner lower connecting plate are fixedly connected with, the external corner electromagnetism wire side Nearly waterproof riser side in external corner lower connecting plate and external corner upper junction plate is set.
9. the assembled toilet according to claim 8 being easily installed, it is characterised in that:The waterproof bottom plate, waterproof Riser, inner corner trim lower connecting plate, inner corner trim upper junction plate, external corner lower connecting plate and external corner upper junction plate are all made of HDPE materials.
10. a kind of assembled Toilet Installation method, which is characterized in that using the dress as described in claim 7~9 any one It is installed, is included the following steps with formula toilet:
Step 1, the size for measuring toilet, according to the size precasting steel frame of toilet;
Step 2, it is laid with same-floor drainage pipeline;
Step 3, steelframe is installed, wherein step 3 includes the following steps:Step 3.1, vertical supporting frame is tentatively adjusted to a system One height;Step 3.2, keel are connect with vertical supporting frame;Step 3.3, the keel and metope on four side of adjustment rectangular platform Between spacing;Step 3.4, accurate adjustment vertical supporting frame height makes to be located at same level on the upside of keel;Step 3.5, pass through cross The spacing between the keel and metope on four side of rectangular platform is locked to supporting rack;
Step 4, the first precast floor is installed;
Step 5, flexible water disk is installed, wherein step 5 includes the following steps:Step 5.1, it is cut according to the size of toilet soft Property coiled material and constitute the original-shape of flexible water disk, the original-shape of flexible water disk is by integrally formed waterproof bottom plate and anti- Water riser collectively forms, and the shape of waterproof bottom plate is identical as toilet flat shape, and waterproof riser is located at around waterproof bottom plate;Step Rapid 5.2, by waterproof riser hot bending, waterproof riser and waterproof bottom plate is made to constitute the case shape of upper opening;Step 5.3, adjacent And external corner electromagnetism joint angle is placed in the exterior angle side for needing the two waterproof risers connected to constitute, adjacent and need two waterproofs connected Place inner corner trim electromagnetism joint angle in the interior angle side that riser is constituted;Step 5.4, with fixture by inner corner trim electromagnetism joint angle, adjacent and need Connection two waterproof risers and external corner electromagnetism joint angle clamp simultaneously, holding inner corner trim electromagnetism joint angle and external corner electromagnetism joint angle it Between have lasting clamping force;Step 5.5, inner corner trim electromagnetism joint angle and external corner electromagnetism joint angle electromagnetic induction heating simultaneously are given, is waited for Between on the upside of the inner corner trim electromagnetic screen surface side of inner corner trim electromagnetism joint angle and two adjacent waterproof risers and waterproof bottom plate, external corner electromagnetism Between the external corner electromagnetic screen surface side of joint angle and two adjacent waterproof risers and waterproof baseplate underside after equal sweat soldering connection Stop electromagnetic induction heating;Step 5.6, discharge outlet is processed, so that discharge outlet is formed and is integrally formed the circle that simultaneously Open Side Down with bottom plate Annular heat turn of bilge;Step 5.7, discharge outlet is connect with main drainpipe;Step 5.8, flexible water disk is shelved on smoothing bed course On;
Step 6, the second precast floor is installed, wherein step 6 includes the following steps:Step 6.1, installation base plate;Step 6.2, Positioning net fixed substrate upper surface will be clamped by installation positioning net between adjacent positioning net;Step 6.3, glue for tile is poured into In positioning net, strike off;Step 6.4, the first positioning is connected to positioning net middle part, the second positioning is connected to positioning net four At angle;Step 6.5, according to the first positioning card and the second positioning locking position paving brick;
Step 7, safety inspection.
CN201810460719.1A 2018-05-15 2018-05-15 The assembled toilet and its installation method being easily installed Pending CN108396871A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810460719.1A CN108396871A (en) 2018-05-15 2018-05-15 The assembled toilet and its installation method being easily installed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810460719.1A CN108396871A (en) 2018-05-15 2018-05-15 The assembled toilet and its installation method being easily installed

Publications (1)

Publication Number Publication Date
CN108396871A true CN108396871A (en) 2018-08-14

Family

ID=63101288

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810460719.1A Pending CN108396871A (en) 2018-05-15 2018-05-15 The assembled toilet and its installation method being easily installed

Country Status (1)

Country Link
CN (1) CN108396871A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020211803A1 (en) * 2019-04-18 2020-10-22 林品通 Assembled device
CN112878440A (en) * 2020-10-13 2021-06-01 南通中慧建筑科技有限公司 Mobile toilet same-floor drainage system based on BIM

