CN202298658U - Anti-settlement integrated manhole - Google Patents
Anti-settlement integrated manhole Download PDFInfo
- Publication number
- CN202298658U CN202298658U CN2011204142624U CN201120414262U CN202298658U CN 202298658 U CN202298658 U CN 202298658U CN 2011204142624 U CN2011204142624 U CN 2011204142624U CN 201120414262 U CN201120414262 U CN 201120414262U CN 202298658 U CN202298658 U CN 202298658U
- Authority
- CN
- China
- Prior art keywords
- manhole
- settlement
- utility
- model
- well
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model relates to an anti-settlement integrated manhole. The anti-settlement integrated manhole comprises a well cover (1) and is characterized in that the well cover (1) is arranged in an extensive well loop (2) which is connected with a shaft (3) embedded under a wellhead ground (6) into a whole. According to the anti-settlement integrated manhole disclosed by the utility model, a static tube is of an integrated structure , pressure from a pavement can be effectively dispersed; and a branch block is arranged so that an anti-settlement effect is greatly reinforced, and settlement of the well cover is ensured to be prevented for a long time; in addition, the anti-settlement integrated manhole disclosed by the utility model has the advantages of integral construction, convenience for construction and lower cost.
Description
Technical field
The utility model relates to the integrated manhole of a kind of anti-settling.
Background technology
At present, the urban road manhole is claimed manhole again, is provided in a side of a kind of well columnar structure thing on the underground trunk pipeline of municipal engineering.Mainly as the operating space that pipeline operating condition is checked and dredged, as the linking of pipeline change elevation, the change gradient, change caliber, change direction, simultaneously, rainwater arm remittance main conduit also is to accomplish connection through manhole.The manhole that is arranged on the road surface mainly contains water-supply line, flowing line, electric power, telecommunication pipeline manhole.The road surface well head refers to the manhole and the binding site on road surface on every side, by walling crib seat, well lid and on every side the road surface form jointly, require well head to flush with road surface on every side, to guarantee the comfortable safety of well head position evenness of road surface and driving, as shown in Figure 1.But; Well head position pavement disease happens occasionally, and like well head sedimentation, convexity, incline Dou and well head place ravelling, the crack, comes off etc.; Become the thorny problem of the department of municipal administration all over the world, seriously had influence on the image of riding qualities and municipal engineering.
The suitable weak link that connects road construction often of manhole and road usually causes highway construction to have mass defect and potential safety hazard.In conjunction with the present situation of the existing road in Jinan City and the condition of construction of newly-built road, the manhole disease mainly comprises: manhole and road surface be along connecing injustice, and manhole is whole to sink, manhole well shaft destroyed and cause polygon ground etc.In above three origin causes of formation, the manhole disease that produces because of the construction aspect accounts for more than 90%, so the work progress of manhole becomes the most important thing of disease control.
The operating space that the urban road manhole is checked and dredged mainly as pipeline operating condition is as the cohesive position of pipeline change elevation, the change gradient, change caliber, change direction.Simultaneously, the rainwater arm imports main conduit and also accomplishes connection through manhole.The manhole that is arranged on the road surface mainly contains feedwater, rain sewage, electric power, combustion gas, heating pipeline manhole etc.And the manhole well head that we usually say is meant the manhole and the binding site on road surface on every side, by walling crib seat, well lid and on every side the road surface form jointly.In order to guarantee the comfortable safety of evenness of road surface of well head position and driving, require well head to flush allowable variation flexible pavement requirement ± 5mm, high standard requirement ± 3mm in the work progress with road surface on every side.
The suitable weak link that connects road construction often of manhole and road usually causes highway construction to have mass defect and potential safety hazard.Many units in charge of construction usually after road is completed, are compelled again the problem manhole is renovated, and cause the waste of human and material resources.
In conjunction with the present situation of the existing road in city and the condition of construction of newly-built road, the manhole disease mainly comprises: manhole and road surface be along connecing injustice, and manhole is whole to sink, manhole well shaft destroyed and cause polygon ground etc.
Accent is examined data and is shown, the various diseases on road surface, manhole place have become one of topmost disease on the urban road flexible pavement at present.The typical case relevant with manhole destroys and mainly contain: 1) the well face sinks, bitumen layer cracking around the walling crib; 2) the well face is outstanding, and bitumen layer is peeled off around the walling crib; 3) around the walling crib sink in the road surface; 4) the manhole phase road pavement discrepancy in elevation is little, but itself resembles an isolated island, and bitumen layer is all cracked around the walling crib, under rainwater and vehicular traffic effect, is emptied.These pavement destructions have become the principal element that influences the urban road quality, have not only influenced the appearance of a street and road surface using character, and have a strong impact on the cruising of vehicle, cause potential safety hazard.Ren so is a blind area in urban road disease field at present in the research of relevant this problem.
Summary of the invention
The utility model main purpose is to provide a kind of integrated manhole of anti-settling that can effectively avoid the manhole sedimentation.
The technical scheme of the utility model is:
The integrated manhole of a kind of anti-settling comprises well lid, it is characterized in that said well lid is arranged in the expanded type walling crib, and the expanded type walling crib is connected to an integral body with the pit shaft that is embedded in below the well head road surface.
