CN202299353U - Building scaffold - Google Patents

Building scaffold Download PDF

Info

Publication number
CN202299353U
CN202299353U CN2011203176801U CN201120317680U CN202299353U CN 202299353 U CN202299353 U CN 202299353U CN 2011203176801 U CN2011203176801 U CN 2011203176801U CN 201120317680 U CN201120317680 U CN 201120317680U CN 202299353 U CN202299353 U CN 202299353U
Authority
CN
China
Prior art keywords
scaffold
pipe
pipe clamp
fixing holes
pipe clamps
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203176801U
Other languages
Chinese (zh)
Inventor
雷灿波
阮进尤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011203176801U priority Critical patent/CN202299353U/en
Application granted granted Critical
Publication of CN202299353U publication Critical patent/CN202299353U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model relates to a building scaffold. The outer sides of two scaffold pipes are respectively sheathed with one pipe clamp; the surface of the fixing end of each pipe clamp is respectively provided with three fixing holes; and the two pipe clamps are used for connecting the corresponding fixing holes by virtue of bolts. When one scaffold rotate for 360 degrees, the two pipe clamps are connected with respective inner-side fixing holes by virtue of the bolts; when the two scaffolds are vertical to each other, the two pipe clamps are connected with the two corresponding fixing holes by virtue of the bolts; when the included angle between the two scaffolds is 45 degrees, the two pipe clamps are fixedly connected with the three corresponding fixing holes by virtue of the bolts; and the inner cavity is filled with a foam material. The building scaffold has the beneficial effect that the two scaffold pipes are respectively provided with one pipe clamp, and the pipe clamps are respectively provided with three corresponding fixedly-connecting holes so as to greatly enhance the flexibility of the scaffold pipes. The inner cavities of the scaffold pipes are filled with foam materials so as to ensure that pipe bodies are firmer.

Description

A kind of building scaffold
Technical field
The utility model relates to a kind of building support, relates in particular to a kind of building scaffold.
Background technology
Scaffold is meant that the job site is operated and solve vertical for the workman and level is transported the various supports of setting up; Promptly refer to be used on the building site the higher place that can't directly construct of exterior wall, interior decoration or floor height; Be mainly that the constructor works up and down or peripheral safety net is safeguarded and high-altitude installation component etc.; Some engineering is also used when template with scaffold, also is widely used in fields such as advertising, municipal administration, traffic road and bridge, mines.Which kind of but no matter implement through member; Must satisfy the performance of aspects such as under various conditions intensity of building structure and member, rigidity, stability, wherein often support strength is not up to standard, enrich inadequately inside, be not enough to intact support for prior art scaffold commonly used; In addition, for the adjustment flexibility ratio of scaffold also outbalance, therefore, need reasonably improve prior art.
The utility model content
To above defective, the utility model provide a kind of connect firm, body is solid, have certain flexibility ratio, the building scaffold of being convenient to regulate, to solve many deficiencies of prior art.
For realizing above-mentioned purpose, the utility model adopts following technical scheme:
A kind of building scaffold, a pipe clamp is inserted in two scaffold tube outsides respectively, and the fixed end surface of each pipe clamp is provided with three fixing holes respectively, and two pipe clamps connect through the fixing hole of bolt with correspondence; Said scaffold tube inner chamber is divided into the chamber of several perforations through reinforcing rib.When one of them scaffold tube can be carried out 360 ° of rotations, two pipe clamps connected inboard fixing hole separately through bolt; When two scaffold tube became 90 °, two pipe clamps connected through two fixing holes of bolt with correspondence; When two scaffold tube became 45 °, two pipe clamps connected three fixing holes of correspondence fixing respectively through bolt; Said inner chamber filled with foaming material inside.
The beneficial effect of the described building scaffold of the utility model is: through a pipe clamp is installed respectively on two scaffold tube; And on pipe clamp, offer three corresponding holes that are fixedly connected respectively; When two pipe clamps only connected inboard fixing hole separately through bolt, scaffold tube two can be carried out 360 ° of rotations; When two pipe clamps connected two fixing holes separately, scaffold tube two can be adjusted to 90 °; When two pipe clamps connected whole three fixing holes separately, scaffold tube two can be adjusted to 45 °, and these have all greatly strengthened the flexibility of scaffold tube; Through filled with foaming material, can make body more solid at the internal cavities place of scaffold tube.
Description of drawings
According to accompanying drawing the utility model is done further explain below.
Fig. 1 is the decomposition texture sketch map of the said building scaffold of the utility model embodiment;
Fig. 2 is the syndeton sketch map of the said building scaffold of the utility model embodiment;
Fig. 3 is the application state sketch map of the said building scaffold of the utility model embodiment.
Among the figure:
1, scaffold tube one; 2, scaffold tube two; 3, pipe clamp one; 4, pipe clamp two; 5, inboard fixing hole; 6, fixing hole two; 7, fixing hole three; 8, cavity; 9, reinforcing rib.
The specific embodiment
Shown in Fig. 1-3; The described building scaffold of the utility model embodiment; Comprise scaffold tube 1, scaffold tube 22, pipe clamp 1, pipe clamp 24, said scaffold tube 1 is inserted in pipe clamp 1, pipe clamp 24 respectively with scaffold tube 22 outsides, and the fixed end surface that is positioned at pipe clamp 1 and pipe clamp 24 is provided with three fixing holes respectively; Be inboard fixing hole 5, fixing hole 26, fixing hole 37, said pipe clamp 1 connects corresponding fixing hole through bolt with pipe clamp 24; When scaffold tube 22 can be carried out 360 ° of rotations, two pipe clamps connected inboard fixing hole 5 separately through bolt; When scaffold tube 22 is adjusted into and scaffold tube 11 one-tenth 90 ° the time, two pipe clamps are connected with fixing hole 37 through the fixing hole 26 of bolt with correspondence; When scaffold tube 22 is adjusted into and scaffold tube 11 one-tenth 45 ° the time, two pipe clamps all are connected inboard fixing hole 5, the fixing hole 26 of correspondence with fixing hole 37 through bolt to be fixed.In addition, the inner chamber 8 of said scaffold tube 1 and scaffold tube 22 is divided into the chamber of several perforations through reinforcing rib 9, and said inner chamber 8 filled with foaming material inside are so that reinforce each scaffold tube.

