CN202280073U - 预浇装配式设备基础 - Google Patents

预浇装配式设备基础 Download PDF

Info

Publication number
CN202280073U
CN202280073U CN201120415314XU CN201120415314U CN202280073U CN 202280073 U CN202280073 U CN 202280073U CN 201120415314X U CN201120415314X U CN 201120415314XU CN 201120415314 U CN201120415314 U CN 201120415314U CN 202280073 U CN202280073 U CN 202280073U
Authority
CN
China
Prior art keywords
concrete
construction
foundation
assembly type
precoating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120415314XU
Other languages
English (en)
Inventor
吴峻
袁超
金永钊
陈海滨
陈杨波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU YUANNENG ELECTRIC POWER ENGINEERING Co Ltd
Original Assignee
JIANGSU YUANNENG ELECTRIC POWER ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU YUANNENG ELECTRIC POWER ENGINEERING Co Ltd filed Critical JIANGSU YUANNENG ELECTRIC POWER ENGINEERING Co Ltd
Priority to CN201120415314XU priority Critical patent/CN202280073U/zh
Application granted granted Critical
Publication of CN202280073U publication Critical patent/CN202280073U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

本实用新型涉及电力基础建设领域,特别是涉及一种预浇装配式的设备基础建设领域。针对目前配网设施的混凝土基础施工技术造成的粉尘大、噪音大、后期养护程序繁琐、施工受天气影响大、材料容易浪费、施工工期长以及质量无法标准化的问题,提供了一种预制装配式设备基础。实现了电力设备基础和电缆沟长期现场浇注混泥土和砌砖砌沟的施工工艺与土建构件单元预制后现场装配式施工工艺的转变。