Said pit shaft outer wall is provided with branch's piece.
Said wellbore bottom is provided with the bottom backing plate.
The external diameter of said expanded type walling crib is greater than the pit shaft external diameter.
The beneficial effect of the utility model is:
The integrated manhole of the anti-settling of the utility model is made into integrative-structure with quiet tube, can effectively disperse the pressure from the road surface, and branch's piece is set; Strengthen the anti-settling effect more, can guarantee for a long time that well lid does not sink, integral construction is built; Easy construction, cost is lower.
Description of drawings
Fig. 1 is the structural representation of the utility model.
Among the figure: 1 is that well lid, 2 is that expanded type walling crib, 3 is that pit shaft, 4 is that branch's piece, 5 is that bottom backing plate, 6 is the well head road surface.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is further described:
Like Fig. 1, the integrated manhole of a kind of anti-settling comprises well lid 1, it is characterized in that said well lid 1 is arranged in the expanded type walling crib 2, expanded type walling crib 2 be embedded in the pit shaft 3 of well head road surface below 6 and be connected to an integral body.
Manhole is as the attached minor installation in road surface, and its based process is generally for paying attention to, thus the base stress that makes manhole greater than road surface, roadbed with degree of depth stress, the substrate sedimentation is greater than roadbed subsidence, well head sinks.Will be appreciated that; Manhole is as the independent structures thing, and what bear is whole wheel impacts load, so reach the wheel load effect to several times of overload; And compare with the bridge construction basis; The substrate buried depth of manhole is much littler than bridge foundation, and is that single manhole is stressed alone, and its basic operating mode is poorer than the basic operating mode of bridge construction; So should manhole based process and bridge construction based process be put on an equal footing, to guarantee that manhole substrate load stress is with consistent with the base stress of degree of depth subgrade and pavement.
The utility model uses and expands disc type well seat and bifurcated shaft structure, and manhole and road surface are integrally formed.
Traditional walling crib seat and well bore; The walling crib seat is a circle ring column; The impact force of wheel is directly passed to the vertical shaft body after putting on well lid, walling crib seat, and the higher road structure of intensity is bearing load not, in vehicular impact power with repeatedly under the action of long-term load; Add the well bore deadweight, then must be with the sinking that causes manhole.For reducing the effect of wheel impacts power to well bore, the utility model adopts the bifurcated pit shaft and expands disc type walling crib holder structure,
Branch's piece of the utility model can adopt prefabricated cement concrete branch's piece or steel concrete branch dish; Expand disc type walling crib seat and can adopt reinforced concrete prefabricated structure; Walling crib seat expansion dish diameter should be bigger than pit shaft; Ying Yousan/one is held in the supercrust, makes the suffered traffic load of walling crib seat pass to supercrust through expanding disc portion
The wheel load that puts on the well lid is transmitted to wheel load in each deck of road surface roadbed through expanding disc type walling crib seat and bifurcated well bore one by one, and unloading one by one enlarges lifting surface area, reduces manhole substrate basis stress.Road surface base course and well body are stressed jointly, make manhole well bore and well head road surface part formation on every side overall structure, and manhole bears traffic load no longer separately, thereby the anti-sedimentation capacity of manhole is improved.
The utility model uses concrete prefabricated building block to build pit shaft.Because of the crisp mashed settlement issues that causes of loam brick material corrosion can be handled through the method for improving the well bore building material; Developed countries such as Europe, U.S.A, day build material with regard to manhole already and reform; As use precast concrete segment formula, prefabricated reinforced concrete pin-connected panel, the bottom is cast-in-place with top precast assembly convolution etc., common ground is that all the well bore material uses cement concrete product to substitute traditional loam brick.Its advantage can be avoided firing in the loam brick process consumption to the soil and the energy, realizes that the rapid construction of pipeline assemblingization needs, the intensity and the durability of control concrete clamp dog, thus avoid rotting the well head sedimentation that causes because of well bore material corrosion shortcake.
Embodiment recited above describes the preferred implementation of the utility model; Be not that design and scope to the utility model limits; Do not breaking away under the utility model design concept prerequisite; Common engineers and technicians make the technical scheme of the utility model in this area various modification and improvement all should fall into the protection domain of the utility model, and the technology contents that the utility model is asked for protection all is documented in claims.
Claims (4)
1. the integrated manhole of anti-settling comprises well lid (1), it is characterized in that said well lid (1) is arranged in the expanded type walling crib (2), and expanded type walling crib (2) is connected to an integral body with the pit shaft (3) that is embedded in below the well head road surface (6).
2. the integrated manhole of anti-settling according to claim 1 is characterized in that said pit shaft (3) outer wall is provided with branch's piece (4).
3. the integrated manhole of anti-settling according to claim 1 is characterized in that said pit shaft (3) bottom is provided with bottom backing plate (5).
