CN202295252U - Trestle type scaffold - Google Patents
Trestle type scaffold Download PDFInfo
- Publication number
- CN202295252U CN202295252U CN2011204033684U CN201120403368U CN202295252U CN 202295252 U CN202295252 U CN 202295252U CN 2011204033684 U CN2011204033684 U CN 2011204033684U CN 201120403368 U CN201120403368 U CN 201120403368U CN 202295252 U CN202295252 U CN 202295252U
- Authority
- CN
- China
- Prior art keywords
- spring board
- support part
- board support
- type scaffold
- safety
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model relates to a tool, particularly to a tool for shipping industry, more specifically to a tool for shipbuilding by stages. Aiming at the problems that the combing stage in the existing shipbuilding by stages has long operating time, low working efficiency, long high-altitude operating time, low safety and the like, the utility model provides a trestle type scaffold which comprises a spring board, a spring board supporting member and a safety net. The trestle type scaffold is characterized by also comprising a fixing member, the spring board supporting member is fixed on the cabin wall of a ship body through the fixing member, the spring board is fixed on the spring board supporting member, and the safety net is hung on the spring board supporting member. The purposes of saving assembly and disassembly time, simplifying construction and improving production efficiency are achieved. Meanwhile, because the high-altitude operating time is reduced, the safety coefficient of construction is effectively increased, and hidden safety dangers are reduced.
Description
Technical field
The utility model relates to a kind of frock tool, particularly relates to a kind of frock tool of shipbuilding industry, relates to a kind of frock tool that is used for the segmentation shipbuilding more specifically.
Background technology
At shipbuilding industry, at present all in utilization Modern Shipbuilding production model, the i.e. technology of segmentation shipbuilding.Thereby make the rate of improving of segmentation, construction precision all be greatly improved.Closing up the stage, only need set up a kind of scaffold along closing up line style, but traditional jumping mode of taking is that the built-in fitting of not considering sectional construction stage springboard is handled at present in closed position; Directly begin to take jumping work in the berth combination stage; Be to use steel pipe and fastener completely to spread specifically, set up from level to level from low to high, cause the aloft work time long at cargo hold; Set up, removal time is long, problems such as inefficiency.
Summary of the invention
The utility model to present segmentation shipbuilding to close up discontinuous running time length, inefficiency, high-altitude application time long; Problems such as safety is low provide a kind of trestle type scaffold, comprise springboard, jump board support part and safety net; It is characterized in that also including connecting element; Said jump board support part is fixed through connecting element and hull bulkhead, and said springboard is fixed on the jump board support part, and said safety net is hung on the jump board support part.It is improved focus on between jump board support part and the hull bulkhead fixing by direct steel pipe completely spread, the mode of setting up changes the indirect mode by connecting element into and accomplishes; Thereby when having avoided closing up directly when building berth is taken jumping work; The coating damage that welding etc. causes, the problem of reduction property of coating.Simultaneously,,, reduced the safety misadventure incidence, reduced the following engineering time of harsh environment, increased work efficiency so reduced the aloft work time owing to closing up preceding operation.
As the improvement of the utility model, said strut member comprises that herringbone props up, vertical and Horizontal Branch, and said vertical bottom also is provided with shrouding.Thereby can well adapt to the machine frame erection work on vertical bulkhead or the straight outside plate.
As the further improvement of the utility model, said connecting element is anti-tripping bracket or anchor clamps.Just make that so fixed form is more diversified, according to different construction needs, can optionally use anti-tripping bracket or anchor clamps to use, but in selection, its supporting mounting means is different as connecting element.As with the supporting occupation mode of anti-tripping bracket, at first in the body section manufacture process, bury anti-tripping bracket underground installation in advance, and when closing up, adopt attaching parts, further anti-tripping bracket is connected with the jump board support part, such as adopts connection mode such as bolt; As the supporting occupation mode of anchor clamps, then be at first anchor clamps to be connected with the jump board support part, for example adopt modes such as welding, and then directly anchor clamps are clipped on the hull bulkhead when closing up, play fixation.
As the improvement further of the utility model, also be provided with reinforced plate on the said anchor clamps.Because the connection mode between anchor clamps and the jump board support part is welding; And the contact surface of anchor clamps and jump board support part is less; The integrally-built steadiness in welding back is lower, thus the utility model discloses this member of reinforced plate, thus face of weld is increased; Improve fixed effect, strengthen the stability of fixing back strut member.
In sum, adopt the disclosed technical scheme of the utility model after, reached practice thrift set up, removal time, construction is simple, the purpose of enhancing productivity.Simultaneously owing to reduced the aloft work time, thereby effectively improve the construction safety coefficient, reduced potential safety hazard.
Description of drawings
Fig. 1 is the utility model assembly drawing;
Fig. 2 is the partial schematic diagram when selecting for use herringbone to prop up;
Fig. 3 is the partial schematic diagram when selecting vertical for use;
Fig. 4 is the partial schematic diagram when selecting Horizontal Branch for use;
Fig. 5 is the birds-eye view of Horizontal Branch among Fig. 4;
Wherein 1-springboard, 2-jump board support part, 4-reinforced plate, 5-safety net, 6-anti-tripping bracket, 7-shrouding, 8-anchor clamps.