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0481246A2 (en) * 1990-10-16 1992-04-22 CENTRO ACCIAI S.p.A. Public lavatory with a self-supporting structure
CN2725413Y (en) * 2004-09-07 2005-09-14 张丽莉 Assembling type network floor
KR100670842B1 (en) * 2006-06-13 2007-01-17 (주)한국환경종합건축사사무소 Foor pannel for building
CN202300428U (en) * 2011-10-28 2012-07-04 成都市新筑路桥机械股份有限公司 Trolley for installing tunnel waterproof plate
CN202442049U (en) * 2012-03-09 2012-09-19 山东胜邦塑胶有限公司 Electromagnetic heating type electric smelting pipe fitting
CN203867202U (en) * 2014-06-19 2014-10-08 中国五冶集团有限公司 Positioning tool special for steel structure vertical keel of metal curtain wall of large gymnasium
CN205062922U (en) * 2015-09-08 2016-03-02 上海中房建筑设计有限公司 Installation is with layer drainage system's bathroom
CN106284911A (en) * 2016-08-23 2017-01-04 天元建设集团有限公司 A kind of assembled raised flooring, assembled space separating system and construction method
CN107268938A (en) * 2017-07-31 2017-10-20 钱浩 A kind of combined type movement floor
CN107859275A (en) * 2017-09-29 2018-03-30 浙江未来加电子商务有限公司 Ground pavement structure based on cross positioning assembly parts
CN108005338A (en) * 2017-11-30 2018-05-08 浙江亚厦装饰股份有限公司 Substrate, substrate floor tile composite module and its assemble method

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0481246A2 (en) * 1990-10-16 1992-04-22 CENTRO ACCIAI S.p.A. Public lavatory with a self-supporting structure
CN2725413Y (en) * 2004-09-07 2005-09-14 张丽莉 Assembling type network floor
KR100670842B1 (en) * 2006-06-13 2007-01-17 (주)한국환경종합건축사사무소 Foor pannel for building
CN202300428U (en) * 2011-10-28 2012-07-04 成都市新筑路桥机械股份有限公司 Trolley for installing tunnel waterproof plate
CN202442049U (en) * 2012-03-09 2012-09-19 山东胜邦塑胶有限公司 Electromagnetic heating type electric smelting pipe fitting
CN203867202U (en) * 2014-06-19 2014-10-08 中国五冶集团有限公司 Positioning tool special for steel structure vertical keel of metal curtain wall of large gymnasium
CN205062922U (en) * 2015-09-08 2016-03-02 上海中房建筑设计有限公司 Installation is with layer drainage system's bathroom
CN106284911A (en) * 2016-08-23 2017-01-04 天元建设集团有限公司 A kind of assembled raised flooring, assembled space separating system and construction method
CN107268938A (en) * 2017-07-31 2017-10-20 钱浩 A kind of combined type movement floor
CN107859275A (en) * 2017-09-29 2018-03-30 浙江未来加电子商务有限公司 Ground pavement structure based on cross positioning assembly parts
CN108005338A (en) * 2017-11-30 2018-05-08 浙江亚厦装饰股份有限公司 Substrate, substrate floor tile composite module and its assemble method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020211803A1 (en) * 2019-04-18 2020-10-22 林品通 Assembled device
CN112878440A (en) * 2020-10-13 2021-06-01 南通中慧建筑科技有限公司 Mobile toilet same-floor drainage system based on BIM

Similar Documents

Publication Publication Date Title
CN108425434A (en) Flexible water disk, flexible water disk processing method and assembled toilet
CN108442738A (en) Assembled toilet and its installation method
CN105113671A (en) Construction method of large conchoidal hyperbolic curtain wall
CN210482605U (en) Building structure movement joint mounting structure
CN108396871A (en) The assembled toilet and its installation method being easily installed
CN208718092U (en) A kind of assembled toilet being easily installed
CN110158394A (en) A kind of concrete ultra-flat terrace cutting-free constructing structure
CN108612284A (en) Aerial steelframe and its installation method
CN106437093B (en) Building decoration concealed installation ceramic tile baseboard structure and construction process thereof
CN208578362U (en) A kind of assembled toilet
CN106894583B (en) A kind of discharge structure and its construction method for ancient building shelter bridge
CN102230338A (en) Prefabricated toilet and construction method and installation method thereof
CN108396934A (en) Precast floor, precast floor installation method and assembled toilet
CN111997236A (en) Slotting and stacking type back bolt stone curtain wall
KR101156099B1 (en) Guide-point of hydroelectricity box for masonry wall and the installation method of hydroelectricity box using it
CN217399823U (en) Indoor appliance drainage connecting disc
CN207017442U (en) A kind of cleaning fixed structure of curved roof
CN113638567B (en) Quick-assembly integral ground system based on descending plate type toilet and construction method
KR20160017465A (en) Heating module board and construction method of heating module board
CN111335352B (en) Positioning and waterproof integrated construction method for roof solar foundation buttress
CN208088817U (en) A kind of easy-to-dismount overhanging type scaffold bolt anchoring assembly
CN111749403A (en) Drainage ditch and deformation joint combined structure and construction method thereof
CN101250892A (en) Hanging device and construction method for light separating-wall hidden installation sanitary equipment
CN213452089U (en) Same-floor drainage and water supply buried pipeline supporting structure
CN105350784B (en) Utilize skirt location technology one-shot forming service sleeve installation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180814