4. the integrated manhole of anti-settling according to claim 1, the external diameter that it is characterized in that said expanded type walling crib (2) is greater than pit shaft (3) external diameter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204142624U CN202298658U (en) | 2011-10-26 | 2011-10-26 | Anti-settlement integrated manhole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204142624U CN202298658U (en) | 2011-10-26 | 2011-10-26 | Anti-settlement integrated manhole |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202298658U true CN202298658U (en) | 2012-07-04 |
Family
ID=46367587
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011204142624U Expired - Fee Related CN202298658U (en) | 2011-10-26 | 2011-10-26 | Anti-settlement integrated manhole |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202298658U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102877542A (en) * | 2012-09-26 | 2013-01-16 | 中国一冶集团有限公司 | Drainage inspection well capable of reducing sedimentation and manufacturing method for drainage inspection well |
CN102877540A (en) * | 2012-09-26 | 2013-01-16 | 中国一冶集团有限公司 | Drainage inspection well capable of reducing sedimentation and manufacturing method for drainage inspection well |
CN107604948A (en) * | 2017-09-11 | 2018-01-19 | 浙江大成工程项目管理有限公司 | A kind of municipal inspection shaft anti-settling structure and its construction method |
CN108978723A (en) * | 2018-07-28 | 2018-12-11 | 邓语清 | Manhole cover structure for underground pipe network detection |
CN109137988A (en) * | 2018-10-23 | 2019-01-04 | 苏州同尚工程设计咨询有限公司 | A kind of inspection shaft and its implementation method |
-
2011
- 2011-10-26 CN CN2011204142624U patent/CN202298658U/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102877542A (en) * | 2012-09-26 | 2013-01-16 | 中国一冶集团有限公司 | Drainage inspection well capable of reducing sedimentation and manufacturing method for drainage inspection well |
CN102877540A (en) * | 2012-09-26 | 2013-01-16 | 中国一冶集团有限公司 | Drainage inspection well capable of reducing sedimentation and manufacturing method for drainage inspection well |
CN102877542B (en) * | 2012-09-26 | 2015-05-20 | 中国一冶集团有限公司 | Drainage inspection well capable of reducing sedimentation and manufacturing method for drainage inspection well |
CN102877540B (en) * | 2012-09-26 | 2015-05-20 | 中国一冶集团有限公司 | Drainage inspection well capable of reducing sedimentation and manufacturing method for drainage inspection well |
CN107604948A (en) * | 2017-09-11 | 2018-01-19 | 浙江大成工程项目管理有限公司 | A kind of municipal inspection shaft anti-settling structure and its construction method |
CN107604948B (en) * | 2017-09-11 | 2020-03-27 | 浙江大成工程项目管理有限公司 | Municipal inspection well anti-settling structure and construction method thereof |
CN108978723A (en) * | 2018-07-28 | 2018-12-11 | 邓语清 | Manhole cover structure for underground pipe network detection |
CN109137988A (en) * | 2018-10-23 | 2019-01-04 | 苏州同尚工程设计咨询有限公司 | A kind of inspection shaft and its implementation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202298658U (en) | Anti-settlement integrated manhole | |
CN109972659B (en) | Novel municipal inspection well structure and construction method | |
CN104120647B (en) | It is suitable for section assembling concrete frame bridge pier system and the construction method of rapid construction | |
CN205711788U (en) | A kind of underground piping protection is contained | |
CN104213514A (en) | Reinforcement method of earthed corrugated steel plate-concrete combined arch bridge | |
CN110295627B (en) | Construction method of road inspection well | |
CN105926422B (en) | The monolithic construction of bridge and underground pipe gallery and its construction method | |
CN110485266A (en) | A kind of road-bridge transition section road structure and construction method based on waste tire | |
CN112695582A (en) | Assembly type construction and repair structure of highway pavement and rapid construction method thereof | |
CN203284808U (en) | Bearing protection plate for wellhead of road inspection well | |
CN102817298B (en) | Construction method on frozen soil | |
CN201411713Y (en) | Manhole of various kinds of pipe networks for urban roads having hole mouth reinforcing mechanism | |
CN108360570A (en) | Bituminous paving inspection shaft gug construction method | |
CN210002442U (en) | novel municipal administration inspection shaft structure | |
CN214784551U (en) | Road inspection shaft structure with prevent subsiding function | |
CN214738600U (en) | Bypass type drainage pipeline inspection well structure | |
CN205804140U (en) | Bridge and the monolithic construction of underground pipe gallery | |
CN101545268B (en) | Method for mounting well tools of inspection well on asphalt concrete pavement | |
CN205742170U (en) | The pile tube anchor pole composite foundation of tension compression bidirectional load can be born | |
CN211690084U (en) | Pavement additional paving structure using existing waveform guard bar | |
CN207891909U (en) | A kind of corrugated steel pipe overlapping cross section structure | |
CN207228130U (en) | A kind of city integrated piping lane foundation pit backfill processing combined system | |
CN206352237U (en) | A kind of new town road | |
CN106948461B (en) | Integrated wellhead module device and modular multifunctional inspection well | |
CN205934985U (en) | Novel inspection well cover |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120704 Termination date: 20161026 |
|
CF01 | Termination of patent right due to non-payment of annual fee |