The specific embodiment
Embodiment 1
As shown in Figure 1, for mounted trestle type scaffold scheme drawing, include springboard 1, jump board support part 2 and safety net 5 and connecting element.According to the needs of diverse location in the hull, connecting element has adopted anti-tripping bracket 6 and anchor clamps 8 respectively in the present embodiment.Wherein select for use the supporting jump board support part 2 of anti-tripping bracket 6 to prop up and vertical for herringbone, its concrete structure scheme drawing as shown in Figures 2 and 3.Its installation process does; First in the sectional construction stage of hull with the anti-tripping bracket 6 pre-buried hulls that are mounted on; And then when closing up, anti-tripping bracket 6 and jump board support part 2 are connected with the bolt (not shown) fastening, thereby jump board support part 2 is fixed in the hull bulkhead.At last with springboard 1 and safety net 5 supporting being installed on the jump board support part 2.
For the hull part with vertical bulkhead, we select anchor clamps connecting element such as Fig. 4 and shown in Figure 5 as jump board support part 2 for use.Its installation process does; At first with jump board support part 2 and anchor clamps 8 weld togethers; In order further to improve the steadiness of welding back integrated member, set up reinforced plate 4 in the present embodiment in the anchor clamps 8 and the weld of jump board support part 2, and with jump board support part 2 and reinforced plate 4 welding; After forming an integral structure, utilize anchor clamps 8 that integral structure is clipped on the hull bulkhead, perhaps be clipped in hull and hold up on the material, accomplish the fixing of jump board support part 2.At last with springboard 1 and safety net 5 supporting being installed on the jump board support part 2.
Further, as shown in Figure 3, in order better to support springboard 1, vertically also be provided with shrouding 7, thereby further providing support a little for springboard 1 to the bottom of jump board support part 2.
The disclosed technological means of the present invention program is not limited only to the disclosed technological means of above-mentioned technological means, also comprises the technical scheme of being made up of above technical characterictic combination in any.
Claims (4)
1. trestle type scaffold; Comprise springboard, jump board support part and safety net, it is characterized in that also including connecting element, said jump board support part is fixed through connecting element and hull bulkhead; Said springboard is fixed on the jump board support part, and said safety net is hung on the jump board support part.
2. trestle type scaffold as claimed in claim 1 is characterized in that: said strut member comprises that herringbone props up, vertical and Horizontal Branch, and said vertical bottom also is provided with shrouding.
3. trestle type scaffold as claimed in claim 1 is characterized in that: said connecting element is anti-tripping bracket or anchor clamps.
4. trestle type scaffold as claimed in claim 3 is characterized in that: also be provided with reinforced plate on the said anchor clamps.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204033684U CN202295252U (en) | 2011-10-21 | 2011-10-21 | Trestle type scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204033684U CN202295252U (en) | 2011-10-21 | 2011-10-21 | Trestle type scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202295252U true CN202295252U (en) | 2012-07-04 |
Family
ID=46364201
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011204033684U Expired - Fee Related CN202295252U (en) | 2011-10-21 | 2011-10-21 | Trestle type scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202295252U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111976918A (en) * | 2020-07-03 | 2020-11-24 | 中船澄西船舶修造有限公司 | Assembled scaffold for shipbuilding |
-
2011
- 2011-10-21 CN CN2011204033684U patent/CN202295252U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111976918A (en) * | 2020-07-03 | 2020-11-24 | 中船澄西船舶修造有限公司 | Assembled scaffold for shipbuilding |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102979312B (en) | Indoor aluminum honeycomb board suspended ceiling reverse installation technology | |
CN203808484U (en) | Integrated cantilevered and attached external scaffolding | |
CN107558723B (en) | Method for manufacturing and installing hanging bracket of hanging basket for inclined roof | |
CN205116728U (en) | Stupefied system of aluminum alloy building templates back of body | |
CN101265748B (en) | Tools type section steel fastener steel tube outer scaffold | |
CN204059845U (en) | Stone material dry suspending wall and subtract material and fall the cladding component of lotus | |
CN106481077B (en) | A kind of novel reinforced system of template and its construction technology | |
CN202295252U (en) | Trestle type scaffold | |
CN201003223Y (en) | Triangle skeleton unit suitable for large space double curved surface suspended ceiling | |
CN201190408Y (en) | Tool type exterior scaffolding of section steel fastening tube | |
CN204056201U (en) | For the paint protection tool of ship side outside plate and tongue and groove in a kind of ship building | |
CN102425254B (en) | Keel connecting device based on suspended curtain wall | |
CN204899108U (en) | Node structure is hung futilely to marble | |
CN205857670U (en) | A kind of external wall construction hanging basket is encorbelmented device | |
CN203514799U (en) | Back arris clamp for combined aluminum formwork | |
CN102785766B (en) | New Marine scaffold tooling combination | |
CN205545078U (en) | Novel distributed roof photovoltaic support | |
CN208777676U (en) | A kind of band iron drawknot structure of construction outrigger and structure sheaf | |
CN208701982U (en) | A kind of ceiling structure under new steel structure ceiling | |
CN202273337U (en) | Keel connecting device based on suspension type curtain wall | |
CN207892179U (en) | A kind of cladding steel construction of stull no-welding | |
CN207405876U (en) | A kind of firm banking for column component | |
CN205296805U (en) | Portable electronic hanging flower basket of rail mounted | |
CN201128959Y (en) | Novel building top structure | |
CN204040254U (en) | A kind of connector of aerated concrete wall panel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120704 Termination date: 20151021 |
|
EXPY | Termination of patent right or utility model |