Description

预浇装配式设备基础
技术领域
本实用新型涉及电力基础建设领域,特别是涉及一种预浇装配式的设备基础建设领域。 
背景技术
目前“混凝土装配式结构”主要应用于建筑物,如柱子、屋架、屋面板等,其主要的装配方式是在工厂或者现场预制后,再吊装简称建筑物,很少有装配式的。不仅如此,在电力建设施工当中,这种装配式结构更为少见,仅在混凝土电杆的三盘,即地盘、卡盘、拉盘中有少数应用,同时随着目前装配式技术的推进,最近也有极少量的铁塔基础采用装配式的施工技术,但是其中的装配基础都是钢结构的金属构件。作为在电力配网过程中,占有众多数量的环网柜、开关柜、各式箱变、电缆分支箱等设施基础采用装配式基础的,在国内外尚未见公开报道以及文献叙述。 
目前的配网设施的混凝土基础施工技术中,通常采用施工现场当场进行混凝土浇灌的作业方式,由此容易导致以下问题: 
1、 无法保证混凝土构件、强度、尺寸等关键质量;
2、 施工现场材料扬尘大、搅拌噪音大等问题;
3、 现场浇注后,需进行后期养护,混凝土的凝固受季节及天气影响较大,导致工期长;
4、 遇到需要迁移装置位置或施工阻挠时,无法拆迁复用,导致材料损毁作废。
与目前我们国家倡导的“绿色施工”严重不符。 
因此,找到一种可以减少场地干扰、尊重基地环境,结合气候施工,节约水、电、材料等资源或能源,环保健康的配网设施的混凝土基础施工技术是目前亟待解决的问题。 
发明内容
本实用新型针对目前配网设施的混凝土基础施工技术造成的粉尘大、噪音大、后期养护程序繁琐、施工受天气影响大、材料容易浪费、施工工期长以及质量无法标准化的问题,提供了一种预制装配式设备基础。所谓的预制装配式是指构筑物的构件,如柱子、横梁、梁板等,都是在工厂(或预制场)预制后,再运输到施工现场装配的设备基础施工方法。它的优点是把大量原先需在施工现场作业的工作量尽可能在预制场、工厂里完成,从而避免现有施工工艺所产生的缺陷和问题。 
为了实现上述发明目的,本实用新型提供了一种预浇装配式设备基础,是由多个基本装配单元组装拼装而成,所述的基本装配单元包括预浇砼空心柱、砼活舌块、砼梁、砼侧卡槽板,所述砼空心柱包括底座柱、中间柱和顶部柱,所述砼活舌块贯通于砼空心柱内,所述砼空心柱外部还设置有与砼侧卡槽板匹配的凹槽。砼活舌块贯通在砼空心柱内,从而将分为三个部分的底座柱、中间柱和顶部柱统一为整体结构,砼侧卡槽板插入砼空心柱外的凹槽内,起到抵挡侧压力的目的。砼梁固定于顶部柱的顶端,与砼空心柱形成设备基础的框架,起大部分的承重作用。 
作为本实用新型的改进,所述砼梁上设置有插栓孔,所述顶部柱上部设置有与插栓孔匹配的定位栓。 
作为本实用新型的进一步改进,所述的插栓孔与定位栓均为6个。 
作为本实用新型的更进一步改进,所述的定位栓以两个为一组,分别设置于顶部柱的三边上。 
由于插栓孔和定位栓的主要目的是完成砼梁与砼空心柱之间的固定,设置插栓孔和定位栓以后,实现了两个构件之间的嵌接固定,从而使得其整体结构更加稳定。 
综上所述,采用本实用新型所公开的技术方案后,实现了电力设备基础和电缆沟长期现场浇注混泥土和砌砖砌沟的施工工艺与土建构件单元预制后现场装配式施工工艺的转变。 
附图说明
图1为形成的配网设施的混凝土基础示意图; 
图2为未安装砼梁时示意图;
其中:1-砼空心柱、1-1-底座柱、1-2-中间柱、1-3-顶部柱、2-砼活舌块、3-砼梁、4-砼卡槽板、5-定位栓。
具体实施方式
首先按照标准的配网设施混凝土基础的建造要求,将基础拆分为若干个基本装配单元,包括由底座柱1-1、中间柱1-2、顶部柱1-3构成的砼空心柱1、砼活舌块2、砼梁3、砼卡槽板4,并且为了其整体结构的稳定性,在砼梁3和顶部柱1-3的对应位置分别设置插栓孔(未示出)和定位栓5,对上述构件在工厂内进行预制,得到标准化构件后,直接运送到建设工地,然后按照标准化的施工技术进行上述构件的组装、固定,具体来说为: 
第一步,根据基础的定位轴线,放置底座柱1-1;当然在放置底座柱1-1前,首先要保证场地整平清理干净;
第二步,安装第一层砼侧卡槽板4,将砼侧卡槽板4分别插入砼空心柱1外部的对应凹槽内,并利用水泥砂浆填实抹平构件之间的缝隙;
第三步,在底座柱1-1中插入砼活舌块2,从而形成混凝土基础的纵向支撑结构;
第四步,在砼活舌块2外侧装置中间柱1-2,并按照第二步中的方法,形成混凝土基础的第二层横向结构;各构件之间的缝隙采用水泥砂浆填实抹平。
第五步,按照第四步中的方式,在砼活舌块2外侧装置顶部1-3,并在外侧凹槽中插入砼侧卡槽板4形成混凝土基础的第三层横向结构; 
最后,将砼梁3插入顶部柱1-3中内,其插栓孔(未示出)要与砼梁3上的定位栓5(如图2中所示)对齐,形成配网设施的混凝土基础,连接插筋间的空隙用水泥砂浆填实抹平。得到如图1所示的配网设施的混凝土基础。
可以看到,所有的构件均是预制后运送到现场,通过组装形成了设备基础的整体机构,但是经过承力等检测,其测量水平与灌浆的整体结构相同,符合对于设备基础的建筑要求。由于整个施工过程只涉及到组装固定,不存在由于人为因素造成的尺寸偏差,可以做到标准化施工、建筑。同时,由于不需要进行浇注等施工方式,所以粉尘少、噪音小,对城镇内居民的正常生活干扰小,方便施工。 

Claims (4)

1.预浇装配式设备基础,其特征是所述预浇装配式基础是由多个基本装配单元组装拼装而成,所述的基本装配单元包括预浇砼空心柱、砼活舌块、砼梁、砼侧卡槽板,所述砼空心柱包括底座柱、中间柱和顶部柱,所述砼活舌块贯通于砼空心柱内,所述砼空心柱外部还设置有与砼侧卡槽板匹配的凹槽。
2.根据权利要求1所述的预浇装配式设备基础,其特征是所述砼梁上设置有插栓孔,所述顶部柱上部设置有与插栓孔匹配的定位栓。
3.根据权利要求2所述的预浇装配式设备基础,其特征是所述的插栓孔与定位栓均为6个。
4.根据权利要求3所述的预浇装配式设备基础,其特征是所述的定位栓以两个为一组,分别设置于顶部柱的三边上。
CN201120415314XU 2011-10-27 2011-10-27 预浇装配式设备基础 Expired - Fee Related CN202280073U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120415314XU CN202280073U (zh) 2011-10-27 2011-10-27 预浇装配式设备基础