Claims (1)

1. building scaffold; Comprise two scaffold tube and each self-corresponding pipe clamp; It is characterized in that: a pipe clamp is inserted in two scaffold tube outsides respectively, and the fixed end surface of each pipe clamp is provided with three fixing holes respectively, and two pipe clamps connect through the fixing hole of bolt with correspondence; Said scaffold tube inner chamber is divided into the chamber of several perforations through reinforcing rib.
CN2011203176801U 2011-08-18 2011-08-18 Building scaffold Expired - Fee Related CN202299353U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203176801U CN202299353U (en) 2011-08-18 2011-08-18 Building scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203176801U CN202299353U (en) 2011-08-18 2011-08-18 Building scaffold

Publications (1)

Publication Number Publication Date
CN202299353U true CN202299353U (en) 2012-07-04

Family

ID=46368279

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203176801U Expired - Fee Related CN202299353U (en) 2011-08-18 2011-08-18 Building scaffold

Country Status (1)

Country Link
CN (1) CN202299353U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760450A (en) * 2015-11-24 2017-05-31 王勇 A kind of manufacturing process of the building scaffold of light-high-strength
CN107443271A (en) * 2017-08-02 2017-12-08 合肥光聚财建筑装饰工程有限公司 A kind of adjustable type clamper and its clamp method for building materials and ornaments pipe

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760450A (en) * 2015-11-24 2017-05-31 王勇 A kind of manufacturing process of the building scaffold of light-high-strength
CN107443271A (en) * 2017-08-02 2017-12-08 合肥光聚财建筑装饰工程有限公司 A kind of adjustable type clamper and its clamp method for building materials and ornaments pipe

Similar Documents

Publication Publication Date Title
CN202498720U (en) Traction machine for plastic pipes
CN202559713U (en) Steel pipe connecting device
CN202299353U (en) Building scaffold
CN104372923B (en) Scaffolding
CN201574507U (en) Soft film ceiling mounting structure
CN206175824U (en) A subway gallows locking device
CN203393734U (en) Embedded welding basic structure for tower crane
CN204299157U (en) The mounted lifting device in attached lifting scaffold side
CN203920973U (en) A kind of Multi-functional transporting chassis for large-scale penstock installation in tunnel
CN202125005U (en) Movable board room unit wall board and combined movable board room wall board thereof
CN203334678U (en) Outer wall formwork strengthening system for concrete pouring
CN204174915U (en) Scaffold
CN204529157U (en) Tower crane attached wall service platform
CN203905008U (en) Diagonal brace supporting structure for superior angle of foundation pit
CN203034916U (en) Assembled construction barrier
CN201687207U (en) Multifunctional construction formwork telescopic waling
CN202430986U (en) Device for lengthening steel pipe
CN204174903U (en) Scaffold
CN204163358U (en) Scaffold
CN204174919U (en) Scaffold
CN204531362U (en) Scaffold
CN204174936U (en) A kind of template support structure of outer wall of basement
CN204040254U (en) A kind of connector of aerated concrete wall panel
CN203684655U (en) Forming formwork for shear wall at expansion joints
CN204163359U (en) Scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20120818