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120415314XU CN202280073U (zh) 2011-10-27 2011-10-27 预浇装配式设备基础

Publications (1)

Publication Number Publication Date
CN202280073U true CN202280073U (zh) 2012-06-20

Family

ID=46226247

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120415314XU Expired - Fee Related CN202280073U (zh) 2011-10-27 2011-10-27 预浇装配式设备基础

Country Status (1)

Country Link
CN (1) CN202280073U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104120734A (zh) * 2014-07-31 2014-10-29 国家电网公司 变压器临时基础
CN105839662A (zh) * 2016-05-23 2016-08-10 国网山东省电力公司枣庄供电公司 一种用于10kV中置柜模块化预制钢筋混凝土基础
CN106451300A (zh) * 2016-08-29 2017-02-22 山东电力工程咨询院有限公司 通用装配式gis空箱基础的电缆沟
CN108335853A (zh) * 2018-03-21 2018-07-27 广东电网有限责任公司东莞供电局 一种预制拼装式箱式变压器基础

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104120734A (zh) * 2014-07-31 2014-10-29 国家电网公司 变压器临时基础
CN104120734B (zh) * 2014-07-31 2016-03-02 国家电网公司 变压器临时基础
CN105839662A (zh) * 2016-05-23 2016-08-10 国网山东省电力公司枣庄供电公司 一种用于10kV中置柜模块化预制钢筋混凝土基础
CN106451300A (zh) * 2016-08-29 2017-02-22 山东电力工程咨询院有限公司 通用装配式gis空箱基础的电缆沟
CN106451300B (zh) * 2016-08-29 2018-06-05 山东电力工程咨询院有限公司 通用装配式gis空箱基础的电缆沟
CN108335853A (zh) * 2018-03-21 2018-07-27 广东电网有限责任公司东莞供电局 一种预制拼装式箱式变压器基础

Similar Documents

Publication Publication Date Title
CN109235499B (zh) 一种明挖地下建筑结构装配式施工方法
CN105908777A (zh) 一种综合管廊滑动模具及其使用方法
CN106759420B (zh) 一种预制装配式变电站基础结构
CN208441230U (zh) 一种装配式混凝土结构主次梁节点
CN202280073U (zh) 预浇装配式设备基础
CN210086295U (zh) 一种复合装配式地下结构
CN112695623A (zh) 一种装配式桥墩及其施工工艺
CN105756087A (zh) 一种装配式预制综合管廊相邻板间锚固结构
CN111549952A (zh) 一种gis设备的安装基础
CN204551532U (zh) 装配式电缆井
CN210562276U (zh) 一种装配式变电站一体化基础结构
CN207646753U (zh) 单墩支撑单舱式架空综合管廊
CN206635786U (zh) 预制装配式变电站基础结构
CN212656260U (zh) 一种地下车站装配式轨顶风道结构
CN109137984A (zh) 装配整体式混合预制综合管廊
CN205445125U (zh) 快速施工型装配式围墙
CN111535361A (zh) 地下车站装配式轨顶风道结构及其构建方法
CN209854577U (zh) 一种装配式薄壁箱型通道
CN210685594U (zh) 基于预应力混凝土空心方桩技术的全预制装配式围墙
CN110847239A (zh) 装配式大型钢筋混凝土预制检查井及其施工方法
CN201883422U (zh) 用于地下连续墙的装配式钢导墙
CN106193685B (zh) 预制装配式通信机房结构
CN213625714U (zh) 一种新型预制板拼接式矩形检查井
CN109707184A (zh) 电管分离式、墙壁设置水管沟槽的精装整体卫生间
CN112281906B (zh) 一种装配式变压器基础结构及其施工方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Wu Jun

Inventor after: Yuan Chao

Inventor after: Jin Yongzhao

Inventor after: Cheng Haibin

Inventor after: Chen Yangbo

Inventor before: Wu Jun

Inventor before: Yuan Chao

Inventor before: Jin Yongzhao

Inventor before: Chen Haibin

Inventor before: Chen Yangbo

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WU JUN YUAN CHAO JIN YONGZHAO CHEN HAIBIN CHEN YANGBO TO: WU JUN YUAN CHAOJIN YONGZHAO CHENG HAIBIN CHEN YANGBO

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120620

Termination date: 20131027